State Dredging Study Update NCBIWA Annual Meeting

Similar documents
Outer Banks Corridor Update. Sterling Baker Division Maintenance Engineer Division One March 25, 2015

FIRE ISLAND INLET TO MORICHES INLET FIRE ISLAND STABILIZATION PROJECT TECHNICAL SUPPORT DOCUMENT

Appendix C. Real Estate. Brazos Island Harbor, Texas Channel Improvement Project Cameron County, Texas

September 2018 MLS Statistical Report

Harbour Island Force Main Replacement Design Build Project. South Neighborhood Association October 22, 2018

Participant s initial briefing on Creating a Neighborhood SSD to Partner with the City for Dredging. Bayville Creek. July 7, 2011

OBX MARKET REPORT. A Review Of The Outer Banks Real Estate Market 1 st Quarter, st Quarter Real Estate Sales Recap for Dare & Currituck County

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON. D.C MAR

A Fiscal Analysis of Shifting Inlets and Terminal Groins in North Carolina

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

Fraser River Model Project fonds

V. Economic Assessment

The District is currently engaged in the following eight service agreements, either directly or via PHWA:

OCEAN ISLE BEACH SHORELINE PROTECTION PROJECT NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT MAJOR PERMIT APPLICATION.

LAKE ZUMBRO RESTORATION PROJECT FEASIBILITY REPORT

Town of Surf City. City Council Presentation April 2, 2013 PETER A. RAVELLA, PRINCIPAL PAR CONSULTING, LLC

Draft Continuing Authorities Program Section 1135 Detailed Project Report and Integrated Environmental Assessment

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

APPENDIX M. Real Estate Plan

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Drainage Study. Report Description. Prepared for: City of Minnetonka Beach. Prepared by: Phillip Elkin, P.E. Darren Amundsen, P.E.

Appendix B Real Estate Plan

Evaluating and Processing Road and Utility Easement Proposals on Corps Lands and Flowage Easements

8. CONSTRUCTION SCHEDULE

R/W PREQUALIFICATION ODOT, 3/14/2018

26 N. Causeway Drive. Blue Harbour Approved For 142 Units & 42 Deep Water Slips. Fort Pierce, FL FOR SALE. Atlantic Ocean

Appendix B Draft Real Estate Plan

QUESTIONS IN REGARDS TO THE MASTER LEASE RFP

Participant s initial briefing on Creating a Neighborhood SSD to Partner with the City for Dredging. Robin Hood Forest.

APPENDIX F REAL ESTATE PLAN. Redwood City Harbor Navigation Improvement Feasibility Study, Redwood City, California

REAL ESTATE PLAN APPENDIX G

Short Term Rentals VIRGINIA BEACH CITY COUNCIL NOVEMBER 7, Mark D. Stiles City Attorney

EDISTO BEACH COASTAL STORM DAMAGE REDUCTION GENERAL INVESTIGATION STUDY APPENDIX K REAL ESTATE

Appendix K. Real Estate Plan

ESTES VALLEY STORMWATER MANAGEMENT PROGRAM

SHORE DRIVE CORRIDOR: PAST, PRESENT, & FUTURE APRIL 19, 2018 BAYFRONT ADVISORY COMMISSION

APPENDIX H REAL ESTATE REQUIREMENTS

PRELIMINARY AGENDA. FLORIDA INLAND NAVIGATION DISTRICT Board of Commissioners Meeting. 9:00 a.m., Friday, September 7, 2018

26 N. Causeway Drive. Blue Harbour Marina. Fort Pierce, FL Atlantic Ocean. To the Ft. Pierce Inlet. Indian River. N Causeway.

NORTHPARK TECHNOLOGY CENTER SITE PACKET

BTNEP AUG 7th MOFFATT & NICHOL. Atchafalaya Long Distance Sediment Pipeline Feasibility Study. Identification of Borrow Sites.

