HOME ENROLLMENT NOTIFICATION OF CONSTRUCTION AND INSPECTION BUILDER/SELLER APPLICATION FOR HOME ENROLLMENT

Similar documents
CHAPTER 24 F FLOOD ZONE OVERLAY DISTRICT

BUILDER S ADDENDUM TO PURCHASE AND SALE AGREEMENT (Use with NWMLA Form 21)

GCS Giles P O Box Professional Service, Construction Fernandina Beach, FL Professionally Delivered Services, LLC Telephone:

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

SAMPLE REMODELING CONTRACT Revised

CHANCE 30-YEAR LIMITED TRANSFERRABLE WARRANTY

REQUIREMENTS FOR RESIDENTIAL PLAN REVIEW New Constructions, additions and remodel

PATIO PERMIT REGULATIONS

FLOODPLAIN MANAGEMENT ORDINANCE

REGIONAL DISTRICT OF NANAIMO BYLAW NO. 1469

HOME WARRANTY REGISTRATION

The CHANCE 30-Year Peace of Mind Warranty

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

SEPTIC PERMIT APPLICATION

EL PASO ACCENT HOMES LLC. BUILDERS NEW HOME SALE CONTRACT FOR THE STATE OF TEXAS

PRE CONSTRUCTION CHECK LIST FOR BUILDING PERMITS

Accessory Dwelling Units (ADUs)

Multifamily Property $599,000. For Sale. 601 S 10th Street, Fort Pierce FL

Special Report All About

SEPTIC PERMIT APPLICATION

SEPTIC PERMIT INFORMATION

REQUEST FOR OFFERS. Tsubota Steel Site. ISSUE DATE: February 12, 2014

VACANT LAND PURCHASE AGREEMENT

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

HC HOMES Emerald Pointe at Sunrise BUILDER'S ADDENDUM A-1

Point Aquarius Property Owners Association Architectural Control Committee REQUEST FOR ARCHITECTURAL CONTROL COMMITTEE APPROVAL

CAYUGA COUNTY TAX FORECLOSED REAL ESTATE LIVE PUBLIC AUCTION AUCTION PROCEDURE, TERMS & BIDDER CERTIFICATION

Fraser River Escarpment Policy

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

VILLAGE OF WEST HAVERSTRAW BUILDING DEPARTMENT RENTAL PROPERTY CODE 186. In-Person: Property Address City Zip

NAME OF INSPECTOR. 3B. ADDRESS OF INSPECTION COMPANY (Include Zip Code) 4.PEST CONTROL OPERATOR LICENSE NUMBER PO Box 2831

ONLINE BIDDER REGISTRATION FORM INSTRUCTIONS. 1. Read the Terms & Conditions of the auction on page 4 6.

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

CONCILIATION PROCEDURE

MAKING AN INFORMED DECISION ABOUT BUYING A MANUFACTURED HOME

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

GREATER TULSA ASSOCIATION OF REALTORS This is a legally binding Contract; if not understood, seek advice from an attorney.

TERMS AND CONDITIONS OF SALE

ARTICLE 7 UTILITIES AND EASEMENTS

PURCHASE AND SALES AGREEMENT New Hampshire Association of REALTORS Standard Form

Buy and Sell Agreement

CONTRACT FOR DEED. , hereinafter referred to as

Greenbrier County Building Code Administrative Policy Manual

V. TOLERANCES: All dimensions must be limited by a specific tolerance. When not specified, it is understood that the following tolerances will apply:

CO-OWNER HANDBOOK. The inner space, which you own, is yours to decorate, to maintain, and to live in.

WILSON COUNTY Health & Public Safety Office

NASSAU COUNTY BUILDING DEPARTMENT MOBILE HOME APPLICATION CHECKLIST

INSTRUCTIONS FOR THE PREPARING AND FILING OF APPLICATIONS WITH THE SRCC. APPLICATION CHECKLIST AND DEADLINE FOR FILING Sewage Disposal Plan (HHE-200)*

PURCHASE AND SALES AGREEMENT New Hampshire Association of REALTORS Standard Form

APPLICATION FOR RENTAL (Archstone Van Ness)

Confirmation of Purchase Order/Terms and Conditions of Sale 1. ACCEPTANCE OF ORDER: Natel Engineering Co., Inc. or it s Powercube division ( Natel or

Senate Bill 1051 Ordered by the House July 5 Including House Amendments dated July 5

(Chapter Flood Damage Prevention)

Fee $1, Property information and location (All lines applicable to this site must be filled in)

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

AWI QUALITY CERTIFICATION CORPORATION AWI-NON-QCP PROJECT INSPECTION SERVICES

WHRL SOLUTIONS LLC. CONDITIONS AND TERMS OF SALE 1. APPLICABLE TERMS.

