SCHEDULE K PLANNING & BUILDING SERVICES

Similar documents
SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Class of Permits and Fees Schedule A

Planning&Development Fee Standards

By-Law of The Corporation of the City of Oshawa

CITY OF TORONTO. BY-LAW No A By-law under the Building Code Act, 1992 respecting permits and related matters.

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

THE CORPORATION OF THE TOWNSHIP OF WELLINGTON NORTH

The Corporation of the Town of Bradford West Gwillimbury. By-law Building By-law

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

City of High Point Development Fee Schedule

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 29-11

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 60-12

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

Appendix G Fee Schedule

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

City of Mississauga Planning and Building Department

Planning, Development, and Building Fees and Charges 2018

City of Mississauga Planning and Building Department

CHAPTER 1321 Permit and Inspection Fees

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

Land Use Determination Procedures

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

CITY OF TORONTO. BY-LAW No (OMB)

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

Town of Truckee. Contents. Article I - Development Code Enactment and Applicability. Chapter Purpose and Effect of Development Code...

TENANT IMPROVEMENT APPLICATION Page 1 of 4

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

County of Kane CHAPTER 6, BUILDINGS AND BUILDING REGULATIONS, OF THE KANE COUNTY CODE

2018 DEVELOPMENT APPLICATION FEES Effective January 1, 2018

THE CITY OF WINNIPEG BY-LAW NO. 66/2016. A By-law of THE CITY OF WINNIPEG to impose planning, development and building fees.

Location in Code Subject Fees

CONSOLIDATED PLANNING AND DEVELOPMENT APPLICATION FEES REGULATION

1.0 General Information Municipal Address: Assessment Roll No. Concession: Registered Plan No.

Building Permit Requirements Back Flow Prevention Device

Basement Walk-Out - Building Permit Application Requirements

FY 2018 FEE SCHEDULE (Effective )

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

CITY OF TARPON SPRINGS, FLORIDA

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

Development and Other Services Fee Schedule"

Structural Alterations within a Single, Semi. or Townhouse Dwelling Building Permit Application Requirements

THE CORPORATION OF THE TOWN OF EAST GWILLIMBURY BY-LAW NUMBER

Ontario Municipal Board Order issued October 22, 2014 in Board File No. PL CITY OF TORONTO. BY-LAW No (OMB)

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

PLANNING AND DEVELOPMENT DIVISION OF BUILDING AND INFRASTRUCTURE HAMILTON COUNTY, OHIO SCHEDULE OF FEES JANUARY, 2014, EDITION

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

Building Permit Requirements

DEER RIVER COMMERCIAL PARK SUBDIVISION

CONSTRUCTION PERMIT FEE SUMMARY

The City of Daytona Beach Fee Schedule

Worcester Township Fee Schedule

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

Resolution Fee Schedule

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

FEE SCHEDULE Construction Services and Permitting

Permit Application Requirements Boiler Replacement

For use by Principal Authority. Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority)

Ontario Municipal Board Decision issued May 27, 2015 and Order issued December 5, 2016 in Board File PL CITY OF TORONTO BY-LAW (OMB)

5220 to 5254 Yonge Street - OPA & Rezoning Application - Preliminary Report

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

Building Permit Miscellaneous Fees At time of submittal, a 15% non-refundable deposit is required.

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

SCHEDULE OF USER FEES & CHARGES 2018 (Updated January 16, 2018)

Schedule of City Fees & Charges

This fee structure applies to applications submitted on or after January 1, 2018.

User Fees Charges By-law Updated Dec. 7, Effective Jan. 1, 2016 APPENDIX "A" ADMINISTRATION. FEE DESCRIPTION Jan.

PLANNING & DEVELOPMENT COMMITTEE THE CORPORATION OF THE CITY OF MISSISSAUGA MONDAY, OCTOBER 28, :00 P.M.

