LEWIS COUNTY BUILDING & CODES DEPARTMENT LEWIS COUNTY COURT HOUSE LOWVILLE, NY Phone: (315) Fax: (315)

Similar documents
BUILDING PERMIT APPLICATION

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

Application is hereby made to: a structure or land located at Repair at a cost of $ for: Extend Remove. Other Use Occupy

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

City of Beacon Building Department

DEMOLITION PERMIT APPLICATION

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

G R O W T H M A N A G E M E N T D E P A R T M E N T DEMOLITION PERMIT APPLICATION

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Address: (w) ( ) 2. Contractor s Name: phone ( ) Address: cell ( ) 4. Type of Construction: Cost of Project $

Permitting / Licensing Process for a Junkyard

Greenbrier County Building Code Administrative Policy Manual

RESIDENTIAL ADDITION/ALTERATION PERMIT APPLICATION

EL DORADO COUNTY BUILDING SERVICES

COMMERCIAL BUILDING PERMIT APPLICATION

Application for a Building/Zoning Permit

Irrigation Permit Requirements FOR OWNER/BUILDER

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

Residential Building Permit Application (To be entered by issuing agency) Parcel #: Permit Number: Intake Person: Project Address:

OWNER-BUILDER STATEMENT/AFFIDAVIT

4. Building plans should include top of foundation elevation

Remember, PA One-Call before excavating. Simply dial 811 or

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Demolition Application Package

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

NASSAU COUNTY SIDING PERMIT APPLICATION

PERMITS & PLANS APPROVALS ADVANCED MODULE INTERNET

BUILDING PERMIT APPLICATION

HERNANDO COUNTY PERMIT APPLICATION PACKET DEMOLITION PERMIT

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Project Address: District: Lot: Block or Subdivision: Parcel: Occupancy Type: R2 (MF)

NOTE TO ALL VARIANCE APPLICANTS:

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

Doors & Windows Package

WEST COCALICO TOWNSHIP P.O. Box 244 Reinholds, PA (717) ZONING/BUILDING PERMIT APPLICATIONS INFORMATION & PROCEDURES

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Restoration Tax Abatement Application

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

CLAY COUNTY NEIGHBORHOOD REVITALIZATION PLAN

NASSAU COUNTY RE-ROOFING PERMIT APPLICATION

U.S. Environmental Protection Agency Applicability Determination Index

Commercial Building Permit Application (To be entered by issuing agency) Parcel #: Permit Number: Intake Person: Project Address & Name:

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

An application to the Zoning Board of Appeals is not complete and will not be scheduled until all of the following information has been provided:

MINERAL COUNTY SHERIFF S OFFICE

Application of the TAHPR and NESHAP to the Demolition of a Public Building

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

PRIVATE PLAN REVIEW AND/OR PRIVATE INSPECTIONS

APPLICATION FOR DEMOLITION PERMIT

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

Vacant Building Ordinance Chapter

REQUIREMENTS FOR RESIDENTIAL PLAN REVIEW New Constructions, additions and remodel

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

Application for Short-Term Rental (STR) Permit

Residential Re-Roof Permit Requirements FOR CONTRACTORS

COMMERCIAL/ INDUSTRIAL PERMIT APPLICATION

TOWN OF HAVERHILL, NH

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

APPLICATION FOR A CERTIFICATE OF ZONING COMPLIANCE

ARTICLE XXIII ADMINISTRATION

DEMOLITION REQUIREMENTS

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

Buildings for Lease or Rent

CITY OF KEEGO HARBOR 2025 Beechmont, Keego Harbor Michigan (248) ORDINANCE NO. 417

-ROOFNEW ROOF RE-ROOF ROOF OVER

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

RIVER RIDGE HOMEOWNERS ASSOCIATION RULES AND REGULATIONS

As Introduced. 132nd General Assembly Regular Session H. B. No

BASIC PERMIT CHECKLIST (Roof, Electric, Plumbing, Gas)

All proposals must include a current Business Registration Certificate, W-9 Form and a Certificate of Employee Information Report

city of Zeeland ARTICLE IX. RENTAL REGISTRATION AND INSPECTION* Sec Purpose and intent. Sec Definitions.

Legally Described as: Lot(s) - in BROOKHAVEN ESTATES PLAT 1, pursuant to the Plat thereof (the, Property ).

