NEW HOME CONSTRUCTION PERMIT PROCESS

Similar documents
HOME ADDITION PERMIT PROCESS

MANUFACTURED HOME SUBMITTAL REQUIREMENTS

Application for a Building/Zoning Permit

~ Please Detach and Save This Page ~

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

Septic Tank / Drainfield / Holding Tank Permit Application

WISE COUNTY DEPARTMENT OF BUILDING & ZONING PO BOX 570 / 206 EAST MAIN ST WISE, VA Applicant: Phone #:

Make checks payable to Columbia County Treasurer. We do not issue refunds. Credit Cards accepted.

LAKE COUNTY INTERIM USE APPLICATION VACATION RENTAL HOME

Septic Tank / Drainfield / Holding Tank Permit Application

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

Septic Tank / Drainfield / Holding Tank Permit Application

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

DEMOLITION REQUIREMENTS

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

Before I can issue a permit, I need the following items:

TOWN OF FAIRPLAY BUILDING PERMIT APPLICATION FOR NEW CONSTRUCTION, ADDITIONS, AND REMODELS

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

Instructions to the Applicant

LAND DIVISION APPLICATION

Lake of the Woods County Land Use Permit Instruction Sheet

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Lake of the Woods County Land Use Permit Instruction Sheet

SWIMMING POOL GUIDELINES

What is a Conditional Use? When is a Conditional Use Necessary? Who decides if I will get a Conditional Use Permit

Interim Use Permit Application

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

BONNER COUNTY PLANNING DEPARTMENT

Date Received: Permit #:

Remember, PA One-Call before excavating. Simply dial 811 or

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

Demolition Permit Application Check List. Notice: Please review and follow the check list to avoid any delays in the permit process.

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

TECHNICAL BULLETIN FX-1

APPLICATION FOR APPROVAL OF LAND DIVISION

206 8 th Ave SE Suite #290 Baudette, MN Phone: Fax: Instructions to Applicant

GENERATOR APPLICATION PROCESS - 1

INCOMPLETE APPLICATIONS WILL BE RETURNED! GENERAL PROPERTY INFORMATION. Applicant s name Day Phone address Authorized Agent (if applicable)

RESIDENTIAL FERRY COUNTY BUILDING PERMIT CHECKLIST

BUILDING LOCATION PERMIT APPLICATION

PERMIT FEES Within the shore impact zone (Includes Rip-Rap and Sand Blankets) $ Over 51 cubic yards $100.00

This permit application includes the land use/zoning and building inspection reviews.

LAND USE PERMIT APPLICATION INSTRUCTION SHEET

Department of Planning and Development

STEP 1: SOIL EVALUATION

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

Certified Survey Review Instructions

STEPS FOR CHANGING A TAX PARCEL

OSSF Permit Application

Hamilton County Building Department County Court House Room NE First Street Jasper, FL Phone (386) Fax (386)

TOWN OF CHILI 3333 Chili Avenue, Rochester, NY Tel: Fax:

INSTRUCTIONS FOR APPLICATION IMPORTANT NOTICES

Athens Township Zoning Permit

NEW SINGLE FAMILY RESIDENTIAL

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

Cassia County Accessory Dwelling Unit (ADU) Permit Application

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

FENCE and or POOL BARRIER CHECKLIST

Huntington Building Inspection

City of McMinnville Community Development Department

SWIMMING POOL PERMIT APPLICATION PACKET

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

City of Greensburg. Step by Step Guidelines for your Project. Informational Packet for a Compliance Permit

MANUFACTURED HOUSING UNIT PLACEMENT Article 11.2 of the Zoning Ordinance

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

Construction & Earthwork Request Form (CERF)

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

BOROUGH OF CHESTER 50 NORTH ROAD CHESTER NJ Chester Borough Business License Application Guidelines

Please complete the enclosed application and PRINT clearly.

Madison County Health Department Environmental Health 493 Medical Park Drive, Marshall, NC Telephone: Fax:

Permit Fee Estimator Worksheet for New or Replacement Single Family Dwellings

Worcester Township Fee Schedule

YAVAPAI COUNTY. Development Services

Environmental Health Division Serving Crawford, Kalkaska, Lake, Manistee, Mason, Mecosta, Missaukee, Newaygo, Oceana, and Wexford Counties

APPLICATION FOR A BUILDING PERMIT

ADMINISTRATIVE PERMIT FOR TEMPORARY MOBILE HOME APPLICATION

ELMORE COUNTY LAND USE & BUILDING DEPARTMENT 520 E 2 nd South Mountain Home, ID (208) Preliminary Plat Application

PROCEDURE FOR OBTAINING A DECK/PORCH PERMIT

GALLATIN COUNTY Land Use Permit Information & Application

CONDITIONAL USE APPLICATION

-EXTERIOR STRUCTURE ALTERATIONSIDING DOORS - WINDOWS

Certificate of Occupancy Application

VILLAGE OF SALEM LAKES

OWNER-BUILDER STATEMENT/AFFIDAVIT

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

PRELIMINARY PLAT Checklist

County of San Bernardino Department of Public Health Environmental Health Services

- HANDICAPPED RAMP - MISCELLANEOUS ACCESSORY STRUCTURE BUILDING PERMIT APPLICATION PACKET

MECHANICAL HVAC PERMIT CHECKLIST

Sheds, Fences, Decks (All Permitted Structures Except New and/or Expansion of Principal Buildings )

ALAMANCE COUNTY ENVIRONMENTAL HEALTH APPLICATION FOR SERVICES SERVICES REQUESTED

Application Instructions for: Property Line Adjustment Outside Urban Growth Boundary (UGB)

