6A ROOF HTR 5TH 5A 5B 5C 5D 5E 5F 5G 5H 5I 8 Lincoln Street P O Box 5 Eugene, Oregon 9744-55 HTR 4TH 4A 4B 4C 4D 4E 4F 4G 4H 4I Phone: 54-44-2 Fax: 54-44-597 www.arborsouth.com PROJECT The Olive Lofts HTR RD A B C D E F G H I HTR 2A 2B 2C 2D 2E 2F 2G 2H 2I 2ND A B C D GROUND 844 Olive Street Eugene, Oregon INDEX 2A H 2A 2A 2A 2A 2A 2A BASEENT ain Switchboard One Line Riser Grounding/ Bonding 2/ 2/ 2/ 2/ 2/ 2/ 2/ HOUSE DISTRIBUTION, 2 AP, Ø, 4W 28Y/2 VOLTS TENANT DISTRIBUTION - DP-, 8 AP, Ø, 4W 28Y/2 VOLTS 2A 8A EXISTING EWEB VAULT 2 A 8 A INCOING SECTION JOB NO 86 DATE 6 April 27 ONE-LINE DIAGRA SCALE: /8" = '-" DRAWN BY Ryan Tyler Bill CHECKED BY Ryan Bill BUILDING AIN REVISION 24 Apr 27 APARTENT AND SALL RETAIL SPACE ETERS (7) 6 ETER 25 AP, Ø, WIRE ETER BASE SECTIONS HOUSE AND LARGE RETAIL ETERS 2 AP Ø, 4 WIRE ETER BASES INCOING 8 AP Ø, 4 WIRE SECTION HOUSE DISTRIB N G SERVICE AIN (TYP) SERVICE ENTRANCE }CONDUCTORS GROUND BUS NEUTRAL BUS GROUNDED SERVICE CONDUCTOR FRO UTILITY XFR (7) @ 2.25" TYP FOR Ø SECTIONS.' (± 9.5" 8.7" 67" '-" AIN SWITCHBOARD ELEVATION SCALE: /8" = '-" #6 TO CO BOARD #/O #/O AIN BONDING JUPER DETAIL NOTE: ALL GROUNDING/BONDING CONDUCTORS ARE COPPER #4 (IN) EXISTING GROUNDING ELECTRODE COLD PIPE #/O GROUNDING ELECTRODE CONDUCTOR #/O #6 (IN) BUILDING STEEL GROUNDING ROD GROUNDING/BONDING SCALE: /8" = '-" EBERS, AERICAN INSTITUTE OF ARCHITECTS SHEET NO E Arbor South Architecture, PC Olive Lofts - 86
SCHEDULE arch 29, 27 : A TYPE: Loadcenter APS: 25 Conn. Demand Demand VOLTS: 2/24 LOAD CLASS PHASE: WIRE: LOCATION: Retail OUTLETS, LIGHTING 48 ****** 48 AIN: Lugs OTOR LOADS ** OUNTING: Flush RESISTANCE LOADS 24 *** 96 ISC. LOADS ** NOTES: SCHEDULE arch 29, 27 : D TYPE: Loadcenter APS: 2 Conn. Demand Demand VOLTS: 2/28 LOAD CLASS PHASE: WIRE: 4 LOCATION: Retail OUTLETS, LIGHTING 564 ****** 564 AIN: Lugs OTOR LOADS 6 ** 6 OUNTING: Flush RESISTANCE LOADS 92 *** 768 ISC. LOADS 8 ** 8 NOTES: TOTAL VOLT-APS 7,7 AXIU PHASE APS 2.7 Demand**** 5,76 24. TOTAL VOLT-APS 6,44 AXIU PHASE APS 2. Demand**** 24,92.8 4 2 2 Outdoor Heat Pump 2 A 2 5 Lighting 2 4 2 B 4 72 Receptacles 2 2 Display Window Receptacle 5 5 A 6 72 Receptacles 2 2 Display Window Receptacle 5 7 B 8 6 Bathroom Receptacles 9 A Spare 2 B 2 Spare 2 A 4 Spare 2 5 B 6 Spare 2 7 A 8 9 B 2 2 A 22 2 B 24 4 2 Outdoor Heat Pump 6 A 2 84 Lighting 4 6 B 4 72 Receptacles 2 2 Display Window Receptacle 5 5 C 6 72 Receptacles 2 2 Display