RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

Similar documents
JAMAICA SOCIAL INVESTMENT FUND LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

Republic of Turkey Additional Financing to Second Renewable Energy and Energy Efficiency Project Resettlement Policy Framework For TSKB and TKB

SCHOOL SECTOR PROGRAM (SSP) FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATION OR WILLING SELLER WILLING BUYER PROCESS

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

Resettlement Policy framework for the Albania s Improvement of the Management and Conditions of the Secondary and Local Roads Project

LAND ACQUISITION AND RESETTLEMENT POLICY FRAMEWORK (LARPF)

LIVESTOCK WASTE MANAGEMENT IN EAST ASIA

REPUBLIC OF MACEDONIA

RESETTLEMENT POLICY FRAMEWORK (RPF)

(DRAFT) LIVESTOCK WASTE MANAGEMENT IN EAST ASIA PROJECT POLICY FRAMEWORK FOR RESETTLEMENT OF PROJECT DISPLACED PERSON IN THAILAND

Summary of Land Acquisition, Resettlement and Rehabilitation Policy for Infrastructure Development Project 2015

FRAMEWORK FOR LAND ACQUISITION THROUGH VOLUNTARY DONATIONS OR WILLING BUYER/WILLING SELLER PROCESSES

Dhaka Water Supply and Sanitation Project

THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PO-RALG) Tanzania Strategic Cities Project (TSCP)

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

Land Acquisition and Resettlement Policy Framework

Resettlement Policy Revised Vol. 3 METRO MANILA URBAN TRANSPORT INTEGRATED PROJECT POLICY FRAMEWORK FOR

PAPUA NEW GUINEA. ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II Additional Financing

Cambodia Health Equity and Quality Improvement Project (H-EQIP) (P157291) Resettlement Policy Framework (RPF) (DRAFT)

Dhaka Water Supply and Sanitation Project Resettlement Policy Framework

Social Screening and Impact Assessment for Sub Projects. B. Justification of project design and alternative analysis:

RESSETTLEMENT POLICY FRAMEWORK

Uniform Relocation/ Section 104(D)/ Environmental Review

PAPUA NEW GUINEA ROAD MAINTENANCE AND REHABILITATION PROJECT (RMRP) II

MARKETILED SMALLHOLDER

KYRGYZ REPUBLIC COMMUNITY DEVELOPMENT AND INVESTMENT AGENCY THIRD RURAL WATER SUPPLY AND SANITATION PROJECT

Socialist Republic of Vietnam POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF DISPLACED PERSONS

Annex 4 Land Acquisition and Resettlement Policy Framework INDONESIA: DAM OPERATIONAL IMPROVEMENT AND SAFETY PROJECT - 2 (DOISP AF)

B. Justification of project design and alternative analysis:

Resettlement Policy Framework

City Of La Mesa Acquisition, Anti-Displacement and Relocation Assistance Plan This Residential Anti-displacement and Relocation Assistance Plan

12 El Saleh Ayoub St., Zamalek, Cairo, Egypt Tel: Fax:

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT

Chapter 9-Uniform Relocation Voluntary Sales Disclosure Environmental Review. Applicability

Resettlement Policy Framework (RPF) for the Sustainable Rural Water and Sanitation Project

Resettlement Compensation Framework Railway Corridor VIII - Eastern section

SOCIAL INVESTMENT AND LOCAL DEVELOPMENT PROJECT

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT, AND REHABILITATION OF DISPLACED PERSONS

ISLAMIC REPUBLIC OF AFGHANISTAN. Ministry of Rural Rehabilitation and Development (MRRD) And. Independent Directorate of Local Governance (IDLG)

COMPONENT 2 - TSKB DRAFT

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

Legislative Brief The Land Acquisition, Rehabilitation and Resettlement Bill, 2011

BIOMASS-BASED DISTRICT HEATING PROJECT

RIGHT OF WAY LIFE CYCLE

SUMMARY LAND ACQUISITION PLAN. Supplementary Appendix to the. Report and Recommendation of the President to the Board of Directors.

