ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Similar documents
CHAPTER 125 (SUPPLEMENTAL SECTION)

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Residential Minor Subdivision Review Checklist

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

Residential Major Subdivision Review Checklist

SUBDIVISION PLAT CHECKLIST. The following information shall be include on the plat:

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT)

APPLICATION FOR PRELIMINARY PLAT CERRO GORDO COUNTY, IOWA

APPLICATION REVIEW CHECKLISTS

Lake County Planning, Building and Development Department

CITY OF SARALAND PRELIMINARY SUBDIVISION PLAT REVIEW

SHORT PLAT APPLICATION CHECKLIST City of White Salmon. Application completed with notarized signatures

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

WESTON COUNTY FINAL PLAT APPLICATION

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

SUBDIVISION APPLICATION INSTRUCTIONS

Preliminary Subdivision Application (Major) (Four (4) lots or more)

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Gates County Planning and Zoning

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

Township of Collier 2418 Hilltop Road Presto, PA 15142

Appendix A: Submittal Checklists

Application For Development Review (Subdivisions and Site Plan Review)

I. Requirements for All Applications. C D W

LAND USE PERMIT APPLICATION

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

ARTICLE 9 SPECIFICATIONS FOR DOCUMENTS TO BE SUBMITTED

Township of Little Egg Harbor Planning Board 665 Radio Road Little Egg Harbor, New Jersey Phone: ext. 221 Fax:

APPENDIX B TOWN OF LITTLE COMPTON, RHODE ISLAND INSTRUCTIONS AND CHECKLIST FOR MINOR SUBDIVISION

Charter Township of Garfield Grand Traverse County

Tentative Map Application Review Procedures

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

Planning Commission Conditional Overlay (CO) Application

APP. FEE: $ DATE & TIME LOCATION: 1/4 SECTION SECTION TOWNSHIP RANGE STREET ADDRESS AND GENERAL LOCATION OF PROPERTY CITY, STATE PHONE (DAY):

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

SECTION 10 STANDARD PLATS

Minor Subdivision Application

SUBDIVISION APPLICATION

MINOR PLAT AMENDMENT APPLICATION CHECK APPLICABLE PERMIT ATTACHMENT:

Operating Standards Attachment to Development Application

FINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002

MAJOR RESIDENTIAL AND NONRESIDENTIAL SUBDIVISIONS

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

SUBDIVISION APPLICATION CHECKLIST SKETCH PLAN PRELIMINARY PLAT FINAL PLAT

A lot line or terminology adjustment will be reviewed concurrently with any other development review application(s) that are required.

PRELIMINARY PLAT Checklist

PRELIMINARY PLAN CHECKLIST Major Land Development Projects. To initiate the application, the applicant shall submit to the Administrative Officer:

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

APPLICATION FOR 555 Washington Street Tentative Map Red Bluff, CA Subdivision Map (530) ext Parcel Map.

CERTIFICATION OF THE APPROVAL OF WATER AND SEWERAGE SYSTEMS

SITE DEVELOPMENT PLAN APPLICATION PAHRUMP REGIONAL PLANNING DISTRICT

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR MINOR REVISIONS TO PUD PLANS

TOWN OF LEWISTON PLANNING BOARD APPLICATION

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

LABEL PLEASE NOTE: ALL APPLICATIONS AND SITE PLANS MUST BE COMPLETED IN BLACK OR BLUE INK ONLY Intake by:

Reference Document Do Not Copy

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

FINAL PLAT APPLICATION

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

LAND USE APPLICATION

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

MINOR SUBDIVISION PLAT

SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR REVISED PRELIMINARY DEVELOPMENT PLAN

CONCEPTUAL MASTER PLAN CHECKLIST Major Land Development Project

SHORT PLAT Information

Final Plat Approval of a Major Subdivision Application Packet

MINOR SUBDIVISION PLAT

SUBDIVISION CHECKLIST GREEN TREE BOROUGH Green Tree Planning Commission 10 West Manilla Avenue Pittsburgh, PA

SMALL CELL TECHNOLOGY in the Right-of-Way ADMINISTRATIVE VARIANCE APPLICATION Community Development Department

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) APPLICANT: Name:

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

CITY OF NEWNAN, GEORGIA Planning & Zoning Department 25 LaGrange Street Newnan, Georgia Office (770) Fax (770)

APPLICATION MONROE COUNTY PLANNING & ENVIRONMENTAL RESOURCES DEPARTMENT

LOCATION AND EXTENT REVIEW FOR DEVELOPMENT OF PUBLIC FACILITIES (Revised 3/1/2017)