BUILDING PERMIT FEE SCHEDULE

Application for Site Plan Agreement

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

Ferry County Ordinance #89-04 BINDING SITE PLAN ORDINANCE

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

Ordinance Page 1

IMPORTANT NOTICE MINOR VARIANCE APPLICATION

RESOLUTION NO

City of Beaumont Development Related Fee Schedule

APPLICATION FOR AN OFFICIAL PLAN AMENDMENT

Building Permit Application

CITY OF CLAREMONT DEVELOPMENT REVIEW FEE SCHEDULE

List of Principal Officials

DEPARTMENT OF BUILDING AND SAFETY

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Living and Dining Room. House less than 5 yrs. old 10% of room area 5% of room area

Building Permit Requirements New / Enlarged Openings

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

County of Fresno / Public Works and Planning Master Schedule of Fees for Development Services, Effective January 3, 2008

Transcription:

SECTION 1. BUILDING CODE ADMINISTRATION/ENFORCEMENT 1. CONSTRUCTION PERMITS 1.1 Minimum Permit Fee 1.1.1 Group C Houses (each) $155.00 $155.00 1.1.2 All other projects (each) $227.90 $239.00 1.2 Tents and Temporary Structures 1.2.1 Tents, one only (each) $143.10 $150.10 1.2.2 Tents, two to ten, same site (per site) $217.30 $227.90 1.2.3 Tents, more than ten, same site (per site) $434.60 $455.80 1.2.4 Temporary office/trailer (per m2) $6.90 $7.20 1.2.5 Other temporary structures including bleachers (per m2) $8.50 $8.90 1.2.6 Portable classrooms, single units (each) $434.60 $455.80 1.3 Group A, Assembly Uses 1.3.1 New, additions, including interiors (per m2) $21.20 $22.20 1.3.2 New, additions, shell only (per m2) $15.90 $16.60 1.3.3 Alterations/repairs/interior finishing (per m2) $6.90 $7.20 1.3.4 Transportation terminals (per m2) $13.80 $14.40 1.3.5 Accessory structures <50m2 (per m2) $6.90 $7.20 1.4 Group B, Institutional Uses 1.4.1 New, additions, including interiors (per m2) $26.50 $27.70 1.4.2 New, additions, shell only (per m2) $20.10 $21.00 1.4.3 Alterations/repairs/interior finishing (per m2) $9.50 $9.90 1.4.4 Accessory structures <50m2 (per m2) $6.90 $7.20 1.5 Group C, Residential Uses 1.5.1 New houses, additions to houses (per m2) $13.80 $14.40 1.5.2 New Certified House Models, for construction (per m2) $12.70 $13.30 1.5.3 New, additions, other residential (per m2) $19.10 $20.00 1.5.4 Addition to houses for garage (per m2) $8.00 $8.30 1.5.5 Alterations/repairs to houses (per m2) $6.50 $6.50 1.5.6 Alterations/repairs to other residential (per m2) $8.50 $8.50 1.5.7 Accessory structures <50m2 (per m2) $6.90 $6.90 1.6 Group D, Business and Personal Service Uses 1.6.1 New, additions, including interiors (per m2) $19.10 $20.00 1.6.2 New, additions, shell only (per m2) $14.80 $15.50 1.6.3 Alterations/repairs/interior finishing (per m2) $5.60 $5.80 1.6.4 Accessory structures <50m2 (per m2) $6.90 $7.20 1.7 Group E, Mercantile Uses 1.7.1 New, additions, including interiors (per m2) $17.00 $17.80 1.7.2 New, additions, shell only (per m2) $12.70 $13.30 1.7.3 Alterations/repairs/interior finishing (per m2) $5.60 $5.80 1.7.4 Accessory structures <50m2 (per m2) $6.90 $7.20 1.8 Group F, Industrial Uses 1.8.1 New, additions, including interiors (per m2) $10.60 $11.10 1.8.2 New, additions, shell only (per m2) $10.20 $10.60 1.8.3 Alterations/repairs/interior finishing (per m2) $4.30 $4.50 1.8.4 Gas stations/canopies, car washes (per m2) $9.40 $9.80 1.8.5 Repair garages (per m2) $10.20 $10.60 1.8.6 Parking garages, new, additions (per m2) $8.80 $9.20 1.8.7 Parking garages, alterations/repairs (per m2) $4.30 $4.50 1.8.8 Accessory structures <50m2 (per m2) $6.90 $7.20