TRAMPOLINE LADDER. 250 Lbs 113 Kgs MODEL# 9200TL PRODUCT MANUAL - VERSION Do not use ladder if children under 6 years of age are nearby.

BUYER Initials: / Date: / Time: / SELLERS Initials: / Date: / Time: /

LAND OWNER OF SITE ADDRESS PHONE NUMBER FAX NUMBER. APPLICANT (if other than owner) ADDRESS PHONE NUMBER FAX NUMBER

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

PRE-OBLIGATION PHASE EXPENSES: Cost incurred and paid for by you between 10/30/2012 and the date of your FEMA obligation

TABLE OF CONTENTS. Choosing A Home 4. Buying A Home 7. The Manufacturer s Warranty 7. Implied Warranties 8. The Retailer s Warranty 8

Westbury Affordable Housing Questions and Answers October 13, 2016

PURCHASE AND SALES AGREEMENT AND DEPOSIT RECEIPT (RETA) New Hampshire Association of REALTORS Standard Form

City of Nogales Planning & Zoning Commission Rezoning Application

ADDENDUM TO PURCHASE AGREEMENT FLORIDA STATE SPECIFIC TERMS

Clubhouse User Manual

Public Notice. Invitation to Bid Precast Concrete Box Culvert Purchase

ARCHITECTURAL MODIFICATION GUIDELINES

AGREEMENT. for letting of furnished room. on an Assured Shorthold Tenancy under. Part 1 of the Housing Act 1988 as

OKLAHOMA REAL ESTATE COMMISSION

DEVELOPMENT PLAN ORDINANCE

City of Gary Redevelopment Commission

COHERENT TERMS AND CONDITIONS OF SALE TAIWAN

Manufactured Home on a Permanente Foundation System Building Permit Application Requirements

6. Name, address, & daytime telephone # of developer (if different from applicant): 7. Address of subject property:

ARCHITECTURAL REVIEW BOARD ARB APPLICATION for Exterior Modifications / Alterations

CITY OF WEATHERFORD DEVELOPER AGREEMENT WITH CITY PARTICIPATION

GREATER TULSA ASSOCIATION OF REALTORS This is a legally binding Contract; if not understood, seek advice from an attorney.

Prospective Builders, Utilities, Public Agencies, and Engineering Firms

SAKURA GARDENS CONDOMINIUM ASSOCIATION ARCHITECTURAL RULES AND REGULATIONS

Purchase Agreement. The undersigned (hereinafter referred to as the Purchaser ) offers to buy the property located at:

Receipt of Consumer Information Acknowledgement

LEAD COMPLIANCE ADDENDUM To Purchase and Sale Contract

CONDOMINIUM DISCLOSURE STATEMENT FOR CROSSWATER CONDOMINIUMS

SUBDIVISION APPLICATION

JOHNSON COUNTY PUBLIC WORKS 2 North Mill Street/Suite 305, Cleburne, TX (817)

OW109 Page 2 of 3 Jk A

Item No Harbour East - Marine Drive Community Council May 4, 2017

LUDOWICI WARRANTY PROGRAM

ENVIRONMENTAL DISCLOSURE FOR TRANSFER OF REAL PROPERTY (IC ) State Form (R / 1-07) Indiana Department of Environmental Management

SECTION 5: ACCESSORY USES

REV General Proposed Additions and Alterations Compliance with Codes 1-1

Pro Flow Dynamics, LLC. Standard Terms and Conditions of Sales

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

PRESS FIRMLY you are writing through 4 copies.