City of Fort Lupton Amended Plat Process

Site Plan Application

CARROLL COUNTY BUREAU OF DEVELOPMENT REVIEW OFF-CONVEYANCE SUBMITTAL CHECKLIST AND REVIEW FEE SHEET NOTICE: INCOMPLETE SUBMITTALS WILL BE RETURNED

DEVELOPMENT PLAN REVIEW CHECKLIST. To initiate the application, the applicant shall submit to the Administrative Officer:

CHAPTER FINAL AND PARCEL MAPS

APPLICATION PACKET SINGLE FAMILY CLUSTER HOUSING OPTION REVIEW

A Final Plat will be reviewed concurrently with any other development review application(s) that is required.

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

CHECKLIST FOR DEVELOPMENT REVIEW

C O M M U N I T Y D E VELOPMENT S E R VICES PLEASE CHECK ALL THAT APPLY

CITY OF FAYETTEVILLE, ARKANSAS FINAL PLAT FOR STAFF USE ONLY FINAL PLAT FEE: $ $ Date Application Submitted: Date Accepted as Complete:

Use permitted by: Right Special Exemption

APPLICATION PROCEDURE

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

Guide to Minor Developments

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

CITY OF NEWNAN, GEORGIA

Section SKETCH PLAN REVIEW

these areas are compatible with such conditions. [Section (6) (c) C. R. S.]

McGowin Park, LLC. B-3, Community Business District

Guide to Combined Preliminary and Final Plats

Transcription:

TENTATIVE SUBDIVISION APPROVAL CHECK SHEET Revised October 5, 2018 The Developer shall submit a request for Tentative Plan Review to the Department of Planning & Development in the appropriate format. After the developer is given red line comments and those comments are addressed, the Developer shall submit a minimum of twelve (12) 24" x 36" folded copies of the proposed tentative subdivision plat. If the proposed subdivision is to be developed in phases, one (1) copy of the master plan must be furnished depicting all of the proposed phases in the subdivision. The subdivision plat must be drawn to scale and include all relevant information as described below. Subdivision Name and Phase: Section-Township-Range Developer Name/Firm: Developer Address: Developer Phone No. Developer E-mail: Engineer Name/Firm: Engineer Address: Engineer Phone No. Engineer E-mail: TENTATIVE SUBDIVISION SUBMITTAL CHECKLIST Please check the appropriate boxes below to insure that the proper information and documentation for the tentative subdivision approval process, as well as items to be depicted on the tentative subdivision plat, have been included with your application: Tentative Subdivision Fees - $30.00 per lot, plus $100.00 Filing Fee 1 Full set of Plans - Digital 12-24" x 36 folded copies of the Tentative subdivision Plat - after redline revisions are made 1-24 x 36 folded Full Set of Plans - after redline revisions are made Traffic Impact Analysis Study (if applicable) Illustration showing the ultimate disposal of drainage Utility Disclosure Letter (notarized) Recreation Plan PUD zoning plan compliance letter (if applicable)

PLAT REVIEW REQUIREMENTS: ST. TAMMANY PARISH Legal description Subdivision name Section, Township and Range Wetland determination (depict lines of demarcation) Vicinity map inset detail Location of sewerage and water facilities Restrictive covenants Typical street cross-section detail North direction arrow Scale of drawings Phases within subdivision Building setback lines Typical lot sizes and dimensions Location of proposed or existing servitudes Proposed street names Adjoining land uses Existing structures Flood Zone (A, B, C or V to be depicted on plat) Information block (zoning, streets, number of lots, acreage, maximum block length, average lot size, water/sewer system etc...) Green Space requirements Proposed form of detention (note or illustrate on plat) Any landfills on property (notation on plat) subdivision entrance detail Dedication Statement including streets, signage, drainage features and greenspace (private or public) Right-of-way widths Tentative Subdivision Fees to be Paid: A 3% processing fee will be added to all credit card/e-check transactions as per STP Ordinance No. 18-3961, effective October 5, 2018. Lots @ $30.00 per lot $ Filing fee @ $100.00 $ Total Amount Paid..$ Please refer to Section 125-190 Tentative Subdivision Review, of Subdivision Regulatory Ordinance Chapter 125 Subdivision Regulations for additional criteria and requirements. I hereby certify that all information provided relative to the tentative subdivision review submission is true, accurate and correct and in accordance to St. Tammany Parish code requirements. DEVELOPER/ENGINEER OR DESIGNEE (SIGNATURE) DATE