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

TOWN OF OSSIPEE ZONING BOARD OF ADJUSTMENT REQUEST FOR VARIANCE

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

CITY OF NOVI LAND DIVISION INSTRUCTIONS

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

NEW MOBILE HOME PERMIT APPLICATION

Alternative plans review and inspection.-- (1) As used in this section, the term:

Adopted August 22, 2013 by Sanders County Commissioners. Page 1 of 6

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

NELSON TOWNSHIP APPLICATION FOR BUILDING PERMIT

SIGN PERMIT APPLICATION

Town of Harrisburg, Lewis County, New York Land Use Permit Application Instructions

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

Chapter 4 Building and Housing

CODIFIED ORDINANCES OF GRANVILLE PART THIRTEEN - BUILDING CODE. Chap Building/Zoning Permit Fees. Chap Building Department.

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

ORDINANCE NO. 14,934

Transcription:

Ward Dailey, Director Don Mallette, Codes Officer Tim Widrick, Codes Officer LEWIS COUNTY BUILDING & CODES DEPARTMENT LEWIS COUNTY COURT HOUSE LOWVILLE, NY 13367 Phone: (315)376-5377 Fax: (315)377-3137 DEMOLITION PERMIT APPLICATION Dear Applicant: Attached is a Lewis County Demolition Permit Application. This application is for use only in communities where the County of Lewis is responsible for enforcement of the Building Codes of New York State. The permit applied for with this form applies only to the Building Codes of New York State and has no bearing on the other local, state, or federal regulations, such as zoning or floodplain ordinance, etc. The permit fee must be submitted to the Lewis County Building & Codes Office with the completed application. Please make all checks payable to the Lewis County Clerk and mail to the Lewis County Building & Codes Department, 7660 North State Street, Lowville, New York 13367. The permit and all correspondence will be mailed to the owner at the address indicated on the application. It is the responsibility of the owner to see that the Lewis County Code Enforcement Officer is notified when the project will be ready for the next inspection. If you have any questions, please contact the Lewis County Building & Codes Office at (315) 376-5377. Sincerely, Ward John Dailey Senior Code Enforcement Officer Attachment Lewis County is an equal opportunity provider, and employer. Complaints of discrimination should be made known to Lewis County Board of Legislators

LEWIS COUNTY BUILDING & CODES DEPARTMENT LEWIS COUNTY COURT HOUSE 7660 N. STATE ST. LOWVILLE, NEW YORK 13367 Phone: (315) 376-5377 Fax: (315) 377-3137 Permit Number Demolition Permit Application Census Code D Tax Map # Construction Start Up Application Fee $ 30.00 Property Owner s Name Phone Mailing address Contractor/Applicant Name Phone Contractor/Applicant Mailing address Project Address (911 address) Town Description of Project Is the project site in a Flood Zone (Yes / No) Total Square Footage of Building/Structure to be Demolished To apply for a Demolition Permit, you MUST provide this Application filled out, a check payable to the Lewis County Clerk for the application fee, One (1) copy of a Plot Plan, and an approved Zoning / Land Use Permit where required by your town. THIS PERMIT COVERS ONLY THE WORK DESCRIBED IN THIS APPLICATION. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF CONSTRUCTION. Signature of Applicant or Authorized Agent I, the undersigned, Code Enforcement Officer of the County of Lewis, hereby (approve) (deny) the within application for a building permit. Code Enforcement Officer FOR ENFORCEMENT OFFICERS USE ONLY Value of Work (materials & labor) - $ Approved Zoning Permit Required Yes / No 1

STATEMENT OF WORKERS COMPENSATION (HOMEOWNER) Under penalty of perjury, I certify that I am the owner of the residence listed on the building permit that I am applying for, and I am not required to show specific proof of workers compensation insurance coverage for such residence because (please circle one): A) I am performing all the work for which this building permit is issued. B) I am not hiring, paying or compensating in any way, the individual(s) that is (are) performing all the work for which this building permit is issued or helping me perform such work. C) I have a homeowners insurance policy that is currently in effect and covers the property listed on the attached building permit AND am hiring or paying individuals a total of less than 40 hours per week (aggregate hours for all paid individuals on the jobsite) for which this building permit is issued. I understand that I will have to acquire Worker s Compensation if, I need to hire or pay individuals a total of 40 hours or more per week (aggregate hours for all paid individuals on the jobsite) for work indicated on this building permit; OR have a general contractor, performing the work listed on the building permit that I am applying for, provide appropriate proof of workers compensation coverage or proof of exemption from that coverage on forms approved by the Chair of the NYS Workers Compensation Board to the government entity issuing the building permit if the project takes a total of 40 hours or more per week (aggregate hours for all paid individuals on the jobsite) for work indicated on this building permit. Signature of Homeowner Signed Homeowners Name Printed STATEMENT OF WORKERS COMPENSATION (CONTRACTOR) As the contractor of record for this permit application, I understand that I am responsible for proof of Workers Compensation or proof of Exemption from Workers Compensation. I agree I will provide proof of Workers Compensation or proof of Exemption to the Lewis County Fire Prevention and Building Codes office. I understand that the proof will be filed for a period of 1 year. Signature of Contractor Signed Contractors Name Printed STATEMENT OF ENVIRONMENTAL CONCERN (HOMEOWNER) This Statement confirms that I have read and been made aware that the New York State Department of Environmental Conservation requires a State Pollution Discharge Elimination System Permit (S.P.D.E.S.) be obtained for disturbance of property greater than one (1) acre; this is to include driveways, location of house and all outbuildings & pools. For more information, you are strongly urged to contact the D.E.C. Bureau of Water Permits at 518-402-8111 or online at www.dec.state.ny.us/website/dow/mainpage.htm State imposed fines for a violation of this law can be a substantial $37,500. per day. If in doubt, call New York State Department of Environmental Conservation. Signature of Homeowner Signed Homeowners Name Printed 2

