APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

Similar documents
EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

APPLICATION FOR PLAN EXAMINATION / BUILDING PERMIT or ZONING PERMIT

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Remember, PA One-Call before excavating. Simply dial 811 or

WEST COCALICO TOWNSHIP P.O. Box 244 Reinholds, PA (717) ZONING/BUILDING PERMIT APPLICATIONS INFORMATION & PROCEDURES

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

ZONING and PA UNIFORM CONSTRUCTION CODE (UCC) PERMIT APPLICATION. I. Zoning Permit Section Date Received Ins. Addendum Y N

1. NAME OF SUBDIVISION : DATE SUBMITTED: LOCATION OF SUBDIVISION : DATE OF PRELIMINARY APPROVAL BY TOWNSHIP SUPERVISORS:

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

BUILDING PERMIT APPLICATION

ZONING BOARD OF ADJUSTMENT MEETINGS ARE TYPICALLY HELD THE 2 nd MONDAY OF THE MONTH AT 7:00 P.M. IN THE COUNCIL ROOM OF THE MUNICIPAL BUILDING

I. Requirements for All Applications. C D W

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

APPLICATION PACKET LAND SPLIT OR COMBINATION REVIEW

Township of Collier 2418 Hilltop Road Presto, PA 15142

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

TITLE 14 ZONING AND LAND USE CONTROL CHAPTER 1 MUNICIPAL PLANNING COMMISSION

Application is hereby made to: a structure or land located at Repair at a cost of $ for: Extend Remove. Other Use Occupy

REQUEST FOR SPECIAL EXCEPTION FOR MANUFACTURED HOMES IN THE AR-1 & R-5 DISTRICT APPLICATION NO.

APPLICATION PACKET LAND SPLIT OR COMBINATION REVIEW

TO BE COMPLETED BY BOROUGH STAFF ONLY. Date Filed Application No. Zoning Board Application Fees. Scheduled for: Review for completeness Hearing

PRELIMINARY PLAT Checklist

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

Application for a Deminimus Development

Commercial Requirements Packet Sheridan, Indiana Hamilton County

APPLICATION FOR FINAL PLAT APPROVAL (Major Subdivision)

9. Public (Federal, State, or local

TOWNSHIP OF BASS RIVER BURLINGTON COUNTY, NJ P.O. BOX North Maple Avenue New Gretna, New Jersey LAND USE APPLICATION FORM

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

APPENDIX E FORMS INDEX OF ZONING FORMS

JACKSON COUNTY, MISSOURI PLANNED DEVELOPMENT ZONING APPLICATION

JOINT PLANNING BOARD APPLICATION FORM

Preliminary Plat/Final Plat Application

CITY AND COUNTY OF BROOMFIELD SUBDIVISION IMPROVEMENT AGREEMENT FOR (PROPERTY NAME - ALL CAPS)

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

West Earl Township Zoning Hearing Board Appeal Procedure

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

Nassau County Single Land Split Application

APPLICATION REVIEW CHECKLISTS

INSTRUCTIONS FOR APPLICANTS FILING APPLICATIONS BEFORE THE LOGAN TOWNSHIP PLANNING BOARD

ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS

APPLICANT/PARCEL OWNER: attach a copy of title or purchase contract.

City of Desert Hot Springs Planning Department

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

CITY OF BELLE GLADE. 110 Dr. Martin Luther King Jr. Blvd., West Belle Glade, FL Telephone (561) Fax (561)

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

NASSAU COUNTY SIDING PERMIT APPLICATION

CITY OF PANAMA CITY BEACH Building and Planning Department

G R O W T H M A N A G E M E N T D E P A R T M E N T DEMOLITION PERMIT APPLICATION

ZONING PERMIT APPLICATION and INSTRUCTIONS

Irrigation Permit Requirements FOR OWNER/BUILDER

SUBDIVISION CHECKLIST GREEN TREE BOROUGH Green Tree Planning Commission 10 West Manilla Avenue Pittsburgh, PA

Applications will be received on business days between 9:00 AM and 3:00 PM

BOROUGH OF MOUNT ARLINGTON ZONING PERMIT APPLICATION PROCEDURE 419 Howard Blvd., Mt. Arlington, NJ (973) ext. 14