Window Receptacle 5 7 A 8 6 Bathroom Receptacles 4 6 2 Air Handler 6 9 B iscellaneous 2 6 4 6 C 2 iscellaneous 2 6 2 Spare A 4 iscellaneous 2 6 2 Spare 5 B 6 iscellaneous 2 6 2 Spare 7 C 8 iscellaneous 2 6 2 Spare 9 A 2 iscellaneous 2 6 2 Spare 2 B 22 iscellaneous 2 6 2 Spare 2 C 24 iscellaneous 2 6 2 Exhaust Fan 2 25 A 26 2 27 B 28 2 29 C A 2 B 4 5 C 6 7 A 8 9 B 4 4 C 42 A B ***** kva at %, remainder at 4% PHASE TOTALS VA 92 78 ** Demand Load at % *** 4% of Nameplate Ratings Amps 2.7.5 **** See Load Summary for additional Demand Flactors that Apply A B C ***** kva at %, remainder at 4% PHASE TOTALS VA 95 452 242 ** Demand Load at % *** 4% of Nameplate Ratings Amps 79.2 2..5 **** See Load Summary for additional Demand Flactors that Apply SCHEDULE arch 29, 27 : House Distribution Panel DP 2 TYPE: APS: 2 Conn. Demand Demand VOLTS: 2/28 LOAD CLASS PHASE: WIRE: 4 LIGHTING 6 25% LOCATION: Basement OUTLETS 6 * AIN: Breaker OTOR LOADS ** OUNTING: Freestanding RESISTANCE LOADS 75 % SUBFEED % NOTES: ISC. LOADS 54 % TOTAL VOLT-APS 88,26 AXIU PHASE APS 85. 6 2 Panel 6A 28 8 A 84 978 Panel H 2 6 6 96 85 B 86 282 6 6 6 87 C 88 2294 6 4 Water Heater - Basement 5 7 A 8 8 Water Heater - rd Floor 2 4 4 5 9 B 8 4 4 5 C 2 8 4 4 2 Water Heater - Second Floor 8 A 4 8 Water Heater - 4th Floor 2 4 4 8 5 B 6 8 4 4 8 7 C 8 8 4 2 Lighting Inverter 9 A 2 8 Water Heater - 5th Floor 2 4 2 B 22 8 4 6 2 C 24 8 4 6 25 A 26 6 6 27 B 28 6 6 29 C 6 A B C * See Load Summary for Demand Load PHASE TOTALS VA 2982 2 2824 Demand VA 2858 2984 276 Amps 8.8 85. 68.7 Demand Amps 7.5 75.7 59.7 Demand 6,28 878.6 SCHEDULE arch 29, 27 : B TYPE: Loadcenter APS: 25 Conn. Demand Demand VOLTS: 2/24 LOAD CLASS PHASE: WIRE: LOCATION: Retail OUTLETS, LIGHTING 48 ****** 48 AIN: Lugs OTOR LOADS ** OUNTING: Flush RESISTANCE LOADS 24 *** 96 ISC. LOADS ** NOTES: TOTAL VOLT-APS 7,7 AXIU PHASE APS 2.7 4 2 Outdoor Heat Pump 2 A 2 5 Lighting 2 4 2 B 4 72 Receptacles 2 2 Display Window Receptacle 5 5 A 6 72 Receptacles 2 2 Display Window Receptacle 5 7 B 8 6 Bathroom Receptacles 9 A Spare 2 B 2 Spare 2 A 4 Spare 2 5 B 6 Spare 2 7 A 8 9 B 2 2 A 22 2 B 24 A B ***** kva at %, remainder at 4% PHASE TOTALS VA 92 78 ** Demand Load at % *** 4% of Nameplate Ratings Amps 2.7.5 **** See Load Summary for additional Demand Flactors that Apply SCHEDULE Demand**** 5,76 24. arch 29, 27 : C TYPE: Loadcenter APS: 25 Conn. Demand Demand VOLTS: 2/24 LOAD CLASS PHASE: WIRE: LOCATION: Retail OUTLETS, LIGHTING 48 ****** 48 AIN: Lugs OTOR LOADS ** OUNTING: Flush RESISTANCE LOADS *** 2 ISC. LOADS ** NOTES: TOTAL VOLT-APS 8, AXIU PHASE APS 5.2 4 2 2 Outdoor Heat Pump 5 A 2 5 Lighting 2 4 5 B 4 72 Receptacles 2 2 Display Window Receptacle 5 5 A 6 72 Receptacles 2 2 Display Window Receptacle 5 7 B 8 6 Bathroom Receptacles 9 A Spare 2 B 2 Spare 2 A 4 Spare 2 5 B 6 Spare 2 7 A 8 9 B 2 2 A 22 2 B 24 A B ***** kva at %, remainder at 4% PHASE TOTALS VA 422 48 ** Demand Load at % *** 4% of Nameplate Ratings Amps 5.2 4. **** See Load Summary for additional Demand Flactors that Apply Demand**** 6, 25. SCHEDULE arch 29, 27 : 6A TYPE: APS: 2 Conn. Demand Demand VOLTS: 2/28 LOAD CLASS PHASE: WIRE: 4 LIGHTING 25% 75 LOCATION: Elevator Penthouse OUTLETS 264 * 264 AIN: Lugs OTOR LOADS 25% 75 OUNTING: RESISTANCE LOADS % SUBFEED % NOTES: ISC. LOADS % TOTAL VOLT-APS,74 AXIU PHASE APS.5 2 Elevator A 2 6 Elevator Controls B 4 6 Elevator Controls 5 C 6 6 Elevator Lighting 2 2 Deck Lighting 5 7 A 8 8 Receptacles, Outdoor 2 Spare 9 B 6 Receptacles, Outdoor 2 Spare C 2 2 Spare A 4 2 Spare 5 B 6 2 Spare 7 C 8 2 Spare 9 A 2 2 Spare 2 B 22 2 Spare 2 C 24 25 A 26 27 B 28 29 C A 2 B 4 5 C 6 7 A 8 9 B 4 4 C 42 A B C * kva at %, remainder at 5% PHASE TOTALS VA 28 96 6 ** % plus 25% of the largest otor Demand VA 485 46 25 Amps.5 9. 88. Demand Amps 2.4 2.2.4 SCHEDULE arch 29, 27 : H TYPE: APS: 2 Conn. Demand Demand VOLTS: 2/28 LOAD CLASS PHASE: WIRE: 4 LIGHTING 6 25% 45 LOCATION: Sprinkler Room OUTLETS 994 * 497 AIN: Lugs OTOR LOADS 5 ** 875 OUNTING: RESISTANCE LOADS 45 % 45 SUBFEED % NOTES: ISC. LOADS % TOTAL VOLT-APS 66,54 AXIU PHASE APS 98.5 2 Hallway Lighting A 2 6 Outdoor Lighting 2 2 2 Electrical Room, Basement Receptacles 8 B 4 5 Fire Alarm Panel 2 2 Communication Room Receptacles 6 5 C 6 8 Receptacles, 2nd Floor Hallway 2 Basement Lighting 8 7 A 8 8 Receptacles, rd Floor Hallway 2 2 Janitor Room Receptacle, 44 9 B 8 Receptacles, 4th Floor Hallway 2 Hallway, Janitor Room, Laundry Room Ltg 2 C 2 8 Receptacles, 5th Floor Hallway 2 2 Basement Storage Room Receptacles 8 A 4 72 Receptacles, st Floor Hallway 2 2 Washer - 2nd Floor 5 5 B 6 72 Laundry Room Receptacles 4 2 Dryer 2nd Floor 25 7 C 8 72 Trash Room Receptacles 4 25 9 A 2 5 Washer -4th Floor 2 4 2 Spare 2 B 22 25 Dryer -4th Floor 2 4 2 2 Washer - 2nd Floor 5 2 C 24 25 4 4 2 Spare 25 A 26 25 Dryer -4th Floor 2 4 4 2 Dryer 2nd Floor 25 27 B 28 25 4 