CAMBERWELL MAGISTRATES' COURT, SE5 PRE-APPLICATION DOCUMENT

Similar documents
WELCOME TIMESCALES. Thank you for attending Anthology s final public exhibition on the emerging plans for Kennington Stage. ANTHOLOGY S COMMITMENTS

5.0 Development Strategy 32

DESIGN, ACCESS & PLANNING STATEMENT

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Planning Application 16/4008/F Rockwell 771 units off Anchor and Hope Lane SE7

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

Stephen Davy Peter Smith Architects

1 AYLESBURY ESTATE Development Specification (Consolidated) November 2015

Southall Gas Works: Design Statement by URBED with Capita Symonds, WYG, Lovejoys, Jestico and Whiles and RPSDesign Statement. Typologies.

Appendix1,Page1. Urban Design Guidelines. Back to Back and Stacked Townhouses. DRAFT September 2017

4.0. Proposals. View from Claremont Park Road (Plot 13 shown illustratively in the background)

1 Cumbrian Gardens London NW2 1EB

Multi-unit residential uses code

P. H. Robinson Consulting Urban Planning, Consulting and Project Management

SCHEDULE 32 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

CHESHIRE WEST AND CHESTER COUNCIL

6.0 DEVELOPMENT OPPORTUNITIES

OVERVIEW PROJECT SUMMARY. A two storey detached townhouse which is modern and affordable.

Control % of fourplex additions on a particular street. Should locate to a site where there are other large buildings

APPENDIX E PAGE 1 of 25 NOTE: ITALICS INDICATE ADDITIONS OR ALTERATIONS RM-9, RM-9A, RM-9N AND RM-9AN GUIDELINES DRAFT

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Cressingham Gardens Estate, Brixton. DRAFT Masterplan Objectives for discussion. September 2015

3.1 Existing Built Form

Rawlinson House, Lewisham, London SE13 5EL

Sotheron Place, Fulham

St Johns Road, Isleworth

LAND USE AMENDMENT ITEM NO: 05

Design & Access Statement 704 Woolwich Road, London SE7 8LQ February 2018

8.5.1 R1, Single Detached Residential District

CASTLES OF CALEDON URBAN DESIGN REPORT

Plan Dutch Village Road

H4. Residential Mixed Housing Suburban Zone

50+54 BELL STREET NORTH

Open Space, Landscape, Parking & Security by Design. Central Hill Estate 2016

5.1 Site Planning & Building Form

SCHEDULE 31 TO CLAUSE DESIGN AND DEVELOPMENT OVERLAY

MILL ROAD DEPOT, CAMBRIDGE Design and Access Statement December

Ashcroft Homes Trim Road Development Planning Rationale

apply sustainability principles to all residential developments in Ardee;

770 BROOKFIELD ROAD Site Plan Control Atlantis Investments November 2017

Montreal Road District Secondary Plan [Amendment #127, October 9, 2013]

Design and Access Statement Volume III Part 4 of 9 Plot A1. May 2018 Allies and Morrison

The Horizon, 54 New Coventry Road, Sheldon, Birmingham, B26 3BB

PLANNING BRIEF SITE ND7, TEMPLE QUAY, BRISTOL

Urban Design Brief Dundas Street. London Affordable Housing Foundation. November Zelinka Priamo Ltd.

Advisory Design Panel Report For the Meeting of February 27, 2019

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

Simon Court 2-4 Neeld Crescent London NW4 3RR

WELCOME! to the resident consultation on the initial designs for Bessborough Road. Bessborough Road. Your Views Matter

Richmond Street West - Zoning Amendment Application - Preliminary Report

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

108 Holders Hill Road London NW4 1LJ

RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

Planning Committee 4 March 2014

Staff Report for Council Public Meeting

PLANNING RATIONALE REPORT CODEAU BUILDING LTD RIDEAU STREET OTTAWA DECEMBER 2013

Pre-Applica on Design Statement : Residen al Development, The Gas Works, 113 Bury Road, The ord, Norfolk 1

18. Appendix H Urban Design Panel Presentation

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND

Director, Community Planning, North York District

Masshouse Plot 3, Land at Masshouse Lane/Park Street, Masshouse Plaza, City Centre, Birmingham, B5

RYEDALE SITES LOCAL PLAN MATTER 3 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

RUSSELL WAY, CRAWLEY, WEST SUSSEX, RH10 1UH. Development Opportunity

Proposed Demolition of Existing Shop & Erection of New Build Development to Form 11 Flats

CA/15/2006/OUT. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2015 Ordnance Survey

ROYAL BOROUGH OF WINDSOR & MAIDENHEAD PLANNING COMMITTEE

3.1. OBJECTIVES FOR RESIDENTIAL LAND USE DESIGNATIONS GENERAL OBJECTIVES FOR ALL RESIDENTIAL DESIGNATIONS

ADELAIDE APARTMENTS TOWER EXTENSION

H5. Residential Mixed Housing Urban Zone

Requirements for accepted development and assessment benchmarks for assessable development

STAFF REPORT. March 14, Toronto and East York Community Council. Director, Community Planning, South District

900 BURRARD STREET CD-1 GUIDELINES (BY-LAW NO. 6421) (CD-1 NO. 229) CONTENTS. 1 Application and Intent... 1

Part 9 Specific Land Uses - Multi Dwelling Housing

BUILDING HEIGHTS. The following diagram depicts the maximum allowable building height in a +3 zone.

