ECONOMIC EXCELLENCE ZONES & REAL ESTATE: ISSUES & OPPORTUNITIES. Real Estate Issues With Specific Reference to SEZs

Similar documents
The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013

Practice Followed by APIIC in Land Acquisition & Industrial Area Management

INDIAN OVERSEAS BANK SMALL AND MEDIUM ENTERPRISES SME-7 APPLICATION FORM FOR CREDIT FACILITIES OVER Rs.50 lacs & UPTO Rs.2 Crores

INDIAN OVERSEAS BANK SMALL AND MEDIUM ENTERPRISES SME-6 APPLICATION FORM FOR CREDIT FACILITIES OVER Rs.10 lacs & UPTO Rs.50 lacs

Minerals and Mining (Compensation And Resettlement) Regulations, 2012 (L.I. 2175)

NO.632/ (29)2004

I U B Reddy The World Bank New Delhi, India

Welcome Navi Mumbai Airport Influence Notified Area (NAINA)

DEVELOPMENT OF BOUTIQUE HOTEL & CONVENTION CENTRE AT SHILPARAMAM, VISAKHAPATNAM ON PPP BASIS BID SUMMARY. October 2018

STATE BANK OF INDIA PREMISES DEPT., 9 TH FLOOR, STATE BANK BHAVAN, CORPORATE CENTRE, NARIMAN POINT, MUMBAI PREMISES REQUIRED ON LEASE

SLUMS IN DELHI ISSUES AND POLICY PERSPECTIVES

Land Acquisitions Act 1894 (1of 1894)

Land Acquisition in India

SUTP Peering Event

EMPANELMENT OF ARCHITECTS CONSULTANCY FIRMS FOR STATE BANK OF INDIA, DELHI CIRCLE IN THE CATEGORY OF 1.0 CRORE AND 5.0 CRORE

DELHI DEVELOPMENT AUTHORITY NOTIFICATION

Transit-Oriented Development Specialized Real Estate Services

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

HARYANA GOVT. GAZ. (EXTRA.), FEB. 16, 2018 (MAGH. 27, 1939 SAKA) 555. Form REP-I PART-A

Foreign Direct Investment in Real Estate in India Policy Insight at a glance

CTBUH Copyright. The Remaking of Mumbai in the Sustainable Age. Mr. Ratnakar Gaikwad

INSIDE RFCTLARR ACT, 2013

Casa Del Señor. Project profile. Rating Assigned: Goa 6 Star. February ,837 square feet (sq ft) No. of villas/blocks 3. No.

DEVELOPMENT OF AMUSEMENT PARK WITH WATER RIDES AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY

JHANSI CANTONMENT BOARD MINISTRY OF DEFENCE, GOVT OF INDIA

FREQUENTLY ASKED QUESTIONS ON LAND REGISTRATION

6. The Screening Committee will meet every fortnight and consider all the cases received.

INSTITUTION OF VALUERS

CITY AND COUNTY OF HONOLULU DEPARTMENT OF BUDGET & FISCAL SERVICES ADMINISTRATIVE GUIDELINES FOR COMMUNITY FACILITIES DISTRICTS

DEVELOPMENT OF CONVENTION CENTRE WITH GUEST ROOMS & SPA AT SHILPARAMAM, TIRUPATI ON PPP BASIS BID SUMMARY. October 2018

Presented by: K.Vidyadhar AMD MEPMA

Revised translation by legal affairs Department CIB/CDC

Basic Division of Construction Activity

SOCIAL ASSESSMENT OF BANGALORE METRO RAIL PROJECT LINE R6

FORM I APPLICATION FOR THE GRANT OF ADVANCE TO GUJARAT ENERGY TRANSMISSION CORPORATION LTD. BUILDING ETC. OF HOUSE. Balance on date Of application

DELHI DEVELOPMENT AUTHORITY OFFICE OF PR.COMMISSIONER(H,LD&CWG)

Executive Summary of Padra Industrial Park Study

PROJECT REPORT PROCESS & PROCEDURE OF LAND ACQUISITION UNDER RFCTLARR ACT, Submitted By Babita Mishra Addl. Tahasildar, 16 TH Batch

Sun Valley. An investment opportunity that has few parallels

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

FEMA INVESTMENTS IN IMMOVABLE PROPERTY IN INDIA & OUTSIDE INDIA INCLUDING FDI IN REAL ESTATE

REDAN CAPITAL LTD 13 Ikeja Close, Off oyo St, Area 2, Garki-, Abuja, Nigeria GUIDELINES FOR PREPARING PROJECT PROPOSALS

