Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. Independent Engineer for Four Laning of Talegaon-Amravati Section of NH-6 from km 00.000 to km 66.725 (Length - km 66.73) in the State of Maharashtra under NHDP Phase III on DBFOT Basis, NH- 06 Monthly O&M Inspection Report September- 204 NATIONAL HIGHWAYS AUTHORITY OF INDIA Independent Engineer:- Concessionaire:- Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. IRB Talegaon Amravati Tollway Private Limited 35, Prabhu Colony Mahadev Khori Road Amravati, Maharashtra, Pin: 444606 E mail: wsa.amravati@gmail.com
PROJECT LOCATION National Highways Authority of India Four Laning of Talegaon-Amravati Section of NH-6from km 00.000 to km 66.725 in the State of Maharashtra under NHDP Phase III on DBFOT Basis O&M Report- September 204 LOCATION PLAN IRB Talegaon-Amravati Tollway Pvt.Ltd Wilbur Smith Associates Pvt. Ltd.
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. TABLE OF CONTENTS Sr. Description of Item Page Table of Contents 2 Introduction and Executive Summary on O & M 2-5 3 Work Plan and Schedules for O & M 6 4 Inspection of Project Highway 7-3 5 Checklist for project facilities 4 9 6 Correspondences 20 7 IE s Comments on Report 24
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. INTRODUCTION AND EXECUTIVE SUMMARY ON O&M. Name of the Project: DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION, OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS.. Funding and Service Contract: This Project is on Design, Build, Operate and Transfer (DBFOT) Basis Contract. The Concessionaire is authorized by the Client (NHAI) to recover the money spent for the construction of Works from the Toll Fee collections for the duration of 22 years less construction period..2 Concession Agreement: The Concession Agreement between the National Highways Authority of India (NHAI) and the Concessionaire, IRB Talegaon Amravati Tollway Pvt Ltd was signed on 8 th November 2009. In the Concession Agreement are listed all the roles, duties, rights and responsibilities of the Parties stipulated in the Contract and the technical requirements to be adhered in the execution of the Works.3 Concessionaire & EPC Contractor: The Concessionaire of the Project is M/s IRB Talegaon Amravati Tollway Pvt. Ltd., the duty of the Concessionaire is clearly defined in the Concession Agreement and are responsible for the execution of the Works and for the maintenance thereof, for a duration of 22 years, and for the collection from the road users the Toll fees. The EPC Contractors nominated by the Concessionaire is M/s Modern Road Makers Pvt Ltd..4 Supervision Services: The Concession Agreement envisaged the appointment of an Independent Engineer (IE) by the NHAI..5 Independent Engineer: The summary of the Independent Engineer s activities in conjunction with the activities of the Concessionaire for the month of September 204 are presented in subsequent paras herein..5. An agreement, between the National Highways Authority of India (NHAI) and M/s. Wilbur Smith Associates Inc. in JV with M/s. Wilbur Smith Associates Pvt. Ltd., to provide Independent Engineer Services for 4 - Laning of the Talegaon Amravati,Section of NH-6, from Km. 00.000 to Km.66.725 in the State of Maharashtra, under NHDP, Phase III on DBFOT basis (Package No.NHAI/Maha/200/TA/IE), was entered into on the 27th October 200. The office of the Independent Engineer has been established at the following address: 2
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. Wilbur Smith Associates Inc. In joint venture with Wilbur Smith Associates Pvt. Ltd. 35, Prabhu Colony Mahadev Khori Road, Amravati, Maharastra, Pin: 444406 E mail: wsa.amravati@gmail.com Amravati - 444406 Phone No:- 072 2560773 Fax No: 072 2560774 Email address: - wsa.amravati@gmail.com The Independent Engineer has mobilized all the required Key Professionals, most of the Sub-Professionals, all office support staff and office furniture etc. as per the requirements of the Contact Agreement. The details of the staff mobilized are given in subsequent para. The Concession Agreement between National Highways Authority of India (NHAI) and the Concessionaire, M/S IRB TALEGAON AMRAVATI TOLLWAY PRIVATE LIMITED was signed on 8th November 2009 and the Appointed Date was given as 03rd September 200..6 Project Data: Project Name Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis 2 Package No. NHDP/Ph-III/BOT/MH-0 3 Estimated Project Cost Rs. 567.00 Cr. 4 Client / Employer National Highways Authority of India (NHAI) 5 Concessionaire M/S IRB Talegaon Amravati Tollway Pvt Ltd 6 Independent Engineer Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. 7 Design Consultant M/s Spectrum Techno Consultant Pvt Ltd 8 Date of Signing of the Concession Agreement. 8th November 2009. 9 Appointed Date 03rd September 200 0 Concession Period 22 Years Construction Period 90 days (nine hundred and ten).7 Work Progress & Completion: The Provisional Completion Certificate (PCC/C.O.D.) has been issued on 24 th April 203. The balance works have been taken as Punch List Items and have been completed on June 203. The Independent Consultant has recommended to 3