SECTION 10 STANDARD PLATS

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

TOWNSHIP OF LOWER 2600 BAYSHORE ROAD, VILLAS, NJ APPLICATION FOR BUILDING MOVING PERMIT MODULAR HOME

SUBDIVISION APPLICATION

Residential Re-Roof Permit Requirements FOR CONTRACTORS

CHARTER TOWNSHIP OF LYON APPLICATION FOR LAND DIVISION (LOT SPLIT)

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

Occupational License Application Community Development Department

Minor Subdivision Application

City of Beacon Building Department

EASEMENT ACCESS INSTRUCTION SHEET

APPLICATION INSTRUCTION AND INFORMATION SHEET Minor Variance or Special Permission (Also see instructions on the application form)

PLANNING BOARD APPLICATION

City of Colleyville Community Development Department. Subdivision Application Packet

Address: (w) ( ) 2. Contractor s Name: phone ( ) Address: cell ( ) 4. Type of Construction: Cost of Project $

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

Boundary Line Adjustment Application

City of East Orange. Department of Policy, Planning and Development LAND USE APPLICATION & SITE PLAN REVIEW CHECKLIST

PLANNING AND DEVELOPMENT DEPARTMENT PRELIMINARY PLAT APPLICATION

INCOMPLETE APPLICATIONS WILL BE RETURNED! GENERAL PROPERTY INFORMATION. Applicant s name Day Phone address Authorized Agent (if applicable)

WARREN TOWNSHIP SEWERAGE AUTHORITY

COMMERCIAL BUILDING PERMIT APPLICATION

APPLICATION FOR FINAL PLAT APPROVAL

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

This certification comes after periodic inspections of the work site, while work was being done and a final inspection of the completed work on.

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

SHORT PLAT Information

BUILDING PERMIT APPLICATION

APPLICATION FOR CERTIFICATE OF ZONING COMPLIANCE/OCCUPANCY PERMIT. APPLICATION TYPE (check all that apply) APPLICANT INFORMATION

BUILDING PERMIT APPLICATION

OWNER/BUILDER AGREEMENT. Applicant Property Owner: Property Address:

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

APPLICATION PROCEDURE

TOWNSHIP OF EDENVILLE COUNTY OF MIDLAND STATE OF MICHIGAN ORDINANCE NO. 178 LAND DIVISION ORDINANCE TOWNSHIP OF EDENVILLE

WARREN TOWNSHIP ZONING BOARD OF ADJUSTMENT APPLICATION FOR VARIANCE, APPEAL OR INTERPRETATION. Name of Applicant: Phone #: Address:

PLANNING COMMISSION SUBDIVISION PLAT APPLICATION

LAND USE APPLICATION

SHORT PLAT APPLICATION CHECKLIST City of White Salmon. Application completed with notarized signatures

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

Transcription:

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA *NOTE: As per the Pennsylvania State Planning Code, there is a 30 day appeal period, under which anyone can appeal the issuance of this permit. Therefore, the holder of this permit should wait for the completion of the 30 day appeal period to expire prior to any expenditure, construction, erection, occupancy of any action for which this permit has been issued. Any expenditure, construction, erection or occupancy made prior to expiration of the 30 day appeal period is at the permit holder's risk. **Applications for structures to be constructed which access to state highway must be accompanied by State Highway Occupancy Permit Number as issued by the state. NOTE: NO APPLICATION SHALL BE OFFICALLY RECEIVED UNLESS APPLICATION IS COMPLETED IN FULL, IS SIGNED, ALL REQUIRED ATTACHMENTS HAVE BEEN PROVIDED, AND FEES ARE PAID: Page 1 of 12 TO BE COMPLETED BY APPLICANT: 1. Name of Applicant(s) 2. Applicant's Address: Phone Number: 3. Is applicant an agent of the Owner? Yes No 4. If yes to #3 above, please state the nature of applicant or agent's relationship to the owner and the nature of and character of any proprietary interest of the applicant regarding the premises: NOTE: Attach copies of any instrument evidencing said interest. 5. Owner's Name: 6. Owner's Address: 7. Location/Address of premises: 8. Tax Parcel o Premises: Zoning Classification: 9. Beaver County Deed Book Reference: Book number: Page #: 10. If premises is a lot in a recorded subdivision, state the following: Subdivision Name: Lot #: 11. Does the proposed construction require any of the following? a. Conditional Use Approval: Yes No b. Approval by Special Exception: Yes No c. Date Granted: Yes No d. Variance Yes: No e. Date Granted: Yes No 12. Is the premises wholly or partially within a Federally Designated Flood plain? Yes No