1.8.9 Farm buildings (per m2) $4.30 $4.50 1.9 Additional Fees for All Occupancies 1.9.1 Shoring (per meter of length) $6.90 $7.20 1.9.2 Underpinning (per meter of length) $10.60 $11.10 1.9.3 Mechanical penthouse (per m2) $6.90 $7.20 1.9.4 Public Pools (each) $1,036.70 $1,088.00 1.9.5 Greywater recycling system (each) $341.30 $358.00 1.9.6 Signs attached to a building $203.50 $213.40 Each Additional Sign $67.80 $71.10 1.9.7 Change of Use to Group A, B or C combined with construction (per m2 of area affected) $2.60 $2.70 1.9.8 Change of Use to Group D, E of F combined with construction (per m2 of area affected) $2.30 $2.40 1.10 Additional Fees for Private Sewage Systems 1.10.1 Greywater sewage system/leaching pit $515.20 $540.40 1.10.2 New septic system $583.00 $611.50 1.10.3 Holding tank $371.00 $389.10 1.10.4 Septic tank replacement only $371.00 $389.10 1.10.5 Leaching field replacement/repair/additions $450.50 $472.50 1.10.6 Performance level plan review for proposed additions (fee to be applied to permit fees if required) $201.40 $211.20 1.10.7 Compliance inspection of existing septic system $201.40 $211.20 1.11 Stand Alone Work 1.11.1 Relocated building placement (per m2) $6.90 $7.20 1.11.2 New Certified House Models, plan review only (each) $699.60 $733.80 1.11.2A Certified House Model Extra Elevation Options, plan review only (each) $699.60 $733.80 1.11.3 Roof sheathing repair or replacement (per m2) $3.00 $3.10 1.11.4 Repair or reclad exterior walls (per m2) $3.00 $3.10 1.11.5 New/enlarged exterior window/door openings (each) $56.20 $58.90 1.11.6 Replace existing windows, same opening (each) $13.80 $14.40 1.11.7 Replacing/repairing guards/railings (per m of length) $2.10 $2.20 1.11.8 Ceiling (new or replacement) (per m2) $0.70 $0.70 1.11.9 Plumbing alterations, extensions to existing distribution and drainage systems (per fixture) $15.90 $16.60 1.11.9(a) Except for backflow devices, all plumbing alterations or extensions to existing distribution and drainage systems (per fixture) $15.90 $16.60 1.11.9(b) Backflow devices being installed at one time (first 5), $227.90 $239.00 (b) (cont'd) additional devices being installed at the same time $31.80 each $33.30 1.11.10 Water service and/or sewer connection (per m length of trench) $1.35 $1.40 1.11.11 Fire alarm installation/upgrade $70.00 $73.40 Plus per device $4.20 $4.40 1.11.12 Sprinkler installation/upgrade $70.00 $73.40 Plus per device $1.35 $1.40 1.11.13 Standpipe installation/upgrade $70.00 $73.40 Plus per cabinet $70.00 $73.40 1.11.14 Electromagnetic lock installation/upgrade $70.00 $73.40 Plus per lock $106.00 $111.10 1.11.15 Heating system installation/upgrade $70.00 $73.40 Plus per damper or firestop $35.00 $36.70 1.11.16 Commercial cooking hood install/upgrade (per hood) $318.00 $333.50 1.11.17 Dust collectors $212.00 $222.30 1.11.18 Spray booth install/upgrade (per booth) $424.00 $444.70

