A MALE. LOCKER RM sqm. 138 DUST COLLECTOR 8 LK6 10 LK6 PROJECT ROOM. 11 sqm. 146 AC DUCT DROP GYM CURTAIN. GYMNASIUM sqm.

Similar documents
Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

Ontario s 2012 Building Code Barrier-Free Design Amendments Ontario Regulation 332/12 Amended by O. Regs. 368/13 and 191/14

E1-12: Final Decision AS

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

BUILDING CODE COMMISSION

THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard.

Extracts from the National Building Code of Canada

c 211 Hotel Fire Safety Act

ADA/TAS Plan Review & Inspection Worksheet Texas Access

Codes Checklist Document 3

PLANNING APPLICATION (REVISION 2.1)

NEW ACCESSIBILITY CHANGES

BUILDING CODE COMMISSION

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

The New NYC Building Code Chapter 11 Accessibility. New York City Department of Buildings. Technical Affairs. Keith Wen, R.A. Copyright Materials

2015 IBC Allowable Heights and Areas

A001 DEMOLITION SITE PLAN A001 1:300 ADDITION DICKINSON DRIVE INGLESIDE, ONTARIO CATHOLIC DISTRICT SCHOOL BOARD OF EASTERN ONTARIO

BUILDING CODE COMMISSION

2012 IBC Mixed Occupancies

Building Code Extracts from the National Building Code of Canada 2010

Sample Questions for Paper 1 Statutory Controls in Building Works

PP Course # Instructor Information. Patrick Vandergriff 35 Cottonwood Canyon Road La Luz, NM

Attic Floor Bedrooms 1 & 2 Family Dwellings

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

Building Code Extracts from the National Building Code of Canada 2010

Andraus high-rise, Sao Paulo, Brazil, February 1972

2012 IBC Means of Egress

WILLIAMS HALL FOOD HALL RETAIL & OFFICE FOR LEASE A AVENUE I EDMONTON I AB HIGHLIGHTS

COUNCIL ORDER No

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 11SN0246. Sina08, LLC Anil Patel. Bermuda Magisterial District Northwest line of Woods Edge Road

Facilities providing accommodation for the public (e.g. Hotels, hostels, guesthouses, self catering apartments).

Tiny House on Wheels A Tiny House

A Safe Community for New Beginnings

Power Center DEMOGRAPHICS: 1 MILE 3 MILE 5 MILE

17 N Centre Ave Leesport, PA 19533

COMMERCIAL REAL ESTATE

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents

Accessibility in Alberta

Section 9.5. Design of Areas, Spaces and Doorways

Disability (Access to Premises Buildings) Standards

PLUMBING SYSTEMS CHAPTER 29

FIELD RESIDENCES PEACH TOWER (BUILDING 4)

NEPAL NATIONAL BUILDING CODE NBC 206: 2015

1604 SOUTH BROADWAY AVE Boise, Idaho 83706

SPECIFIC GUIDANCE FOR A BEDSIT TYPE HOUSE IN MULTIPLE OCCUPATION (HMO)

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

Governors State University Tornado & Severe Weather Shelter Plan August 4, 2016

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

625 San Anselmo Ave. Planning Submittal A0.00

Yarmouth County Registry of Deeds

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4

Arriving and Getting In

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO

BUILDING CODE COMMISSION

Copyright 2013, Queen s Printer for Ontario

Harmony Row Dublin 2. Dublin 2

Utopia Gymnastics Accessibility Guidance. Utopia Gymnastics

Regional District of Nanaimo Secondary Suite Program

BUILDING CODE COMMISSION

The UBBL Applications of Fire Safety Provisions

Existing Building Accessibility Quick Checklist (CBC 11B) Job Address Permit

DETAILS + Retail Strata Units For Sale/Lease (Spring 2019)! AREA TENANTS DEMOGRAPHICS. CONTACT Dan Clark

RURAL - Residential Development Permit Application FORM A

FOR LEASE Retail & Restaurant Spaces 1604 South Broadway Ave., Boise, Idaho Listing Features

The Fire Code: An Overview for Tenants FEDERATION OF METRO TENANTS ASSOCIATIONS

California Building Code

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION

14 Hatfields, Loughton, IG10 1TJ

Minimum requirments for Fire Fighting Installations Type of Installation. Yard Hydrant. Down Comer. Dry Riser* Wet Riser.