Page 2 of 12 13. Estimated start date of construction: 14. Estimated completion date of construction: 15. Estimated date of occupancy: 16. Pursuant to the provisions, conditions, and limitations of the Zoning Ordinance of the Township of Center, Ordinance No. 293. as amended, application is herewith made to construct upon the premises, the following: 17. Specify intended use of proposed construction: 18. Attach 5 copies of a Site Plan, drawn to scale, showing: a. Exact dimensions and total acreage of lot or parcel (s). Note: Applicant may be required to furnish a survey of the lot or parcel (s) if accurate information is not readily available. b. Exact exterior size (dimension and height) and location of all existing and proposed buildings or structures. c. Exact location and areas of water courses, drainage ways, utility rights-of ways and easements, if any. d. Exact location of driveways, roads, and streets within, adjacent, and opposite e. Existing and proposed off-street parking and off-street loading, if any. f. Existing and proposed building line and all dimensions for front, side and rear yards for all principal and accessory buildings. 19. Attach 5 copies of a Building Plan, drawn to scale showing the following items: NOTE: Single family dwellings and accessory uses to single family dwellings need not have building plans submitted unless within a Federally designated Flood Plain. a. Exact interior dimension (width, depth, height). b. If within a Flood Plain, the elevation above sea level of the lowest floor. c. Type of construction to include foundation, interior and exterior walls, roof, electrical, plumbing and heating. d. Number and use of rooms. e. Square footage of interior space. f. As required, approval from the Pennsylvania Department of Labor and Industry. g. As required, a Developer's Agreement. 20. Attach Notice of Intent to Construct and Warranty forms as per the requirements of the Building Energy Conservation Act (PA Act 222, as amended). Said forms to be completed in full and signed. 21. Is a driveway to be constructed? Yes No If driveway is to be constructed, attach a copy of the Township Driveway Permit Application as per requirements of the Township Ordinance No. 173, as amended. Said application is to be completed in full and signed.

Page 3 of 12 22. Yes No Applicant certifies that he/she has independently verified that, as of the date of this Application, the premises described is serviced or can be practicably accommodated by the potable water distribution system of the Center Township Water Authority, and further certifies that prior to occupancy, and as a condition of the Zoning Use and Compliance Certificate for which application is made, the premises shall be connected to said water distribution system. Yes No Applicant attends to serve the proposed construction by an on-lot water well. 23. Yes No Applicant certifies that he/she has independently verified that, as of the date of this Application, the premises above described is served or can be practically accommodated by the sanitary collection sewerage system of the Center Township Sewer Authority, and further certifies that prior to occupancy, and as a condition of the Zoning Use and Compliance Certificate for which application is made, the premises shall be connected to said sanitary collector sewerage system. Yes No Applicant intends to serve the proposed construction by an on-lot sewerage treatment system. If yes, attach copy of a permit for an on-site sewage disposal system obtained from the Township Sewage Enforcement Officer. 24. Estimated value of Proposed Construction: $ *Note: Estimated value of proposed construction shall be determined as per the following: -For new construction of a building, structure, or addition to a building or structure the total value of materials and labor. If construction is to be done by any person other than Owner, attach copy of executed construction contract. If work to be completed by owner, include value of one's own labor. -For remodeling or rehabilitation of a building or structure the total value of materials and labor involved in the structural alteration or reconstruction, i.e., roof changes-not roofing, altering a window opening-not window sash replacement. If construction is to be done by any persons other than owner, attach copy of executed construction contract. If work to be completed by owner, include value of owner's labor. Applicant hereby certified that the statements and representations made herein and contained in all accompanying matter made part of the Application are true and correct. Date this day of, (Applicant s Signature)

