FEE SCHEDULE Construction Services and Permitting

Similar documents
RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

RESOLUTION NO

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

Planning&Development Fee Standards

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

Permitting Fee Schedule

APPENDIX A BUILDING PERMIT AND RELATED FEES

FY 2018 FEE SCHEDULE (Effective )

City of High Point Development Fee Schedule

BUILDINGS AND BUILDING REGULATIONS: (1) Building permit fees ( 6-3(108.2 of the Florida Building Code, 2004 ed.)): See subsection (6) for all new

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Commissioners to enact, amend, and enforce technical construction and building codes; and,

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

THE BOARD OF COUNTY COMMISSIONERS

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Residential Permits R-2, R-3, R-4, and U Occupancies 2019 Building Permit Valuation/Fee Schedule

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

Village of Baxter Estates Fee Schedule

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

City of Georgetown. Inspection Services

City of Wausau Building, Housing and Zoning Fee Schedule

City of Wausau Building, Housing and Zoning Fee Schedule 2019

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

CHAPTER 1321 Permit and Inspection Fees

6 WHEREAS, Hernando County has established development requirement conditions for

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

Town of Palm Beach Building Division CONSTRUCTION PERMIT APPLICATION

SCOPE All fees associated with and referenced in the 2016 Building Code of the City and County of Denver ( Code ) are as set forth in this policy.

City of Georgetown. Inspection Services

City of Roswell - Fee Schedule

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Worcester Township Fee Schedule

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

BUILDING PERMIT FEE SCHEDULE

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

Towamencin Township Fee Schedule

10% of Building Permit in addition to the full Building Permit Fee

Fees--Residential Development (1 or 2 units) Effective August 1, 2017

CITY OF TARPON SPRINGS, FLORIDA

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

Location in Code Subject Fees

APPENDIX A 2018 FEE SCHEDULE

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

Greenbrier County Building Code Administrative Policy Manual

Building Division Fee Schedule January 2018

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

This fee structure applies to applications submitted on or after January 1, 2018.

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

The City of Daytona Beach Fee Schedule

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

BUILDING AND PLANNING DEPARTMENT FEE SCHEDULES

TOWN OF HILLSBOROUGH SCHEDULE OF FEES AND CHARGES SPECIAL TAX, SERVICE CHARGES & OTHER CITYWIDE FEES

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

INCORPORATED VILLAGE OF GARDEN CITY

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

ARLINGTON COUNTY, VIRGINIA

Information Needed for a Building Permit

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

2016 CALN TOWNSHIP FEE SCHEDULE REVISION 1 (Adopted 8/25/16)

CITY OF SPRING LAKE PARK 2018 FEE SCHEDULE

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

New Hanover Township

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

PINELLAS COUNTY. Table of Contents DEPARTMENT / AGENCY

Fees--Residential Development (1 or 2 units) Effective January 1, 2014

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

ORDINANCE NO

Transcription:

FEE SCHEDULE Construction Services and Permitting Revised 10/1/2017 Construction Valuations for permit fee purposes: Permit fees for new construction shall be based on the valuation of the proposed work. The valuation shall include all labor and material cost. The valuation shall be based on the most recent published values per square foot as established by the International Code Council Building Valuation Data (BVD) using a regional construction cost adjustment factor of.85 except where a valid cost breakdown is submitted to and approved by the POD. A valid cost breakdown shall be the actual contract cost (including all labor and materials) as provided by the applicant and accepted as reasonable by the POD. Alterations or tenant buildouts shall use 50% of the BVD calculation used above except where a valid cost breakdown is submitted to and approved by the POD which shall be the actual contract cost (including all labor and materials) as provided by the applicant and accepted as reasonable by the POD. When labor or material cost are not charged or imposed the valuation shall be based on the BVD calculation used above. The valuation of fences, walls, roofs, screen enclosures, swimming pools, signs, satellite antennas, elevators, standpipes and sprinkler systems, gasoline tanks and pumps, and high pressure boilers shall be based on actual contract cost (including all labor and materials) or estimated cost as established by the POD based on the cost typically charged for the work. Other permit fees: The permit fees shall be based on the total construction value of all permits applied for (electrical, mechanical, plumbing, etc.) as determined in this chart. The permit fees are based on the valuation of the proposed work and are required in order to defray the costs of inspection, plan review and enforcement provisions of the Florida Building Code, local ordinances, and other building and fire code related regulations. Where the valuation does not exceed $1,000.00 For a valuation over $1,000.00, up to and including $1,000,000.00: For each $1,000.00 or fraction thereof: Single Family Residential and Duplexes Commercial (this includes all other uses) 7.00 9.00

