Appeal Ref: APP/Q6810/A/15/ Site address: Goetre Uchaf, Off Ffordd Penrhos, Bangor, Gwynedd, LL57 2NT

Similar documents
gan Clive Sproule BSc MSc MSc MRTPI MIEnvSci CEnv by Clive Sproule BSc MSc MSc MRTPI MIEnvSci CEnv

AT Land Adjacent to Tollgate Cottage, Broughton Grounds Lane, Milton Keynes. Parish: Broughton & Milton Keynes Parish Council

Appeal Ref: APP/Y6930/A/14/ Site address: Lôn Hir Industrial Estate, Lôn Hir, Alltwen, Pontardawe, SA8 3DE

108 Holders Hill Road London NW4 1LJ

Appeal Ref: APP/J3720/W/18/ Land off The Burrows, Newbold-on-Stour, Stratford-on-Avon, Warwickshire CV37 8UP

Notice of Intention by Rob Huntley, a Reporter appointed by the Scottish Ministers

Community Infrastructure Levy & S106 Workshop

INTRODUCTION This application is brought before committee as Councillor Howell has submitted a red card due to residents concerns.

an Inspector appointed by the Secretary of State for Communities and Local Government

1 Cumbrian Gardens London NW2 1EB

Subdivision of existing dwellinghouse to create 1x one bedroom flat and 1x two bedroom flat

an Inspector appointed by the Secretary of State for Communities and Local Government

Town and Country Planning Act 1990

77 And 79 Devonshire Road London NW7 1DR

an Inspector appointed by the Secretary of State for Communities and Local Government

abcdefghijklmnopqrstu

Land at East Bay Close, Cardiff. Planning Statement Proposed Redevelopment to Provide Student Accommodation.

Powys Local Development Plan ( ) Supplementary Planning Guidance. Affordable Housing. Consultation Draft - July 2018

CA/15/2006/OUT. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2015 Ordnance Survey

Test Valley Borough Council Southern Area Planning Committee 12 December 2017

The application is being presented to the planning committee as Brentwood Borough Council is the applicant.

16 May 2017 PLANNING COMMITTEE. 5i 16/1244 Reg d: Expires: Ward: HE. of Weeks on Cttee Day:

Paragraph 47 National Planning Policy Framework. rpsgroup.com/uk

Changing a planning condition for delivery times January 2016

Simon Court 2-4 Neeld Crescent London NW4 3RR

Team Leader: Alex Harrison Minor Applications Team Leader Contact Details:

Examination into Cheshire East Local Plan

East Riding Of Yorkshire Council

16 Sevington Road London NW4 3SB

Report of: DEVELOPMENT MANAGEMENT SECTION HEAD. 19 Cassiobury Park Avenue PARK

Too early to conclude there is no demand DETERMINE. Fairfield for these units. Variation of Condition - Recommended for Approval

52A-56 High Street. Central

AFFORDABLE HOUSING SUPPLEMENTARY PLANNING DOCUMENT

BIRMINGHAM DEVELOPMENT PLAN EXAMINATION 2014 MATTER E: GREEN BELT POLICY & THE LANGLEY SUE

SCOTTISH BORDERS COUNCIL PLANNING AND BUILDING STANDARDS COMMITTEE 6 MARCH 2017

Delivering affordable housing using section 106 agreements: Practice Guidance

NORTH LEEDS MATTER 2. Response to Leeds Sites and Allocations DPD Examination Inspector s Questions. August 2017

ISLAND PLAN. Affordable Housing Contributions. Supplementary Planning Document

OUTLINE PLANNING PERMISSION

Bill 7, Promoting Affordable Housing Act, 2016

Tudor Court 2 Crewys Road London NW2 2AA

an Inspector appointed by the Secretary of State for Communities and Local Government

Britannia House High Road London N12 9RY

Flat 3 43 Sunny Gardens Road London NW4 1SL

EXPLANATORY MEMORANDUM TO THE HOUSING (SERVICE CHARGE LOANS) (AMENDMENT) (WALES) REGULATIONS 2011 SI 2011 No.