1.11.19 Decks, deck extensions $297.90 $312.40 1.12 Designated Structures 1.12.1 Communication tower (each) $424.00 $444.70 1.12.2 Exterior storage tank (each) $424.00 $444.70 1.12.13 Pedestrian Bridge (per m2) $13.80 $14.40 1.12.4 Retaining wall - first 20M $212.00 $222.30 per 20M or portion thereafter $132.50 $138.90 1.12.5 Satellite dish, solar collector, wind turbine (each) $339.20 $355.80 1.12.6 Freestanding signs (each) $296.80 $311.30 2. CONDITIONAL PERMITS 2.1 Conditional Permit - houses (each) $212.00 $222.30 2.2 Conditional Permit - other (each) $339.20 $340.00 3. DEMOLITION PERMITS 3.1 Buildings up to 600m2 building area and up to 3 storeys in building height (each) $296.80 $311.30 3.2 All other buildings (each) $699.60 $733.80 4. CHANGE OF USE PERMITS 4.1 Group A, Assembly Uses (per m2) $2.50 $2.60 4.2 Group B, Institutional Uses (per m2) $3.50 $3.60 4.3 Group C, Residential Uses (per m2) $2.95 $3.00 4.4 Group D, Business and Personal Service Uses (per m2) $2.30 $2.40 4.5 Group E, Mercantile Uses (per m2) $2.30 $2.40 4.6 Group F, Industrial Uses (per m2) $2.30 $2.40 5. SPECIAL SERVICES 5.1 Revised Part 9 permits or applications (per hour) $159.00 $166.70 5.2 Revised Part 3 permits or applications (per hour) $190.80 $200.10 5.3 Pre-submission plan reviews Residential (per model) $424.00 $444.70 5.4 Pre-submission plan reviews Non-Residential (per building) $699.60 $733.80 5.5 Transfer of Permit to new Owner $143.10 $150.10 5.6 Request to Use Alternative Solution (per hour) $280.90 $294.60 5.7 Deferral of Revocation of an Issued Permit (each) $74.20 $77.80 5.8 Occupant Load Inspection and Report $222.60 $233.50 6. ENFORCEMENT SERVICES 6.1 Surcharge for Pre-permit Start (each) 25% of permit fee minimum $206 6.2 Re-inspection of defective or incomplete work (each) $148.40 $155.60 6.3 Issuance of an Order/ Deficiency Report (each) $159.00 $166.70 6.4 File Management fee if Order Registered on Title $742.00 $778.30 6.5 Issuance of a Summons (each) Plus Legal Expenses $742.00 $778.30 6.6 After-hours Inspection Fee, Part 9 buildings (per hour) $153.70 $161.20 6.7 After-hours Inspection Fee, Part 3 buildings (per hour) $159.00 $166.70 After-hours Emergency Call-Out (per hour) $360.40 $378.00 NOTES: Except as provided in sections 1.2, 1.11 and 1.12, the permit fee for a project shall be calculated by: a) Determining the occupancy classification, gross floor area and scope of work for which the permit applies; b) Multiplying the fee rate listed in sections 1.3 to 1.8 by the appropriate measure; c) Adding any additional fee rates listed in 1.9 and 1.10; and d) Ensuring the total permit fee is at least the minimum fee listed in section 1.1. Except as provided in the additional fee rates listed in sections 1.9 and 1.10, all plumbing, heating, air conditioning and ventilation work associated with a project and shown on the permit drawings are included in the base fee rate. Fees not listed shall be determined by the Chief Building Official by reasonable comparison with the listed fee rates. 25% of permit fee minimum $206