CITY OF SOUTH SAN FRANCISCO PLANNING DIVISION 315 Maple Avenue, South San Francisco, CA (650)

Transcription:

HOME ENROLLMENT You should have now completed the necessary documents for your registration. On the following pages you will find the forms needed for the enrollment process of our program. NOTIFICATION OF CONSTRUCTION AND INSPECTION We will need this form completed per subdivision or individual lot that you are building in/on, and forwarded to us. This form advises us what requirements are needed on the home. BUILDER/SELLER APPLICATION FOR HOME ENROLLMENT This is the form that you will take to closing. We do not need it forwarded to our office until the home has closed. Once you have been approved as an active member, we will notify you by letter. The letter will have your assigned rate on it, which is the rate you will use to fill in the rate formula on line #8. Within thirty (30) days of closing on each home being enrolled, forward the warranty fee due and Builder/Seller Application for Home Enrollment (with builder and buyer signatures on the same form). Upon receipt of confirmation, and once we have received your Builder/Seller Application for Home Enrollment and the warranty fee, we will place a warranty on the home and forward a Certificate of Warranty to the homebuyer(s) along with a warranty booklet and additional pamphlets. A copy of the Certificate of Warranty will also be forwarded to the builder to acknowledge that we have placed the home under warranty in our program. If you have any further questions concerning our enrollment procedures, please do not hesitate to contact us at (800) 488-8844. Home_Enroll_LTR_022712 210HBW@2-10.COM FAX 303.306.2222

BUILDER/SELLER APPLICATION FOR ENROLLMENT This document is not your New Home Warranty Your Builder/Seller is applying to enroll in the 2-10 HBW Program the home whose address is listed below. The Builder/Seller is responsible to complete all enrollment requirements, and if not completed, no coverage by the Builder/Seller s Warranty Insurer will be provided. If the Buyer has not received the Certificate of Warranty and Warranty Booklet within THIRTY (30) days after closing, the warranty was not issued and THE BUYER SHOULD CONTACT THE BUILDER/SELLER. 1. Buyer(s): As recorded on deed. Building Dept: Lot / Block: Subdivision: MAIL TO: 2-10 Home Buyers Warranty P.O. Box 371348 Denver, CO 80237-1348 800.488.8844 Address of Home: Homeowner(s) Mailing Address: ADDRESS CITY STATE ZIP ADDRESS CITY STATE ZIP 2. Builder/Seller Name: 2-10 HBW Member No: 3. Effective Date of Warranty: Provide dates for each. Date of Closing: Date of First Title Transfer: Date of First Occupancy by anyone: Specify date Certificate of Occupancy issued: 4. COVERAGE: Both the Builder/Seller and Buyer(s) must check and initial which of the following coverage(s) apply to the home being enrolled. A. 2-10 Product: 1-Year Workmanship / 2-Year Systems / 10-Year Structural Coverage B. 10-Year Product: 10-Year Structural Coverage C. 2-10 Manufactured Product 5. Type of Home: Single Family Detached Single Family Attached If Multi Family: Low Rise (1-2 Story) Mid Rise (3-7 Story) 6. Type of Construction: Site Built Modular Manufactured 7. FHA/VA Financing: Yes No 8. Rate Formula 1,000 = x = x 1.25 = If price does not Final Sales Price Rate Basic Warranty Fee Final Warranty Fee include land BUYER S ACKNOWLEDGEMENT AND CONSENT Buyer(s) agree that any and all claims or disputes between him (them) and the Builder/Seller (including any person you contend is responsible for a defect in your home) arising from or relating to the Warranty, shall be submitted to binding arbitration pursuant to the Federal Arbitration Act (9 U.S.C. 1-16). By signing below, Buyer acknowledges reading a sample copy of the 2-10 HBW Warranty Booklet, and CONSENTS TO THE TERMS OF THAT DOCUMENT INCLUDING THE BINDING ARBITRATION PROVISION contained therein. Buyer(s) accepts the 2-10 HBW warranty and in return, waives the Builder/Seller s implied warranty of habitability, merchantability or fitness. BUILDER/SELLER S AUTHORIZED SIGNATURE: Date: Print Name (Builder): Buyer(s) Signature: Buyer(s) Signature: Buyer(s) Phone #/Email: Date: Date: Warranty #: OFFICE USE ONLY HBW_302_031512 210HBW@2-10.COM FAX: 303.306.2222