ADVISORY TO DEMOLITION PERMIT An asbestos survey is required for all renovation, remodeling, repair and demolition of all interior and exterior building materials. As per New York State Industrial Code Rule 56, asbestos material must be abated by licensed contractors utilizing certified asbestos handlers, with the exception of owner-occupied single family homes, where the owner may remove the asbestos. Department of Labor must be contacted when an asbestos survey is performed. Industrial Code Rule 56, Asbestos. Requires asbestos survey prior to any demolition activities on buildings, with specific exceptions. Provides requirements for asbestos abatement. http://www.labor.state.ny.us/workerprotection/safetyhealth/dos_code_rules.shtm. Demolition is defined as: The work incidental to or associated with the total or partial dismantling or razing of a building or structure including the removing or dismantling of machinery or other equipment. Applicants Signature 3

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN 56-5.1 Asbestos survey requirements for building/structure demolition, renovation, remodeling and repair. (a) Asbestos survey required. An owner or an owner's agent, except the owner of one and two-family dwellings who contracts for, but does not direct or control the work, shall cause to be conducted, an asbestos survey completed by a licensed asbestos contractor using inspectors certified in compliance with section 56-3.2(d) of this Part, to determine whether or not the building or structure, or portion(s) thereof to be demolished, renovated, remodeled, or have repair work, contains ACM, PACM or asbestos material. This asbestos survey shall be completed and submitted as indicated in subdivision (g) of this section, prior to commencing work. All such asbestos surveys shall be conducted in conformance with the requirements of subdivision (e) of this section. (d) Responsibility to comply. No exemption to the requirement to conduct an asbestos survey shall exempt any person, asbestos contractor, property owner or business entity from the inspection or asbestos survey requirements of EPA, OSHA, and any other applicable section of this Part. (g) Transmittal of building/structure asbestos survey information. One copy of the results of the building/structure asbestos survey shall be immediately transmitted by the building/ structure owner as follows: (1) One copy of the completed asbestos survey shall be sent by the owner or their agent to the local government entity charged with issuing a permit for such demolition, renovation, remodeling or repair work under applicable State or local laws. (2) The completed asbestos survey for controlled demolition (as per section 56-11.5 of this Part) or pre-demolition asbestos projects shall also be submitted to the Asbestos Control Bureau district office that is closest to the building or structure location. (3) The completed asbestos survey shall be kept on the construction site with the asbestos notification and variance, if required, throughout the duration of the asbestos project and any associated demolition, renovation, remodeling or repair project. (h) Removal required. If the building/structure asbestos survey finds that the portion of the building/structure to be demolished, renovated, remodeled, or have repair work contains ACM, PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material, which is impacted by the work, the owner or the owner's agent shall conduct, or cause to have conducted, asbestos removal performed by a licensed asbestos abatement contractor in conformance with all standards set forth in this Part. All ACM, PACM, suspect miscellaneous ACM assumed to be ACM, or asbestos material impacted by the demolition, renovation, remodeling or repair project shall be removed as per this Part, prior to access or disturbance by other uncertified trades or personnel. No demolition, renovation, remodeling or repair work shall be commenced by any owner or the owner's agent prior to the completion of the asbestos abatement in accordance with the notification requirements of this Part. For multi-phased work, the access restriction for uncertified trades or personnel applies to each intermediate portion of the entire project. Upon completion of the intermediate portion of the asbestos project, other trades or personnel may access that portion of the work site. For demolition projects that are exempt from asbestos survey requirements due to being structurally unsound, the demolition is considered an asbestos project and shall proceed as per section 56-11.5 of this Part. 4