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects

Acquisition & Relocation CDBG/HOME Guidebook

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

Resettlement Planning Document

DRAFT EXECUTIVE SUMMARY

SAMPLE 1 INDUCEMENT AND INDEMNITY AGREEMENT LETTER

How Swaziland Is Upgrading Its Slums

REPORT 2014/050 INTERNAL AUDIT DIVISION. Audit of United Nations Human Settlements Programme operations in Sri Lanka

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

RP1313. AZERBAIJAN Health Sector Reform Project (HSRP) Resettlement Policy Framework (RPF) May 03, I. Project Background

MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT

Comparative Analysis of Afghanistan s Legal Framework and Involuntary Resettlement Safeguards in the ADB Safeguard Policy Statement

Scheme of Service. for. Housing Officers

HOUSING ELEMENT. 3. group and foster home construction. 1. increase the supply of new affordable housing with: a regional housing trust fund;

RESETTLEMENT ACTION PLAN

Land Acquisition/Resettlement Framework. Proposed Loan and Administration of Grant Cook Islands: Renewable Energy Sector Project

RP909 V1. Giza North 2x750 MWe GAS-FIRED COMBINED CYCLE POWER PROJECT FINAL REPORT. January Submitted by: ENGINEERING CONSULTANTS GROUP

RESETTLEMENT MANAGEMENT FRAMEWORK

ABBREVIATED RESETTLEMENT ACTION PLAN

VIETNAM ELECTRICITY TRUNG SON HYDROPOWER MANAGEMENT BOARD RP857 V4. Vietnam: Trung Son Hydropower Project Transmission Line Component

IIF: ENVIRONMENTAL AND SOCIAL SAFEGUARDS FRAMEWORK (ESSF) 1

RESETTLEMENT POLICY FRAMEWORK

The Bill is called the Land Acquisition, Rehabilitation and Resettlement Act, 2011

Koridori Srbije Corridor X Highway Project Land Acquisition and Resettlement Framework LARF

Federal Aid Acquisition Guide. For Property Owners

POYRAZ HEPP YESIL ENERJI ELEKTRIK URETIM SAN. TIC. A.S. REPORTING FORM FOR LAND ACQUISITION

RP Introduction ABBREVIATED RESETTLEMENT ACTION PLAN (RAP) 1 MAURITIUS URBAN INFRASTRUCTURE PROJECT

Acquisition IOWA 2015 CDBG MANAGEMENT GUIDE APPENDIX 2 PAGE: 79

GUIDEFORM NOTICE Disclosure to Seller with Voluntary, Arm s Length Purchase Offer. (Grantee or Agency Letterhead)

Chittagong Water Supply Improvement and Sanitation Project. Resettlement Policy Framework

Implementing Agency Department of Housing, Ministry of Local Government, Urban Development, Housing and Environment

Republic of Uganda. Department of Refugees, Office of the Prime Minister

Manila Water Company, Inc.

KENYA URBAN WATER AND SANITATION, OUTPUT BASED AID PROJECT (OBA) FUND FOR LOW INCOME AREAS

RESETTLEMENT POLICY FRAMEWORK FOR KENYA POWER PROJECTS

LAND ACQUISITION AND RESETTLEMENT ACTION PLAN FOR THE REGIONAL SANITARY LANDFILL & WASTE TRANSFER STATION SOUTHERN COASTAL REGION

Social Safeguards Due Diligence Report

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS5 Land Acquisition, Restrictions on Land Use and Involuntary Resettlement

Indonesia: Neighborhood Upgrading and Shelter Project Phase 2

2. Our community wants to demolish some blighted properties. How can we meet a CDBG national objective with this activity?