Federal Mandates and Willing Sellers: Real Estate Acquisition for the Missouri River Recovery Program

2006 YEAR END HOUSING MONITORING AND SUBDIVISION STATUS REPORTS

Dredged Material Management Plan Atlantic Intracoastal Waterway Port Royal Sound, South Carolina to Cumberland Sound, Georgia November 2015

APPENDIX D REAL ESTATE PLAN

APPENDIX D REAL ESTATE DRAFT. MOBILE HARBOR, MOBILE, ALABAMA Integrated General Reevaluation Report With Supplemental Environmental Impact Statement

Our Focus: Your Future 2007 YEAR END HOUSING MONITORING AND SUBDIVISION STATUS REPORTS

DRAFT- SUBJECT TO REVISIONS BEFORE FILING

Electronic Questions and Answers

Section 3 Right-of-Way

INDIANA HARBOR AND CANAL CONFINED DISPOSAL FACILITY EAST CHICAGO, INDIANA

ZAREMBA GROUP COMPANY PROFILE

PUBLIC OPEN HOUSE September 19, 2018

Development Charges Update

NCDOT Surplus and Residue Property and Procedures for Sale and Disposal. Jon Nance March 20, 2013

ADDENDUM 5 City of Jackson, TN Solid Waste Hauling PROPOSALS Due November 4 DATE OF ADDENDUM NOVEMBER 2, 2015

Washoe County. Quarterly Revenue and Economic Review

ZONING AMENDMENT, SUBDIVISION & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 16, 2006

TASK 2 INITIAL REVIEW AND ANALYSIS U.S. 301/GALL BOULEVARD CORRIDOR FORM-BASED CODE

COUNCIL AGENDA DISTRICT OF WEST VANCOUVER TH STREET, WEST VANCOUVER BC V7V 3T3 COUNCIL REPORT

2Q. We have owned this property for many years, why are we just now hearing about this?

DRAFT INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL ASSESSMENT

April 1, 2014 thru June 30, 2014 Performance Report

Appendix H: Real Estate Plan

EARLY PLANNING - SCHOOL SITE SELECTION

Local and Federal Funding for Mainland Beach Restoration Projects

Absent: Major Chris Hanson, Volk Field John Ross, Jackson County Emergency Management; Paul Wydeven, Wisconsin Department of Transportation

Ministry of Health and Long Term Care Community Health Capital Program Operational Framework-Training Narration Module 4

Columbia County Fire Assessment Update Study. July 20, 2017

REQUEST FOR PROPOSAL City of Brighton Downtown Development Authority

Planning Commission Agenda Item

This Land is Your Land on the Balance Sheet. FASAB Research and Findings of the Accounting and Reporting of Government Land Project

Public Money for I&I Reduction on Private Property. John Hendron, P.E. RH2 Engineering, Inc PNCWA Annual Conference Bend, Oregon

M/t A s \A( Lam' A ''

Buyer s Guide Making the dream of owning real estate on the Outer Banks of North Carolina a dream come true!

Lompoc Redevelopment Agency Agenda Item

LEE COUNTY RESOLUTION NO.

Summary of Tower Road Property Planning and Maintenance

Ohio EPA Guidance - VAP Environmental Covenants Updated July 2015

Answers to Chatham Residents Questions about the Western Wake Partners

Initial Project Report Appl # Brink/Harrison

A University of Hawai'i Cooperative Extension Service Project.

The Shops at Timberland Crossing

LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT

MEMORANDUM FOR Commander, U.S. Army Engineer Division, North Central, 536 South Clark Street, Chicago, Illinois

Chapter 1 OVERVIEW OF THE PROGRAM AND PLAN

Assign certain City owned property, at Swan Island Lagoon, from Environmental Services to Parks and Recreation. (Ordinance)

Applying IFRS. New IASB leases standard oilfield services. December 2016

Florida Department of Agriculture and Consumer Services Division of Aquaculture. Proposed Aquaculture Lease Expansion in Levy County

City of Owasso Public Work Department STATUS REPORT November 7, 2017

July 1, 2018 thru September 30, 2018 Performance Report

TOWN OF MINNESOTT BEACH PLANNING BOARD MEETING August 6, 2009

City of Grande Prairie Development Services Department

Ohio EPA Guidance - VAP Environmental Covenants May 2005 Updated February 2012

Rough River Lake Flowage Easement Encroachment Resolution:

Our Staff Member are committed to helping you during this process.