Eglinton Avenue East and 3-7 Cardiff Road Official Plan and Zoning Amendment Applications Request for Direction

6040 Bathurst Street and 5 Fisherville Road Zoning Bylaw Amendment Application Preliminary Report

London Legacy Development Corporation Quality Review Panel. Report of Planning Application Review Meeting: Strand East Plot R6

Policy and Standards for Public Local Residential Streets And Private Streets

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017

REPRESENTATIONS TO SHEPWAY DISTRICT COUNCIL (SDC) PLACES AND POLICIES LOCAL PLAN SUBMISSIONS DRAFT SDC/COZUMEL ESTATES LIMITED

Seavington House Champion Hill

57 Foscote Road London NW4 3SE

Phase V the Quant, 6-10 Church Hill, E17 3AG. Planning Statement

DRAFT FOR DISCUSSION PURPOSES ONLY. Port Credit Local Area Plan Built Form Guidelines and Standards DRAFT For Discussion Purposes

Planning Policy Report for the Proposed Residential Development at The Old Sorting Office

Truax Park Apartments

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns.

LIBERTY HOUSE. Paul Keogh Architects. Paul Keogh Architects LIBERTY HOUSE HOMES

The site is located within the area forming phase 2 of the Town Centre redevelopment scheme. The relevant previous planning history is as follows:-

Marshall s Mill Holbeck

Planning Rationale. 224 Cooper Street

25 Leonard Avenue - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

A APPENDIX A: FORM-BASED BUILDING PROTOTYPES

S U B D I V I S I O N A N D D E V E L O P M E N T A P P E A L B O A R D A G E N D A

Director, Community Planning, Toronto and East York District

Site Allocations Plan

H5. Residential Mixed Housing Urban Zone

Tileman House - Putney

Article 6. GENERAL URBAN (G-) NEIGHBORHOOD CONTEXT

Transcription:

CAMBERWELL MAGISTRATES' COURT, SE5 PRE-APPLICATION DOCUMENT MARCH 2018

2

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 PRE-APPLICATION DOCUMENT CONTENTS 1.0 INTRODUCTION 2.0 SITE CONTEXT 2.1 SITE LOCATION 2.2 PLANNING POLICY OVERVIEW 2.3 URBAN ANALYSIS 2.4 EMERGING CONTEXT AND TALL BUILDINGS 2.5 CONTEXT CHARACTER 3.0 SITE ANALYSIS 3.1 EXISTING SITE AND BUILDING 3.2 WIDER SETTING 3.3 CONSTRAINTS AND OPPORTUNITIES 4.0 ESTABLISHING A FRAMEWORK 4.1 OPTION STUDIES 4.2 KEY PRINCIPLES 5.0 SCHEME PROPOSALS - COMBINED SITE 5.1 SCHEME OVERVIEW 5.2 DESIGN FOR EMPLOYMENT USES 5.3 TOWNSCAPE VIEWS 5.4 PROPOSED LAYOUTS & MIX 5.5 HOUSING QUALITY 5.6 AMENITY PROVISION 5.7 SERVICING 6.0 MATERIALITY 6.1 STREET VIEWS & CHARACTER 7.0 CONCLUSION 8.0 APPENDIX - STAND-ALONE SITE 8.1 SCHEME OVERVIEW 8.2 TOWNSCAPE VIEWS 8.3 PROPOSED LAYOUTS & MIX 8.4 AMENITY PROVISION 8.0 APPENDIX - STAND-ALONE SITE 8.5 SERVICING Ref: 3387 Stockwool, The Pump House, 19 Hooper Street, London E1 8BU 020 7264 8600 www.stockwool.co.uk Stockwool 3

1.0 1.0 INTRODUCTION Stockwool has been appointed to assess the development potential of the Camberwell Magistrates' Court site and the land around the building itself. The pre-application document summarises our work to date which has been carried out with input from JLL Planning and Development. The document is made up of three parts covering two site scenarios; - the initial context and site analysis (chapters 2-3) - development of key design principles and proposals for the combined Magistrates' Court site as the most appropriate site scenario (chapters 4-6) - and redevelopment of the stand-alone site only (appendix). Redevelopment of the site and its setting offers an exciting opportunity to build upon the success of the Camberwell Green area and its ongoing regeneration. The site can provide new uses in the form of creative employment space and housing which will add vibrancy to the area within an urban form which is more appropriate to the setting. 4

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 AERIAL VIEW OF THE SITE 5

2.0 2.0 SITE CONTEXT 2.1 SITE LOCATION The proposals need to cover two site scenarios; - the Magistrates' site only (site parcel A, referenced as stand-alone site) - and the Magistrates Court site, the adjacent land to the west of the building and the highway land to the north and east both owned by LB Southwark (site parcels A, B & C, referenced as combined site). B A C The site is northeast of Camberwell Green, very centrally located within the London Borough of Southwark. Camberwell Green and the roads in the immediate vicinity provide a variety of amenities and facilities including retail and shopping on Camberwell Road, Denmark Hill and Camberwell Church Street. Around D Eynsford Street are located more civic facilities including the existing Court buildings, a new library facility and the doctors surgery. Public transport includes a number of bus routes in the immediate vicinity. Overall the area provides all the facilities of a good district centre which also provides excellent access to the city. SITE PARCELS KEY LAND PARCEL A - 0.267HA MINISTRY OF JUSTICE OWNERSHIP LAND PARCEL B - 0.086HA SOUTHWARK OWNERSHIP LAND PARCEL B - AREA TO BE EXCLUDED LAND PARCEL C - 0.097HA SOUTHWARK HIGHWAY LAND 6