Upgrading and Construction of Chumateleti-Khevi Section of the E-60 Highway

Mongolia: Western Regional Road Corridor Investment Program

COLOMBIA MINISTRY OF ENVIRONMENT, HOUSING AND TERRITORIAL DEVELOPMENT WATER AND SANITATION SECTOR SUPPORT PROJECT RESSETLEMENT POLICY FRAMEWORK

SLUMS IN DELHI ISSUES AND POLICY PERSPECTIVES

Islamic Republic of Afghanistan

EXHIBIT LIST No Exhibit Name Page 1 P7 Compensation Presentation.pdf (P7) 2-47

INTEGRATED ENVIRONMENTAL AND SOCIAL SAFEGUARDS MANAGEMENT FRAMEWORK (IESSMF) METRO MANILA WASTEWATER MANAGEMENT PROJECT (MWMP)

Kazakhstan: Proposed Moinak Electricity Transmission Project Land Acquisition Policy Framework

ABBREVIATED RESETTLMENT PLAN LEZHA MUNICIPALITY

NATIONAL GANGA RIVER BASIN AUTHORITY

Land Acquisition and Resettlement Framework. Date: May 2016 Status: Update. FIJI: Transport Infrastructure Investment Sector Project

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Resettlement Policy Framework for the Turkey Geothermal Development Project

Uniform Act for CDBG-DR

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Summary of Land Acquisition Policy Framework JAMAICA: JM Hurricane Dean ERL Project RP607 A. Introduction No land acquisition or involuntary resettlement is comtemplated under the Project. Nonetheless, the Land Acquisition and Resettlement Policy Framework summarized below applies to all JSIFfunded community projects. For JSIF-funded community projects, the Policy Framework will supplement existing Jamaican law pertaining to land acquisition and resettlement (the Land Acquisition Act of 1947) by introducing additional compensation measures to achieve compensation at replacement cost and income restoration together with implementation and consultation arrangements to minimize land acquisition impacts and obtain the informed consent of those affected by land acquisition. JSIF has prepared a Land Acquisition and Resettlement Policy Framework (LARPF), which establishes equivalence with the objectives and operational principles in OP 4.00 and OP/BP 4.12. The LARPF has been reviewed and found acceptable by the Bank and was approved by the JSIF Board on January 25, 2006. The framework was also disclosed by the Bank though the InfoShop on February 6, 2006 and has been made publicly available in-country by the client. 1 The final EMF is also included as part of the JSIF Operations Manual. A complete Policy Framework has been incorporated into the JSIF Operations Manual. JSIF-funded community projects comprise a range of infrastructure investments including drinking water supply, sewerage, sanitation, storm drainage, small roads, school buildings, and community and recreation facilities. Since the land acquisition impacts deriving from these community projects will be minor, the appropriate instrument to manage such impacts shall be an Abbreviated Resettlement Plan attached as an annex to the project proposal/plan agreed between the community and JSIF. If land acquisition under a community project causes displacement, the Abbreviated Resettlement Plan shall include economic rehabilitation measures. B. Means of Obtaining Land The infrastructure investments undertaken in JSIF-financed community based projects are for the most part located within and identified by the beneficiary communities, which implies that access to land may be obtained through other means than just land acquisition through eminent domain. Thus, land for different investment components in a community project could be obtained though one or a combination of the different means listed below. While all of these means of obtaining land would require documentation, not all would necessitate payment of compensation and/or provision of relocation and rehabilitation assistance. However, in all cases, care shall be taken to ensure that the persons involved are fully informed about the project, about the avenues for grievance redress, and confirm that the donation or long-term lease is voluntary. This information is provided during the consultations that take place as part of the participatory community project preparation process. 1 In-country disclosure has been done through publication on the JSIF website (http://www.jsif.org/inner_city_basic_serv.asp). 1