PROCEDURAL FLOW DIAGRAM FOR THE TENTATIVE SUBDIVISION REVIEW PROCESS Developer Submits Tentative Subdivision to the Department of Planning & Development Planning & Development Staff Reviews and Redlines Subdivision Plats for Correction Legal Advertising and Posting of Property Notification to Council District Representative of Pending Tentative Subdivision Tentative Subdivision Reviewed At Public Hearing by Planning Commission Postponed Approved Denied Rescheduled for Next Meeting Developer or Public Can Appeal Decision to the Parish Council Approved Denied Process Terminated

PRELIMINARY SUBDIVISION APPROVAL CHECK SHEET Revised October 5, 2018 The Developer shall submit a request for Preliminary Plan Review to the Department of Planning & Development in the appropriate format. After the developer is given red line comments and those comments are addressed, the Developer shall submit a minimum of twelve (12) 24" x 36" folded copies of the proposed preliminary subdivision plat, twelve (12) 24" x 36" folded copies of the proposed paving and drainage plan, one (1) 24" x 36" folded full set of plans, and an updated digital submittal. The subdivision plat shall depict the detailed plan of the subdivision by which the construction of the streets, drainage, structure and channels will be executed by the developer. Subdivision Name and Phase: Section-Township-Range Developer Name/Firm: Developer Address: Developer Email: Developer Phone No. Engineer Name/Firm: Engineer Address: Engineer Email: Engineer Phone No. PRELIMINARY SUBDIVISION SUBMITTAL CHECKLIST Please check the appropriate boxes below to insure that the proper information and documentation for the preliminary subdivision approval process, as well as items to be depicted on the preliminary subdivision plat, have been included with your application: Preliminary Subdivision Fees - $70.00 per lot total (Lot Fee -$60.00 per lot, Sewer & Water Fees - $10.00 per lot) 1 Full Set of Plans - Digital 12-24 x 36 folded copies of the Preliminary Plat - after redline revisions are made 12-24 x 36 folded copies of the Preliminary Paving and Drainage Plan - after redline revisions are made 1-24 x 36 folded Full Set of Plans - after redline revisions are made Coastal Use Permit (if applicable) Interstate land sales compliance letter Drainage Impact Study Fill and Grading Statement PLAT REVIEW REQUIREMENTS: Legal description Subdivision name Total length of streets to be constructed Vicinity map Section corner tie, Township, Range Location of Sewer and Water Facilities

PLAT REVIEW REQUIREMENTS CONTINUED: ST. TAMMANY PARISH Signature lines for parish officials and clerk of court Signature lines for developer/owner Restrictive covenants Typical Street Cross-section detail North direction arrow Scale of Plat Phases within Subdivision Existing and Proposed easements Information block (zoning, streets, number of lots acreage, maximum block length, average lot size, etc...) Minimum height of roadway (+6.0 MSL) Ditch/canal profile bottoms not in street ROW Flood Zone A,B,C, V to be depicted on Plat Building setback lines Right-of-way grants (if any) Areas subject to inundation (100 year flood) Detention pond maintenance: whom (note on plat) Dedication Statement including streets, signage, drainage features and greenspace (private or public) Right of Way width Wetland determination depict lines of demarcation Preliminary Subdivision Fees to be Paid: A 3% processing fee will be added to all credit card/e-check transactions as per STP Ordinance No. 18-3961, effective October 5, 2018. Subdivision Fees Sewerage & Water Fees Lots @ $60.00 per lot $ Lots @ $10.00 per lot $ Linear feet of sewerage collection pipe @ $0.10 per foot.$ Linear feet of water distribution pipe @ $0.05 per foot...$ Water supply facilities @ $30.00 per facility...$ Sewerage collection treatment facilities @ $30.00 per facility.$ Total Amount Paid...$ Please refer to Section 125-195 Preliminary Subdivision Review, and Section 125-196 Additional Requirements to Preliminary of Subdivision Regulatory Ordinance Chapter 125 Subdivision Regulations for additional criteria and requirements. I hereby certify that all information provided relative to the preliminary subdivision review submission is true, accurate and correct and in accordance to St. Tammany Parish code requirements. DEVELOPER/ENGINEER OR DESIGNEE (SIGNATURE) DATE