DRAFT REAL ESTATE PLAN APPENDIX C GULF INTRACOASTAL WATERWAY BRAZOS RIVER FLOODGATES AND COLORADO RIVER LOCKS SYSTEMS FEASIBILITY STUDY

FOR SALE PROPERTY BROCHURE 'x14' Drive In & Drive Thru Doors. 101 N Main St Platteville, CO CONTACT:

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

PLANNING 101. What architects think I do. the what s and how s of land use planning

Transcription:

State Dredging Study Update NCBIWA Annual Meeting November 13, 2017

Study Purpose Three (3) Studies Requested Use of Dredge Manteo for Additional Work Acquisition of Dedicated Dredging Capacity Cost/Benefit of State vs. Private Industry Originally, Three Studies with Three Separate Due Dates (December 1 April 1) Currently, Combine All Three Into One Study (with Standalone Portions) Due April 1 NCBIWA November 13, 2017 2

Approximate the Annual Cost to the State to Operate & Maintain the Dredge Manteo Current Dredging Equipment Includes 14 Dredge, Barges, Tugs, and 10,000 of 12 Pipeline Other Use NCDOT Equipment Charged As Rental Study Purpose Provide a Plan to Allow Use of the Dredge Manteo By Other State Departments/Agencies to Increase the Cost Effectiveness of the Dredge and Assist With Other Navigational Needs Within the State NCBIWA November 13, 2017 3

Equipment NCBIWA November 13, 2017 4

Equipment NCBIWA November 13, 2017 5

Documentation of Existing Workload and Costs 8 Ferry Routes (7 Normal Routes & 1 Emergency Route) Knotts Island - Currituck Swan Quarter Ocracoke Ocracoke Cedar Island Hatteras Southdock 14 Facility Basins Knotts Island Currituck Swan Quarter Cape Hatteras Southdock Ocracoke Bayview Bayview Aurora Minnesott Beach Cherry Branch Southport Fort Fisher Stumpy Point Rodanthe (Emergency Route) Aurora Minnesott Beach Cherry Branch Cedar Island Southport Fort Fisher Manns Harbor (Maintenance Yard) NCBIWA November 13, 2017 6

Documentation of Existing Workload and Costs NCBIWA November 13, 2017 7

Documentation of Existing Workload and Costs 1-Year of Operational Data Available from Dredge Manteo FY16-17 NCBIWA November 13, 2017 8

NC Ferry Division Provided Projected Project Cost to FY2036 Based on Average Annual Costs ($650,000), Manteo Expected to Dredge on Average: ~ 138 Days / Year ~ 71,350 CY/ Year Documentation of Future Workload and Costs Maximum Expectancy: $1,175,000 Annual Cost 249 Project Days 128,733 CY Minimum Expectancy: $200,000 Annual Cost 43 Project Days 22,231 CY NCBIWA November 13, 2017 9

Documentation of Existing Workload and Costs 1-Year of Operational Data Available from Dredge Manteo FY16-17 Using NCDOT Data NCBIWA November 13, 2017 10

Comparison of Current vs Proposed Dredging Methods CEDEP Calibration Required ~65% Downtime to Match Significant Issues with Placement Sites NCBIWA November 13, 2017 11

Comparison of Current vs Proposed Dredging Methods CEDEP Projections Keep Existing Downtime NCBIWA November 13, 2017 12

Comparison of Current vs Proposed Dredging Methods CEDEP Projections Drop Downtime By ~30% to Match Other Recent Projects * Projections Will Be Revised As Additional Data Comes In Production Will Go Down/Costs Will Go Up NCBIWA November 13, 2017 13

Comparison of Current vs Proposed Dredging Methods CEDEP Projections Drop Downtime By ~30% to Match Other Recent Projects & Change Pipe Diam. * Projections Will Be Revised As Additional Data Comes In Production Will Go Down/Costs Will Go Up NCBIWA November 13, 2017 14

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Additional State Agencies NCDMF, NCDCM, NCWRC All Contacted NCWRC Is Only Group With Potential Need Still Awaiting Quantities to Be Provided Likely Very Small Projects With Occasional Need NCBIWA November 13, 2017 15