244 to 246 284 227 305 309 16 7 13 9 11 10 12 14 17 8 4 90 100 Block K 1 to 10 3 Block B 27 Block F Block J 1 to 20 6 20 5 19 29 1 to 5 9 1 to 6 25 to 35 123 124 61 91 113 60 90 112 1 7 14 27 13 28 9 12 29 11 30 6 15 26 2 32 33 46 4 21 27 1 9 38 39 56 57 62 6 to 8 14 24 48 2 23 25 3 89 90 4 2 8 STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 oad 74 HOPEWELL STREET 12 to 20 Hopewell Yard 1 to 42 Christabel 80 Pankhurst Court 1 to 24 1 to 30 Dekker House 1 to 11 92 Clemance Hall 11 1 HOUSEMAN WAY 16 6 PH 242 248 244 246 Lamb House 1 to 43 Landor House 105 107 1to6 109 1to3 1 to 18 Herrick House ELMINGTON ROAD 1 to 40 250 Playground 254 260 Shelter Play Area 12 24 7 8 19 20 Drayton House 1 13 44 45 96 104 47 48 49 88 94 102 86 106 98 90 92 100 108 102 to 186 LOMOND GROVE ELMINGTON ROAD Place Of Worship to 25 26 to 28 32 to 34 Play Area Posts 22 BULLACE ROW 1 to 49 Lomond House 17 to 21 to 16 51 101 103 50 100 102 22 24 CAMBERWELL ROAD El Sub Sta 20 26 7 9 6 Magistrates Court to 13 18 28 PH Camberwell Green Care Home Surgery 52 Library D'EYNSFORD ROAD 160 to 164 DON PHELAN CLOSE 63 89 115 62 88 114 11 37 10 36 4 Park House Brighton Ho HARVEY 1 to 25 Peabody MARY DATCHELOR CLOSE 1 to 8 2 Court 150 to 154 The Good Neighbours CAMBERWELL 1 to 8 148 149 House 38 Block N 1 to 10 ROAD 143 to 147 75 77 74 76 126 66 70 Block O 1 to 10 Club 58 1 to 6 Block L 1 to 10 49 's ek Orthodox Church CAMBERWELL GREEN Camberwell Green Play Area CAMBERWELL GREEN Block M 2 to 10 Passage Shelters Peabody Buildings Block P Block G 1 to 20 Camberwell Block A 1 to 14 1 to 10 Play Area 71 72 73 Block D 1 to 15 Public Baths KIMPTON ROAD 28 122 to 132 39 40 41 127 8 20 21 42 43 44 19 22 45 46 47 59 63 67 128 1 to 11 Belham Walk El Sub Sta Block H 1 to 20 1 to 14 Block E 1 to 15 22 Shelter 37 31 91 Block C 1 to 14 1 to 15 Kimpton Court 10 321c 319 321 15 Artichoke 6 SM 92 93 94 323 5 Mews 334 325 Bank 3 1 112 114 115 104 105 106 Shelter 101 to 116 1 to 3 TILLINGS CLOSE 4 to 6 340 10 342 344 to 7 1 to 15 13 12 348 11 352 350 354 20 21 22 23 24 25 2 12 Shelter 15 24 Library 21 23 ARTICHOKE PLACE PH 25 27 29 to 33 35 49 51 The Dome Hotel 53 4 Datchelor Place 55 2 1 101 102 103 201 to 214 SITE LOCATION PLAN Block A 16 18 19 PH 1 2 14 PH 2 30 32 34 to 36 CAMBERWELL CHURCH STREET 46 52 58 18 to 20 4 58a AERIAL VIEW OF THE WIDER AREA AERIAL VIEW OF THE SITE 7

2.0 SITE CONTEXT 2.2 PLANNING POLICY OVERVIEW The Local Planning Authority is Southwark Council. The site is located within the Camberwell Action Area and a District Town Centre where a mix of uses is supported. The key planning policy documents include: London Plan (incorporating Further Alterations, 2015) Southwark Core Strategy 2011 Saved Policies from the Southwark Plan 2007 Regard should also be had to the Government s National Planning Policy Framework (NPPF, 2012) and the emerging New Southwark Plan and Camberwell SPD. SOUTHWARK CORE STRATEGY, 2011 - CAMBERWELL ACTION AREA KEY DESIGN STANDARDS Policy DM9 requires the following criteria to be considered in forthcoming developments: Ensures the height, scale, massing and arrangement of development responds positively to the existing townscape, character and context Better reveals local distinctiveness and architectural character Ensures an urban grain and site layout that takes into account and improves existing patterns of development and movement, permeability and street widths Ensures buildings, public spaces and routes are positioned according to their function, importance and use Ensures a high-quality public realm that is safe, understandable and attractive and that eases the movement of pedestrians, cyclists and vehicular traffic. Street clutter should be avoided Ensures contextual landscaping including the retention of street trees, the use of green infrastructure and the principles of water sensitive urban design Provides accessible and inclusive design for all ages and people with disabilities. Provides opportunities for formal and informal play SOUTHWARK CORE STRATEGY, 2011 - DENSITY ZONES SOUTHWARK CORE STRATEGY, 2011 - OPEN SPACES 8

