The UBBL Applications of Fire Safety Provisions

Similar documents
The New NYC Building Code Chapter 10 Means of Egress. New York City Department of Buildings. Technical Affairs. Fatma M. Amer, P.E.

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

Sample Questions for Paper 1 Statutory Controls in Building Works

Andraus high-rise, Sao Paulo, Brazil, February 1972

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

BUILDING CODE COMMISSION

DRS RWANDA STANDARD. Code of practice for fire safety. of building. Part 5: Exit requirements and personal hazard.

E1-12: Final Decision AS

THIS CHECKLIST HAS BEEN AMENDED TO INCLUDE ONLY LEVEL ONE CRITERIA AS REQUESTED BY TIR REAL PROPERTY. As such it does not form a complete Checklist.

The New NYC Building Code Chapter 11 Accessibility. New York City Department of Buildings. Technical Affairs. Keith Wen, R.A. Copyright Materials

Minimum requirments for Fire Fighting Installations Type of Installation. Yard Hydrant. Down Comer. Dry Riser* Wet Riser.

5. Turnover Condition : Bare Shell, rough flooring, fire sprinkler and smoke detectors for installation., Fan Coil Units provided

2012 IBC Means of Egress

Presentation By. Chris Poujol. Jeffery Rodriguez. James Rigley

Discuss the history of fires that resulted in much of the development of codes related to means of egress. Review mean of egress terminology

BUILDING CODE COMMISSION

(2) Determining Occupant Loads for the Operation of a Building (The Alberta Fire Code)

SPECIFIC GUIDANCE FOR A BEDSIT TYPE HOUSE IN MULTIPLE OCCUPATION (HMO)

Natural Light & Ventilation. Sources. Regulation 45 (1) & 45 (2) A Public road with right of way. A Courtyard or Open Space within the site.

Regional District of Nanaimo Secondary Suite Program

HIGH-RISE BUILDING INVENTORY FORMS (B.I.F.) PRODUCTION AND APPROVAL

PROPERTY CONDITION CHECK LIST FOR A LICENCED HMO

BUILDING CODE COMMISSION

NEPAL NATIONAL BUILDING CODE NBC 206: 2015

q/., S Lt _ _.._--.

BUILDING CODE COMMISSION

CORPORATE SQUARE. Sector - 127, Noida

BUILDING CODE COMMISSION

Compliance Schedules and Building Warrants of Fitness

1. Project No.: 812 Muslim Commercial Bank, Karachi Mechanical & Electrical System

Background: 5 th Edition (2014) Florida Building Code, Building

MINIMUM HMO & HOSTEL STANDARDS

The House Of Stairs Penguin Readers

Codes Checklist Document 3

Tiny House on Wheels A Tiny House

ADA/TAS Plan Review & Inspection Worksheet Texas Access

Access to and use of buildings

DRAFT ZONING BY-LAW AMENDMENT 75 DUBLIN STREET NORTH ZC1612

Net lettable area (NLA) is used to calculate tenancy areas in: office buildings office and business parks.

Part 9 Specific Land Uses - Multi Dwelling Housing

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

Accessible Housing Standards 2015

Suite Permission. Suites complying with shall be permitted to be used to meet the corridor access requirements of

The House Of Stairs Sevnet

Access Statement for Primrose Farm

PROPERTY ADDRESS. 720 Greenwood Avenue (Alternate Address- 215 York Road) Jenkintown, Pennsylvania

Attic Floor Bedrooms 1 & 2 Family Dwellings

DEPARTMENT OF DEVELOPMENT SERVICES ACCESSIBILITY CHECK LIST FOR MULTI-FAMILY RESIDENTIAL BUILDINGS

Accessible Facilities Report Template

APPLICATION OF SECTION 3.8 OF THE 2012 ONTARIO BUILDING CODE FOR: BARRIER-FREE AUDIT OF SENECA COLLEGE NEWNHAM CAMPUS TORONTO, ONTARIO

SPECIALIZED RESIDENTIAL APARTMENT (R.4) ZONES

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

BUILDING CODE COMMISSION

Residential Accessible, Type A, and Type B Dwelling Unit Requirements 2012 International Building Code and 2009 ICC/ANSI A117.1

2012 Texas Accessibility Standards Reference Guide for changes to the code

Copyright 2013, Queen s Printer for Ontario

3. Miscellaneous Instructions and Definitions.

Residential - Mixed Housing Urban and Suburban zones

ERRATA AND REVISIONS MEASURES FOR FIRE SAFETY IN HIGH BUILDINGS

High-Rise Fire Sample Scenario with Stairwell Pressurization by Steve Kerber Fire Engineering Simulation

MANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)

CITY OF TORONTO. BY-LAW No (OMB)

Regulation Outline. Under section 59 of the Community Planning Act, the Lieutenant-Governor in Council makes the following Regulation:

Schedule C Barrier-Free Design

BUILDING CODE COMMISSION

Understanding Accessibility Features to Meet Housing Needs

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

1. All registered guests of Mantra Circle on Cavill agree to abide by the Mantra Circle on Cavill House Rules;

Single Point of Failure and Inter-relationship between Stair Pressurisation System and Evacuation Strategy for Tall Buildings

DATE: 4/24/12 PRESENT AT SITE: Aaron Lobas, Daniel Imlay - URS JOB NAME: Cuyahoga County Huntington Park Garage JOB NUMBER:

ADAPTABLE DESIGN GUIDELINES

130 - General Regulations for Residential Zones and Uses Only

Protecting the Stair Enclosure in Tall Buildings Impacted by Stack Effect

BUILDING GUIDELINE MEASUREMENT. Appraisal Institute of Canada 403 ~ 200 Catherine Street Ottawa, Ontario K2P 2K9

Small Lot Housing Code (June 2013):

A Safe Community for New Beginnings

2015 IBC Allowable Heights and Areas

NEW ACCESSIBILITY CHANGES

SMART Access Assessment

MANDATORY MEASURES DAYLIGHTING. Reference: Sub-Chapter 4, Section 130.1(d)

Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

100 CHARACTERISTICS OF THE GREEN GLADES ESTATE

MOUNT GRAVATT- CAPALABA ROAD

FAIRFIELD INN & SUITES

Euromoney Real Estate Survey 2016

Disability (Access to Premises Buildings) Standards

Small Lot Housing Code

STAIRS Design & Construction

Ontario Municipal Board Order issued on February 25, 2005 in Board File Nos. PL and PL CITY OF TORONTO. BY-LAW No.

BUILDING CODE INTERPRETATION

Re: Parking Study Davenport Road Mixed Use Development

Section 9.5. Design of Areas, Spaces and Doorways

12/18/2017. Objective. Accessibility Code MN 1341 Frequent Questions and Key Criteria. Agenda. Code Documents

Brighton & Hove City Council. Standards for Licensable Houses in Multiple Occupation

Requirements for accepted development and assessment benchmarks for assessable development

11A Accessibility Standards Frequently Asked Questions for Residential Projects

Existing Building Accessibility Quick Checklist (CBC 11B) Job Address Permit

Transcription:

The UBBL Applications of Fire Safety Provisions Atriums Open Structures and Corridors Fire Appliance Access Ar Chong Lee Siong APAM MIFireE MIArbs PAM-IFEM SEMINAR 2016 ATRIUMS UBBL clause 137 UBBL clause 252A

1984 UBBL Clause 137 : Compartment Floor In any building which exceeds 30 metres in height, any floor which is more than 9 metres above ground floor level which separates one storey from another storey, other than a floor which is either within a maisonette or a mezzanine floor shall be constructed as a compartment floor. 1984 UBBL cl 137 All Buildings above 30m 30m All floors above 9m to be Compartment Floors Floors 9m or below need not be compartmented 9m

1984 UBBL cl 137 30m By inference, Buildings below 30m..need not have compartmented floors 9m 2012 UBBL Clause 137 : Compartment Floor (1) In any building not exceeding 30 metres in height, any floor which is more than 9 metres above ground floor level which separates one storey from another storey, other than a floor which is either within a maisonette or a mezzanine floor shall be constructed as a compartment floor. (2) In any building exceeding 30 metres in height, all floors shall be constructed as compartment floors, other than a compartment which is within a residential maisonette which may comprise two storey levels.

2012 UBBL cl 137 Any building NOT exceeding 30m 30m All floors above 9m to be Compartment Floors Floors 9m or below need not be compartmented 9m 2012 UBBL cl 137 Any building exceeding 30m 30m All floors to be Compartmented Including floors below 9m 9m

2012 UBBL cl 137 Openings between floors shall be designed as an ATRIUM 30m An atrium shall comply with the requirements of by-law 252A. 9m 2012 UBBL 252A Atriums in buildings 1. Minimum dimensions: 6m and 95m2 2. Exits separated from atrium 3. 1 hour FRP separation 4. Automatic sprinklers 5. Smoke control/exhaust system

OPEN STRUCTURES OPEN CORRIDORS 10 th Schedule 2012 UBBL 10 th Schedule A. Hose Reel System B. Sprinkler System C. Gaseous Extinquishing System D. Pressurized Fire Hydrant 1. Manual Electric Fire Alarm 2. Automatic Fire Detector System 3. Centralised Monitoring System 4. Public Address System 5. Fire Command Center