(ELECTRONIC MODE ONLY) No. GSIDC/ENGG./NIT- 90/ Time for complet ion includi ng monsoo n. hours. hours

Whispering Heights Real Estate Private Limited

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

MASTER PLAN PROVISIONS (1st, 2nd & 3rd MASTER PLANS)

Promoter s Introduction to Land Compensation. Colin Smith FRICS

TOWN OF LEE NOBLE FARM DEVELOPMENT PARTNERSHIP

Frequently asked questions on business combinations

LAND ACQUISITION BILL: THEN AND NOW

APPLICATION FOR SUBDIVISION APPROVAL Summary of Application Review & Approval Process and Application Form April 1, 2009

CHAUTAUQUA COUNTY LAND BANK CORPORATION

PLANNING REPORT. Lot 5, SDR Lot 6 and 7 Concession 3 Township of Normanby Municipality of West Grey County of Grey

CONTRACTOR EMPLOYER

INSTRUCTIONS TO PRIVATE DEVELOPERS

City of Brandon Brownfield Strategy

Land Acquisition Rehabilitation and Resettlement Act, 2013

0,...0 Los Angeles W orld Airports

Purchase of City-Owned Property Application * Department of Housing and Community Development Land Resources Division

Charter Township of Lyon P.A. 198 Industrial Facilities Tax Exemption Tax Abatement Guidelines

A step-by-step guide to... Help to Buy. Shared Ownership. hastoesales.com

Decree on State Land Lease or Concession

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this

AGREEMENT FOR SALE FOR PURCHASE OF A PLOT FOR CONSTRUCTING FLATS. THIS AGREEMENT of sale made at... on this

Classification: EXTERNAL DRAFT THE COMPANIES ACT, 2013 (COMPANY LIMITED BY SHARES)

DISCLOSEABLE TRANSACTION PROPOSED ACQUISITION OF 49% EQUITY INTEREST IN THE PROJECT COMPANY

UNRA Connecting Uganda! LA - DRBD 1

LAND REFORM IN MALAWI

Application for GGL s CNG Franchisee Station. Site/applicant details to select CNG Station Franchisee

Crown Land Use Policy: Agriculture - Extensive APPROVED AMENDMENTS: Summary of Changes: /Approval

Ron Shultz, Director of Policy Washington State Conservation Commission

Presentation by Auriga Corporate Advisors, Mumbai

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

DUE DILIGENCE HEART OF A PRIVATE EQUITY TRANSACTION

South African Council for Town and Regional Planners

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

NOTICE INVITING BID. Chief Engineer (NMIA) CIDCO Limited.

LIFE INSURANCE CORPORATION OF INDIA MUZAFFARPUR Divisional Office. JEEVAN PRAKASH U.S.PD.MARG, CLUB ROAD MUZAFFARPUR PHONE NO

GM Infinite s Global Techies Town

NAGPUR IMPROVEMENT TRUST

Legislative Brief The Land Acquisition (Amendment) Bill, 2007

ROLE OF SOUTH AFRICAN GOVERNMENT IN SOCIAL HOUSING. Section 26 of the Constitution enshrines the right to housing as follows:

Presentation on RFCTLARR Act, March 22, 2018

ACQUISITION POLICY IN INDIA; AN INTROSPECTION

In December 2000, the Ministry of Civil Aviation advised the Maharashtra government to carry out detailed studies on the Navi Mumbai location.

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

TENDER DOCUMENT FOR HIRING OF BUILDING FOR BRANCH OFFICE DHARUHERA

GUJARAT INTEGRATED TOWNSHIP POLICY

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi

MAKING THE MOST EFFECTIVE AND SUSTAINABLE USE OF LAND

WELCOME. Chitra Sampath, Senior Advocate 1

Town of Yucca Valley GENERAL PLAN 1

RESIDENTIAL AND RECREATIONAL

ALLEGANY COUNTY LAND BANK CORPORATION LAND ACQUISITION AND DISPOSITION POLICIES AND PRIORITIES

THE LAND POOLING RULES OF THE KINGDOM OF BHUTAN 2009 ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT

Vietnam Land Administration - the Past, Recent and for the Future

Guide to Combined Preliminary and Final Plats

Transcription:

ECONOMIC EXCELLENCE ZONES & REAL ESTATE: ISSUES & OPPORTUNITIES Real Estate Issues With Specific Reference to SEZs by

WHAT ARE THE ISSUES INVOLVED - IN LAND ACQUISITION? - REHABILITATION POLICY?