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. NHAI the Issuance of Final Completion Certificate with effective date as on 4 th January 204 and approval awaited from the Competent Authority. The Competent Authority approved for 2 nd PCOD as of st April 204 and the Punch List items for 90 Days was identified (from 0.04.204 to 30.6.204). Inspection for the completion of all Punch List Items was carried out on 4 th July 204..7. Details of Construction Activities: All works have been completed in Km. 00.000 to Km. 66.725 in the State of Maharashtra, under NHDP Phase III NH-6 as per Punch List items except for the works that were affected by non-availability of land..8 Summary of Work Progress: (a) Physical Progress. Contract / Project Ending Previous Month Scheduled Actual Scheduled Cumulative Actual to date Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III NH-6 00 % 00% 00% 00% Status of the Project :. The Provisional Completion Certificate (PCC) was issued by IE (Upon NHAI s approval) on 24 th April 203. 2. The Punch List items have been completed within 90 days after the issuance of PCC/C.O.D on July 203. 3. IC recommended to issue Final Completion Certificate to NHAI on 4 th January 204 and approval awaited from Competent Authority 4. Recommendation for 2 nd PCOD was issued on st April 204 and the highway was placed on Commercial Operations as of 0.04.204 with the revised toll rates. Notes:.9 Operation & Maintenance for the period 203-204: The O & M Manual submitted by the Concessionaire in the first year of operation and was concurred by M/s. Wilbur Smith Associates Inc. in JV with M/s. Wilbur Smith Associates Pvt. Ltd. Facilities like Highway Patrolling vehicles, Tow-away truck, and Augmentation of Highway Maintenance Team etc. are complied as requested. The Independent Engineer is monitoring the Project Highway as per the obligations of the concessionaire in line with the Concession Agreement. ( Schedule K). Any deviations from contractual obligations will be documented. 4
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. The Concessionaire has been advised by the IE to properly maintain the Project Highway as per O & M Manual and in accordance with the provisions of the Concession Agreement. There has been number of instances and issues related to Operation & Maintenance where the Concessionaire was obligated to perform and comply with the provisions of Concession Agreement.The correspondence related to such matters has been conveyed to the Concessionaire. ***************** 5
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. O&M INSPECTION REPORT: September-204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE III ON DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. WORK PLAN FOR SEPTEMBER 204 The Concessionaire is obligated to carry out any remedial/rectification works as reported from time to time through correspondences for the reporting month (September 204) in adherence to Article 9 of the Concession Agreement. Nontimely attendance of such rectification works can result in the recovery of Damages by the Authority from the Concessionaire under and in accordance with the provisions of Clause 7.8 of the Concession Agreement. No reporting of any defects was observed during the inspection for the month of September 204. The following are the list of items (works) that require routine check by the Concessionaire (although not exhaustive) which shall be monitored periodically and shall be added from time to time. Shoulder Settlement 2. High masts lighting. 3. Guard-rail 4. Median opening 5. Construction Material dumped on shoulder/within ROW 6. Rain cuts ( in the event of rain) 7. Sign Boards/hazard-markers/ROW Pillars/ Km Stones 8. Avenue Plantation / Median plantation. 9. Slope protection measures 0. Rigid Pavement Distress. Total plaza concrete pavement 2. CD Structures - Rain cuts in surrounding 3. Cross drainage Structures - Rank Vegetation Over Slope and nearby surrounding wing wall 4. Checking of bituminous surfaces for distress ***************** 6
Name of the Work Employer Concessionaire Independent Engineer Schedule of 7 Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd INSPECTION REPORT FOR PAVEMENT AND SHOULDERS Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Comments on the Concessionaire's submission. No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections were carried out to ensure the same. Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed. Page - 7
Page-8 Name of the Work Employer Concessionaire Schedule 2 of 7 INSPECTION REPORT FOR STRUCTURES Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Independent Engineer Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Comments on the Concessionaire's submission. 2 3 No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections were carried out to ensure the same. 4 Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed.