SECTION 2. BY-LAW ADMINISTRATION/ENFORCEMENT 1. POOL ENCLOSURE BY-LAW 1.1 Pool Enclosure Permit $285.00 $285.00 1.2 Pool Enclosure Permit when project is combined with a deck permit or change house permit issued concurrently $75.00 $75.00 1.3 Pre-permit surcharge fee when pool installed before an enclosure permit is issued $200.00 $200.00 1.4 Re-inspection fee due to non-compliance or temporary fencing $145.00 $145.00 1.5 Fee invoiced to property owner when an inspection confirms a by-law contravention $145.00 $145.00 1.6 Issuance of a Summons (each) Plus Legal Expenses $712.50 $712.50 2. PRIVATE RETAINING WALL BY-LAW 2.1 Retaining walls regulated by municipal by-law and not regulated by the Ontario Building Code, first 20m of length or portion thereof $201.40 $201.40 2.2 Each additional 20m of length or portion thereof $132.50 $132.50 2.3 Permit surcharge when work commenced before permit issued $212.00 $212.00 2.4 Re-inspection fee due to non-compliance $153.70 $153.70 2.5 Issuance of a Summons (each) Plus Legal Expenses $755.30 $755.30 3. TIE BACKS AND CRANE JIB PERMITS 3.1 Application fee, per site $1,590.00 $1,667.90 4. REPORTS 4.1 Issuance Listing Report $74.20 $77.80 5. ADMINISTRATION S FOR SUBDIVISION AGREEMENTS AND SITE PLAN AGREEMENTS 5.1 Per dwelling unit in new plans of subdivision, collected at time of permit application $212.00 $222.30 5.2 Per building for projects regulated by site plan control, for initial development, collected at time of permit application $360.40 $378.00 5.3 Plan revisions $47.70 $50.00 5.4 Re-inspection fee due to corrective work by the developer, per hour, minimum 0.5 hours $153.70 $161.20 5.5 Upon issuance of a first warning letter/notice of default to the land developer $434.60 $455.80 5.6 Upon issuance of a second warning letter/notice of default to the land developer $212.00 $222.30 5.7 Letter issued to current property owners advising of City's undertaking of deficient work (per property) $153.70 $161.20 5.8 Work undertaken on behalf of developer City's out-of-pocket expenses plus 50% City's out-of-pocket expenses plus 50% 6. RESEARCH REQUESTS 6.1 Special requests for file research (per hour) $153.70 $153.70 7. COMPLIANCE REPORTS/LETTERS 7.1 Standard department information (each property) $79.50 $83.30 7.2 Forty-eight hour rush response (each property) $121.90 $127.80 SECTION 3. PLANNING SERVICES S 1. OFFICIAL PLAN/ZONING BY-LAW AMENDMENTS 1.1 Rezoning - without Official Plan Amendment $15,661.45 $16,052.99 1.2 Rezoning Applications with Official Plan Amendments $17,539.20 $17,977.68 1.3 Official Plan Amendments $18,082.23 $18,534.28 1.4 Rezoning- Removal of Holding Provision $2,085.83 $2,137.97 1.5 Temporary Use $8,784.83 $9,004.45