Page 4 of 12 If applicant is agent of owner, attach Power of Attorney evidencing authority to act on behalf of owner. Name of Corporation By Title Officer Secretary 1. Zoning Use and Compliance Certificate Fee, as specified in Township Resolution 405 $ 2. Driveway Permit Fee, as specified in Township Ordinance 173 $ 3. Grading Permit Fee, as specified in Township Ordinance 245$ 4. Fire Prevention Code Fee, as specified in Township Ordinance 229 $ 5. Occupancy Permit Fee, as specified in Township Ordinance 405 $ Note: Fees required of the Township's Sewer Authority and Water Authority shall be paid through the offices of said Authority. The above fee, the total amount of $_were paid this day of, 20, for which Receipt No. was issued.

Page 5 of 12 CENTER TOWNSHIP WATER AUTHORITY REJECTION And now, this day of,20, the Center Township Water Authority hereby certifies that the above described premises are not served, benefited, or accommodated by the distribution lines of the Authority and that said premises are not within practicable reach of existing distribution lines CENTER TOWNSHIP WATER AUTHORITY By PRELIMINARY APPROVAL And now, this day of,20, the Center Township Water Authority hereby certifies that the above described premises are not served, benefited, or accommodated by the distribution lines of the Authority and that preliminary application for connection has been approved. CENTER TOWNSHIP WATER AUTHORITY By Tapping fee required $ Tapping Fee in the sum of $ paid this day of, 20, for which Receipt No. was issued. CENTER TOWNSHIP WATER AUTHORITY By

Page 6 of 12 CENTER TOWNSHIP SEWER AUTHORITY FINAL APPROVAL And now, this day of,, the Center Township Water Authority certifies that all fees, bonds, and approvals, required as a condition precedent to construction have been filed with and approved by the Authority; that the Authority has been advised by its Engineers that it has the present capacity to provide water service to said premises, or will have such capacity to prior to anticipated occupancy as specified by the Applicant. The service to said premises and will receive from the applicant a corporate surety bond, or other satisfactory security, to guarantee the construction of the improvements described on the plat of said premises prepared by, dated, and entitled the same by attachment and reference made a part of this application. CENTER TOWNSHIP WATER AUTHORITY By

Page 7 of 12 CENTER TOWNSHIP SANITARY AUTHORITY REJECTION And now, this day of, 20, the Center Township Sewer Authority hereby certifies that the above described premises are not served, benefited, within practicable reach of exiting distribution lines. CENTER TOWNSHIP SANITARY AUTHORITY BY: PRELIMINARY APPROVAL And now, this day of 20, the Center Township Sewer Authority herby certifies that the above described premises are served, benefited, or accommodated by the distribution line of the Authority and that preliminary application for connection has been approved. CENTER TOWNSHIP SANITARY AUTHORITY BY: Tapping Fee Required $ Tapping Fee in the sum of $, paid this day of, 20, for which Receipt No. has been issued. CENTER TOWNSHIP SANITARY AUTHORITY BY: If the proposed construction is intended to be served by an on-lot sewage treatment system, the Sewage Permit for such system, issued by a certified Sewage Enforcement Office retained by the Township of Center, must accompany this Application and the following must be specified: Permit Number Date of Issuance of Permit Date of Expiration of Permit

Page 8 of 12 BUREAU OF FIRE PREVENTION FIRE MARSHAL OF THE TOWNSHIP OF CENTER PRELIMINARY APPROVAL And now, this day of,, the plans and specifications accompanying this Application are preliminary approved as apparently conforming to the Fire Prevention Code of the Township of Center, Ordinance No.229, as amended. This preliminary approval merely signifies that as of this date applicant has, apparently, submitted sufficient documentation to permit official review. Fire Marshal Fee required $ Fee in the amount of $ paid this day of,, for which Receipt No. was issued. REJECTION And now, this day of,, Application is disapproved as not conforming to the provisions of the Fire Prevention Code Ordinance of the Township of Center, Ordinance No. 299, as amended, in the following particulars:. Fire Marshal BUREAU OF FIRE PREVENTION FIRE MARSHAL OF THE TOWNSHIP OF CENTER FINAL APPROVAL And now, this day of,, the undersigned hereby grants final approval to the construction proposed to be performed on the premises, as described in the plat prepared by _ dated the same countersigned by the undersigned and by attachment and reference made a part of the application. Fire Marshal

