Before I can issue a permit, I need the following items:

Similar documents
WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

BUCKINGHAM COUNTY BUILDING PERMIT CHECKLIST

Application for a Building/Zoning Permit

TOWN OF COLONIAL BEACH 315 Douglas Ave. Colonial Beach, Virginia (804) FAX (804)

Pavers, Concrete Driveways, Sidewalks, Patio and Pads Permit Requirements FOR OWNER/BUILDER

Irrigation Permit Requirements FOR OWNER/BUILDER

6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT

COMMERCIAL BUILDING PERMIT APPLICATION

Zoning and Building Permit Application

LOT SUBDIVISION LOT BLOCK SIZE

Date Received: Permit #:

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

Project Address: District: Lot: Block or Subdivision: Parcel: Occupancy Type: R2 (MF)

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Greenbrier County Building Code Administrative Policy Manual

BUILDING CODE SERVICES PERMIT SUBMITTAL REQUIREMENTS (2017 Florida Building Code in Effect)

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

Residential Re-Roof Permit Requirements FOR CONTRACTORS

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

NEW SINGLE FAMILY RESIDENTIAL

Remember, PA One-Call before excavating. Simply dial 811 or

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

-PLUMBING- BUILDING PERMIT APPLICATION PACKET

RESIDENTIAL ADDITION/ALTERATION PERMIT APPLICATION

BUILDING PERMIT APPLICATION

City of Beacon Building Department

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

11/30/2016. Residential Building Plan submittal:

NEW MOBILE HOME PERMIT APPLICATION

- POOL / HOT TUB / JACUZZI / SPA - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

OSSF Permit Application

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

BUILDING PERMIT APPLICATION

-ROOFNEW ROOF RE-ROOF ROOF OVER

OWNER-BUILDER STATEMENT/AFFIDAVIT

APPLICATION FOR A BUILDING PERMIT

HOMEOWNER S PROCEDURES FOR FILING A BUILDING PERMIT APPLICATION FOR WASHINGTON COUNTY, MARYLAND

OWNER/BUILDER AGREEMENT. Applicant Property Owner: Property Address:

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

INSTRUCTIONS FOR COMPLETING THE APPLICATION FORM

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

BUILDING PERMIT APPLICATION

City of Umatilla 1 South Central Avenue P.O. Box 2286 Umatilla, FL Phone (352) FAX (352) DEMOLITION PERMIT APPLICATION

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

ZONING COMPLIANCE PERMIT APPLICATION

-MECHANICAL- BUILDING PERMIT APPLICATION PACKET

NASSAU COUNTY SIDING PERMIT APPLICATION

HOME ADDITION PERMIT PROCESS

Marion County Board of County Commissioners

CHAPTER 3 PLUMBING CODE

HERNANDO COUNTY PERMIT APPLICATION PACKET DEMOLITION PERMIT

BUILDING PERMIT APPLICATION

NASSAU COUNTY MECHANICAL PERMIT APPLICATION

HERNANDO COUNTY PERMIT APPLICATION PACKET MECHANICAL PERMIT

Progressive Review Time Submittal of application and necessary documents

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

MANUFACTURED (MOBILE) HOME Instructions for Building Permit Application & Inspections

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

Information Needed for a Building Permit

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

Septic Tank / Drainfield / Holding Tank Permit Application

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

Doors & Windows Package

NEW HOME CONSTRUCTION PERMIT PROCESS

STEP 1: SOIL EVALUATION

ORDINANCE # CITY OF MOUNDVILLE BUILDING INSPECTOR RULES AND PROCEDURE AND BUILDING CODES AND FEES

GROWTH MANAGEMENT DEPARTMENT POLICY

INFORMATION REQUIRED FOR OBTAINING A BUILDING PERMIT

4. Building plans should include top of foundation elevation

Demolition Application Package

WEST VINCENT TOWNSHIP COMMERCIAL BUILDING PERMIT

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

Huntington Building Inspection

WALLS: PERIMETER / RETAINING

Septic Tank / Drainfield / Holding Tank Permit Application

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Review Fee Receipt No. Total Amount Rec d Credit Card Authorization FLORIDA BUILDING AND ACCESSIBILITY CODE, 2010 EDITION APPLIES