Name of the Work Employer Concessionaire Independent Engineer Schedule 3 of 7 INSPECTION REPORT FOR DRAINAGE Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Remarks After Verification at Site 2 3 No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections will be carried out to ensure the same. 4 Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed. Page- 9
Page-0 Schedule 4 of 7 Name of the Work Employer Concessionaire Independent Engineer INSPECTION REPORT FOR SLOPE PROTECTION Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Remarks After Verification at Site 2 3 No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections were carried out to ensure the same. 4 Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed.
Name of the Work Name of the Work Employer Concessionaire Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Schedule 5 of 7 Improvement, Operation and Maintenance Including Strengthening & Widening of Existing 2-Lane Road to 4-Lane Road Dual Carriageway from Km. 7.756 to Km. 62.295 of NH- (Agra- Bharatpur Section) in the State of Uttar Pradesh & Rajasthan on Build Operate & Transfer (BOT) basis. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Remarks After Verification at Site 3 No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections were carried out to ensure the same. 4 5 Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed. Page -
Page-2 Schedule 6 of 7 Name of the Work Employer Concessionaire Independent Engineer INSPECTION REPORT FOR PROJECT FECILITIES Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Remarks After Verification at Site 2 No defects/deficiencies/distresses has been observed for the reporting month (September 204). However, regular site inspections were carried out to ensure the same. 3 4 Remarks: The Concessionaire is required to carry out VISUAL, CLOSE, and THOROUGH Inspections as per Clause 6.0 of Schedule 'K'. The repair/rectification of defects and deficiencies as mentioned in Annexure I of Schedule K should be maintained. Check-lists for inspection is being enclosed.
Page-3 Schedule 7 of 7 Name of the Work Employer Concessionaire Independent Engineer TEST REPORT Design, Engineering, Finance, Construction, Development, Operation and Maintenance of the section of NH-6, from Km. 00.000 to Km. 66.725 in the state of Maharashtra, under NHDP Phase III on DBFOT basis National Highways Authority of India M/S IRB Talegaon Amravati Tollway Pvt Ltd Wilbur Smith Associates, Inc. with Wilbur Smith Pvt. Ltd. (JV), Bangalore. Sr. No. Date of Inspection Carriageway Reach Observations & findings after Site Inspection of Project Highway LCW / RCW From To Concessionaire's Submission IE's Remarks After Verification at Site Remarks:. BI Test- Schedule "K" of the C/A, the road roughness value shall be measured at least twice in a year by a properly calibrated bump Integrator device before monsoon and soon after monsoon. Page-3
Sr. No. A Pavement of Carriageway:- Pot Holes Nil 2 Cracks Sqm. Nil 3 (a) Length/ width (b) Depth Description of Project Asset Sqm. MM 4 Other defects - Ravelling, shoving, slipage etc. Ravelling Sqm. Nil Shoving Sqm. Nil Slipage Nil 5 Kerb line, Central line, edge line marking Sqm. (a) Missing (b) Faded Sqm. Nil 6 Studds/Cats eyes in Carriageway missing 7 Rumble Strips Checklist for monitoring of project facilities : Pages 4-9 Unit Nil Inspection Findings Remarks of Independent Engineer (a) Painting (b) Studds missing Sqm. 8 Performance criteria (BBD and BI Test) Km. BI Km. NA BBD Km. NA