PROCEDURAL FLOW DIAGRAM FOR THE PRELIMINARY SUBDIVISION REVIEW PROCESS Developer Submits Preliminary Subdivision to the Department of Planning & Development Planning & Engineering Staff Reviews and Redlines Subdivision Plats for Correction Legal Advertising and Posting of Property Notification to Council District Representative of Pending Prelim. Subdivision Preliminary Subdivision Reviewed At Public Hearing by Planning Commission Postponed Approved Denied Rescheduled for Next Meeting Developer or Public Can Appeal Decision to the Parish Council Funded Performance Obligation Established for Maintenance of Streets and Other Infrastructure Approved Denied Work Order for Construction Issued by the Department of Engineering Process Terminated

FINAL SUBDIVISION APPROVAL CHECK SHEET Revised October 5, 2018 The Developer shall submit a request for Final Plan Review to the Department of Planning & Development in the appropriate format, a minimum of twelve (12) 24" x 36" folded copies of the proposed final subdivision plat, twelve (12) 24" x 36" folded copies of the proposed paving and drainage plan, and one (1) 24" x 36" folded full set of plans. To obtain final subdivision approval, all work must be substantially completed. The subdivision plats must be drawn to scale inclusive of providing all relevant information as described below. Subdivision Name: Section-Township-Range Developer Name/Firm: Developer Address: Developer Phone No. Developer E-mail: Engineer Name/Firm: Engineer Address: Engineer Email: Engineer Phone No. FINAL SUBDIVISION SUBMITTAL CHECKLIST Please check the appropriate boxes below to insure that the proper information and documentation for the final subdivision approval process, as well as items to be depicted on the final subdivision plat, have been included with your application: Final Subdivision Fees - $135.00 per lot total plus a onetime Inspection Fee of $20.00 (Lot Fee - $120.00 per lot, Sewer & Water Fees - $15.00 per lot) 1 Full Set of Plans - Digital 12-24 x 36 folded copies of the Final Plat 12-24 x 36 folded copies of the Final Paving and Drainage Plan 1-24 x 36 folded Full Set of Plans Recordation check for $185.00 made out to St. Tammany Parish Clerk of Court for 12 Recorded Plats Fill and Grading Statement (if not submitted with Preliminary) Approved As-Built Plans and Plat in CAD Format

PLAT REVIEW REQUIREMENTS: ST. TAMMANY PARISH Legal description Subdivision name Section corner tie, Township, Range Wetland determination - depict lines of demarcation Location of permanent markers on each corner lot Restrictive Covenants Dedication Statement including streets, signage, drainage features and greenspace (private or public) Approval and Recordation Signatures Signature lines for parish officials and clerk of court Signature lines for developer/owner Typical Street Cross-section detail Location of Sewer and Water Facilities Total length of streets constructed Boundary Survey with Surveyor s Signature and Stamp Existing and Proposed Easements and Right-ofway Existing Street Connections North direction arrow Phases within Subdivision Municipal addresses for all lots Information block (zoning, streets, number of lots, acreage, maximum block length, average lot size, etc...) Building setback lines Right of Way width Flood Zone A,B,C and V to be depicted on Plan Final Subdivision Fees to be Paid: A 3% processing fee will be added to all credit card/e-check transactions as per STP Ordinance No. 18-3961, effective October 5, 2018. Subdivision Fees Sewerage & Water Fees Lots @ $120.00 per lot $ Lots @ $15.00 per lot, plus a $20.00 one-time inspection fee $ Total Amount Paid $ Please refer to Section 125-202 Final Subdivision Review, of Subdivision Regulations Chapter 125 for additional criteria and requirements. I hereby certify that all information provided relative to the final subdivision review submission is true, accurate and correct and in accordance to St. Tammany Parish code requirements. DEVELOPER/ENGINEER OR DESIGNEE (SIGNATURE) DATE

PROCEDURAL FLOW DIAGRAM FOR THE FINAL SUBDIVISION REVIEW PROCESS Developer Submits Final Subdivision to the Department of Planning & Development Planning & Engineering Staff Reviews and Redlines Subdivision Plats for Correction, Environmental Services Department Reviews Sewerage and Water Plans Legal Advertising and Posting of Property Notification to Council District Representative of Pending Final Subdivision Final Subdivision Reviewed At Public Hearing by Planning Commission Postponed Approved Denied Rescheduled for Next Meeting Only Developer Can Appeal Decision to the Parish Council Funded Warranty and/or Performance Obligation(s) Established for Street Maintenance and Other Infrastructure Approved Denied Subdivision Plat is Recorded for Public Record in Clerk of Courts Office Process Terminated DEPARTMENT OF DEVELOPMENT - ENGINEERING