For Single-Family Dwelling (not including townhomes or other multifamily uses) less than or equal to 1,400 habitable square feet (flat fee) 2 For a valuation over $1,000,000.00: First $1,000,000.00 Plus, for each additional $1,000.00 or fraction thereof: 9,000.00 3.00 Property owner surcharge: to be charged for each permit issued to a property owner for work costing more than $2,000.00 20.00 Building Related Permit Fees: Affidavit Permit If Authorized by the POD prior to start of construction: Single-family residential Commercial and all other residential If not authorized by the POD prior to start of construction (seesection 12-4 for additional permit fees when work was started without permit(s): Single-family residential Commercial and all other residential 100.00 500.00 2 7 Change of address: First address Each additional address on the same property 20.00 Demolition (additional permit(s) may be required): Demo base fee up to 5,000 square feet Over 5,000 square feet 125.00 2

Driveway Permit, residential Construction up to two driveways and/or curb cuts and construction of sidewalk (additional DRS and Engineering fees may apply) 45.00 Early Start authorization, per request 100.00 Flood Insurance: Flood determination letter Community flood elevation certificate 60.00 100.00 Housemoving: Relocating a house within the City of St. Petersburg Moving a house into the City Moving a house outside the City 2 2 2 Property card subscription service Up to 20 requests per month, with escrow account, or $5.00 per request Permit Extension up to 90 days: Commercial Residential Each additional 30 days Extension after permit expiration Extension after permit expiration of two or more permits for same parcel 75.00 2 2 3 Private provider: Permit fee for application with inspections to be performed by outside entity (contracted by applicant): The permit fee for an application when the Building Official has approved the request of the applicant to have an outside entity, contracted by the applicant, perform the required inspections shall be one-half of the permit fee of the proposed structure as calculated pursuant to this chapter, with a minimum $55.00 fee (this does not include any fees paid to the outside entity). See description

Refunds of permit fee only (not plan review or other fees) Work has not commenced and the permit is less than six months old Work has commenced or the permit is over six months old Permit fee paid minus 75.00 No Refund Service Permits: Specified single-family and duplex residential permit fees Air conditioning unit changeout (no electric) Air conditioning unit changeout (with electric) Hot water heater unit changeout (no electric) Hot water heater unit changeout (no gas) Hot water heater unit changeout (with electric) Hot water heater unit changeout (with gas) Hot water heater unit changeout (with electric and gas) Tankless hot water heater unit changeout (with plumbing) Tankless hot water heater unit changeout (with plumbing and electric) Tankless hot water heater unit changeout (with plumbing and gas) Tankless hot water heater unit changeout (with plumbing, gas and electric) 65.00 Special project fee: A fee charged for special services requiring staff research, inspections, document preparation and other assistance that is beyond the scope of services routinely provided by a department. The fee will be calculated based on actual staff time and other related costs that are incurred in order to complete the request. Minimum fee 30.00 Temporary Use permit (additional plan review, DRS and Fire fees may apply) Building Related Plan Review Fees Plan Review: One- and two-family dwellings: New Construction Additions and renovations 30.00