Sr. No. Description of Project Asset Unit B Condition of Earthen Shoulder Depression/Settlement Cum. Nil 2 Improper cross slopes Cum. Nil 3 Raised shoulders Cum. Nil C Broken Median Kerb Rmt. Nil 2 Faded colour of median wall Sqm. Nil 4 Median Drains functioning Sqm. Nil D Crash Barrier Rmt. (a) Missing Rmt. (b) Tilted Rmt. Nil (c) Broken Rmt. 2 Steel Guard Rails Rmt. (a) Missing Rmt. (b) Tilted Rmt. (c) Broken Rmt. Nil (d) Faded Rmt. 3 Traffic Signs and Gantries - (i) Directional Signs - (a) Missing (b) Tilted (c) Broken Nil (d) Faded (e) Posters on signages (ii) Cautionary Signs - (a) Missing (b) Tilted (c) Broken (d) Faded (e) Posters on signages Inspection Findings Remarks of Independent Engineer
Sr. No. Description of Project Asset Unit (iii) Mandatory Signs (a) Missing (b) Tilted (c) Broken Nil (d) Faded (e) Posters on signages - (iv) Chevron Sign - (a) Missing (b) Tilted (c) Broken Nil (d) Faded (e) Posters on signages - (v) Hazard Marker/ Bollard Sign - (a) Missing (b) Tilted (c) Broken Nil (d) Faded (e) Posters on signages - (vi) Other Delinators (viii) Retro reflective tape below W-beam, any object in.5 m of c/w - 4 Other Road Furniture - (i) Kilometer stones (a) Missing (b) Tilted - (c) Faded - (d) Posters on signages - (ii) Hectometer (a) Missing - (b) Tilted - (c) Faded - (d) Posters on signages - Inspection Findings Remarks of Independent Engineer
Sr. No. Description of Project Asset Unit (iii) RoW pillars - (a) Missing (b) Tilted (c) Faded (d) Posters on signages E Service Road:- Potholes 2 Debris Sqm. 3 Entry/Exit point Nil 4 Other defects in service road F Footpath/ Drain Cover Drain cover broken 2 Functioning of Inlet Sqm. 3 Side wall broken Cum. 4 Silting of drains Sqm. 5 Water pool visible within ROW Sqm. 6 Drainage of service road Sqm. G House keeping of Area with ROW:- Cleaning of ROW Sqm. 2 Removal of Debris Sqm. In Progress 3 Encroachment of ROW Sqm. 4 unauthorized hordings within ROW H Structures Painting of Head Wall Sqm. Nil 2 Numbering of Structure Nil 3 Settlement of Approach road Sqm. Nil 4 Handrails missing, Faded Sqm. Nil 5 Functioning of Spouts Good 6 Wearing coat/footpath damaged Sqm. Nil 7 Condition of Expansion Joint Sqm. Nil 8 Floor of Structure/ Bed damaged Sqm. Nil 9 Silting at bed level Sqm. Nil Inspection Findings Remarks of Independent Engineer
Sr. No. Description of Project Asset Unit 0 Pitching of embankment Sqm. Nil Chute drain damaged Sqm. Nil 2 Rank vegetation in Retaining/RE wall Sqm. Nil 3 Slope of embankment damaged Sqm. Nil 4 Cracking in pier/abutment/slabs/return wall/dirtwall Sqm. Nil 5 Scouring arround pier and abutment Sqm. Nil I Bus Shelter and Truck Laybyes:- Roof shade/ side walls in damaged condition Sqm. 2 Seating arrangement (Kota Stone) Missing/ Sqm. 3 Debris in circulation areas Sqm. 4 Potholes in circulation areas Sqm. 5 Village name board on bus bays 6 Toilets cleaning, water supply, tube light fittings 7 Damaged taps, leaking from taps 8 Damaged blocks in truck lay byes 9 Drinking water facilities J Lighting High mast light - (a) Missing Due to accident (b) Not working (c ) Faded pole (d) posters on pole - Inspection Findings Remarks of Independent Engineer