OPEN STRUCTURE (1)Total surface area of openings is to be no less than 40% of the total perimeter wall area enclosing the floor or compartment (2)The opening is to be shaped and located in such a way that total length in plan of the opening(s) is to be no less than 50% of the perimeter of the floor or compartment Openings is to be opened to outside, unenclosed space or permitted airwells. Any individual opening having a surface area less than 600mm2 or area width of opening is less than 25mm is not to be regarded as an opening for this purpose. OPEN STRUCTURES Example: Total perimeter length (25m + 50m ) x 2 = 150m minimum 50% = 75m Total perimeter wall area 150m x 5m = 750m2 minimum 40% = 300m2 5m height 25m 50m 4m 3m 2m high opening Total length of openings :(25m 50m + 50m)x2 = 100m 75m = 150m Total area of openings : 75m 150m 100m x x 4m 2m 3m = = 300m2

OPEN CORRIDOR (1)Total surface area of opening(s) is to be no less than 25% of the total perimeter wall area enclosing the balcony (corridor) (2)The opening(s) is to be shaped and located in such a way that total length in plan of the opening(s) is to be no less than 50% of the perimeter of the floor or compartment Openings is to be opened to outside, unenclosed space or permitted airwells. Any individual opening having a surface area less than 600mm2 or area width of opening is less than 25mm is not to be regarded as an opening for this purpose. OPEN CORRIDOR 6m 6m Example (corridor) Total perimeter length (24m + 2m ) x 2 = 52m minimum 50% = 26m Total perimeter wall area 52m x 3m = 156m2 minimum 25% = 39m2 6m 6m 3m 3m 2m length 3m height Permitted Airwells (UBBL 40) 1.5m high opening Total length of openings 24m + 2m + 2m= 28m Total area of openings : 28m x 1.5m = 42m2

10 th SCHEDULE A : HR B : Spkr C : GasEx D : PrHy 1 : ManAl 2 : AutoD 3 : CMS 4 : PAS 5 : FCC Note 8: Trolley 25kg extinguisher 10 th SCHEDULE A : HR B : Spkr C : GasEx D : PrHy 1 : ManAl 2 : AutoD 3 : CMS 4 : PAS 5 : FCC Note 8: Trolley 25kg extinguisher

10 th SCHEDULE A : HR B : Spkr C : GasEx D : PrHy 1 : ManAl 2 : AutoD 3 : CMS 4 : PAS 5 : FCC 10 th SCHEDULE HOTELS Note 7 : self contained SD in bedrooms A : HR B : Spkr C : GasEx D : PrHy 1 : ManAl 2 : AutoD 3 : CMS 4 : PAS 5 : FCC

10 th SCHEDULE A : HR B : Spkr C : GasEx D : PrHy 1 : ManAl 2 : AutoD 3 : CMS 4 : PAS 5 : FCC Note 5: Fire Ext Note 6: SD at stairs FIRE FIGHTING ACCESS UBBL clause 140 UBBL clause 197 UBBL clause 197A UBBL 197B

FIRE APPLIANCE ACCESS 2012 UBBL 140 ACCESS WAY An area for the entry, maneuvering and parking of Fire Appliances during fire fighting and rescue operations ACCESS ROAD A road capable of accommodating the passage of Fire Appliances to enter an Access Way ACCESS OPENINGS Doorways or openings that allows fast and safe entry of Fire Fighting and Rescue personnel into a building during fire fighting and rescue operations Pressurised Hydrant System

Sprinkler System Dry Riser system

Wet Riser System External source of water Hydrants Lakes, Ponds, Pools, rivers Fire Tenders Fire Fighting Appliance on Access Way Breaching Inlet Sprinklers Risers Internal Systems Sprinklers Hose reels Risers

Required portion of building fronting the Access Way Required portion of building fronting the Access Way ACCESS WAY ACCESS ROAD minimum width 4.5m (suggested) Gradient <= 1: 8.3 Minimum overhead clearance 4.5m ACCESS WAY Minimum 6m width 30 tonnes load Gradient <= 1:15 No overhead obstructions ACCESS OPENING Located fronting Access Way (suggested) width >= required exit width Edge of Access Way Minimum 2m Maximum 10m ACCESS ROAD minimum width 4.5m (suggested) Gradient <= 1: 8.3 Minimum overhead clearance 4.5m Maximum 90m Hydrant to Hydrant Hydrant Fire Fighting Access Lobbies Firemen s Lift Fire Fighting Staircase Risers Emergency Power Generators Fire Pumps Breeching Inlets Hydrant Maximum 30m Hydrant to Breeching Inlet

Fire appliance access level and Access Way Access Way at upper ground level

13,000 m3 (1/6) Access way at upper ground level Access road / ramp 8,600m3 (1/6) 36,000m3 (1/4) Access road / ramp Access way at appliance access level Access ramp Access ramp a Command center Breaching inlet Pump room access

THANK YOU Ar Chong Lee Siong APAM MIFireE MMIArbs