Form No. SLD-5 Page 9 of 12 CENTER TOWNSHIP ENGINEER GRADING ORDINANCE EXEMPTION And now, this day of,, the grading/filling/excavation to be performed in the premises as described in the plans and specifications accompanying this Application, are exempt from the provisions of the Grading Ordinance of the Township of Center, Ordinance No. 245, as amend. Township Engineer PRELIMINARY APPROVAL And now, this day of,, the grading/filling/excavation to be performed in the premises, as described in the plans and specifications accompanying this Application, are preliminary approved as apparently conforming to the Grading Ordinance of the Township of Center, Ordinance No. 245, as amended. This preliminary approval merely signifies that as of this date the Applicant, has apparently, submitted sufficient documentation to permit the Township Engineering review. Fee required $ Fee in the amount of $ paid this day of,, for which Receipt No. was issued. REJECTION And now, this day of,, this Application is disapproved as not conforming to the provisions of the Grading Ordinance of the Township of Center, Ordinance No. 245, as amended, in the following particulars: Township Engineer

Form No. SLD-5 Page 10 of 12 FINAL APPROVAL And now, this day of, the undersigned hereby grants final approval to the grading/filling/excavation to be performed in the premises, as described in the plat prepared by dated ~ and entitled", the same countersigned by the undersigned and by attachment and reference made a part of the application. Bond in the amount of $ to be filed. Township Engineer I hereby certify that I have examined the following described bond submitted in connection with the above grading permit and hereby approve the same as to form. Dated: Bond No. Principal: Township Solicitor Surety

Form No. SLD-5 Page 11 of 12 TOWNSHIP OF CENTER ZONING OFFICER APPROVAL OF ZONING USE AND COMPLIANCE CERTIFICATE APPLICATION Date Received: And now, this day of,, the within application is approved subject to the following special conditions which are, hereby made part of the Zoning Use and Compliance Certificate No concurrently issued herewith: Occupancy permit not be issued until final inspection of completed construction and after Applicant has furnished an executed copy of the construction contract together with required addition building permit and occupancy permit fees, if any. DISAPPROVAL OF ZONING USE AND COMPLIANCE CERTIFICATE APPLICATION And now, this day of,, within application is disapproved as not conforming to the provisions of the Ordinance of the Township of Center, Ordinance No., as amended in the following particulars: Zoning Officer Note: Applicant may seek relief from the adverse determination of the Zoning Officer by filing application (appeal) there from within thirty days after notice thereof. Such applications shall be made to the Zoning Hearing Board of the Township of Center. Application forms may be obtained from the Board Secretary at the Municipal Building, 224 Center Grange Road, Center Township, Beaver County, Pennsylvania. Post Office: Aliquippa, Pennsylvania 15001.

Form No. SLD-5 Page 12 of 12 WORKERS COMPENSATION INSURANCE COVERAGE INFORMATION A. The applicant is: A contractor within the meaning of the Pennsylvania Workers' Compensation Law Yes No If the answer is "yes," complete Sections Band C below as appropriate. B. Insurance Information Name of Applicant Federal or State Employer Identification No. Applicant is a qualified self-insurer for workers' compensation. Certificate attached Name of Workers' Compensation Insurer Workers' Compensation Insurance Policy No. Certificate attached Policy Expiration Date C. Exemption Complete Section C if the applicant is a contractor claiming exemption from providing workers' compensation insurance. The undersigned swears or affirms that he/she is not required to provide workers' compensation insurance under the provisions of Pennsylvania Workers' Compensation Law for one of the following reasons, as indicated: Contractor with no employees. Contractor prohibited by law from employing any individual to perform work pursuant to this building permit unless contractor provides proof of insurance to the township. Religious exemption under the Workers' Compensation Law. Subscribed and sworn to before me this day of, (Signature of Notary Public) My Commission expires: Signature of applicant (Seal) Address County Municipality of