SAN FRANCISCO FIRE DEPARTMENT FIRE STATION 5 CIVIC DESIGN REVIEW PHASE II APRIL 20TH, 2015
SITE MAP Eddy Street Buchanan Street Turk Street Webster Street Fillmore Street Steiner Street PROJECT LOCATION 1301 TURK STREET Golden Gate Avenue McAllister Street NORTH
EXISTING VIEWS CORNER OF TURK & WEBSTER STREET WEBSTER STREET - SOUTH & EAST FACADES TURK STREET - NORTH & WEST FACADES WEBSTER STREET - EAST FACADE WEBSTER STREET - EAST FACADE TURK STREET - NORTH FACADE
NORTH Design Development - Concept Floor Plans BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 Civic Design Review - Phase I October 2014
NORTH TERRACE Design Development - Concept Floor Plans BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 Civic Design Review - Phase I October 2014
WEBSTER & TURK EAST ELEVATION - WEBSTER STREET NORTH ELEVATION - TURK STREET BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 Civic Design Review - Phase I October 2014
TURK STREET VIEW SOUTH ELEVATION WEST ELEVATION BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 Civic Design Review - Phase I October 2014
WEBSTER STREET VIEW TURK STREET VIEW BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 Civic Design Review - Phase I October 2014
COMMENTS AFTER PHASE I Too many materials/textures = too busy Study glass facade options - channel glass may not work Public entry planter not encouraged Grey interstitial space seems unnecessary CHANGES AFTER PHASE I Square footage decreased - as a result the terrace enlarged Channel glass not working well with operable windows - changed to curtain wall Band of mezzanine windows/recess at APP bay eliminated - constructibility issues Officer s quarters moved to 2nd level - quieter and more private Fitness moved to terrace level Met with SFAC VAC committee about trees and public art location
WEBSTER & TURK EAST ELEVATION - WEBSTER STREET NORTH ELEVATION - TURK STREET BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 DRAFT Civic Design Review - Phase II March 2015
WEBSTER & TURK EAST ELEVATION - WEBSTER STREET NORTH ELEVATION - TURK STREET BUILDING DESIGN & CONSTRUCTION SAN FRANCISCO FIRE DEPARTMENT ESER BOND I FIRE STATION No. 5 DRAFT Civic Design Review - Phase II March 2015
CHANGES AFTER PRE-PHASE II INFORMAL Changed to curtain wall with horizontal mullions - works better with beds and contrasts vertical metal panels Need protective elements for training ladders Grey metal panel at rear now acts as terrace parapet Simplified color scheme with interlocking materials at mezzanine Considering tan tile as alternate to grey COMMENTS AFTER PRE-PHASE II INFORMAL Carefully study scale of porcelain tile Agreed simpler better curtain wall is better choice Minimal landscape on this project seems fine Preferred tan porcelain tile to grey Bring color options to CDR phase II presentation for comment
SITE PLAN Fire Station 5 Civic Design Phase II 04.20.15 1
FLOOR PLANS GAS METER TURK PUBLIC ENTRY SHOP TURNOUT LOCKERS MECH/ ELEC ELEV LOBBY PUBLIC T. STOR. STOR. OFFICER S BEDROOM 4 TOILET ELEC ELEV POLE POLE BBQ TURN- OUT DRYING OPEN TO BELOW TOILET KITCHEN POLE PANTRY DINING COMM. ROOM POLE WEBSTER OFFICER S BEDROOM 3 OFFICER S BEDROOM 2 PRACTICE PLATFORM DAYROOM A.C. OFFICE TOILET TOILET BOLLARDS OFFICER S BEDROOM 1 8 SPACES GATE FLAG POLE 1ST FLOOR 2ND FLOOR SCALE: 1/32 = 1-0 Fire Station 5 Civic Design Phase II 04.20.15 2
FLOOR PLANS LIBRARY ELEV. CONTROL ELEC ELEV STUDY RAIL FITNESS MEN S BATHROOM DORMITORY LAUN. LOCKERS RAIL JAN. TERRACE WOMEN S BATHROOM TERRACE BELOW STOR 3RD FLOOR ROOF SCALE: 1/32 = 1-0 Fire Station 5 Civic Design Phase II 04.20.15 3
ELEVATIONS NORTH ELEVATION EAST ELEVATION Fire Station 5 Civic Design Phase II 04.20.15 4
ELEVATIONS SOUTH ELEVATION WEST ELEVATION Fire Station 5 Civic Design Phase II 04.20.15 5
VIEW AT WEBSTER ST - TILE OPTION A Fire Station 5 Civic Design Phase II 04.20.15 6
VIEW DOWN TURK ST - TILE OPTION A Fire Station 5 Civic Design Phase II 04.20.15 7
VIEW AT WEBSTER ST - TILE OPTION B Fire Station 5 Civic Design Phase II 04.20.15 8
VIEW DOWN TURK ST - TILE OPTION B Fire Station 5 Civic Design Phase II 04.20.15 9
VIEW AT DUSK Fire Station 5 Civic Design Phase II 04.20.15 10
VIEW WITHOUT TREES Fire Station 5 Civic Design Phase II 04.20.15 11