Sr. No. Description of Project Asset Unit K Toll Plaza Details of Grivance Register Maintaind 2 Response time of Accident On Time 3 Functioning of Ambulance, Tow-away Trucks and Cranes Good 4 Functioning of PTZ camera Good 5 Functioning of Registration plate camera Good 6 Toll booms functioning Good 7 Validation with ATCC Good 8 Surpirse/ inspection check of toll operations (one in each week) Done 9 Visibility of signages on toll plaza Good L Avenue Plantation Total Scope - 2 No. of Plants more than one year 3 No. of Plants, Planted this Year - (a) Protection (b) Watering (c ) Manuring (d) Mowing, rounding M Median Plantation Total Scope 2 Missing plants 3 Pruning 4 Watering 5 Cleaning of rank vegitation 6 Other Horticulture operation like Manuring, rounding etc. Inspection Findings Remarks of Independent Engineer
INDEPENDENT ENGINEER WILBUR SMITH ASSOCIIATES Inc In JV with WILBUR SMITH ASSOCIATES PVT LTD. MONTHLY O&M INSPECTION REPORT SEPTEMBER-204 DESIGN,ENGINEERING, FINANCE,PROCUREMENT,CONSTRUCTION IMPROVEMENT, OPERATION AND MAINTENANCE OF TALEGAON - AMRAVATI SECTION OF NH - 6 FROM KM. 00.00 TO 66.725 IN THE STATES OF MAHARASHTRA ON DBFOT BASIS. CORRESPONDENCE EXCHANGED WITH STAKEHOLDERS Concessionaire to Independent Engineer Sr. No. Letter Received on Subject IRB/TATPL/AMT/IE/204/D.No.059 3/9/204 Submission of O&M report-aug 204. 2 IRB/TATPL/AMT/IE/204/D.No.060 3/9/204 Submission of accident report-aug 204. 3 IRB/TATPL/AMT/IBP/204/D.No.00 30/9/204 Reply to your letter discount on Toll Tax to Employees as per the schedule of NHAI (Sub Rule(3) of Rule 9. NHAI to Independent Engineer Sr. Letter Received on Subject NHAI/PIU/AMT/NKTAJ/204/049 3/9/204 Providing good photograph visuals of NHAI Projects during various phases of construction. 2 NHAI/PIU/AMT/etender/training/204/d.no.05 08/09/204 Training of E-Training process by M/s C India Pvt. Ltd. at Ghandhinagar on 28.08.204 & 29.08.204 3 NHAI/PIU/AMT/TA/Gen/204/8 22/9/204 Release of III Tranche of Equity Support of NHAI. 4 NHAI/PIU/AMT/NKTAJ/204/30 22/9/204 5 NHAI/PIU/AMT/NKT/PMIS/204/6 22/9/204 Use of Bill Tracking System (BTS) and Application Tracking System (ATS) across all units of NHAI. Online Monitoring of PPP Project through Project Monitoring and information System (PMIS). Page 20
INDEPENDENT ENGINEER WILBUR SMITH ASSOCIIATES Inc In JV with WILBUR SMITH ASSOCIATES PVT LTD. MONTHLY O&M INSPECTION REPORT SEPTEMBER-204 DESIGN,ENGINEERING, FINANCE,PROCUREMENT,CONSTRUCTION IMPROVEMENT, OPERATION AND MAINTENANCE OF TALEGAON - AMRAVATI SECTION OF NH - 6 FROM KM. 00.00 TO 66.725 IN THE STATES OF MAHARASHTRA ON DBFOT BASIS. Independent Engineer to Concessionaire Sr. No. Letter Received on Subject 4 Independent Engineer to NHAI Sr. No. Letter Received on Subject No Correspondence Page 2
INDEPENDENT ENGINEER WILBUR SMITH ASSOCIIATES Inc In JV with WILBUR SMITH ASSOCIATES PVT LTD. MONTHLY O&M INSPECTION REPORT SEPTEMBER-204 DESIGN,ENGINEERING, FINANCE,PROCUREMENT,CONSTRUCTION IMPROVEMENT, OPERATION AND MAINTENANCE OF TALEGAON - AMRAVATI SECTION OF NH - 6 FROM KM. 00.00 TO 66.725 IN THE STATES OF MAHARASHTRA ON DBFOT BASIS. Concessionaire to NHAI Sr. No. Letter Received on Subject IRB/TATPL/AMT/NHAI/D.No.677 3/9/204 Submission of information of prevention of overloading. 2 IRB/TATPL/AMT/NHAI/D.No.678 4/9/204 Submission of Incident Management data Aug-204. 