3 LAND ACQUISITION - ISSUES

IDENTIFICATION OF LOCATION External Connectivity Roads (National Highway, State Highway etc) Rail, Air, Sea Distance from nearest Water & Power Sources (Proximity of source & Capacity) Distance from the nearest town, city or metropolitan (access to Social Infrastructure) Availability of Factors of Production Raw Material Manpower If Yes, leverage it. No then, Pull them in or Create Accessibility Backward & Forward Linkages - Details of other Industries in the vicinity Details of the habitations & settlements in and around the site Climatic Conditions 4

SITE SELECTION Topographical Conditions Type of Land Agricultural Land Non-agricultural Land Barren dry Land Agricultural Land only Single Crop permitted Soil Conditions Geotechnical & Geo-morphological conditions of the site Lay, contours, dimensions of length and width Seismic Zone Poor Soil Conditions Marshy Land Poor Load Bearing Capacity High Piling Cost Cheap may be Expensive... 5

ISSUES IN LAND ACQUISITION Lack of proper regulatory frame work R&R Policy Much Awaited Lack of uniformity in Land Acquisition Laws in various states Lack of Transparency Unfair Process of Valuation Acquisition not done at Market Rate Hold out problem Market distortions High Transaction costs Adverse Selection Poor record of Property protection Problems of Title Non-Agricultural Use, Clearance Value & Prices

RECENT CONTROVERSIES Acquisition of agricultural land causing large-scale displacement of farmers Agitations by farmers over Land Acquisition Navi Mumbai Nandigram Singur 7

ACTION BY GOVERNMENT Formulation of a definite Relief and Rehabilitation Policy Adequate compensation Job guarantees Parliamentary Committee visiting the proposed SEZ sites Assessing effectiveness of present land acquisitions Relevant rehabilitation and compensation policy 8

AMENDMENTS IN RULES The Approval from GOI specifically makes the Developer responsible for making adequate provision for rehabilitation of the displaced as per the RR Policy of the State Government Direction to State Governments / Proposed amendments to SEZ rules: Land use in SEZ: 40% of SEZ area should be greenery Land to be acquired for SEZ: 90% of the SEZ should be barren, waste or single crop land, or Not more than 10% of the area may be double crop 9

E-GOM DECISIONS Decisions of the egom held on 5.4.2007 Size of a SEZ cannot exceed 5000 hectares. The State Governments would however be able to decide upon the lower limits. The minimum processing area limit to be fixed uniformly at 50% for multi product SEZs as well as sector specific SEZs. Pending applications for SEZs to be processed for in principle, formal approval, notifications subject to the condition that the State Governments would not undertake any compulsory acquisition of land for such SEZs. Ministry of Rural Development is requested to reformulate a comprehensive land acquisition act to address all relevant issues A comprehensive Resettlement and Rehabilitation Policy will be worked out ensuring livelihood from the project to at least one person from each displaced family. 10

REHABILITATION POLICY

TRADITIONAL LAND PROCUREMENT OPTIONS Key Challenges Inadequate compensation as provided by the LAA Impact on livelihood Rehabilitation action in case of loss of homestead/workplace Implementation of R&R by Govt. Machinery Priority given to Land Acquisition & Re-allocation R&R areas lack due attention on development of Infrastructure, facilities, community services Key Challenges Free Market based Characteristics Speculative forces cause inflation of certain parcels of land beyond the market value The average price increases considerably No legal directive of Land Acquisitions Certain landowners (mainly speculators / Real Estate firms) might decide not to sell c ertain strategic land parcels Can lead to contiguity issues in a Multiproduct SEZ Absence of State Support for verifying the title and possession rights Possibility of litigation on the title of the land by various interested parties increases. 12

LAND ACQUISITION PRESCRIPTION BY GOVT. OF INDIA (AS PER DRAFT R&R POLICY) GOI directives/proposals to ensure a smooth & efficient process of Land procurement for SEZ projects Minimum involvement of State Government in the Land Acquisition process. Encouraged the Private Purchase of land by the developer. Above will ensure that land-owner gets the market value for his/her land No acquisition of wet / fertile land Double crop lands to be acquired only if very necessary, e.g. for maintaining contiguity Equity partnership / land plots in the SEZ/industrial project to be given to land sellers to ensure long-term benefit Government is likely to finalize and implement a National Rehabilitation Policy which is likely to address the issues of loss of all livelihoods due to Land acquisition R&R support that would be mandatory for the Developer/Govt. at the time of land acquisition. Ensuring partnership through equity share or through an alternate plot of land. 13