SECTION 2. BY-LAW ADMINISTRATION/ENFORCEMENT 1. POOL ENCLOSURE BY-LAW 1.1 Pool Enclosure Permit $285.00 $285.00 1.2 Pool Enclosure Permit when project is combined with a deck permit or change house permit issued concurrently $75.00 $75.00 1.3 Pre-permit surcharge fee when pool installed before an enclosure permit is issued $200.00 $200.00 1.4 Re-inspection fee due to non-compliance or temporary fencing $145.00 $145.00 1.5 Fee invoiced to property owner when an inspection confirms a by-law contravention $145.00 $145.00 1.6 Issuance of a Summons (each) Plus Legal Expenses $712.50 $712.50 2. PRIVATE RETAINING WALL BY-LAW 2.1 Retaining walls regulated by municipal by-law and not regulated by the Ontario Building Code, first 20m of length or portion thereof $201.40 $201.40 2.2 Each additional 20m of length or portion thereof $132.50 $132.50 2.3 Permit surcharge when work commenced before permit issued $212.00 $212.00 2.4 Re-inspection fee due to non-compliance $153.70 $153.70 2.5 Issuance of a Summons (each) Plus Legal Expenses $755.30 $755.30 3. TIE BACKS AND CRANE JIB PERMITS 3.1 Application fee, per site $1,590.00 $1,667.90 4. REPORTS 4.1 Issuance Listing Report $74.20 $77.80 5. ADMINISTRATION S FOR SUBDIVISION AGREEMENTS AND SITE PLAN AGREEMENTS 5.1 Per dwelling unit in new plans of subdivision, collected at time of permit application $212.00 $222.30 5.2 Per building for projects regulated by site plan control, for initial development, collected at time of permit application $360.40 $378.00 5.3 Plan revisions $47.70 $50.00 5.4 Re-inspection fee due to corrective work by the developer, per hour, minimum 0.5 hours $153.70 $161.20 5.5 Upon issuance of a first warning letter/notice of default to the land developer $434.60 $455.80 5.6 Upon issuance of a second warning letter/notice of default to the land developer $212.00 $222.30 5.7 Letter issued to current property owners advising of City's undertaking of deficient work (per property) $153.70 $161.20 5.8 Work undertaken on behalf of developer City's out-of-pocket expenses plus 50% City's out-of-pocket expenses plus 50% 6. RESEARCH REQUESTS 6.1 Special requests for file research (per hour) $153.70 $153.70 7. COMPLIANCE REPORTS/LETTERS 7.1 Standard department information (each property) $79.50 $83.30 7.2 Forty-eight hour rush response (each property) $121.90 $127.80 SECTION 3. PLANNING SERVICES S 1. OFFICIAL PLAN/ZONING BY-LAW AMENDMENTS 1.1 Rezoning - without Official Plan Amendment $15,661.45 $16,052.99 1.2 Rezoning Applications with Official Plan Amendments $17,539.20 $17,977.68 1.3 Official Plan Amendments $18,082.23 $18,534.28 1.4 Rezoning- Removal of Holding Provision $2,085.83 $2,137.97 1.5 Temporary Use $8,784.83 $9,004.45

1.6 Extension of Temporary Use - per request $4,455.85 $4,567.25 2. PLAN OF SUBDIVISION/CONDOMINIUM 2.1 Plan of Subdivision Application - Base fee plus per unit fee $17,564.58 $18,003.69 (a) Units 1-25 $355.00 $363.88 (b) Units 26-100 $255.00 $261.38 (c) Units 101-200 $205.00 $210.13 (d) Units 201+ $150.00 $153.75 2.2 Plan of Condominium application $9,322.78 $9,555.84 2.3 Plan of Subdivision - extension of draft plan time $3,785.95 $3,880.60 2.4 Plan of Condominium - extension of draft plan time $3,608.33 $3,698.53 2.5 Condominium Exemption $2,907.98 $2,980.67 2.6 Application for Red Line Revision $5,511.45 $5,649.24 2.7 Fourth and Subsequent Subdivision and Site Plan Submission Review $5,151/ full submission - plan of subdivision $1,548/full submission - site plan $5,279.78/ full submission - plan of subdivision $1,586.70/full submission - site plan 3. SITE PLAN 3.1 - Up to 5000 m2 $8,602.13 $8,817.18 (a) - 5001 to 20,000 m2 $11,099.03 $11,376.50 (b) - 20,001-35,000 m2 $13,266.05 $13,597.70 (c) - Developments greater than 35,000 m2 $15,453.38 $15,839.71 3.2 Revision to Site Plan $3,374.88 $3,459.25 3.3 Extension of Site Plan Approval $2,522.28 $2,585.33 3.4 Site Plan Exemption $1,015.00 $1,040.38 4. PRE-CONSULTATIONS 4.1 All Applications $1,908.20 $1,955.91 4.2 Conformity Review Fee $1,955.91 5. CASH-IN-LIEU OF PARKING SPACE 5.1 Cash-in-lieu of Parking Rate Per Stall $15,225.00 $15,605.63 5.2 Cash-in-lieu of Parking Rate Per Stall - C1 Zones within the City Centre $5,075.00 $5,201.88 6. TELECOMMUNICATIONS FACILITIES 6.1 Processing and review of applications for the installation of telecommunication $3,065.30 $3,141.93 7. SITE PLAN 7.1 Request for Validation Order $619.15 $634.63 8. DEEMING BY-LAW 8.1 Application fee (includes legal fees) $796.78 $816.69