All other uses (including multifamily, commercial and industrial) the plan review fee shall be 20 percent of the estimated permit fee with a minimum fee of which shall be paid at the time of submission of the permit application See Description Plan consultation fee (preliminary building plan review), will be calculated based on the cost of staff attending the meeting plus overhead. This fee shall be applied as a credit towards the applicable plan review fees if the application is submitted within 180 days of the initial meeting date. Additional meetings may incur additional fees which shall be nonrefundable and shall not be applied as a credit. See Description Private Provider: Plan review fee for plans reviewed by a private entity contracted by the permit applicant, pursuant to the provisions in F.S. 553.791, the plan review fee shall be one-half of the fee calculated pursuant to this Chapter (this does not include any fees paid the outside entity) with a minimum of 45.00. See Description Master Plan: Plan review fee for master plan (which is intended to be used for multiple properties) for new single-family structures: Review of a master plan 1 Review of an individual application building using an approved master plan 30.00 Plan resubmittal fee: Plans submitted for review after second correction comments are made are subject to additional plan revision review fees See plan revision fees

Plan revision review fee: Commercial revisions review: One page Each additional page 45.00 12.00 Residential revisions review 45.00 Certificate of occupancy (C.O.): C.O. single-family and duplex residential C.O. commercial C.O. temporary single-family residential per unit C.O. temporary commercial, per unit (90 days) Each additional 30 days 75.00 125.00 75.00 200.00 200.00 Certificate of completion (C.C.) 100.00 Certificate of use 100.00 Change of use: Subject to normal building permit fee based on valuation (may be subject to MIF fees) minimum Early release of power: Early release of power commercial Early release of power residential 125.00 Temporary Use plan review (separate DRS and Fire review fees may be required) Flat Fee Permits

Photo voltaic systems 200.00 Solar water heater (includes electric permit if required) 200.00 Solar pool heating 100.00 Pools/spas above ground (plus electric permit if required) 75.00 Pools/spas inground (plus electric permit if required) 2 Pool enclosure 2 Antennas more than 30 feet above grade, on existing structures 65.00 Other - Plumbing with no required plan review and one inspection 65.00 Other - Electrical with no plan review and one inspection 65.00 Other - Mechanical with no plan review and one inspection 65.00 Mobile home removal 65.00 Mobile home installation including foundation (MEP extra) 190.00 Reroof up to 15 squares (a sq. equals 100 sq. ft.) 100.00

Reroof over 15 squares up to 40 squares (a sq. equals 100 sq. ft.) 1 Reroof over 40 squares (a sq. equals 100 sq. ft.) 300.00 Masonry walls or fences up to 300 LF 1 Masonry walls or fences over 300 LF 2 Signs - pylon, pole, billboards (plus electric permit if required) 1 Signs - walls sign (plus electric permit if required) 110.00 Siding including stucco, wood or vinyl 120.00 Fascia soffit 60.00 Sheds 60.00 Tanks 60.00 Electric - commercial alarm - low voltage 40.00 Electric pre-power inspection 65.00 Saw pole 120.00

Electric Service Change - Residential 100.00 Electric Service Change - Commercial 125.00 Electric Service recertification (service and riser only) 175.00 Special Services: Fees for specialized services Inspections: Reinspection fee after a second failed reinspection for noncompliance with at least one of the same code deficiencies Single-family consultation and partial inspection Inspection appointments per Division procedure Saturday inspection with minimum of three inspections (fee per inspection) Commercial partial inspections unless waived by POD due to complexity of a project 100.00 65.00 75.00 90.00 65.00 Plan review: Expedited plan review (when available): First review Plan review fee plus 30% Second and each subsequent review of same plan Additional 30% of the plan review fee Other agency fees: Multimodal impact fee: To be assessed in accordance with Pinellas County Ordinance 85-43, as amended, except as additionally required in the Gateway Area-wide Development of Regional Impact. Surcharge: Florida surcharge to be assessed in accordance with F.S. 553.721 and 468.631