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 EXTRACT FROM SOUTHWARK POLICIES MAP, 2011 - IDENTIFYING THE SITE ALLOCATIONS BOROUGH PLANNING CONTEXT The planning context for the Borough provides an important background in considering proposals for the subject site. The site is located close to an important north-south route through the western edge of the Borough and Camberwell Green itself is a local shopping area and District centre. On this basis, the site has excellent access to transport, local facilities and amenity spaces. The Southwark policies map highlights that the site is a Conservation area (partially) an Archaeology Priority Zone, the Urban density zone, Air Quality zone and directly adjacent to the District Centre. 9

2.0 SITE CONTEXT 2.3 URBAN ANALYSIS 1000 M ACCESS LEVEL MAP (PTAL) TRANSPORT LINKS 0 (WORST) 2 5 1B 3 6A 1A 4 6B (BEST) Burgess Park Camberwell Green Myatt's Fields VIEWS OF CAMBERWELL GREEN LOCAL AMENITY 10

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 FIGURE GROUND MASSING 1-2 STOREYS 5-6 STOREYS 3-4 STOREYS 6+ STOREYS ACCESS USES MAIN VEHICULAR ROUTES MAIN PEDESTRIAN ROUTES OVERGROUND RESIDENTIAL COMMERCIAL INDUSTRIAL SECONDARY VEHICULAR ROUTES SECONDARY PEDESTRIAN ROUTES BUS STOP COMMUNITY RETAIL PARK / GREEN SPACES 11

2.0 SITE CONTEXT 2.4 EMERGING CONTEXT AND TALL BUILDINGS 1. 2. 3. 4. 5. 6. 7. 8. CONISTON HOUSE 22 STOREYS GWEN MORRIS HOUSE 5-12 STOREYS 14/AP/0175 4-9 STOREYS 254 CAMBERWELL ROAD 17 STOREYS 272-274&286 4-7 STOREYS MASTERMAN HOUSE 17 STOREYS 11/AP/4309 9 STOREYS 14/AP/2948 2-9 STOREYS CAMBERWELL GREEN MAGISTRATES' COURT 8 STOREYS APPROVED APPLICATIONS 12

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 EXISTING BUILDINGS 1. CONISTON HOUSE 22 STOREYS 2. GWEN MORRIS HOUSE 5-12 STOREYS 3. 16A WYNDHAM ROAD AND 166, 168, 170, 172, 174, 176 AND 176A CAMBERWELL ROAD 4-9 STOREYS 4. 254 CAMBERWELL ROAD 7 STOREYS 5. 272-274 & 286-304 CAMBERWELL ROAD 4-7 STOREYS 6. MASTERMAN HOUSE 17 STOREYS 7. 1EDMUND STREET, SOUTHAMPTON WAY AND NOTLEY STREET 9 STOREYS 8. 240&252 CAMBERWELL ROAD 2-9 STOREYS 13

2.0 SITE CONTEXT 2.5 CONTEXT CHARACTER The site context and character is generally varied, it can however be split into two areas, the Camberwell Green Conservation area, which is located to the south west of the site and the streets around Kimpton, and Elmington Road. SOUTHWEST - THE GREEN Camberwell Green is a large scale London square, providing open public space for the local community. The square is surrounded by roads on all four sides, including Camberwell Road which forms the main north/ south route in the area and Camberwell New Road and Camberwell Church Street to the south of the Green which is the main east/ west route in the area. The buildings around the square are generally 19/20th century, including the Peabody buildings along the eastern edge. The space measures 60 m x 145 m. The historical street pattern is still very much in evidence. NORTH EAST The area is characterised by a mix of post-war buildings which include 1960's four storey maisonette blocks, and larger scale flatted developments. On this basis, the streetscape is more mixed and varies in quality. The historical street pattern has been altered significantly in places and the nature, scale and frontages of the buildings contrast with the continuity of the conservation area. CONSERVATION AREA MAP CONSERVATION AREA 1 2 LISTED BUILDINGS MAP 1 BRYANSTON HOUSE AND RAILINGS (GRADE II) GRADE I GRADE II GRADE III 14

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 HISTORIC MAP, 1896 2 FORMER CAMBERWELL PUBLIC BATHS (GRADE II, CIRAC 1891) 2 BACK ACCESS TO THE FORMER PUBIC BATHS ON D'EYNSFORD AND HARVEY ROAD OPPOSITE THE SITE 15