EMAIL OR FAX TO: 210HBW@2-10.COM 303.306.2222 NOTIFICATION OF CONSTRUCTION & INSPECTION A. Builder Name: Builder No: Person Filing: Date: Home to be Built In: CITY Name of Jurisdictional Building Department: Name of Foundation Design Engineer: Phone: Subdivision Name (if applicable): COUNTY STATE B. Type of Home(s) to be built: Check the proper box(es). 1. Single-Family Detached (if subdivision, how many homes are you building in this subdivision?) 2. Single-Family Attached (Check which if the following apply) Duplex Triplex Quadruplex Row House 3. Multi-Family (Check which of the following apply) Low-Rise Mid-Rise (3-5 Stories) High Rise Apartments 4. Other Complete for items 2 through 4: How many buildings? How many total units? Will wood be used in common element external stairs or landings? Yes No C. Type of Construction: Check the proper box. Site Built Modular Manufactured on Permanent Foundation D. Check here, if the homes are to built in an area that contains expansive or consolidadting soils. If this box is checked, the Final Grade Certificate inspection will by conducted by: Check the proper box. 1. Land Surveyor 2. Engineer 3. HBW Staff/Fee Inspector E. Foundation(s) to be built on: Check the proper box(es). 1. Virgin Ground 2. Existing Fill 3. Compacted Structural Fill 4. Hillsides/Massive Fills with Steeper Than 2:1 Slope 5. Expansive Soils 6. Consolidating Soils F. Type of foundation(s) to be built: Check the proper box(es). 1. Conventional Spread Footing (35) 8. Driven Piles / Structural Rebar Slab on Grade (31) 2. Conventional Spread Foot Foundation Wall / Drain (6) 9. Engineered Spread Footing / Drain (7) 3. Drilled Piers / Foundation Wall / Drain (11) 10. Interrupted Footing or Pads (8) 4. Drilled Piers / Grade Beam / Structural Wood Floor (56) 11. Post-tensioned Slab on Grade (32) 5. Drilled Piers / Post Tensioned Slab on Grade (30) 12. Structural Rebar Slab on Grade (33) 6. Drilled Piers / Structural Rebar Slab on Grade (31) 13. Wall On Grade (10) 7. Driven Piles / Post Tensioned Slab on Grade (40) 14. Wood Foundation (14) 15. INDIVIDUAL LOT BUILDERS Helical Piers This form is to be completed prior to beginning construction on any home to be enrolled in the 2-10 Home Buyers Warranty program. If the information required to complete this form is not available at the time of construction, then forward the completed form to HBW immediately upon closing of the home along with the Application for Home OFFICE USE ONLY Enrollment (302) and warranty fee. For condominiums, this form must be submitted to HBW for each condominium project. SUBDIVISION AND MULTI-FAMILY BUILDERS This form is to be completed for each subdivision being enrolled in the 2-10 Home Buyers Warranty program, prior to NOC #: BLDG. DEPT. #: FOUNDATION TYPE: SOIL REPORT: beginning construction on any of the homes. Subdivision builders only need to resubmit this form if the information HOME TYPE: on this form has changed. If the information required to complete this form is not available then forward the ENTERED BY: completed form to HBW immediately upon closing of the home along with the Application for Home Enrollment (302) and warranty fee. For condominiums, this form must be submitted to HBW for each condominium project. DATE: HBW_108_NOC_030810 P.O. Box 371348 Denver, CO 80237-1348 800.488.8844

MAIL TO: 2-10 Home Buyers Warranty P.O. Box 371348 Denver, CO 80237-1348 800.488.8844 ATTACHED HOUSING NOTIFICATION OF STARTS Single-Family Attached (Includes duplex, triplex, quadraplex, townhouse) Multi-Family (Includes: low-rise, 1-2 stories; mid-rise, 3-5 stories; high-rise, 6 + stories; condominiums or cooperatives) Plot Plan of Project Company Name: Date: Builder #: Project Name: Total # Units in Project: Total # Units in Project: Building #: # of Units in Building: # of Stories in Building: Street Name: City: State: Estimated Sales Price ALL units in building: Start Date Building: C/O Date Building: First Unit Closed: Stairways & Landings: Wood Concrete All exterior common stairways and landings contained within multi-family projects must be Constructed with metal and/or concrete materials. However, wood materials may be used in Common element stairways and landings if a supplemental premium specified by hbw has been Paid. USE 1 PAGE PER BUILDING (Shaded areas for HBW use only) HBW # ADDRESS / UNIT # CLOSING DATE (If Available) H/O NAME (If Available) PRICE SHIP DATE All units must be enrolled in the 10-year structural program. HBW_220_NOS_031110 Page 1 of 2 210HBW@2-10.COM FAX: 303.306.2222