3 IRB/TATPL/AMT/NHAI/D.No.679 9/9/204 4 IRB/TATPL/AMT/NHAI/D.No.680 5/9/204 5 IRB/TATPL/AMT/NHAI/D.No.68 7/9/204 6 IRB/TATPL/AMT/NHAI/D.No.682 22/9/204 7 IRB/TATPL/AMT/NHAI/D.No.683 22/9/204 8 IRB/TATPL/AMT/NHAI/D.No.684 22/9/204 Submission of Erscrow Accuse statement from st Aug- 204 to 3 st Aug-204. Providing good photograph and visuals of NHAI Project during various phases of construction. Compliant received from Secretary Akhil Bhartiya Shri. Gurudeo Sevamandal Gurukunj Ashram Tal Tiwsa Dist. Amti. construction of drain reply submission. Proposal of M/s Reliance Infratel Ltd. Pune for rectification of OFL Km. 40.350 Km. 49.450 RHS of Talegaon Amti. of NH-6. Representation received from Grampanchayat Shendola Khurd, reply submission. Encroachment took place within Existing Row Area at Ch. 20+500 RHS Notifying. 9 IRB/TATPL/AMT/NHAI/D.No.685 29/9/204 Release of III Tranche of Grant. Page 22
INDEPENDENT ENGINEER WILBUR SMITH ASSOCIIATES Inc In JV with WILBUR SMITH ASSOCIATES PVT LTD. MONTHLY O&M INSPECTION REPORT SEPTEMBER-204 DESIGN,ENGINEERING, FINANCE,PROCUREMENT,CONSTRUCTION IMPROVEMENT, OPERATION AND MAINTENANCE OF TALEGAON - AMRAVATI SECTION OF NH - 6 FROM KM. 00.00 TO 66.725 IN THE STATES OF MAHARASHTRA ON DBFOT BASIS. NHAI to Concessionaire Sr. No. Letter Received on Subject NHAI/PIU/AMT/TA/NKTA/204/049 03/09/204 Providing good photograph and visuals of NHAI Project during various phases of construction. 2 NHAI/PIU/AMT/etender/training/204/d.no.05 08/09/204 Training of E-Training process by M/s C India Pvt. Ltd. at Ghandhinagar on 28.08.204 & 29.08.204 3. NHAI/PIU/AMT/NKT/PMIS/204/6 22/9/204 4 NHAI/PIU/AMT/NKTA/204/30 22/09/204 Online Monitoring of PPP Project through Project Monitoring and information System (PMIS). Use of Bill Tracking System (BTS) and Application Tracking System (ATS) across all units of NHAI.Use of bill trading system 5 NHAI/PIU/AMT/TA/Gen/204/8 22/9/204 Release of III Tranche of Equity support of NHAI 6 NHAI/PIU/AMT/TA/Gen/204/50 29/09/204 Widening of existing 2 lane road to 4/6 lane dual carriageway from Talegaon to Amravati section including Amravati bypass of NH-6 Km.00..00 to Km. 66.725 in state of Maharashtra. 7 NHAI/PIU/AMT/TA/GEN/56 29/09/204 Providing Median cut @ Km 25.000 at Shendola Khurd. Page 23
INDEPENDENT ENGINEER Wilbur Smith Associates Inc. In Joint Venture with Wilbur Smith Associates Pvt. Ltd. MONTHLY O&M REPORT September- 204 DESIGN,ENGINEERING,FINANCE,PROCUREMENT, CONSTRUCTION,OPERATION AND MAINTENANCE OF THE 4 LANING OF TALEGAON AMRAVATI SECTION OF NH-6 FROM KM 00.000 TO KM 66.725 IN THE STATE OF MAHARASHTRA UNDER NHDP PHASEILION DESIGN, BUILD, FINANCE, OPERATE AND TRANSFER (DBFOT) BASIS. Independent Engineer comments on Concessionaire s O & M Monthly report for September- 204. Operation & Maintenance: During the reporting month, the Concessionaire was obligated to comply with the defects/deficiencies/distresses as communicated by Inspection Reports of previous months. This has been complied with. 2. Incident Management: The Concessionaire is obligated for proper house-keeping and removing garbage from the Carriageway or the Service Road. Complied Construction material was also removed The Concessionaire is obligated to remove unauthorized construction (median cut) 3. Highway Asset Details/Encroachment/Unauthorized Constructions: Certain unauthorized median gaps has been identified which has been closed and monitored for recurring 4. Accident Details: Report to be submitted separately. 5. Highway Inspection Report: During the reporting month, Independent Consultant verifies that all the works as reported by the Concessionaire has been completed but maintenance of the project highway is in progress. 24 P a g e