3.0 3.0 SITE ANALYSIS 3.1 EXISTING SITE AND BUILDING The existing site is occupied by the Camber well Magistrates' Court building. The building occupies the urban block formed by Kimpton Road, D'eynsford Road, Elmington Road and Hind Grove (this part of Hind Grove is pedestrianised and hard landscaped). The roads around the court building were widened, presumably when the building was built and the road layout contrasts with other roads in the immediate area. The building itself in effect sits at the centre of an 'island' formed by the above mentioned roads, generally the frontage of the existing building are set back from the pavement edges. The building steps up in height towards the centre of the site, approximately three storeys around the edges rising to 8/9 storeys in the centre. The building is obviously purpose built. AERIAL VIEW OF MAGISTRATES' COURT KEY POOR QUALITY / FRAGMENTED PUBLIC SPACE FRAGMENTED FRONTAGES WIDE ROADS INWARD LOOKING BUILDING ISOLATED MAIN ENTRANCE / MINIMUM STREET ACTIVITY SECONDARY ENTRANCE ASSESSMENT OF THE URBAN SETTING 16

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 CONTRIBUTION TO THE URBAN SETTING Camberwell Green and the conservation area provide a high-quality urban setting which has a distinctive character and a series of buildings which respond appropriate to the character while being 'of their time'. Approaching from Camberwell Green the contrast provided by the Magistrates' building is significant, obviously the change in scale is one factor, but it is the nature of the frontages and spaces around the building which add to this contrast. All of the spaces and streets around the existing building are poor quality, the spaces created by the setbacks along the streets create poorly defined open space which is not usable or well landscaped. With the exception of the main entrance typically the frontages are closed and do not address the street The widening of the streets have also had an impact on the quality of the urban environment, the two main frontages are dominated by the roads themselves which are not busy or well used. Despite the obvious flaws in the buildings contribution to the setting Stockwool has considered the potential for re-use of the building, this is covered in the appendix. VIEW OF MAGISTRATES' COURT FROM KIMPTON ROAD 17

3.0 SITE ANALYSIS 3.1 EXISTING SITE AND BUILDING 2 1 3 6 5 4 7 KEY PLAN 1. VIEW FROM ELMINGTON ROAD TOWARDS THE SITE 4. VIEW OF THE SITE FROM D'EYNSFORD ROAD 18

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 2&3. VIEWS OF THE SITE FROM LOMOND GROVE TOWARDS THE OPEN SPACE BETWEEN MAGISTRATES' COURT AND CAMBERWELL LIBRARY 5. SITE SOUTHERN BOUNDARY ON D'EYNSFORD ROAD LOOKING EAST 7. DISTANT VIEW FROM KIMPTON ROAD 6. SITE SOUTHERN BOUNDARY ON D'EYNSFORD ROAD LOOKING WEST 19

3.0 SITE ANALYSIS 3.2 WIDER SETTING 3 7 4 2 1 8 6 5 KEY PLAN 1. VIEW FROM D'EYNSFORD ROAD TOWARDS THE LIBRARY GREEN 2. VIEW ALONG KIMPTON ROAD LOOKING NORTH 20 3. VIEW OF THE PEDESTRIAN PASSAGE TOWARDS CAMBERWELL GREEN

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 4. VIEWS OF THE LIBRARY FROM THE ENTRANCE OF CAMBERWELL MAGISTRATES COURT 5. VIEW OF THE CAMBERWELL GREEN ENTRANCE 6. VIEW OF CAMBERWELL GREEN 7. VIEW OF THE LIBRARY GREEN FROM THE PEDESTRIAN PASSAGE 8. VIEW ALONG THE PEDESTRIAN LINK 21

3.0 SITE ANALYSIS 3.3 CONSTRAINTS AND OPPORTUNITIES KEY CONSTRAINTS 22

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 KEY OPPORTUNITIES 23

4.0 2 3 4.0 ESTABLISHING A FRAMEWORK 4.1 OPTION STUDIES OPTION 1 Two tall buildings Mews housing facing library space Complete perimeter block 1 KEY PLAN VIEW 1 VIEW 2 24 VIEW 3

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 OPTION 2 OPTION 3 Single tall building Single tall building High rise - low rise approach Closed & compact perimeter block Maximise residential amenity space & new public space Open perimeter block VIEW 1 VIEW 1 VIEW 2 VIEW 2 VIEW 3 VIEW 3 25

4.0 ESTABLISHING A FRAMEWORK 4.2 KEY PRINCIPLES 1 REINSTATING THE URBAN BLOCK 2 PERIMETER + COURTYARD The site and key aspects of the context: The existing green space adjacent to the library building the diagonal connection between Camberwell Green the site itself The new development should become a part of the Conservation area, reinstating the urban forms of this part of Camberwell Green. Full re-development of the site enables improvements to all of the street frontages which are more appropriate to the setting. By incorporating the adjacent land the site is appropriately sized to create a communal courtyard space around which the development is wrapped. The urban block is outward facing creating residential frontages on all sides. The four frontages face onto areas of differing character, and the building needs to respond to this while providing unbroken clearly defined frontages. 26

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 3 PERMEABILITY + ADDRESS 4 HEIGHT + MASSING The form of the perimeter block is modified to suit the shape of the site, in particular, the north-east corner. Communal entrances are located at appropriate points to provide legibility and a high-quality address. The heights around the perimeter block are adjusted to suit the particular aspects of the setting. The tallest element is located at the junction of three roads, an important thoroughfare connecting Camberwell Green with the more residential areas beyond. The southern side of the block is lowered to ensure good levels of light penetration into the courtyard space. The location of the taller elements are based on an analysis of the key views and routes around the site 27