Affordable Housing in the Draft National Planning Policy Framework

CA//15/02526/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2016 Ordnance Survey

Richborough Estates. Appeal Decision. Inquiry held on 9, 10, 11 and 19 October 2012 Site visit made on 11 October 2012

CHESHIRE WEST AND CHESTER COUNCIL

Hardwick St Neots Road (S/3064/16/OL) Hardwick St Neots Road (S/3064/16/OL)

Domestic Energy Assessor Quality Assurance Requirements England & Wales and Northern Ireland Regions Effective Date 1 st August 2012

Leeds City Council Site Allocations Plan Examination

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND


Nottingham City Council Development Department

57 Foscote Road London NW4 3SE

Rochford District Council Rochford Core Strategy - Statement on housing following revocation of East of England Plan

Description: Change of use from job centre (A1) to 15 bedroom sui generis HMO (C4)

Section 106: Appendices

APPLICATION No. 17/01532/MNR APPLICATION DATE: 29/06/2017

3 Accommodation Road London NW11 8ED

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS

Yorkshire Dales National Park Authority

Persimmon Homes Severn Valley comment St Cuthbert (Out) Neighbourhood Plan Pre-Submission Consultation

DRAFT LOCAL VALIDATION CHECKLIST FOR ALL APPLICATIONS

Review of the Plaistow and Ifold Site Options and Assessment Report Issued by AECOM in August 2016.

APPENDIX 7. Housing Enforcement Policy V May 2003

GWYNEDD AND ANGLESEY JOINT LOCAL DEVELOPMENT PLAN ( )

18/00994/FUL Land at Newton Grange Farm, Sadberge, Darlington

Woldingham Association

an Inspector appointed by the Secretary of State for Communities and Local Government

Core Strategy Topic Paper 1. PPS25 Sequential Test

Identifying brownfield land suitable for new housing

Mr P. Spong Collingtree C of E Primary School. Concerned regarding the level of noise and disruption residential amenity

Welfare Benefit Reform Strategy

Mr Richard Duggan Inspector c/o Programme Officer. Date: 9 January Dear Sir,

Perth and Kinross Council Development Management Committee 24 January 2013 Report of Handling by Development Quality Manager

UNIT 1 and 2, 23 SALISBURY GROVE, MYTCHETT, CAMBERLEY, GU16 6BP

CA/15/01198/FUL. Canterbury City Council Military Road Canterbury Kent CT1 1YW. Crown copyright and database rights 2015 Ordnance Survey

Mortgagee in Possession Section 106 Standard Clauses. Practice Note January 2019

CROSSRAIL INFORMATION PAPER C10 - LAND DISPOSAL POLICY

Report of Commissioning Director, Environment. Urgent No Key No Enclosures Appendix 1 Example of licence conditions. Summary

an Inspector appointed by the Secretary of State for Communities and Local Government

Mr Haydn Jones Pegasus Planning Group Unit 5 The Priory Old London Road Canwell Sutton Coldfield B75 5SH

Description: Erection of detached agricultural workers dwelling (Resubmission)

shortfall of housing land compared to the Core Strategy requirement of 1000 dwellings per 1 Background

LOCATION: LAND ADJOINING 10 BEDWELL CRESCENT CROSS LANES WREXHAM LL13 0TT

Group Company A together with its subsidiaries

East Herts District Plan Part 1: Strategy Sieve 5: Strategy Testing. Land Owner/Developer Questionnaire

Registered office address

Rawlinson House, Lewisham, London SE13 5EL

1 SUMMARY OF APPLICATION AND RECOMMENDED DECISION

RYEDALE SITES LOCAL PLAN MATTER 4 PROPOSED HOUSING SITE OPTION REF. 116 LAND AT MIDDLETON ROAD, PICKERING BARRATT HOMES & DAVID WILSON HOMES

79th OREGON LEGISLATIVE ASSEMBLY Regular Session. Senate Bill 310 SUMMARY

Radical Solutions to the Housing Supply Crisis. Duncan Bowie University of Westminster. SHELTER CYMRU 6 July 2017

PART A. Report of: Head of Development Management. Date of committee: 1 st September 2016

Town of Scarborough, Maine

Change of use from storage and workshop (Use Class B2) to vehicle examination site (MOT) (Use Class Sui Generis)

Planning Policy Guidance 3: Housing

Tel: Fax:

Transcription:

Penderfyniad ar yr Apêl Gwrandawiad a gynhaliwyd ar 23/02/16 Ymweliad â safle a wnaed ar 23/02/16 Appeal Decision Hearing held on 23/02/16 Site visit made on 23/02/16 gan Declan Beggan Bsc (Hons) DipTP DipMan MRTPI Arolygydd a benodir gan Weinidogion Cymru Dyddiad: 22/04/16 Date: 22/04/16 by Declan Beggan Bsc (Hons) DipTP DipMan MRTPI an Inspector appointed by the Welsh Ministers Appeal Ref: APP/Q6810/A/15/3134548 Site address: Goetre Uchaf, Off Ffordd Penrhos, Bangor, Gwynedd, LL57 2NT The Welsh Ministers have transferred the authority to decide this appeal to me as the appointed Inspector. The appeal is made under section 78 of the Town and Country Planning Act 1990 against a failure to give notice within the prescribed period of a decision on an application for planning permission. The appeal is made by Redrow Homes NW against Gwynedd Council. The application Ref C15/0634/25/LL is dated 3 June 2015. The application sought planning permission for the part re-plan to 174 residential dwellings at existing approved development (Ref: C12/1347/25/LL). The re-plan is proposed to increase the overall number of dwellings from 245 to 266, comprising detached, semi-detached and apartments to include affordable units (35%) with associated parking and garden areas. Decision 1. I allow the appeal and grant planning permission for the part re-plan to 174 residential dwellings at existing approved development (Ref: C12/1347/25/LL). The re-plan is proposed to increase the overall number of dwellings from 245 to 266, comprising detached, semi-detached and apartments to include affordable units (35%) with associated parking and garden areas at Goetre Uchaf, Off Ffordd Penrhos, Bangor, Gwynedd, LL57 2NT in accordance with the terms of the application, Ref. C15/0634/25/LL, dated 3 June 2015, and the plans submitted with it, subject to the conditions in the schedule at the end of this decision. Application for Costs 2. At the Hearing an application for costs was made by Redrow Homes NW against Gwynedd Council. This application is the subject of a separate Decision. Procedural Matters 3. On the day of the hearing the appellant submitted a Section 106 Unilateral Undertaking (UU) regarding a mechanism for the provision of affordable housing on the site which provides for a number of options before the dwellings are disposed of on the open market without any restrictions. Due to the timing of the submission of the UU the Council were given a further ten days to clarify their position on its contents; in addition the appellant was allowed an opportunity to respond. I have had regard to it in my consideration of the appeal.

4. The Council confirmed at the Hearing that it had neither objection to the principle of development, nor to the detail of the application. The only matter now in dispute between the parties was the mechanism to provide for affordable housing. Main Issue 5. Bearing in mind paragraph four above, the main issue is whether the appellant s submitted unilateral undertaking satisfactorily addresses the requirement to provide affordable housing on the site, and if not, whether any other mechanism would satisfy that requirement. Reasons 6. The appeal site is located in the sub-regional centre of Gwynedd as defined in the UDP and represents one of the largest allocated sites within the plan area. Policy CH6 of the UDP requires the provision of affordable housing on all allocated sites in the plan area unless it can be proven to the satisfaction of the Planning Authority that after considering all the relevant factors it would be inappropriate to provide for affordable housing on the site. Clearly the site is expected to provide for a significant number of dwellings including affordable units. Policy CH6 is supplemented by the Council s adopted Supplementary Planning Guidance: Affordable Housing 2009 (SPG). The SPG states at paragraph 3.15 that a financial or other contribution towards affordable housing on a suitable site will only be acceptable in exceptional circumstances when a need has been established, all other alternatives have been explored and soundly discounted, and when it can be demonstrated that the affordable housing will be provided. The Council s adopted Supplementary Planning Guidance: Development Briefs 2009 provides guidance to supplement policies in the UDP; it states in regards to the appeal site that planning applications should ensure that approximately 35% of the houses constitute affordable housing. Planning Policy Wales, Edition 8 (PPW) refers to site specific targets for the provision of affordable housing. 7. The UU would provide a cascade approach in regards to the provision of affordable housing whereby the developer would seek to dispose of affordable housing on the site via a Registered Provider (RP) who would provide affordable rented units, then in turn if this is not taken up a RP would be offered the units as affordable housing with intermediate tenures. If the intermediate tenures are not taken up by a RP, then the units would be offered for sale to a Qualifying Person (QP) as an affordable housing unit. Finally if no offer is received from a QP, then the dwelling will be disposed of on the open market and the developer would pay the Council an off-site commuted sum. This whole process would take 24-30 weeks from the granting of planning permission. 8. The appellant argues the submitted UU does not seek to challenge the principal of providing 35% affordable housing but instead seeks to provide a mechanism that would allow the disposal of housing units in the event that an affordable need is not justified. I appreciate that the appellant does not want to be left with the potential burden of properties that cannot be occupied due to lack of interest from those with an affordable housing need. Nonetheless I am not convinced that the period of 24-30 weeks is a sufficient period of time to identify affordable housing demand related to the site. I consider that the period of 24-30 weeks would place an unreasonable constraint on the provision of those affordable units due to the relatively short time frame between individual elements of the cascade being enacted, and also in its overall timing, notwithstanding that development has already commenced on the site. To my mind, at this moment in time, to permit the development with a UU that ties the provision of affordable units to the proposed timescales is unreasonable, and 2