HYBRID MODEL The key advantages of the Hybrid model Maximum purchase through market determined model - It ensures fair value of land to both the seller as well as the developer It also ensures that all the required land for the project can get procured without any unrest or resentment from the landowners Inclusive development of the local community involvement of both the Private Developer and the Government 14

KEY PRINCIPLES

DESIGNING THE PACKAGE Land Sale on Market Price Price as per location and type Specific Size of plots to each land seller Seller to be part of the develop ment Cashless Equity of a predecided amount per acre as convertibl e debenture s Professio nal training courses to enhance employab ility Health & Hygiene and Education Initiatives Acquisition of Balance Land may be then done through Consent Award

NOTIFICATION LEVEL COMPLIANCES (AS PER SEZ ACT & RULES) Developer to furnish to the Central Govt. details in respect of identified area proof of legal right and possession and a certificate from state government or the authorized agency that the area is free from all encumbrances in case of lease hold land, lease shall be for a period of not less than 20 yrs. Area shall be Contiguous and Vacant And shall have no public thoroughfare ** BOA can relax the condition of contiguity on case to case basis, on mertis,, for reasons to be recorded in writing Central Govt. shall notify the area as SEZ after receipt of details and on fulfillment of conditions specified in the LOA if area is not less than the minimum area prescribed

PERMITTED OPTIONS SEZs for IT, Gems & Jewellery, Bio tech & Non Conventional Energy FTWZ (Free Trade & Warehousing Zone) Sector Specific SEZ Multi-Product SEZ Min Area 10 Ha. 40 Ha 100 Ha <=5000 Ha Min. Built up 1,00,000 Sq. mtr for IT/ITES 40,000 Sq. mtr for Biotechnology not less than 1,00,000 sq.mts. Min. Processing Area 50% Min. Processing Area 50% 5000 Sq. mtr for Gems & Jewellery Net Worth Rs. 50 crores Rs. 50 crores Rs. 250 crores Minimum Investment Rs. 250 crores Rs. 250 cr Rs. 250 crores Rs. 1000 crores Others IT/ITES Required to be centrally air-conditioned FTWZ within Multiproduct SEZ shall not exceed 20% of the PA.

LIMITS FOR BENEFITS Particulars Shopping Arcade, Retail Space, Office Service Space, Multiplexes Apartments Housing IT/ITES/BT/G& J SEZ Total Area Sector - Specific SEZ Total Area Multi-product SEZ (per 1000 Ha SEZ Area) Total Area < 1000 Sq. Mtr <50000 sq.mtrs < 2,00,000 sq.mtr <10,000 sq.mtr Upto 7500 houses 25,000 houses <25,00,000 sq. Hotels, Service Included in Hotel <7,50,000 with 100 sq. Hotels mtr with 250 Apartments above rooms mtr/ 100 rooms/ 250 Service Service Apartments Apartments Clinic & Medical No Provisions Max. 25 Bed Max. 100 Bed Centres < Hospital 10,000 <25,000 Hospital sq.mtr School/Educational No Provisions Total Built up Area Total Built up Area sq.mtrs Institutions <25000 sq.mtr <2,50,000sq.mtr Total Area in Area in 11,000 8,37,323 29,84,293 Sq.mtr Total Area in Sq.ft 1,18,360 90, 09, 598 3,21,10, 993

AN APPROACH DTA Ancillary Industries DTA Social Infrastructure Multi-Product SEZ <=5000 Ha OR If enough Land is not acquired /available initially Kick Start with a Sector Specific SEZ & subsequently acquire enough land and develop multi-product SEZ ** Conversion to another class of SEZ allowed (Rule 5.(2).d) Sector specific SEZ if approved or notified and subsequently developer acquires more land and meets the criteria of multi-product SEZ then a sector specific SEZ can be converted into Multi- Product SEZ

STAMP DUTY RELATED ISSUES

CONFLICTS BETWEEN CENTRAL & STATE Approval of SEZ status by the Central government required registration of land with the State government concerned State authorities not prepared to grant exemption from stamp duty for registration without Central approval of SEZ status Examples Andhra Pradesh provides refund of stamp duty to approved SEZs. Gujarat gives some time limit for payment of stamp duty enabling the Developer to obtain the SEZ approval. If the approval is obtained no stamp duty is payable.