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

City of Wausau Building, Housing and Zoning Fee Schedule 2019

APPLICATION FOR AN ACCESSORY APARTMENT PERMIT

~ Please Detach and Save This Page ~

Community & Economic Development Department 2200 Civic Center Place Miramar, Florida Tel: Fax:

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

CITY OF PANAMA CITY BEACH Building and Planning Department

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Hamilton County Building Department County Court House Room NE First Street Jasper, FL Phone (386) Fax (386)

BAY COUNTY BUILDERS SERVICES DIVISION RESIDENTIAL. MANUFACTURER/MOBILE HOME PLAN REVIEW SUBMITTAL FORM (For HUD approved structures only)

SWIMMING POOL PERMIT APPLICATION PACKET

MEDINA COUNTY BUILDING REGULATIONS

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

ALFRED TEBBE JR Jackson County Treasurer 201 W Platt St Maquoketa,Iowa 52060

NASSAU COUNTY RE-ROOFING PERMIT APPLICATION

This permit application includes the land use/zoning and building inspection reviews.

DEMOLITION REQUIREMENTS

Center Township Department of Building Safety 150 Henricks Road, Butler, PA Phone: Fax:

Transcription:

P. O. BOX 218 Manufacture Homes Single, Double or Triple wide Before I can issue a permit, I need the following items: I need septic approval from Floyd County Health Dept (perk test approval) (SEPTIC TANK SOIL ABSORPTION SYSTEM CONSTRUCTION PERMIT PAPER WORK) I need information from the Mobile Home Company (Effective July 2002) a. Description of the Manufacture Unit b. Date of Manufacture (Month/Date/Year) c. Identification Number of Unit (Vehicle Identification Number) - or Copy of Original Title of Unit Agreement in lieu of form signed by Landowner and signed by a Certified Responsible Land Disturber with the certificate number and when it expires. (If over 10,000 sq. ft.) >> The Contractor s License number does not approve for a Certified Responsible Land Disturber. Information is located at www.dcr.state.va.us/sw. --or-- Notary form for agreement in lieu of signed by Landowner (If less than 10,000 sq. ft.) Effective June 1, 2005, the attached form will be required and must be approved by the Department of Inspections and Community Development before any new building permits will be issued. The following is the information that will be required: Bring a copy of approved plat --Or-- Attest that the parcel was legally created prior to the current Subdivision Ordinance adoption (October 22, 2002). A copy of the recorded deed must be attached to the application to certify that the parcel was created prior to October 22, 2002. PERMITS WILL NOT BE ISSUED AFTER 4:00 PM

FLOYD COUNTY PERMIT FEE S Effective July 1, 2009 State Surcharge will be 2% on ALL permits Building Permit (Dwellings, Townhouses, Apartments, Modular, Additions, Porches/Decks/Basements, Carports, Residential Garages) 20 cents per square foot (outside dimensions) then add 2% surcharge for state (DO NOT USE LIVING SPACE) Outside dimensions ONLY Minimum $100 We count the basement, 1 st floor, 2 nd floor, 3 rd floor, etc. Manufacture Homes Single Wide - $200.00 Double Wide - $300.00 Triple Wide - $400.00 Then you add 2% surcharge for State Electric Permit Temporary electric $30.00 Permanent (200 amp) $60.00 Permanent (300 amp) $90.00 Permanent (400 amp) $110.00 Then you add 2% surcharge for State Plumbing Permit $4 per fixture plus $25.00 for the permit, then add 2% surcharge for state Fixtures are Kitchen sink Number of Bathtubs Number of Bathroom sinks Number of Commodes Number of Shower stalls Laundry sink Water Heater Washer Number of floor drains in basement and or garage Town Water Connect Town Sewer Connect Hot Tub/Jacuzzi Mechanical Permit (Residential) 25.00 Then you add 2% surcharge for State

P. O. BOX 218 Permit Application for Manufactured Home Applicant Name: Phone number: (Name of Person that is completing this application) Address: ------------------------------------------------------------------------------------------------------------ LAND OWNER INFORMATION Owner(s) Name: Phone number: Mailing Address: Site Address (Name of Road driveway comes off of): Directions to site: PARCEL INFORMATION Tax Map Number: (You can obtain this information from the Commissioner of Revenue s Office or on your tax ticket do not use the number from the Health Department paper work) Name of Subdivision (If applicable): Lot Number: ------------------------------------------------------------------------------------------------------------ Owner s Name Purchasing Home: (If different from Land owner) Mailing Address: Phone Number:

Manufactured Home Who is the Contractor? (Contractor that is setting the home up; if you put SELF you have to sign an affidavit form that you take responsibilities of the job, the form will be in our office. This also includes for Electrical & Plumbing) Contractor s License Number: Expiration Date: Contractor s Address: Contractor s Name (To contact if any questions or problems): Telephone Number (To contact if any questions or problems): ------------------------------------------------------------------------------------------------------------ Is this a Single, Double or Triplewide home? Year of Mobile Home? Dimensions of Mobile Home? Dimensions of Basement? (If applicable) How much did you pay for Mobile Home? (Estimate) How much did you pay for Basement? (Estimate) (If applicable) How much land is being disturbed? Counting septic/well area, driveway, etc. Square Feet ----------------------------------------------------------------------------------------------------------- Owner name on title: (What is the owner(s) name on title for Mobile Home)? What was the previous owner(s) name on title: Name of Manufacture Unit: Date of Manufacture (when it was built) Month/Date/Year: Identification Number of Unit (VIN Number): (This information is required before our office can issue a permit) --Or-- I need a copy of the original title

ELECTRIC PERMIT INFORMATION (If you put SELF you have to sign an affidavit form that you take responsibilities of the job, the form will be in our office). Who is the Electrical Contractor? Contractor s License Number: Expiration Date: Contractor s Address: Contractor s Name (To contact if any questions or problems): Telephone Number (To contact if any questions or problems): ------------------------------------------------------------------------------------------------------------ Permanent service size you are going to use? (Please circle) 200 amp / 400 amp AEP Work Order Number (Permanent Power) 9 digit #: (You may not have the AEP order number yet and that is okay; I can still issue permit without it. But I will need it when a service hookup inspection is called in). =============================================================== Are you running additional wiring from existing service (no new service/american Electrical Power is not involved) (Please circle one) YES / NO What is the electric service existing? (If applicable) 100 amp / 200 amp / 300 amp / 400 amp (Please circle one) =============================================================== Upgrading electrical service: 60 amp to 100 amp 100 amp to 200 amp 200 amp to 400 amp Other AEP Work Order Number (Reconnect) 9 digit #:

PLUMBING INFORMATION (If you put SELF you have to sign an affidavit form that you take responsibilities of the job, the form will be in our office). Who is the Plumber Contractor? Who is connecting plumbing underneath home? Contractor s License Number: Expiration Date: Contractor s Address: Contractor s Name (To contact if any questions or problems): Telephone Number (To contact if any questions or problems): ------------------------------------------------------------------------------------------------------------ Are you building a basement? (Please circle) Yes / No If you circled YES; please complete plumbing information below. If you circled NO; please do not complete plumbing information below. Plumbing Fixtures in Basement: Kitchen sink: Number of bathtubs: Number of bathroom sinks: Hot tub/jacuzzi: Number of commodes: Number of shower stalls: (without tub) Laundry sink: Water heater: Washer: Town Water Connect: Town Sewer Connect: Number of floor drains in basement and or garage: Any questions regarding this application please call our office at 540-745-9359. A TWO DAY NOTICE SHALL BE GIVEN FOR ANY INSPECTIONS, DO NOT CALL AND EXPECT AN INSPECTION THE SAME DAY!! ANY INSPECTION NOTICE SHALL BE GIVEN IN ADVANCE!! PERMITS WILL NOT BE ISSUED AFTER 4:00 PM