BUILDING CODE COMMISSION

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Natural Light & Ventilation. Sources. Regulation 45 (1) & 45 (2) A Public road with right of way. A Courtyard or Open Space within the site.

PRIVATE ELEVATOR WITH ACCESS TO

EMAAR DISCOVERY CENTRE ISTANBUL DRAWING SET C1 - FINAL DESIGN SAMPLE ONLY

AGD III OFFICE BUILDING 7389 AIRPORT VIEW DR SW ROCHESTER, MINNESOTA 55902

Binz-Engleman Rd./FM 1516 at Walzem Rd. Extension, San Antonio, Texas 78244

Single Point of Failure and Inter-relationship between Stair Pressurisation System and Evacuation Strategy for Tall Buildings

FOR LEASE Last Remaining Retail Space 1604 South Broadway Ave., Boise, Idaho Listing Features

PART. Building Planning. Chapter 3: Building Use Chapter 4: Construction Types Chapter 5: Building Size Chapter 6: Special Uses and Considerations

L1.01 LEE HIGHWAY SHREVE APARTMENTS ENLARGEMENT 2 SEE SHEET - L COURTYARD HARDSCAPE PLAN SEE SHEET - L COURTYARD LANDSCAPE PLAN

BUILDING CODE COMMISSION

TENANT IMPROVEMENT APPLICATION Page 1 of 4

A Guide to Secondary Suites

Effective Date: July 21, 2017 Page 1 of 8. Reference: DBC Admin 132.9, IEBC 407.1, Ordinance No , Series of 2017

Property Finder PH - Sale, Rent and Sell Houses in the Philippines 1,696,266

City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME Registration of Short-Term Rental Checklist

CHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS

MOVE UP TO THE VILLA LIFE A LUXURY BOUTIQUE VILLA COMMUNITY IN MANAPAKKAM

KUM & GO 300 SUBDIVISION

PROPERTY CONDITION CHECK LIST FOR A LICENCED HMO

2012 Texas Accessibility Standards Reference Guide for changes to the code

The application of the California Building Code

Equality and Access Plan The Abbey School, Reading

Transcription:

ON 00 ON 0 ON 00 SHOO ON 0 ON 0 80 0 O N 0 8 D 0 STEAT ESENT ON 0 NS 8 8 8 8 8 8 ON 0 E ON 0 E 8 ON 0 S N ON 0 S N 8A ST S ON 0 NS EXISTING ETS STOP EXISTING FENE EXISTING UNTION BOX TYP 0 INE OF POPETY U: PAN 0 00 INE OF SEAK 8 INE OF SEAK U: PAN 0 0 00 000 000 0 8 8 SUMMESIDE DIVE OFF-SITE P OFF SPAE NE 000 IDE MONOAK 00 000 000 000 EMOVE EXISTING BOUEVAD SIDEAK EIGHT MODUA S 08 DUST OETO NE OMMEIA OSSING TO ITY STANDAD EMOVE AND EOATE EXISTING TEE TO SATISFATION OF ITY EMOVE AND EOATE EXISTING IGHT STANDAD TO SATISFATION 0 OF ITY 00 GAS METE HAD SUFAE PAY AEA 8 SM EDMONTON ATHOI SUMMESIDE K SHOO ZONING 000 00 ON 0 S N : UBAN SEVIES (US) EGA DESIPTION : OT M, BOK, PAN 0 0 APPOXIMATE ADDESS :???????? MAIN FOO EEVATION : 00000 GEODETI :?????? 80 00 80 0000 000 000 000 8 EXISTING 00 IDE BOUEVAD SIDEAK 8 0 8 PAENTS P OFF ZONE 00 000 8 0 m HIGH ONAMENTA BAIE FENE P OFF ZONE OADING OADING ZONE (m x m) ZONE (m x m) K 0 00 MAIN ENTY 0 INE OF POPETY 880 0000 FAG POE 8 80 FAG POE NE 000 IDE MONOAK m HIGH ONAMENTA BAIE FENE U: PAN 0 80 80 SPENE YND S EMOVE EXISTING 00 IDE ON SIDEAK 00 000 000 00 80 8 ON OFF-SITE P OFF SPAE EXISTING BOUEVAD TEES TO BE EOATED TO SUIT NE 000 IDE ON MONOAK 000 000 000 000 00 800 00 000 00 0 0 8 000 IDE U: PAN 0 00 STAS @ 00 = 800 800 00 8 0 00 00 0 STAS @ 00 = 000 800 00 00 0 00 00 00 00 BF BF 0 00 0 S DNE 000 000 00 EXISTING 00 IDE BOUEVAD SIDEAK 00 00 00 00 08 000 00 000 00 00 S DNE ON ON NE OMMEIA OSSING TO ITY STANDAD EMOVE AND EOATE EXISTING TEE TO SATISFATION OF ITY 80 AVE S ON 8 0 0 EMOVE AND EOATE EXISTING TEE TO SATISFATION OF ITY NE OMMEIA OSSING TO ITY STANDAD EMOVE AND EOATE EXISTING TEE TO SATISFATION OF ITY 0 ON ON Notes: ON ON - 0 Avenue Edmonton AB TS 8 anada T 80800 F 8080 wwwaci-archcom All Drawings and Specifications are instruments of service and are the property of the Architect or Engineer This Drawing is the opyright of AHITETS IN or the onsultant named on this Drawing as at the date shown and may not be used or reproduced in whole or in part without the express written consent of the Architect or Engineer PAKING - EDMONTON BYA #800 (FEB, 0) - SHEDUE - VEHIUA PAKING EQUIEMENT / 0 PUBI O PIVATE EEMENTAY AND UNIO HIGH SHOOS - STAS PE 8 8 ST S 8 AHITETS IN Do not scale drawing It is the responsibility of the ontractor to check and verify all dimensions on site and report all errors and/or omissions to the Architect or Engineer It is the responsibility of the appropriate ontractor to comply with all odes and egulations applicable to the performance of their work TOTA BYA EQUIED PAKING (IN BAIE-FEE) - 0% OF THE NUMBE OF VEHIUA PAKING SPAE 0 POVIDED BIYE PAKING PASSENGE P-OFF SPAES - EDMONTON BYA #800 (FEB, 0) - SHEDUE - PASSENGE P-OFF SPAES FO PUBI AND PIVATE EEMENTATY, UNIO HIGH SHOO AND HIGH SHOOS / EEMENTAY O UNIO HIGH SHOO / NUMBE OF ON-SITE P-OFF SPAES EQUIED - SPAES PE 00 STUDENT, O SPAES, HIHEVE IS GEATE BYA EQUIED P-OFF SPAES ON-SITE BYA EQUIED TOTA P-OFF SPAES TOTA POVIDED PAKING (IN BAIE-FEE) + TOTA BYA EQUIED BAIE- FEE PAKING POVIDED P-OFF SPAES ON-SITE TOTA AOATED P-OFF SPAES OFF-SITE POVIDED TOTA P-OFF 0SPAES TOTA POVIDED BAIE-FEE PAKING + BIYE PAKING - EDMONTON BYA #800 (FEB, 0) - SHEDUE - BIYE PAKING EQUIEMENT / ADMINISTATION USE AND EDUATIONA FITIES BYA EQUIED BIYE PAKING 0 +8 OADING SPAES - EDMONTON BYA #800 (FEB, 0) - SHEDUE - OADING SPAE EQUIEMENT / ANY DEVEOPMENT ITHIN THE ESIDENTIA-EATED, BYA EQUIED OADING SPAES SITE EGEND BASI SEVIES O OMMUNITY, EDUATIONA, EEATIONA AND UTUA SEVIE USE ASSES AND POFESSIONA, FINANIA AND OFFIE SPOT SEVIES - TO 800 sqm (EAH ADDITIONA 800 sqm) HEAVY-DUTY ASPHAT POVIDED OADING SPAES +0 0 + + 0 8 88 ST S 000 800 HAD SUFAE PAY AEA SM 8 0 0 80 00 000 80 00 EIGHT MODUA S 000 0 00 000 00 8 8 0 00 STAS @ 00 = 0 8 BF BF 80 SHED PAD 00 0 8 00 00 0 STAS @ 00 = 000 00 S EXISTING 00 IDE 00 BOUEVAD SIDEAK STANDAD ASPHAT ONETE U (UTIITY IGHT OF AY) SIGNAGE EGEND BF - BAIE FEE PAKING 8 ONY - NO PAKING OADING ZONE 0 ON 0 SN 00 OADING ZONE PASSENGE min 0:00-:00 ON - P OFF ONY NO PAKING EXISTING FENE SHOO DAYS ON AVE S 8 INE OF POPETY U: PAN 0 P OMMON POPETY ON - APOO PAKING ONY 0 N S 8 0 000 IDE ON AKAY MUTIPE HIGH VOTAGE OVEHEAD INES 00 INE OF SEAK INE OF SEAK INE OF POPETY 8 0:00-:00 SHOO DAYS DNE S EV K - NOT ENTE - STOP - EETI VEHIE HAGING STATION - NO PAKING OADING ZONE UNIT - KE EFT ON 0 E OT PU BOK PAN 0 0 INE OF POPETY INE OF SEAK Issues/evisions No Description Date By A SITE PAN Scale: :00 00 UNIT 8 00 0 0 0 0 M INE OF SEAK Seal PEIMINAY NOT FO ONSTUTION ON ON 0 NS AVE S 0 8 ON INE OF POPETY 0 0 8 000 IDE ON AKAY 0 8 lient Project 0 EDMONTON ATHOI SUMMESIDE K- SHOO 8 ON A AVE S A AVE S Scale AS NOTED Designed By ON 0 E 88 ST S ON ON ON 8 ST S 000 IDE ON AKAY 8 0 0 0 0 0 08 0 0 Project No 0 Drawn By Date MAY 0 Drawing Title SITE PAN hecked By 0 8 Drawing No K SPENE Y A