9. PART LOT CONTROL 9.1 Application fee (includes legal fees) $1,182.48 $1,212.04 10. COMMITTEE OF ADJUSTMENT S 10.1 Preconsultation (per hour) with a minimum of 0.5 hours, with 50% credited to the subsequent application fee $131.95 $135.25 10.2 Severance/Consent Application $2,370.03 $2,429.28 10.3 Application for Minor Variance $1,882.83 $1,929.90 10.4 Easements for Utilities $1,131.73 $1,160.02 10.5 Collier Street - North side from Poyntz Street to Berczy Street $103 off original fee $105.58 off original fee 10.6 Deferral/Amendments requiring recirculation 50% off original fee 50% off original fee 10.7 Special Meeting Request $822.15 $842.70 10.8 Stamping of Deed $142.10 $145.65 11. ZONING REVIEW OF DEVELOPMENT APPLICATIONS 11.1 Residential Building Permit (New, additions) 11.2 Residential Building Permit (Alterations, repairs) $70/dwelling unit for first 10 units, plus $35/dwelling unit thereafter $30.45/dwelling unit, maximum of $305 $71.75/dwelling unit for first 10 units, plus $35.88 /dwelling unit thereafter $31.21/dwelling unit, maximum of $312 11.3 Allandale Historic Neighbourhood New Building Permit and Alterations/Repairs in Scoped $284.20 $291.31 Site Plan Review Area - Allandale Heritage Urban Design Guidelines 11.4 Non-residential Building Permit (new, <50 m2, per building) $70.04 $71.79 11.5 Non-residential Building Permit (new, additions, per building) $201.73 $206.77 11.6 Non-residential Building Permit (Alterations, repairs, per application) $70.04 $71.79 11.7 Two-Unit Registration or Business License review/investigation (per hour, minimum 0.5 $140.07 $143.57 hours) 11.8 Pool Enclosure Permit $48.72 $49.94 11.9 Pool Enclosure Permit when project is combined with a deck permit or change house permit issued concurrently $27.41 $28.09 11.10 Retaining walls not regulated by Building Code $48.72 $49.94 11.11 Change of Use Permit $70.04 $71.79 12. MISCELLANEUOS PLANNING S 12.1 Permitted Use Letter $123.00 $126.08 12.2 Address Change Request $203.00 $208.08 13. ZONING BY-LAW ENFORCEMENT 13.1 Fee invoiced to the property owner when an investigation confirms the property does not comply with the City s Zoning By-law Upon issuance of a first warning letter/notice interior and exterior of building $163.42 $167.50 Upon issuance of a first warning letter/notice exterior of building only $81.71 $83.75 Upon issuance of a second warning letter/notice interior and exterior of building $678.02 $694.97 Upon issuance of a second warning letter/notice exterior of building only $370.48 $379.74 13.2 Issuance of a Summons (each) Plus Legal expenses $733.85 $752.19 14. TWO-UNIT HOUSE REGISTRATION BY-LAW 14.1 Registration Fee - existing two unit registration $513.59 $526.43 14.2 File management fee when a second or subsequent letter is issued to an unregistered two-unit house $147.18 $150.85

14.3 Issuance of a Summons (each) Plus Legal Expenses $733.85 $752.19