P. O. BOX 218 INSPECTION REQUIREMENTS FOR SINGLE, DOUBLE AND TRIPLE WIDE HOMES o Footings before concrete is poured and or home is set o Plumbing, electrical, piers, tie-downs and blocking before underneath of home is enclosed o Final (Home is completed with block, porches, decks and underpinning) Meter base can be attached to doublewides if it has a permanent foundation. Install a mast up through roof. Meter base may not be attached to single wide homes. If the Building Official can not get up underneath home, he will not pass the final inspection. No certificate of occupancy will be issued. ** NOTICE >> A CERTIFICATE OF OCCUPANCY MUST BE OBTAINED PRIOR TO THE OCCUPANCY OF ANY BUILDING OR STRUCTURE. Occupancy without a certificate of occupancy is a violation of the Virginia Uniform Statewide Building Code and is punishable by not more than a $2,500.00 fine. A TWO DAY NOTIICE SHALL BE GIIVEN FOR ANY IINSPECTIIONS,, DO NOT CALL OR COME IIN OUR OFFIICE AND EXPECT AN IINSPECTIION THE SAME DAY!!!! ANY IINSPECTIION NOTIICE SHALL BE GIIVEN IIN ADVANCE!!!! **PLEASE NOTE >> You must begin work within six (6) months after the permit is issued or permit will be void. If authorized work is suspended or abandoned for six (6) months, the permit shall be null and void.

P O BOX 218 The Floyd County Building Inspector performs inspections on all construction in all areas of Floyd County. Inspections may be scheduled Monday thru Friday by calling our office at (540) 745-9359. A 24 hour notice must be given in advance on ALL inspections. NO inspections will be made on the same day of the call in. It is helpful if you give us your building permit number and the name of the owner of the project. We realize your project is important and timing is critical. We do our best to respond as quickly as possible. Inspections are not performed on weekends. **PLEASE NOTE A re-inspection fee will be added if work is not complete for inspection or accessible upon arrival, unless weather related. If you call in for a footer inspection and you have already poured concrete, you will be asked to dig the footer back out and after that has been completed you will need to call back for a re-inspection. (There will be a re-inspection fee) The fee for re-inspection is $25.00 plus 2% State Surcharge. I have acknowledged the above statement and understand that I am to give a 24 hour notice of all inspections. I also understand that there is a fee for re-inspection if work was not completed when the inspector arrives. I will also relay this letter to my sub-contractor and/or homeowner. OWNER/AGENT SIGNATURE DATE

BUILDING PERMIT # ELECTRICAL PERMIT # PLUMBING PERMIT # MECHANICAL PERMIT # MANUFACTURE HOME PERMIT # AFFIDAVIT I of (address) affirm that I am the owner of a certain tract or parcel of land located at: and that I have applied for a building permit. I affirm that I am familiar with the prerequisites of 54.1-111 of the Code of Virginia and I am not subject to licensure as a contractor or subcontractor. Owner signature Date STATE OF COUNTY/CITY OF, to wit. I,, a Notary Public of and for the aforementioned State and County do hereby state that did appear before me this day of, 20, and acknowledge the foregoing document by executing the same. Notary Public My Commission Expires:. http://leg1.state.va.us 54.1-1111. Prerequisites to obtaining building, etc., permit. Any person applying to the building inspector or any other authority of a county, city, or town in this Commonwealth, charged with the duty of issuing building or other permits for the construction of any building, highway, sewer, or structure, or any removal, grading or improvement shall furnish prior to the issuance of the permit, either (i) satisfactory proof to such inspector or authority that he is duly licensed or certified under the terms of this chapter to carry out or superintend the same, or (ii) file a written statement, supported by an affidavit, that he is not subject to licensure or certification as a contractor or subcontractor pursuant to this chapter. The applicant shall also furnish satisfactory proof that the taxes or license fees required by any county, city, or town have been paid so as to be qualified to bid upon or contract for the work for which the permit has been applied. It shall be unlawful for the building inspector or other authority to issue or allow the issuance of such permits unless the applicant has furnished his license or certificate number issued pursuant to this chapter or evidence of being exempt from the provisions of this chapter. The building inspector, or other such authority, violating the terms of this section shall be guilty of a Class 3 misdemeanor. (Code 1950, 54-138; 1970, c. 319; 1980, c. 634; 1988, c. 765; 1990, c. 911; 1991, c. 151; 1992, c. 713; 1995, c. 771; 1998, c. 754.)