5.0 5.0 SCHEME PROPOSALS - COMBINED SITE 5.1 SCHEME OVERVIEW 166 NEW HOMES 19,332 SQFT CREATIVE EMPLOYMENT SPACE (1796 SQM) ENLARGEMENT OF LIBRARY GREEN AND NEW FRONTAGES NEW ROAD LAYOUT ALONG KIMPTON ROAD BUILDING HEIGHTS - 16/ 7/ 5 AND 4 STOREYS PROPOSED SITE LAYOUT DIAGRAMMATIC PROPOSED GROUND FLOOR SHOWING THE DIFFERENT EMPLOYMENT TYPES 28

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 SECTION THROUGH THE CENTRAL COURTYARD AND LIBRARY GREEN CREATIVE STUDIOS LARGE MAKE STUDIOS LEISURE / RETAIL 29

5.0 SCHEME PROPOSALS - COMBINED SITE 5.2 DESIGN FOR EMPLOYMENT USES A A KEY DESIGN CONSIDERATIONS 1. UTILISING THE EXISTING BASEMENT SPACE 2. INCREASED GROUND FLOOR HEIGHT - 5.0m 3. FLEXIBLE LAYOUTS TO ACCOMMODATE A VARIETY OF USES 4. DUAL ASPECT UNITS TO MAXIMISE FLEXIBILITY 5. FRONTAGES OVERLOOKING AND ACTIVATING LIBRARY GREEN 6. UNITS WITH VISUAL CONNECTION TO THE LANDSCAPED COURTYARD 7. DOUBLE HEIGHT BASEMENT SPACE WITH SKYLIGHTS TO MAXIMISE NATURAL LIGHT 8. HIGH QUALITY PUBLIC REALM TO OPEN UP THE SITE AND CREATE NEW SOCIABLE SPACES 5 2 6 8 7 7 LIBRARY LIBRARY GREEN TWO STOREY CREATIVE STUDIOS LANDSCAPED COURTYARD LARGE MAKE STUDIOS SECTION AA 1 EXISTING BUILDING SECTION 30

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 RESIDENTIAL CARPARK KIMPTON ROAD 31

5.0 SCHEME PROPOSALS - COMBINED SITE 5.3 TOWNSCAPE VIEWS VIEW 1 - CAMBERWELL ROAD VIEW 2 - CAMBERWELL GREEN MODEL VIEW PROPOSED MODEL VIEW PROPOSED MODEL VIEW EXISTING MODEL VIEW EXISTING 32

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 VIEW 3 - LOMOND GROVE VIEW 4 - ELMINGTON ROAD MODEL VIEW PROPOSED MODEL VIEW PROPOSED MODEL VIEW EXISTING MODEL VIEW EXISTING 33

5.0 SCHEME PROPOSALS - COMBINED SITE 5.4 PROPOSED LAYOUTS & MIX 1B2P 2B3P LOMOND GROVE 2B4P 3B4P ELMINGTON ROAD 3B5P CIRCULATION KIMPTON ROAD SERVICES CREATIVE STUDIOS / EXHIBITION SPACE INCREASED HEIGHT (4.5-6.0M) LARGE MAKE STUDIOS INCREASED HEIGHT (6.0M) OFFICES / CO-WORKING SPACE LEISURE / RETAIL D'EYNSFORD ROAD EXISTING BASEMENT OUTLINE GROUND FLOOR PLAN LOWER BASEMENT FLOOR CREATIVE STUDIOS LARGE MAKE STUDIOS GROUND FLOOR CREATIVE STUDIOS LEISURE / RETAIL OFFICES TOTAL 1253m2 388m2 865m2 543m2 230m2 146m2 167m2 1796m2 19332ft2 LOWER BASEMENT PLAN UPPER BASEMENT PLAN 34

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 SECOND-THIRD FLOOR PLAN FOURTH FLOOR PLAN FIFTH FLOOR PLAN SIXTH FLOOR PLAN ACCOMMODATION SCHEDULE RESIDENTIAL LHDG STANDARD AREA 37 50 61 70 74 86 93 RESIDENTIAL AMENITY GIA HAB. ROOMS 1 2 3 3 4 4 5 NET AREA TARGET STUDIO 1B/2P 2B/3P 2B/4P 3B/4P 3B/5P 3B/5P D TOTAL UNITS HAB ROOMS m 2 ft 2 m 2 m 2 ft 2 CORE A 0 4 0 19 2 9 0 34 109 2522 27145 239 3345 36005 CORE C 0 33 0 25 0 1 0 59 145 3564 3564 0 4868 52403 CORE D 0 12 4 10 1 7 0 34 96 2231 24009 217 3062 32963 CORE E 0 18 5 8 0 6 2 39 106 2576 27733 240 3553 38246 TOTAL PROVISION STUDIO 1B/2P 2B/3P 2B/4P 3B/4P 3B/5P 3B/5P D TOTAL UNITS HAB ROOMS m 2 ft 2 m 2 m 2 ft 2 TOTAL 0 67 9 62 3 23 2 166 456 10892 82451 696 14829 159618 PERCENTAGE BASED ON UNITS 0% 40% 43% 17% 100% 60% GIA m 2 m 2 TOTAL RESIDENTIAL 14829 PARKING/SERVICES 1449 16277 DENSITY SITE AREA ha HAB RMS HRH 0.450 456 1,013 35