4 25 29 C 5 Washer -4th Floor 2 2 Washer - rd Floor 5 A 2 25 Dryer -5th Floor 2 4 4 2 Dryer rd Floor 25 B 4 25 4 4 25 5 C 6 5 Washer - 5th Floor 2 2 Washer - rd Floor 5 7 A 8 25 Dryer -5th Floor 2 4 4 2 Dryer rd Floor 25 9 B 4 25 4 4 25 4 C 42 5 Washer - 5th Floor 2 4 A B C * kva at %, remainder at 5% PHASE TOTALS VA 978 282 2294 ** % plus 25% of the largest otor Demand VA 9289 22245 2 Amps 64.8 98.5 9.2 Demand Amps 6.7 85.4 77.6 Demand 4,55 2.4 Demand 62,845 85.4
Voltage kw Branch Circuit /2"C, 2#2, #2 G to Retail Panel /2"C, 2#2, #2 G to Retail Panel /2"C, 2#2, #2 G to Retail Panel Olive Loft Apartments Load Summary - Per NEC 22-82 Unit A Square Footage Tag 2A 8A 2A 2A 5 SF Lighting Appliance Fans Range Subtotal st kw at % Remainder at 4% Split System Heat Pump Quantity 5 5 2 5 5 45 84 84 29 6 26 26 () 76 66 Amps Current at 28V, Phase Load Summary - Per NEC 22-82 Unit B Square Footage Load Summary - Per NEC 22-82 Unit C Square Footage " () " (4) /2" () 5" Ground # Cu SE Cable 4#25 C AL 4#5 C AL in Each 4 5 C Al in Each 4 5 C CU in Each 8 Cu / Al 4/ AL in Each 25 C Al IN Each 8 Lincoln Street P O Box 5 Eugene, Oregon 9744-55 www.arborsouth.com Olive Loft Apartments Light Fixture Schedule Type Quantity 8 4 2 5 5 45 84 84 299 96 26 26 () 796 66 Amps Current at 28V, Phase Conductors Phone: 54-44-2 Fax: 54-44-597 8 SF Lighting Appliance Fans Range Subtotal st kw at % Remainder at 4% Split System Heat Pump Conduit PROJECT A LED Downlights - in Apartment Soffits and Corridors B Under Counter LED Strip - 4 feet in length C 8 foot Long Suspended Channel anufacturer Series Lithonia L7XLED T24 Re=EAL6 D6 BN ESL L K.95 Volt Lighting icro Channel with 2 volt LED Tape Volt Lighting Suspended Channel with 2 volt LED Tape Wattage / Lumens Lumen, Watt D Bedroom - Surface Drum 4" Diameter Lithonia FLRL 4 28 24 Watt LED E Closet Light F Wall mounted Light Form above Bathroom irror G Ceiling mounted LED Fan Combination Unit H Wall Sconce Stairway Lithonia FLRL 48 6 Watt LED Lithonia FVCCL 6IN VOLT 5K 9 CRI BN 4 Watt LED Panasonic Whispergreen Select FV5 VKL 2 2 Lumen LED, Lightolier CDL SAU 6 Watt K Wall ounted Area Light Kim WD4D2 E5 6L4K2 BL 7 Watt LED L Bollard Light 57 Watt LED S LED Strip light with diffuser lens Kim SL LED 6L 4K UV BL Lithonia ZLF L48 L DDD 2 4K 8CRI WH NPP6D "EX" Exit Sign Lithonia TLE RELN LED Watt / Foot LED 24 Watt LED 45 Remarks Control With Compatible LED Dimmer See Floor Plans for