Means of obtaining land Voluntary donation or long term lease of private land Donation of community land Willing-seller-willing-buyer transaction Transfer of public land without squatters or other encumbrances Transfer of public land with squatters or other encumbrances Involuntary land acquisition based on eminent domain with or without associated displacement Requirements be Proof of Ownership and Documentation of Donation of Assets or Documentation of Long Term Lease be Proof of Ownership and Documentation of Donation of Assets. be Proof of Ownership and Documentation of Sale of Assets. be permission from the Government Agency holding the land or from the Commissioner of Lands. be permission from the Government Agency holding the land or from the Commissioner of Lands together with a mitigation plan based on this Policy Framework to provide rehabilitation and relocation assistance for squatters. Abbreviated Resettlement Plan attached as an annex to the community project proposal/plan C. Community Project Preparation, Consultation, and Land Acquisition Planning Given that the persons potentially affected by land acquisition and displacement in JSIF-financed community-based projects are in most cases also project beneficiaries with a voice in decision making on both the type of investments and technical alternatives, there is a strong incentive to seek solutions that avoid or reduce adverse impacts from land acquisition. During the community-based participatory project preparation process, consultation on technical options will involve a concurrent assessment of potential associated land acquisition impacts as described in the table below. This will facilitate an early and ongoing identification of feasible technical design alternatives to avoid or minimize such impacts, and will also enable consultation with persons affected by land acquisition to obtain their consent regarding mitigation measures. Community Project Preparation 1. Promotion (information dissemination on JSIF funding of community projects and rules of the game) Actions on Land Acquisition Information dissemination on: project eligibility (< 10 families to be resettled); need to avoid or minimize land acquisition in project planning; acceptable means of obtaining land; and compensation options for PAPs. 2. Project Application Indicate: expected need for land for specific investment components; means of obtaining such land; and need for land acquisition and assessment of impacts. 3. Review of Application Reject application and return for revision if 10 or more families are planned to be resettled as a result of envisaged land acquisition. Responsible Community Liaison Community/CBO Officer 2

4. Project Concept Development 5. JSIF Technical & Social Review Include preparation of Abbreviated Resettlement Plan in TOR for design consultant if required. Preliminary Site Screening and Community Consultations to: verify need for land for specific investment components; confirm information on voluntary land donations and availability of unused government land; assess options for avoiding or minimizing land acquisition; ensure that potentially affected persons and land donors are involved in the consultation and informed of options; if squatters have to be resettled, attempt to find secure alternative accommodation for these in the community; and conduct census of PAPs. Assist community in obtaining permission to use available government land from the Agency holding the land or from the Commissioner of Lands; Obtain documentation on land donations from community and private donors; Review technical options to avoid or minimize land acquisition; Compile inventory of assets lost by PAPs; Draft Abbreviated Resettlement Plan; and Review/approve Abbreviated Resettlement Plan. 6. Project Design Present Abbreviated Resettlement Plan in a community consultation to obtain endorsement from PAP s and community. 7. Project Approval For World Bank assisted projects: submit Abbreviated Resettlement Plan for review and approval; and disclose the Abbreviated Resettlement Plan at a place accessible to PAPs and NGOs. Technical Appraisal Technical Appraisal Design Consultant JSIF Resettlement Officer Community Liaison JSIF D. Institutional Arrangements The overall responsibility for the implementation and enforcement of the Land Acquisition & Resettlement Policy Framework rests with JSIF. Within JSIF, there shall be an Environment & Resettlement a Legal Officer. Acquisition of the land required for a particular community project will be undertaken by the Commissioner of Land based on information and documentation provided by JSIF. Valuation of the assets to be acquired will be conducted by the Land Valuation Division of the National Land Agency. 3