5.0 SCHEME PROPOSALS - COMBINED SITE 5.5 HOUSING QUALITY The scheme proposals have been developed to provide a high-quality living environment as set out in Strategic Policy 5 and the relevant SPD. The development of the design is in its early stages, but the principles established in the current proposals seek to address the policy criteria. For example: Maximise dual aspect units Provide sufficient overlooking distances to maximise privacy and achieve good daylight standards The design allows for ceiling heights of 2.4m minimum There are no more than eight flats per core All units are provided with private amenity space as well as access to communal amenity space, most bathrooms and kitchens are naturally lit and a variety of housing typologies are provided All units will meet the design criteria of the London Plan, including space standards and amenity provision. Further detail and testing will be required in relation to sustainable design, and sun/daylight levels. The latter part of the document demonstrates our intentions in relation to the quality of the architecture. Street sections on the next page show set-off distances of the new proposed street layout on Elmington and Kimpton Road as well as the new open space on Library Green. TYPICAL UPPER FLOOR 10:00 12:00 14:00 STUDY SHOWING SUNLIGHT AVAILABILITY IN THE COURTYARD ON 21 ST MARCH 36

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 NEW PROPOSED STREET SECTION - KIMPTON ROAD NEW PROPOSED STREET SECTION - ELMINGTON ROAD NEW PROPOSED STREET SECTION - LIBRARY GREEN 37

5.0 SCHEME PROPOSALS - COMBINED SITE 5.6 AMENITY PROVISION EXISTING AMENITY DIAGRAM GROUND FLOOR AMENITY ROOF TOP AMENITY 38

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 5.0 SCHEME PROPOSALS - COMBINED SITE 5.7 SERVICING GROUND FLOOR UPPER BASEMENT PLAN LOWER BASEMENT PLAN 39

6.0 ELMINGTON ROAD KEY CHARACTERISTICS LARGE SCALED URBAN STREETS 6.0 MATERIALITY 6.1 STREET VIEWS & CHARACTER WELL DEFINED FRONTAGES WITH DEFENSIBLE SPACE AT GROUND FLOOR ROBUST PALETTE OF MATERIALS WHICH RELATE TO CONSERVATION AREA LEGIBILITY IN THE URBAN FORMS AND DEFINITION OF KEY ROUTES/ CROSSINGS CLEAR ADDRESSES TO THE BUILDING VIEW TOWARDS THE SITE FROM KIMPTON ROAD VIEW AS EXISTING 40

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 41

6.0 MATERIALITY 6.1 STREET VIEWS & CHARACTER D EYNSFORD ROAD KEY CHARACTERISTICS SMALL SCALE STREET WITH TIGHTER URBAN GRAIN VARIETY IN BUILDING FORMS AND ELEVATIONAL TREATMENT PEDESTRIAN FRIENDLY PUBLIC REALM DEFENSIBLE SPACE ALONG FRONTAGES DEFINING PUBLIC AND PRIVATE BREAK IN FRONTAGE PROVIDES VISUAL CONNECTION WITH COURTYARD SPACE VIEW ALONG D'EYNSFORD ROAD 42 VIEW OF THE PROPOSED SCHEME FROM HARVEY ROAD

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 43

6.0 MATERIALITY 6.1 STREET VIEWS & CHARACTER COURTYARD KEY CHARACTERISTICS HIGH QUALITY LANDSCAPING PROVIDING SEMI-PRIVATE COMMUNAL AMENITY PROJECTING BALCONIES ANIMATING THE FAÇADE AND MAXIMISING VIEWS FOCAL POINT OF THE DEVELOPMENT SOFTER PALETTE OF MATERIALS MULTI USE AMENITY SPACE VIEW OF THE COURTYARD SPACE 44

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 45

6.0 MATERIALITY 6.1 STREET VIEWS & CHARACTER LIBRARY GREEN KEY CHARACTERISTICS GREEN PUBLIC AMENITY SPACE ADJACENT TO LIBRARY FRONTAGES OVERLOOKING THE SPACE STRUCTURED PLANTING, INCLUDING TREES RECESSED BALCONIES PROVIDING AMENITY AND VIEWS REPETITIVE STRUCTURED ELEVATION TREATMENT, RELATING TO THE ARCHITECTURE OF THE CONSERVATION AREA VIEW FROM D'EYNSFORD ROAD TOWARDS THE LIBRARY GREEN 46 VIEW OF THE PEDESTRIAN PASSAGE FROM LOMOND GROVE TOWARDS CAMBERWELL GREEN

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 47

7.0 7.0 CONCLUSION The proposals for this important site have been carefully considered to build upon the ongoing regeneration of Camberwell Green. From these studies it is clear that the site 2 land package (which combines MOJ and LBS land) offers greater opportunities for both new and existing residents. The additional land provides a larger urban plot which helps with the relationships between buildings, the larger site also utilises under used poor quality Highway spaces thus creating much more successful streets and frontages on to Kempton and Elmington Road in particular. The potential for complimentary employment uses is significant. The proposals seek to utilise the existing basement structure to create bespoke spaces for more appropriate employment uses. This aspect of the scheme can help to deliver a broader range of benefits which will also serve to enrich the existing Camberwell Green locality. In summary, the preferred approach provides the following benefits: providing much needed, high-quality homes for the area new employment uses in the form of creative employment space reinstate the urban block with a more appropriate form for the setting enhance Library Green with frontages overlooking and activating the space set the standard for future development in the immediate vicinity We look forward to discussing the proposals in more detail with Southwark Borough Council. 48