FINANCING OPTIONS Issues & Challenges for SEZs

DEVELOPMENT OPTIONS July 21, 2007 Similar to Industrial Parks Site Development Leveling Internal Roads Drainage Sewerage Land Acquire Notify Plan Green / Fence Catalyst Incentives Exemptions Concessions Privileges24

DEVELOPMENT OPTIONS By Public - Private Partnership By Co-Developers Collaborative Advantage Additional Opportunity in External the Multi-product Connectivity To SH / NH Rail Siding Air Port / Strip / Helipad Port/ICD/ICT July 21, 2007 Utility Plants Power Water Energy Info-comm Utility Connections Power Water Energy Info-comm Site Development Leveling Internal Roads Drainage Sewerage Land Acquire Notify Plan Green / Fence Catalyst Incentives Exemptions Concessions Privileges 25

Fully Integrated On Shared Cost Basis DEVELOPMENT OPTIONS Value Add Furnished Wired Equipped Managed Built-up Residential Institutional Commercial Recreational July 21, 2007 Mandatory / Common Facilities Warehouses Laboratories Certification Authorization External Connectivity To SH / NH Rail Siding Air Port / Strip / Helipad Port/ICD/ICT Utility Plants Power Water Energy Info-comm Utility Connections Power Water Energy Info-comm Site Development Leveling Internal Roads Drainage Sewerage Land Acquire Notify Plan Green / Fence etc. Catalyst Incentives Exemptions Concessions Privileges 26

SEZ DEVELOPMENT MODELS Industrial Park Developer provides basic land and industrial infrastructure, very little social infrastructure. Fully Integrated Developer builds everything including ports, airports, power plant, desalination plant, roads, and also provide social infrastructure such as hotels malls housing etc Outsourced Utilities Developers outsource ports, air ports, power plant, roads, to co developer, often there is revenue sharing agreements. Shared Infrastructure A few SEZ in the same vicinity come together to build and share infrastructure such as port or air ports or power plant. This model was popular in pudong, china. 27

DEVELOPMENTAL APPROACH All by us Some in JV Outsource An Appropriate Mix 28

NEED BASED APPROACH High Criticality of Infrastructure to Locators Develop and procure O&M contract from reputed Service Providers Outsource the Infrastructure Developers to create and operate the infrastructure Create the same if it can be leveraged for cross subsidization else outsource the development Low Revenue Generating Capacity High 29

PARTNERSHIP OPTIONS Vendor Service Provider Design BOT Revenue Sharing Equity Participation 30

PARTNERSHIP RATIONALE Risk Sharing - Operations Risk Sharing - Expertise / Technology Risk Sharing - Business Capital Injection Financial Institution Requirement 31

APPROACH TO STRATEGIC PARTNERS The Component Approach Self Sustainability Criteria Opportunity Sharing 32

FINANCIAL CLOSURE Consider indicative project cost Land Procurement Land development land cutting, filling, grading, Road Development, Street Furniture, Parking Lots Interchanges & Bridges Compound wall, Fencing (Processing Area) Utility Corridor Utility provisions Water Treatment plant, Sewerage Network, Solid Waste Management, Fire Fighting System External linkages and offsite infrastructure Facilities and vertical infrastructure in Processing & Non Processing Area Cost associated with developing/enhancing USP Soft Cost( Preliminary, Pre-ops, marketing, Contingency) 33

FINANCIAL CLOSURE CONTD. To be done in a phase wise Should consider Revenue and Cash Flows Should consider Financing Structure (Debt: Equity) for JV & SPV Door - to - Door (7 yrs) Time from getting the funds till its repayment Funding Sources Debt funding sources Equity Funding Sources 34

FINANCIAL PLAN 35

FINANCIAL PLAY Self Sustaining Components Minimum Critical return for partners Expand don t Share the pie Lender - Investor Parameters For all development Options 36

KEY REGULATORY CHALLENGES

KEY REGULATORY CHALLENGES State Policy for SEZ not in sync with the Central Government prescriptions Limited understanding amongst field formations Conflict in Definitional conflicts among extant laws Absence of SEZ Act at State level State level exemptions not streamlined

Thank You 4-B Aqua Forte 12, Kensington Road Ulsoor Bangalore 560 042 T 91 80 4147 1888 F 91 80 4147 1399