MAIL TO: 2-10 Home Buyers Warranty P.O. Box 371348 Denver, CO 80237-1348 800.488.8844 ATTACHED HOUSING NOTIFICATION OF STARTS Building #: # of Units in Building: # of Stories in Building: Street Name: City: State: Estimated Sales Price ALL units in building: Start Date Building: C/O Date Building: First Unit Closed: Stairways & Landings: Wood Concrete All exterior common stairways and landings contained within multi-family projects must be Constructed with metal and/or concrete materials. However, wood materials may be used in Common element stairways and landings if a supplemental premium specified by hbw has been Paid. USE 1 PAGE PER BUILDING (Shaded areas for HBW use only) HBW # ADDRESS / UNIT # CLOSING DATE (If Available) H/O NAME (If Available) PRICE SHIP DATE All units must be enrolled in the 10-year structural program. HBW_220_NOS_031110 Page 2 of 2 210HBW@2-10.COM FAX: 303.306.2222

Risk Management Requirements for High-End Homes, Attached Homes and Multi-Family Buildings Listed below are the Risk Management Enrollment Requirements for High-End Single-Family Detached, Attached, and Multi- Family Structures. This is a one page summary only. More detailed information is provided in the following pages. Note that these requirements are in addition to any/all other enrollment requirements of the HBW program: Enrollment of any Home with a sales price of $1 million and above must be pre-approved by Risk Management. Enrollment of any Home in a Single-Family Attached or Multi-Family structure having a combined sales price of all units in a building of $5 million or above; must be pre-approved by Risk Management. Warranty Limit is $10 million per structure. Building Height Limit is 5 stories. Attached Housing Notification of Starts (Form HBW 220) must be completed prior to enrollment of any Home in a Single-Family Attached or Multi-Family structure. Questions concerning these enrollment requirements or the acceptability of any high-end home or multi-family project may be directed to HBW Risk Management. High End Homes HBW Risk Management must review and approve all Homes with a sales price of $1 million and above prior to enrollment. Homes $1 Million to $2 Million. Homes with a sales price between $1 million and $2 million require an inspection by a HBW-approved fee or staff inspector reporting results directly to Risk Management. Homes $2 Million to $5 Million. Homes with a sales price between $2 million and $5 million require an inspection by a HBW-approved fee or staff inspector reporting results directly to Risk Management. Inspection by fee or staff inspector must be accompanied by photos. Inspection by HBW-approved engineer is acceptable without photos. Homes $5 Million and above. Homes with a sales price of $5 million and above must have a geotechnical investigation and report conducted and prepared in compliance with HBW specifications; must include complete foundation and structural plans; and must be inspected by an HBW-approved engineer reporting results directly to Risk Management. Exceptions: Risk Management may accept photographs in lieu of inspection on homes between $1 million and $2 million provided builder has been active in HBW program a minimum of one (1) year; has a satisfactory claims history; is not building in a Special Standards or other high risk area; photos show at a minimum home from all four sides; front, back, and side yards; and there are no retaining walls, slopes, fill, or other potentially hazardous geological conditions on property that may affect foundation performance. HBW_2010_RM_Req_031510 Page 1 of 2 210HBW@2-10.COM FAX 303.306.2222