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 49

8.0 8.0 APPENDIX - STAND-ALONE SITE 8.1 SCHEME OVERVIEW 118 NEW HOMES 14,714 SQFT CREATIVE EMPLOYMENT SPACE (1796 SQM) BUILDING HEIGHTS - 14/ 7/ 5 AND 3 STOREYS PROPOSED SITE LAYOUT CAMBERWELL LIBRARY LIBRARY GREEN SECTION THROUGH 50

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 20.8M POTENTIAL LANDSCAPED AREA TWO STOREY LANDSCAPED COURTYARD RESIDENTIAL KIMPTON ROAD CREATIVE STUDIOS LARGE MAKE STUDIOS 51

8.0 APPENDIX - STAND-AL0NE SITE 8.2 TOWNSCAPE VIEWS VIEW 1 - CAMBERWELL ROAD VIEW 2 - CAMBERWELL GREEN MODEL VIEW PROPOSED MODEL VIEW PROPOSED MODEL VIEW EXISTING MODEL VIEW EXISTING 52

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 VIEW 3 - LOMOND GROVE VIEW 4 - ELMINGTON ROAD MODEL VIEW PROPOSED MODEL VIEW PROPOSED MODEL VIEW EXISTING MODEL VIEW EXISTING 53

8.0 APPENDIX - STAND-ALONE SITE 8.3 PROPOSED LAYOUTS & MIX 1B2P 2B3P LOMOND GROVE 2B4P 3B4P ELMINGTON ROAD 3B5P CIRCULATION KIMPTON ROAD SERVICES CREATIVE STUDIOS / EXHIBITION SPACE INCREASED HEIGHT (4.5-6.0M) LARGE MAKE STUDIOS INCREASED HEIGHT (6.0M) OFFICES / CO-WORKING SPACE LEISURE / RETAIL D'EYNSFORD ROAD EXISTING BASEMENT OUTLINE GROUND FLOOR PLAN LOWER BASEMENT FLOOR CREATIVE STUDIOS LARGE MAKE STUDIOS GROUND FLOOR CREATIVE STUDIOS LEISURE / RETAIL OFFICES TOTAL 841m2 383m2 458m2 526m2 288m2 107m2 131m2 1367m2 14714ft2 LOWER BASEMENT PLAN UPPER BASEMENT PLAN 54

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 FIRST-SECOND FLOOR PLAN FOURTH FLOOR PLAN FIFTH FLOOR PLAN SIXTH FLOOR PLAN ACCOMMODATION SCHEDULE SCHEDULE OF ACCOMMODATION STATUS PROJECT DATE CAMBERWELL MAGISTRATE'S COUR, SE5 3387 LHDG STANDARD AREA 37 50 61 70 74 84 86 93 RESIDENTIAL AMENITY HAB. ROOMS 1 2 3 3 4 4 4 5 NET AREA AREA TARGET GIA NOTES: GIA INCLUDE OPEN DECKE RESIDENTIAL STUDIO 1B/2P 2B/3P 2B/4P 3B/4P 3B/4P D 3B/5P 3B/5P D TOTAL UNITS HAB ROOMS m 2 ft 2 m 2 m 2 m 2 ft 2 CORE A 0 11 3 0 2 0 4 0 20 55 1269 13659 #N/A 119 1702 18326 CORE B 0 10 0 4 4 0 1 0 19 52 1198 12899 #N/A 114 1583 17034 CORE C 0 26 0 26 0 0 0 0 52 130 3158 3158 4120 0 4120 44347 CORE D 0 14 2 7 0 0 3 1 27 71 1742 18754 #N/A 163 2347 25263 TOTAL PROVISION STUDIO 1B/2P 2B/3P 2B/4P 3B/4P 3B/4P D 3B/5P 3B/5P D TOTAL UNITS HAB ROOMS m 2 ft 2 m 2 m 2 m 2 ft 2 TOTAL 0 61 5 37 6 0 8 1 118 308 7367 48470 #N/A 396 9752 104970 PERCENTAGE BASED ON UNITS 0% 52% 36% 13% 100% 48% DENSITY SITE AREA ha HAB RMS HRH 0.267 308 1,152 EMPLOYMENT PROVISION Level Lower Basement Floor Ground Floor Employment Type CREATIVE STUDIOS LARGE MAKE STUDIOS CREATIVE STUDIOS LEISURE Measured Area 383.13 457.86 840.99 m² 288.28 107.05 55

8.0 APPENDIX - STAND-ALONE SITE 8.4 AMENITY PROVISION GROUND FLOOR AMENITY ROOF TOP AMENITY 56

STOCKWOOL CAMBERWELL MAGISTRATES COURT, SE5 MARCH 2018 8.0 APPENDIX - STAND-ALONE SITE 8.5 SERVICING GROUND FLOOR UPPER BASEMENT PLAN LOWER BASEMENT PLAN 57