Exact Length Control With Compatible LED Dimmer Control With Compatible LED Dimmer The Olive Lofts 844 Olive Street Eugene, Oregon Wall ounted at +6' Wall ounted at +8' Deck ounted at Roof INDEX Equipment and Lighting Schedules Load Summaries Back ounted Above Door 4 SF Quantity Lighting Appliance Fans Range Subtotal st kw at % Remainder at 4% Split System Heat Pump 4 2 5 5 84 2 45 84 287 48 26 26 () Current at 28V, Phase JOB NO 86 748 66 Amps Load Summary - Per NEC 22-82 Unit D Square Footage DATE 6 April 27 DRAWN BY 42 SF Quantity Lighting Appliance Fans Range Subtotal st kw at % Remainder at 4% Split System Heat Pump 42 2 5 5 84 26 () Current at 28V, Phase Ryan Tyler Bill 26 45 84 244 26 CHECKED BY Ryan Bill REVISION 26 Oct 27 844 67 Amps 5 Electrical Service Load Summary - Per NEC 22.84 Unit / Load Quantity Load/unit Demand A 24 55 % 6 B 4 559 % 878 C 4 547 % 8564 D 4 57 % 8852 Retail Panel 77 % 77 Retail Panel 2 77 % 77 Retail Panel 8 % 8 Retail Panel 4 644 % 644 DP - 24475 678.8 Amps Water Heater Penthouse Panel House Panel - DP-2 4 54 74 6654 % % % 26 74 6654 628 878.6 Amps 6 Jan 28 5 RETAIL LOADS WERE DETERINED BY ADDING CODE REQUIRED AXIU LIGHTING LOAD TO ALLOWANCE FOR STORE FRONT LIGHTING, LOAD OF HVAC UNIT AND A GENERAL USE RECEPTACLE LOAD. THE LOADS WILL BE RECALCULATED WHEN INDIVIDUAL TENANTS ARE SELECTED. EBERS, AERICAN INSTITUTE OF ARCHITECTS SHEET NO E8 REVISION 5 Arbor South Architecture, PC Olive Lofts - 86 All required egress lighting that is on an occupancy sensor or photocell is to have an override so all lights come on with loss of power or activation of the fire sprinkler system. Load Summaries - 2/8/28, 8:2:9 A Tag HP- FC- HP-2 FC-2 HP- FC- HP-4 FC-4 HP-5 FC-5 HP-6 FC-6 HP-7 FC-7 HP-8 FC-8 HP-9 FC-9 HP- HP- FC- HP-2 FC-2 HP- FC- HP-4 FC-4 HP-5 FC-5 HP-6 FC-6 HP-7 FC-7 HP-8 FC-8 HP-9 FC-9 HP-2 HP-2 FC-2 HP-22 FC-22 HP-2 FC-2 HP-24 FC-24 HP-25 FC-25 HP-26 FC-26 HP-27 FC-27 HP-28 FC-28 HP-29 FC-29 HP- FC- HP- FC- HP-2 FC-2 HP- FC- HP-4 FC-4 HP-5 FC-5 HP-6 FC-6 HP-7 FC-7 HP-8 FC-8 HP-9 FC-9 Feeder Schedule Received by City of Eugene: 78 E8 Equipment and Lighting Schedules Olive Loft Apartments echanical Equipment Schedule
Received by City of Eugene: 79 E9 Electrcial Specifications - /25/28, 2:44:54 P All required egress lighting that is on an occupancy sensor or photocell is to have an override so all lights come on with loss of power or activation of the fire sprinkler system.