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Other Navigational Needs Within State Current Shallow Draft Dredging Split Into Three (3) Categories Shallow Draft Inlets (Beach Compatible) AIWW Crossings (Beach Compatible) Remainder of AIWW and Inland Channels (Non-beach Compatible Material) NCBIWA November 13, 2017 16

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Shallow Draft Inlets (Beach Compatible) NCBIWA November 13, 2017 17

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet AIWW Crossings (Beach Compatible) NCBIWA November 13, 2017 18

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Remainder of AIWW & Inland Channels (Non-beach Compatible) NCBIWA November 13, 2017 19

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Overall Summary to Date Shallow Draft Inlets Need Is 3 3.5 Mcy/yr AIWW Crossings Need Is 300k 400k cy/yr Remainder of AIWW and Inland Channels Is 0.8 1 Mcy/yr It Would Appear That a Portion of the AIWW Crossings May Be the Best Fit For Additional Manteo Work During Dredge Window NCBIWA November 13, 2017 20

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Overall Summary to Date Shallow Draft Inlets Need Is 3 3.5 Mcy/yr AIWW Crossings Need Is 300k 400k cy/yr Remainder of AIWW and Inland Channels Is 0.8 1 Mcy/yr Another 1 2 Dredges Similar to Manteo Could Likely Handle Remainder of AIWW and Inland Channels Need NCBIWA November 13, 2017 21

Preliminary Estimates of Work Available to Dredge Manteo & Additional Fleet Overall Summary to Date Shallow Draft Inlets Need Is 3 3.5 Mcy/yr AIWW Crossings Need Is 300k 400k cy/yr Remainder of AIWW and Inland Channels Is 0.8 1 Mcy/yr Shallow Draft Inlets (Including Oregon Inlet) Will Likely Require Much Larger Pipelines and # Required Dependent on Current Dredge Windows (2 4 Dredges Needed VERY PRELIMINARY) NCBIWA November 13, 2017 22

Estimate of Private Contractors to Complete Work By Dredge Manteo USACE Dredges Sidecaster/Special Purpose NCBIWA November 13, 2017 23

Estimate of Private Contractors to Complete Work By Dredge Manteo Private Contractors NC Small Pipeline with Placement NCBIWA November 13, 2017 24

Estimate of Private Contractors to Complete Work By Dredge Manteo Small Regional USACE Private Contractor Projects (Pipeline) NCBIWA November 13, 2017 25

Due Date for All Reports Shifted to April 1, 2018 Strategy for Reporting Change in Legislation & Plan Forward Three (3) Studies Will Have Separate Stand-alone Sections (Chapter Sections or Appendices) Combine All Three Studies Into One (1) Report Submitted to Both Committees With the Following: Literature Search of Government-Owned Dredges & Documentation of These & Dredge Manteo Costs (Initial and O&M Costs) Documentation of Current and Future Ferry, State and Other Dredging Needs NCBIWA November 13, 2017 26

Reporting Strategy (cont d) Change in Legislation & Plan Forward Determination of Additional Work that Dredge Manteo Can Complete (Under Current & Full-Use Scenarios) and Additional Fleet Needed to Make Up the Difference (Include Initial and O&M Costs) Determine Potential Funding Sources for State Fleet and Partnership Options Thru Shared Ownership Agreements Determine Costs for Private Dredge Industry to Complete the Work Above & Investigate Contracting Options to Reduce Time & Costs (Multi-Project/Multi- Year) NCBIWA November 13, 2017 27

Reporting Strategy (cont d) Complete Cost/Benefit Analysis of State-Owned vs. Private Industry Develop Draft/Final Reports Change in Legislation & Single Report Will Allow for Efficient Review and Eliminate Need to Reference Separate Reports Single Succinct Executive Summary and All Encompassing Report and Presentation Plan Forward NCBIWA November 13, 2017 28

Other Thoughts That Have Come to Light Expansion of Environmental Windows? End of April? Given the Limiting Factor of Placement Areas for Non-Beach Compatible Placement, Can the Work Crews Use Outside Environmental Window Times to Improve Dredge Placement Areas? Should the State Develop a Dredge Material Management Plan to Permit These Improvements? NCBIWA November 13, 2017 29