AHITETS IN - 0 Avenue Edmonton AB TS 8 anada T 80800 F 8080 wwwaci-archcom Notes: Do not scale drawing It is the responsibility of the ontractor to check and verify all dimensions on site and report all errors and/or omissions to the Architect or Engineer It is the responsibility of the appropriate ontractor to comply with all odes and egulations applicable to the performance of their work All Drawings and Specifications are instruments of service and are the property of the Architect or Engineer This Drawing is the opyright of AHITETS IN or the onsultant named on this Drawing as at the date shown and may not be used or reproduced in whole or in part without the express written consent of the Architect or Engineer 0 800 8 Az A Ay Dz z Bz 000 0 8 8 FUTUE FUTUE FUTUE FUTUE 00 sqm 00 sqm 00 z sqm 00 sqm 00 0 A8 0 A z FEMAE sqm 0 0 STAI (BF) 00 MAE 0 sqm BEO MAIN FOO PAN Scale: :0 BOOT z MUSI sqm sqm k sqm 8 STAFF OUNGE sqm 0 sqm PENETATION FO FUTUE MODUA SEVIES OI STO sqm 88 PATIE 8 sqm PATIE 8 sqm MUSI 0 sqm ONFEENE sqm OFFIE sqm 0 USTODIA OFFIE sqm 8 F-DY F-ASH EETIA 8 sqm 8 OK sqm OFFIE sqm 08 EYE sqm 0 INFIMAY sqm A sqm OFFIE sqm 0 HAGING/ sqm GENEA ADMIN sqm 0 A8 OFFIE sqm 0 0 QUIET 8 sqm 0 80 GYM sqm MUTI-POSE 8 sqm ETION 0 0 DATA OSET sqm A8 ENTY OBBY 0 sqm 0 ENTY sqm 0 EEV sqm A8 8 (BF) (BF) STAI sqm 0 A8 SIDING PAITION GYMNASIUM sqm 0 TV OI EANING OMMONS sqm 0 sqm 0 GYM UTAIN GATHEING PASS THOUGH MAE OKE M sqm 8 0 K FEMAE OKE M sqm 0 K PE sqm 0 SH 8 K (BF) (BF) - BASKEA MAIN OUT ASSIST - VOEYBA MAIN OUT - BASKEA OSS OUTS - VOEYBA OSS OUTS sqm - BADMINTON OUTS 8 K HANGE TABE HOYE IFT HAI sqm 8 SEVEY sqm BEAKOUT sqm DUST OETO POET sqm A STO sqm PANTY sqm BEAKOUT sqm STO 8 SQM DUT P OOE OOE AI P A8 AI P SEVE sqm Planer ointer OOD SHOP 0 sqm Scroll Saws TS POET AEA 0 sqm F STO sqm F F F FOODS AB 8 sqm Table Saw AI P A8 8x0mm umber Storage (F&E) Belt F-ASH F-DY AI P Belt Spindle Drill Press EESTOY IN 000H 00AFF Drill Press Drill Press EESTOY IN 000H 00AFF mm xmm Plywood Storage (F&E) Mitre Saws Spindle 00 80 80 AP AOUND sqm sqm 0 sqm 0 METE sqm y B PENETATION FO FUTUE MODUA SEVIES ANIAY/ ESOUE sqm ES 88 sqm 8 OI 8 MOVEABE PAITION ES 8 sqm sqm 8 0 0 0 F y BOOT F-ASH F-DY sqm 0 (BF) sqm BEO STAI MAE 8 sqm 0 sqm 00 FEMAE sqm y ks sqm 00 y ks sqm 00 ks sqm 00 sqm 00 FUTUE sqm sqm 008 00 FUTUE sqm 88 0 0 By y Dy z y z SUMMESIDE EDMONTON ATHOI SHOO DIVISION K- 00 PEMANENT OE APTY: 00 OPENING APTY (ITH MODUAS): 0 FUTUE BUIT-OUT APTY (ITH MODUAS): 00 MAIN FOO OE AEA: SQM SEOND FOO OE AEA: 8 SQM TOTA FOO OE AEA: 8 SQM INFASTUTUE AOABE OE AEA: 80 SQM AB 00 Building ode eview The new Edmonton atholic ewis Farms/Secord K- School will be designed and constructed in accordance with the Alberta Building ode 00 Building Description Building Height: Number of Streets storeys Street Building Area Main Floor ore Area,08 m² Second Floor ore Area, m² Total Floor ore Area, m² Project Description Major Occupancy School Building Height Number of Streets New onstruction Group A, Division, Assembly Occupancy storeys streets Occupant oad Permanent ore apacity 00 students Opening apacity with Modulars 0 students Built-Out apacity with Modulars 00 students The school has been designed to support an occupant load of 00 students and up to 0 staff () The school, including modulars will be sprinklered Building Size and onstruction elative to Occupancy Group A, Division, up to Storeys, Any Area, Sprinklered () AB 00 Building ode eview Fire Alarm and Detection Systems () A fire alarm system shall be installed in a building in which an automatic sprinkler system is installed () A single or two stage fire alarm system is permitted (d) A single stage fire alarm system in a building of assembly occupancy with an occupant load greater than 00, shall be designed to notify the fire department that an alarm signal has been initiated () Smoke detectors must be installed in each room in a contained use area and corridors serving those rooms and in each exit stair shaft (b ande) Provision for Fire Fighting () Portable extinguishers shall be provided and installed in conformance with the Alberta Fire ode 00 ighting and Emergency Power Systems () An exit, a public corridor, or a corridor providing access