would undermine policy CH6 of the UDP which seeks the provision of affordable housing on all allocated sites. 9. In addition, in the event that appellant could not dispose of the properties via a RP or QP, then the UU would require the developer to pay the Council an off-site commuted sum. The Community Infrastructure Levy Regulations 2010 (CIL Regs) make it unlawful for a planning obligation to be taken into account in a planning decision unless it is necessary to make the development acceptable in planning terms, directly related to development and fairly and reasonably related in scale and kind to the development. However, should the stage be reached in the cascading mechanism that there is no need for affordable housing on the site, then it is arguable that a financial contribution is not necessary. Subsequently any requirement of the UU to provide a commuted sum to the Council to use for off-site provision, would run contrary to the CIL Regs. Consequently I am not satisfied the UU meets the requirements of the CIL Regs, nor the additional tests set out in Circular 13/97 on Planning Obligations. For the reasons given above therefore, the UU carries very little weight in the determination of this appeal. 10. Technical Advice Note 2: Planning and Affordable Housing, 2006 (TAN2), recognises that both planning conditions and obligations may be used to achieve the development and use of land in a way that contributes to meeting the identified need for affordable housing and to achieve mixed and sustainable communities. Circular 13/97 also recognises there is a choice between imposing conditions and entering into a planning obligation. As it currently stands, as acknowledged by both parties, there is a need to provide for affordable housing in line with local planning policy. The appellant confirmed a RP has agreed in principle to acquire all of the affordable dwellings on the site, and bearing in mind my view that the cascade approach advocated by the appellant in the UU carries little weight, I consider the Council s suggested planning condition, as discussed and amended at the Hearing, would provide an adequate mechanism to ensure the affordable provision is met on the site, and would meet with requirements of policy CH6 of the UDP. Conditions 11. I have considered the conditions suggested by the Council, given my decision to allow the appeal. In doing so I have had regard to the tests for conditions set out in Circular 016/2014: The Use of Planning Conditions for Development Management. 12. I agree that condition 1 is necessary in regards to the imposition of the five year time limit. Condition 2 is necessary as it relates to the listing of the approved plans and documents to facilitate any minor material amendments, and to define the plans with which the scheme should accord for the avoidance of doubt. Conditions 3, 4, 5, 6 & 7 are necessary in the interests of visual amenity. Condition 8, as discussed and agreed by the parties at the Hearing is necessary in the interests of highway safety. Condition 9 restricts the permitted development rights of the affordable units and is necessary in order to maintain their affordability. Condition 10 relating to the provision of affordable housing is necessary for the reasons as discussed above. Conditions 11 & 12 are necessary in the interests of flood control. Condition 13 is necessary in the interests of safeguarding the ecology of the area. Condition 14 is necessary to safeguard the archaeology of the area; however in the interests of precision I have reworded it. Condition 15 is necessary in order to protect a public footpath. Proposed condition 16 which relates to the provisions of the previous planning permission issued for the site is not considered necessary. 3

Conclusions 13. The proposed development is acceptable in principle and detail. For the reasons given above I have afforded very little weight to the UU submitted by the appellant; however I consider the provision of affordable housing on the site via the Council s suggested planning condition as discussed and amended at the Hearing, would provide a satisfactory mechanism for the delivery of the required affordable units. Subject to the conditions referred to in the schedule below, I conclude that the proposed development would not be in conflict with the relevant policies of the UDP, the Council s Supplementary Planning Guidance related to affordable housing, the Council s Supplementary Planning Guidance related to development briefs, and PPW. 14. After taking account of all the evidence before me, and for reasons given above, I therefore conclude that the appeal should be allowed. Declan Beggan INSPECTOR Schedule of Conditions 1. The development hereby permitted shall begin no later than five years from the date of this decision. 2. The development shall be carried out in accordance with the approved plans and documents numbered 1074-02-02-301, 1074-02-02-302, 1074-02-02-304revA, 1074-02-02-306, 1074-02-02-308, 1074/S104/01revC, E-SD0806, E-SD900, E-SD910, E- SD906, Snowdon d series, Stour Avon WE series, Broadway WE series, B2 apartments C series, Alton apartments C series, Oxford Ef series, Letchworth Ef series, Canterbury Ef series, Cambridge Ef series, Broadway-Evesham Ef series, Shrewsbury Ef series, Shaftebury Ef series, Windsor Ef series, Warwick Ef series, Stratford Ef series, Double garage type 10, Single garage type 1 submitted to the Local Planning Authority, and contained in the form of application and in any other documents accompanying such application unless condition(s) to amend them is/are included on this decision. 3. The roof of all dwellings and garages shall be covered with new natural Welsh slates, the colour of which shall be agreed in writing by the Local Planning Authority or with slates of equivalent colour, texture and weathering characteristic as may be approved in writing by the Local Planning Authority. 4. The external finish of all buildings shall be as agreed in writing with the Local Planning Authority before any work is commenced in connection with this approval. 5. Prior to the commencement of development, written details must be submitted for approval to the Local Planning Authority of all walls, fences, lighting bollards and all/any other street furniture to be erected/placed on the site. The details of the structures erected shall be in accordance with those approved. 6. Within one month of commencement of the development, a landscaping and tree planting scheme shall be submitted to, and approved in writing by the Local Planning Authority. 4