Risk Management Requirements Risk Management Review and Approval Procedures Single-Family Attached and Multi-Family All single-family attached or multi-family structures having a combined sales price of all units in a building of $5 million or above, and all renovated housing, must be pre-approved by Risk Management prior to the enrollment of any unit in the building. Attached or Multi-family structures with a combined sales price of all units in a building above $5 million must have a geotechnical investigation and report conducted and prepared in compliance with HBW specifications; must include complete foundation and structural plans prepared by a state-registered professional engineer; and must be inspected by an HBW-approved engineer reporting results of inspections directly to Risk Management. Single-Family Detached Homes Warranty Limit is $10 Million. No single-family detached home with a sales price exceeding $10 million may be enrolled in the HBW Warranty Program. Exceptions: In the Special Standards and Investigative Areas of Colorado, Oklahoma, Texas, and Mississippi, no home with sales price exceeding $5 million may be enrolled in either the 2-10 or 10-year unless underlying soils are low or non-expansive; or Risk Management pre-approval is obtained. Single-Family Attached and Multi-Family Buildings All single-family attached or multi-family structures having a combined sales price of all units in a building of $5 million or above, and all renovated housing, must be pre-approved by Risk Management prior to the enrollment of any unit in the building. Warranty Limit per building is $10 million. No home or unit may be enrolled in any single-family attached or multi-family structure having a combined sales price of all units in a building exceeding $10 million. Building Height Limit is 5 stories. No unit in any building having a height of 6 or more stories, exclusive of parking structures, rooftop structures or other uninhabitable space, may be enrolled. Exceptions: In the Special Standards and Investigative Areas of Colorado, Oklahoma, Texas, and Mississippi, no home with sales price exceeding $5 million may be enrolled in either the 2-10 or 10-year unless underlying soils are low or non-expansive; or Risk Management pre-approval is obtained. HBW_2010_RM_Req_031510 Page 2 of 2 210HBW@2-10.COM FAX 303.306.2222

ANSWERS TO BUILDERS QUESTIONS ABOUT THE 2-10 HBW FILL PROVISION Your Builder Proposal and Agreement, Section 8, paragraph 2 requires: All fill placed by builder which carries the load of the foundation must be uniformly compacted throughout the complete depth of the fill to the density specified by a registered professional geotechnical engineer; free of all organic and metallic materials that deteriorate with the passage of time and in the presence of moisture; and supported by natural soil under the fill which has sufficient strength and density to support the load of the fill above without total consolidation exceeding that which could cause a qualifying Structural Defect. 1. How does the Builder satisfy the HBW Fill Provision? When the Builder builds a home on a lot where any fill will be used under the foundation no matter how small the fill area, the Fill Provision requires: A. LOT PREPARATION to the following standards: a. Remove all surface vegetation, trash, debris, etc. b. Excavate all soft subsurface soil layers, and soil layers that contain organics or metallic debris, per the builder s geotechnical engineer s recommendations. c. Excavation depth must extend to natural soils that have sufficient strength and density to support the load of the fill above. B. FILL PLACEMENT to the following standards: a. All fill soils should be place under the supervision of a geotechnical engineer, but, as a minimum, fills must be placed in a series of lifts with each lift no more than 12 inches in depth and each lift uniformly compacted throughout the complete depth of fill to the density specified by the Builder s geotechnical engineer. b. Note: the Builder must maintain proof that all fill soils were placed and tested in accordance with the geotechnical engineer s recommendations. 2. What if a Home will be constructed on a lot that was purchased from a developer? 2-10 HBWrecommends that the Builder s geotechnical engineer perform soil testing on each lot that was purchased from a developer in order to confirm that all fills or suspected fills were placed in accordance with the requirements stated in paragraph 1, above. Why? This is the only way the builder can be sure of the quality of fills placed by the developer. In joining the 2-10 HBW Program, the Builder assumes all liability when a Structural Defect is due to improperly placed fill. 3. Why can t you substitute footing/foundation inspections or pad compaction tests for a geotechnical design with associated testing? Consolidation can occur at any level within improperly placed fill or within natural soil that is too weak to support the fill above. Inspections and tests that are confined to the top layer of the fill pad do not determine the deeper fill s ability to support the foundation and prevent fill consolidation from occurring. 4. Why should the Builder satisfy the 2-10 HBW Fill Provision? If requirements of the Fill Provision are not satisfied and the home experiences a fill consolidation-related qualifying Structural Defect, the Builder, under the terms of the BP&A, will be required to reimburse the Warranty Insurer for the costs to repair the Structural Defect. 5. What is the cost of repairs for a qualifying structural defect caused by fill consolidation on a typical home? Our experience in 2006 indicates that the cost to repair a home with a qualifying structural defect caused by fill consolidation averaged $50,000. Fill_Provisions_110211 210HBW@2-10.COM 303.306.2222