Grievance redress will be pursued at different levels (community, JSIF, specialized arbitration institutions) with recourse to the courts as the last option for the aggrieved party. E. Monitoring Arrangements For each community project, information on land requirements and the means of obtaining any land required by a particular project component will be recorded in the MIS for different stages of the project cycle: Community Project Cycle Data for MIS Project Application Estimated need for land for specific investment components; Means of obtaining such land (donation, govt. land, purchase, land acquisition); and Scale of resettlement, if any. Review of Application Approval; or Rejection (> 10 families to be resettled) Project Concept Development and JSIF Technical & Social Review Community consultations (date, # of participants including potential PAPs, issues); and Documentation provided on voluntary land donations and transfer of unused government land. Abbreviated Resettlement Plan Data from census with inventory of assets lost by PAPs, entitlements, and socio-economic data; Dates of receipt, review, and approval by JSIF of ARP; Dates of submission and approval by Bank of ARP (for Bank assisted projects); and Date of disclosure of ARP. Implementation Delivery of compensation and rehabilitation entitlements as per ARP; and Data on grievance redress Post-implementation Evaluation including assessment of economic rehabilitation/income restoration. Each Abbreviated Resettlement Plan will establish a baseline through the census of PAPs which will comprise socio-economic data, the inventory of assets lost, and the compensation and resettlement benefits awarded to the PAPs. Progress monitoring by JSIF will record the timely provision of compensation to PAPs (whether provided before or after possession was taken of the asset), and the timely provision of resettlement assistance. The data will be entered into JSIF s MIS together with information on land provided through voluntary donations, nominal long-term leases, and vacant government land. An evaluation will be undertaken to establish whether the objective of the measures to mitigate the land acquisition and resettlement impacts have been achieved, namely, whether PAPs affected by land acquisition and resettlement have been able to improve, or at least restore, their livelihoods and standards of living to pre-displacement levels. Data on grievance redress will also be entered in the MIS and summarized in status reports. For projects assisted by the World Bank, periodic supervision will assess whether the implementation is in compliance with the provisions in approved Abbreviated Resettlement Plans. 4

F. Land requirements under Community Projects For the 12 community projects under the Inner City Basic Services for the Poor Project, consultations were conducted during project preparation on the need for land and means to obtain such land. 2 Land required for specific project components will be obtained as listed in the table below. The table was updated in a consultation on JSIF s Land Acquisition Policy Framework with representatives of all the 12 target communities on January 13, 2006. Project Communities Parish Community Project Component requiring land Whitfield Town Kingston-St.Andrew None Federal Gardens Kingston-St.Andrew Community Center Yes Passmore Town/Browns Town (Dunkirk) 3 Kingston-St.Andrew None Method of obtaining land Vacant Govt land Private donation Purchase: Willing- Seller- Willing- Buyer Jones Town Kingston-St.Andrew None Tawes Pen St. Catherine Community Center 4 Yes March Pen (Africa) St. Catherine None Central Village St. Catherine - Community Center - New drain from Central Road to river To be decided To be decided Dempshire Pen/ - Community Center 5 Jones Pen St. Catherine - Off-site drain Yes (Shelter Rock) extensions Lauriston St. Catherine Community Center Yes 6 Bog Walk St. Catherine - Community Center 7 - Drainage Yes Yes Bucknor Clarendon - Community Center Yes Flankers St.James - Community Center 8 - Drainage 9 - Road (Hog City) 10 Yes To be decided 2 Final Neighborhood Basic Infrastructure & Public Buildings Safety Plans Community Specific Plans, JSIF, Dec. 2005. 3 The project will refurbish the existing sewer network, which will be connected to a sewage treatment facility to be funded from other sources. Since the two activities are linked, the access to land for the treatment facility needs to be clarified. 4 Upgrading of existing structure. 5 Upgrading of existing structure. 6 The land was previously bought by a neighborhood CBO with its own funds. 7 The Community Center will be located on a piece of land presently used in part as a community sports/play-ground, and in part as residential area by squatters. At the consultation on JSIF s Policy Framework on January 13, 2006, community members were of the opinion that the Community Center could be constructed on the site without disturbing the squatter settlement or the sports/play-ground. 8 Upgrading of existing structure. 9 During a Bank team field visit to the Flankers neighborhood on January 12, 2006, it was found that the planned rehabilitation and extension of a storm drain from Providence Heights in Hog City would require at least temporary relocation of 3 squatter houses built on the bank and partly over the gully. An assessment of the need for temporary or permanent relocation needs to be made as part of the finalization of the community plan for Flankers, and if required, the plan needs to be amended with resettlement mitigation measures. 10 Road rehabilitation will require minor realignment and shifting of a fence. 5

6