7. All planting, seeding or turfing comprised in the approved details of landscaping and tree planting shall be carried out in the first planting and seeding seasons following the occupation of the buildings or the completion of the development, whichever is the sooner; and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species, unless the Local Planning Authority gives written consent to any variation. 8. The parking provision as indicated on the submitted details shall be provided prior to occupation of the dwellings to which they relate to and thereafter retained for those purposes. 9. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 as amended (or any order revoking, re-enacting or modifying that Order), no development falling into Article 2, Part 1, Class A to E shall take place on the residential units identified as affordable units specified by condition 10. 10. The development shall not begin until a scheme for the provision of affordable housing as part of the development has been submitted to and approved in writing by the Local Planning Authority. The affordable housing shall be provided in accordance with the approved scheme and shall meet the definition of affordable housing in Annex B of Planning Policy Wales Technical Advice Note 2: Planning and Affordable Housing or any future guidance that replaces it. The scheme shall include: i) the numbers, type, tenure and location on the site of the affordable housing provision to be made; ii) the timing of the construction of the affordable housing and its phasing in relation to the occupancy of the market housing; iii) the arrangements for the transfer of the affordable housing to an affordable housing provider or the management of the affordable housing; iv) the arrangements to ensure that such provision is affordable for both first and subsequent occupiers of the affordable housing; and v) the occupancy criteria to be used for determining the identity of occupiers of the affordable housing and the means by which such occupancy criteria shall be enforced. 11. No development approved by this permission shall be commenced until a scheme for the provision and implementation of a surface water regulation system has been submitted to and approved in writing by the Local Planning Authority. Such a scheme shall be implemented prior to the construction of any impermeable surfaces draining to the system unless otherwise agreed in writing by the Local Planning Authority. Surface water generated from the new impermeable surfaces must be limited to equivalent Greenfield rate for the site, the level of which shall be agreed with the Local Planning Authority. 12. No development approved by this permission shall be commenced until an updated Hydraulic Modelling Assessment is undertaken for the site. The assessment shall be 5

submitted to and approved in writing by the Local Planning Authority in consultation with Dŵr Cymru/Welsh Water. The scheme shall be carried out in strict accordance with the approved details. 13. An updated bat mitigation assessment must be submitted to the Local Planning Authority for approval prior to development commencing. The development hereby approved, must be carried out in strict accordance with the guidance and requirements contained in the report, unless otherwise agreed in writing with the Local Planning Authority. 14. Details of a management plan/maintenance strategy for the Scheduled Ancient Monument and surrounding area must be submitted to the Local Planning Authority for written approval prior to the commencement of development and any subsequently approved scheme shall be implemented in full thereafter. 15. Public footpath number 11- Pentir community, shall be protected and public access maintained during and after this development. 6

APPEARANCES FOR THE APPELLANT Mr M Gilbert BSc Hons MRTPI Mr P Murray Director The Planning Consultancy Redrow FOR THE LOCAL PLANNING AUTHORITY Mr GL Gruffudd BA MSc Ms K Swennie BA Hons, MSc Development Management Officer Senior Development Management Officer Ms C Owen BA P.Dip Development Management Manager THIRD PARTIES Mr T Chan Local Resident Mr R Mc Cann Local Resident Ms F Davies Local Resident DOCUMENTS SUBMITTED AT THE HEARING 1 Council s notification letter and list of those notified 2 Copy of Letter from Welsh Water dated 25 January 2016 3. Copy of Drawing No. 1074/S104/01 Rev C 4. Appellant s written cost application 7