TEMPORARY OUTDOOR SALES/SEASONAL EVENT PACKET

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (PRELIMINARY PLAT)

Transcription:

TOWNSHIP COOPERATIVE PLANNING ASSOCIATION 4111 11 th Avenue SW Room 10 Roger Ihrke, Administrator Rochester, MN 55902 David H. Meir, Administrator Barbara Literski, Adm. Asst. Phone: (507) 529-0774 roger@tcpamn.org Fax: (507) 281-6821 david@tcpamn.org TCPA NEW HOME CONSTRUCTION PERMIT PROCESS This packet includes the forms you will need to submit an application to build a new home within the townships administered by TCPA. 1. Building Permit application: Complete as much of the form as possible and remember to sign it. 2. Zoning Certificate application: Complete and sign. In particular, you MUST include a site plan showing the location of the proposed home in relation to all lot lines, the distance from the well and the distances from the septic field and septic tank. Your permit cannot be processed without this required site plan. 3. Energy Calculations form: Most people will have their HVAC contractor complete this form. 4. Wall Section form: This form is provided for your convenience. If you ve had professional construction plans drawn they will most likely include this required information. 5. Septic permit: No form included in this packet. Your septic designer will submit the septic design to GGG in Chatfield. GGG will issue the septic permit and email it to our office. Your building permit cannot be issued until we ve received your septic permit. If you re planning to use an existing septic system i.e. from an older home being removed from the same site you will need a septic compliance check that has been completed within the last three years. That compliance check must indicate the existing septic system is properly sized for the proposed new home.

6. Well permit: Again no form is included here. Your well driller will apply for a well permit. You will need to get his number to our office before your building permit can be issued. If you re planning on using an existing well, we will need a passing water test completed within the last six months. 7. Driveway permit: If you re building a new home in Rochester or Cascade Township you can use the driveway permit application included in this packet. If you are building in any of the other townships administered by TCPA you ll need to contact a Town Board member for an access permit.

BUILDING PERMIT APPLICATION NO: TOWNSHIP COOPERATIVE PLANNING ASSOCIATION 4111 11TH Avenue SW Room 10 Rochester, MN 55902 PH: (507) 529-0774 FX: (507) 281-6821 JOB SITE LOCATION: Township: Address: City: State: Zip: PROPERTY OWNER: Name: Address: Home PH#: City: State: Zip: Work PH#: PROPERTY LEGAL DESCRIPTION: Township Section #: Email Address: PROPOSED USE: Description of Project: Dwelling Deck Furnace Dwelling Addition/Year Built: Pole Building 3-Season Porch Water Heater Finish Basement Private Garage Siding Gas Line Dwelling Remodel/Year Built: Business Commercial Re-Roofing Fireplace Other: Building Dimensions: Lot Size/Dimensions: Use & Occupancy: Construction Type: Estimated Value: * General Contractor * Plumbing Contractor Address * Plumber License # Mechanical Contractor * License # Phone # Phone # Septic Installer Denotes Required * information for all permits Electrician Well Driller Floodplain Management District: YES NO Shoreland Management District: YES NO You must attach two (2) copies of building plans and a free-hand sketch showing land dimensions, building locations and distances in relation to other buildings, lot lines, roads, road right-of-ways, septic & well locations plus neighboring septics & wells if located in a subdivision or on a small acreage in a developed area. Set-backs apply. Designate North. Variance & Conditional Use permits may also be needed. If this activity is located in a shoreland management district, you must also show distance to the ordinary high water level and certify your existing septic system. Wells must meet required distance from septic systems. A building permit will not be issued for any construction until approval is received from TCPA. A penalty may, and will be assessed up to the amount of the building permit fee, if activity is started prior to obtaining a building permit. Additions to the application or re-inspections may be billed separately when they become applicable and must be paid prior to the inspection(s). This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended or abandoned for a period of 180 days at any time after work has commenced. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Refund and Cancellation Policy: upon request of cancellation of building permits, charges or refunds will be based on expenses for office time, inspections, and zoning fees that were completed prior to the cancellation notice. IF YOU HAVE QUESTIONS PLEASE CALL TCPA AT (507) 529-0774 IF THIS APPLICATION IS INCOMPLETE IT WILL BE RETURNED TO THE APPLICANT SIGNATURE: PRINT NAME: APPLICANT MAY BE BILLED FOR INSPECTIONS PREMATURELY REQUESTED (work not ready for inspection) TO BE COMPLETED BY TCPA DATE: Received by: Date Received: Building Permit: $ Plan Review: $ State Surcharge: $ Finished Value (not cost) Plumbing Permit: $ Plan Review: $ State Surcharge: $ Mechanical Permit: $ Plan Review: $ State Surcharge: $ Other: $ TOTAL DUE: $ Permit Approved By: (Building Official) Date:

TOWNSHIP COOPERATIVE PLANNING ASSOCIATION 4111 11 th Avenue SW Room 10 Roger Ihrke, Administrator Rochester, MN 55902 David H. Meir, Administrator Barbara Literski, Adm. Asst. Phone: (507) 529-0774 roger@tcpamn.org Fax: (507) 281-6821 david@tcpamn.org TCPA Rochester & Cascade Township New Dwelling Driveway Permits On the attached form provide all contact information for the; A.) applicant B.) property owner C.) installer Contact Mark Cochran at; PH: 507-951-3487 EM: mark.c.township@gmail.com... to schedule an appointment at the site to determine the need for a culvert.