P O BOX 218 To All Homeowners: By signing the affidavit form you are RESPONSIBLE for all the construction that is performed. If you have any complaints about the person you have hired to perform any job, it is between you and that person. If any work is done wrong, the violation goes against you, not the person that you had hired. You are also required to call in our office for all needed inspections and a final inspection for a certificate of occupancy after the job is completed. A CERTIFICATE OF OCCUPANCY MUST BE OBTAINED PRIOR TO THE OCCUPANCY OF ANY BUILDING OR STRUCTURE. The contractor should obtain any necessary permits. This should be spelled out in your contract; otherwise, you may be held legally responsible for failure to obtain any required permits. The contractor will then be required to call in for all inspections and final for a certificate of occupancy. PLEASE NOTE: All contractors are required to hold a license issued by the Board for Contractors. Failure to hold a required license is a violation of the statutes and can result in prosecution. Homeowners who utilize unlicensed contractors forfeit their right to access the Contractor Transaction Recovery Fund and do not receive any protection from the board. We have a list of contractors in our office that you can obtain anytime. Our office recommends you to go to the Department of Professional and Occupational Regulation website at www.dpor.virginia.gov to make sure the contractor you had hired is properly licensed to perform the work you want. Also, you can review a copy of their license on line and make sure there are no violations against the person you are considering to hire. Please call our office at 540-745-9359 if you have any questions.

P. O. BOX 218 Application for Parcel Approval prior to Issuance of Building Permit Part 1. To confirm that the subject parcel conforms to the Floyd County Subdivision Ordinance (Section 3-1-1g and h), anyone seeking a Building Permit must show one of the following (please place a check in the appropriate circle): o An approved Plat of Survey (NOT A LOTLINE REVISON) or Subdivision Plat (copies of those recorded may be obtained at the Courthouse); OR o That the parcel was created legally prior to October 22, 2002 (show copy of recorded deed). Please attach the appropriate document and complete Part 2 below. Part 2. Owner s Statement As owner or authorized agent of the owner, I certify that the information reported above is true and accurate. By my signature I accept legal responsibility for this affirmation and understand that penalties may be imposed if the statement is incorrect. Owner or Authorized Agent Date STATE OF COUNTY/CITY OF, to wit. I,, a Notary Public of and for the aforementioned State and County do hereby state that did appear before me this day of, 20, and acknowledge the foregoing document by executing the same. Notary Public My Commission Expires:.

AGREEMENT IN LIEU OF AN EROSION AND SEDIMENT CONTROL PLAN FOR A SINGLE FAMILY RESIDENCE IN A SUBDIVISION LAND DISTURBING PERMIT NO: BUILDING PERMIT NO: SUBDIVISION: LOT NUMBER: In lieu of submission of an erosion and sediment control plan for the construction of this single family dwelling, I agree to comply with any reasonable requirements determined necessary by employees of Floyd County, representing the Erosion and Sediment Control Program Administrator. Such requirements shall be based on the conservation standards contained in the Floyd County Erosion and Sediment Control Ordinance, and shall represent the minimum practices necessary to provide adequate control of erosion and sedimentation on or resulting from this project. As a minimum, all denuded areas on the lot shall be stabilized within 7 days of final grading with permanent vegetation or a protective ground cover suitable for the time of year. I further understand that failure to comply with such requirements within three working days following notice by the representatives of Floyd County could result in citation for violation of the Floyd County Erosion and Sediment Control Ordinance. Measures specified by the Plan Approving Authority: Take necessary steps to keep sediment on site and prevent erosion run-off. Signature of Landowner: Party Responsible for Erosion and Sediment Control (if different from landowner): Certified Responsible Land Disturber with certificate number and when it expires Approved By: Date:

P. O. BOX 218 BUILDING PERMIT NUMBER: I CERTIFY THAT THE LAND DISTURBING ACTIVITY ASSOCIATED WITH AND IN CONJUCTION TO THE CONSTRUCTION OF MY SINGLE FAMILY DWELLING IS LESS THAN 10,000 SQUARE FEET. OWNER/AGENT SIGNATURE DATE STATE OF: COUNTY/CITY:, TO-WIT: THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS DAY OF, 20 BY. MY COMMISSION EXPIRES NOTARY PUBLIC

P O BOX 218 EFFECTIVE AUGUST 17, 2005 Water systems (2000 VA Uniform Statewide Building Code Section R306.5) Before any Certificate of Occupancy will be issued for Residential Structures a completion statement from the Virginia Department of Health must be presented to this office approving the water system. *** Does not apply to replacement of existing home or town water. Please feel free to call the inspection office if you have any questions. Floyd County Building Official