to exit for the public or serving patient s sleeping rooms or classrooms shall be equipped to provide illumination to an average level not less than 0 lux at floor or tread level and at angles and intersections at changes of level where there are stairs or ramps () Emergency power to provide supervisory power for hours and after that emergency power for a minimum of thirty minutes is required ( and 8) Safety ithin Floor Areas () Two points of egress shall be provided for a service space referred to in sentence 8) if the area is more than 00 m² or the travel distance measured from any point in the service space to a point of egress is more than m() Two egress doors are required for areas with an occupant load over 0, the travel distance to an egress door is more than meters, or the area of the room is over 00m² () ithin the Edmonton atholic K- School this requirement applies to the learning commons and the gymnasium The minimum width of a public corridor will be,00mm () Travel Distance Travel distance to an exit shall be not more than 0m from any point in a service space () Exits () Exits shall be located so that the travel distance to at least one exit shall be not more than m () The required width of exiting for the school is (00 students+0 staff = 0 x mm/person) =,0mm () The required exit width for the gymnasium is 8m² divided by 0m²/person = 0 X mm/person =,mm () The required exit width for the stairs is students and staff x 8mm/person =,8mm () AB 00 Building ode eview Barrier-Free Design (8) The requirements of this section apply to this project and the building must comply with all requirements to assist those persons with physical, sensory, and developmental disabilities Programmed Occupant oad lumbing Services and Health (Part ) Occupant oad The school has been designed to support an occupant load of 00 students and up to 0 staff ater losets ater closets required for Assembly Occupancies (): Males water closet/0 students water closets, / of which can be urinals Females water closet / students 8 Staff () Males -0 Females -0 Issues/evisions No Description Date By Seal lient the building is sprinklered throughout the building shall be of non-combustible construction floor assemblies shall be fire separations with a fire-resistance rating not less than hour mezzanines shall have a fire-resistance rating not less than hour load-bearing walls, columns, and arches shall have a fire-resistance rating shall not less than that required for the supported assembly (ie the fire separation between the modulars, built of combustible construction, and core school will have a fire-resistance rating of not less than hour) An exhaust ventilation system designed in conformance with the appropriate requirements of Part shall be provided in a building or part of a building in which dust, fumes, gases, vapour or other impurities or contaminants have the potential to create a fire or explosion hazard (0) This requirement applies to the wood shop and science room in the school Non-fixed seating shall conform to the Alberta Fire ode 00 () ater losets Provided: Students Male (including change rooms) including barrier-free (with / urinals) Female (including change rooms) including barrier-free Modulars, although not constructed of wood, are not certified as non-combustible Given the construction requirements noted above, a H firewall will be constructed between the core school building and the modulars at each end of the main floor The modulars will meet the following standards: Group A, Division, up to Storeys, Sprinklered () the building is sprinklered throughout the building is permitted to be of combustible or non-combustible construction, used singly or in combination it is not more than two storeys in building height and its has a building area not more than 00 m² if storey in building height The maximum travel distance to at least one egress door is meters () Internal Fire Separation equirements anitor s ooms no rating ) Storage ooms hour Mechanical hour Universal Assisted ashrooms ES ashrooms Infirmary Male Staff Female Staff Project EDMONTON ATHOI SUMMESIDE K- SHOO Scale :0 Designed By Project No 0 Drawn By B Date 0 MAY hecked By Drawing Title MAIN FOO PAN Drawing No DP-A

AHITETS IN - 0 Avenue Edmonton AB TS 8 anada T 80800 F 8080 wwwaci-archcom Notes: Do not scale drawing It is the responsibility of the ontractor to check and verify all dimensions on site and report all errors and/or omissions to the Architect or Engineer It is the responsibility of the appropriate ontractor to comply with all odes and egulations applicable to the performance of their work All Drawings and Specifications are instruments of service and are the property of the Architect or Engineer This Drawing is the opyright of AHITETS IN or the onsultant named on this Drawing as at the date shown and may not be used or reproduced in whole or in part without the express written consent of the Architect or Engineer 0 80 0 A 00 880 B Dz z 000 8 8 z Bz Az 0 A8 MAE sqm 0 0 8 8 z A 0 AN sqm 0 STAI sqm 0 FEMAE sqm 08 800 00 800 000 00 000 800 000 DN sqm (BF) (BF) kd 8 sqm 0 z SEOND FOO PAN Scale: :0 BEAKOUT AEA sqm 00 000 00 000 800 sqm kd OI 0 808 sqm 0 8 kd kd 808 sqm 0 z MEHANIA 0 sqm BEAKOUT AEA 000 000 000 00 000 000 000 00 000 00 0 kd A8 0 sqm 80 OOF BEO STAFF OK AEA sqm 0 0 MAH sqm sqm 000 00 000 A8 z OPIE ANOPY BEO DN 00 0 EEV sqm A8 kd STAI sqm 0 KIN (BF) sqm 8 AT 0 sqm 8 A8 E TV GYMNASIUM BEO GATHEING 8 FH SM sqm 8 kd (BF) (BF) kd kd 000 00 000 00 000 00 000 00 000 00 000 00 800 000 000 8 0 00 00 000 00 000 800 00 0 0 00 00 00 000 00 000 00 000 00 MOVEABE GAZED PATITION HAPE sqm E SIENE P sqm SIENE 0 sqm F SM E FH E SIENE 0 sqm 000 000 000 00 BEAKOUT AEA y OOF BEO kd Server hase 8 sqm 800 ANIAY/ DAMA sqm 0000 0 A8 sqm UTAIN 8 kd y 0 DAMA sqm HANGE TABE SH kd sqm 0 ASSIST sqm HOYE IFT 000 000 00 000 800 sqm BEAKOUT AEA sqm OI y 8 kd sqm DN STAI sqm MAE sqm 8 AN sqm 0 y FEMAE sqm Ay By y 88 0 0 y Dy Issues/evisions No Description Date By Seal lient Project EDMONTON ATHOI SUMMESIDE K- SHOO Scale :0 Designed By Project No 0 Drawn By Date 0 UNE hecked By Drawing Title SEOND FOO PAN Drawing No DP-A