Fee Resolution

Similar documents
Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

CHAPTER 1321 Permit and Inspection Fees

City of Wausau Building, Housing and Zoning Fee Schedule 2019

APPENDIX A BUILDING PERMIT AND RELATED FEES

FY 2018 FEE SCHEDULE (Effective )

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

BUILDING PERMIT FEE ESTIMATE

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

City of High Point Development Fee Schedule

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

WEST VINCENT TOWNSHIP COMMERCIAL BUILDING PERMIT

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

39-1. Enforcing agency established; subcode officials designated.

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

The City of Daytona Beach Fee Schedule

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

DEPARTMENT OF BUILDING AND SAFETY

Chapter 101, CONSTRUCTION CODES, UNIFORM [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs as indicated in article

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

Worcester Township Fee Schedule

Planning&Development Fee Standards

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

3. COMMUNITY DEVELOPMENT Approved FY 18 19

CONSTRUCTION PERMIT FEE SUMMARY

BUILDING SERVICES ~ FEE SCHEDULE

CITY OF SEA ISLE CITY NEW JERSEY ORDINANCE NO (2016)

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Administrative Services Department

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

UPPER SAUCON TOWNSHIP DEPARTMENT OF COMMUNITY DEVELOPMENT COMPREHENSIVE FEE SCHEDULE (Per Resolution )

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

RESOLUTION NO

List of Principal Officials

Location in Code Subject Fees

Resolution Fee Schedule

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

C. For all areas of unincorporated Multnomah County:

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Borough of Honesdale Resolution # Fee Schedules A resolution to replace all otfier resolutions setting fees for the Borough of Honesdale:

RESOLUTION NO

EAST WHITELAND TOWNSHIP FEE SCHEDULE 2018

SCHEDULE OF BUILDING PERMIT FEES

BUI L DIN G A ND E L E V A T O R F E ES

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

Submission Procedures

East Vincent Township Chester County, Pennsylvania

WEST MANHEIM TOWNSHIP FEE SCHEDULE FOR SERVICES & PERMITS. Resolution #

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Wrightstown Township. Fee Schedule Resolution # Adopted 01/05/09

BOROUGH OF WOODCLIFF LAKE Bergen County, New Jersey ORDINANCE NO

New Hanover Township

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

VIEW POINTE MAINTENANCE CORPORATION

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

Department of Public Works Permit Fee Schedule

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

CHARLESTON PLACE TENANT CALCULATION CHECK/DATA TABULATION SHEET(S) Forms must be completed by the Tenant's Mechanical or Electrical Engineer.

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

CITY OF TARPON SPRINGS, FLORIDA

City of Lake Dallas Master Fee Schedule Fiscal Year 2017

Fee Schedule Last Updated: November 21, 2017

ORDINANCE NO

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

Ordinance 991 CHAPTER 91 RENTAL HOUSING CODE

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

ORDINANCE NO (revised by Ordinance )

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

RESOLUTION NO

9. Public (Federal, State, or local

This fee structure applies to applications submitted on or after January 1, 2018.

Planning Zoning Addendum of Fees. Item/Service. Agricultural Lot Split $ Conditional Use Application $300.00

EXHIBIT A to Ordinance No PART 1

Tiny House on Wheels A Tiny House

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

Appendix G Fee Schedule

Transcription:

Fee Resolution 2016-6 A resolution establishing fees for the filing of applications, permits and licenses for the Township of Leet. WHEREAS, the Board of Commissioners of the Township of Leet has adopted a codification, consolidation and revision of the ordinances of the Township of Leet; and, WHEREAS, it is the desire of the Board of Commissioners of the Township of Leet to eliminate all filing fees, permit fees and license fees from the Code of Ordinances and enact them instead by resolution; and, NOW, THEREFORE BE IT RESOLVED THAT and it is hereby resolved by the Board of Commissioners of the Township of Leet that all fees are hereby fixed as follows: Subject CODE ENFORCEMENT Uniform Construction Code Building Inspection Underwriters of PA, Inc. Residential Building ; Use Groups R-3 & R-4 New construction and additions Alterations & repairs Utility and miscellaneous use groups (sheds, decks, fences, towers, pools, concrete slabs, retaining walls, etc.) Commercial Building ; All Other Use Groups Except F & S New construction and additions $40 plus $0.19 per square foot of GFA*.01 of total construction cost (labor and material) (min. fee $50 one visit).01 of total construction cost (labor and material) (min. fee $50 one visit) $60 plus $.27 per sq. ft. of GFA* Alterations, renovations, and repairs Up to $500,000 x.015 ($7,500) Minimum fee $50 $500,001 to $1,000,000 x.0125 plus ($7,500) Above $1,000,000 x.01 plus ($13,750) *GFA Gross floor area defined as the total square footage of all floors within the perimeter of the outside walls, including basements, cellars, garages, roofed patios, breezeways, covered walkways and attics with floor to ceiling height of 6 ft. 6 in. or more. Commercial Building with BCO Approval Factory & Storage Use Groups Consisting of a Shell Type Structure with Basic Utilities Inside. -1-

F-1 & F-2 use groups Up to 250,000 sq. ft. @ $.25 per sq. ft. ($62,500) Over 250,000 sq. ft. @ $.10 per sq. ft. plus ($62,500) S-1 & S-2 use groups Up to 10,000 sq. ft. @ $.25 per sq. ft. ($2,500) From 10,001 to 100,000 sq. ft. @ $.15 per sq. ft. plus ($2,500) Over 100,000 sq. ft. @ $.10 per sq. ft. plus ($16,000) Fire: All use groups except one and two family Sprinklers Standpipe $40 plus $.25 per sprinkler head $80 each Wet/dry carbon dioxide $100 up to 100 lbs. ($.75 each pound over) Commercial cooking system Demolition Signs Commercial Plan Review $150 per system (Hood, Duct, & Suppression) $.01 per sq. ft. with a minimum of $100 $25 plus $2 per sq.ft. of sign area [both sides when applicable] For buildings with an estimated construction value up to $3,000,000, the building plan review fee is.0013 of the estimated value ($250 minimum). For buildings with an estimated construction value over $3,000,000 up to $6,000,000, the fee is $3,900 plus.0005 of the estimated value over $3,000,000. For buildings over $6,000,000, the fee is $5,400 plus.0004 of the estimated value over $6,000,000. The plan review fee for electrical, mechanical and plumbing are computed at 25 percent of the building plan review fee for each discipline ($250 minimum). Electrical Inspection Commercial/Residential Service and Feeders 200 amps or less $55 201 amps to 400 amps $80 Over 400 amps: Sub-feeders or sub-panels Over 600 volts Residential Flat Rate Inspections 100 amp service and max 100 devices $90 $20 per 100 amps ¼ of above fee double above fees

200 amp service and max 100 devices $120 Mobile/Modular Homes 1 trip Service & feeder $65 Minor Alterations and Service Max. 15 devices $65 Storable & Therapeutic/Hydrotherapeutic Pools $55 Permanent Pools & Hot tubs $125 Electrical Survey Only $125 Rough Wiring All-switching, receptacles and lighting outlets 1 to 25 $25 Each 10 additional $5 Finished Wiring All switches, receptacles and lighting outlets 1 to 25 $25 Each 10 additional $5 Heating, Cooling, Cooking Equipments Motors, Generators, Capacitors, Etc. Less than ⅓ hp kw, kva, or kvar Over ⅓ hp, dw, kva, or kvar: Over 100 ⅓ to 1.0 $15 1.1 to 5.0 $18 5.1 to 10.0 $20 10.1 to 30.0 $25 30.1 to 50.0 $30 50.1 to 100 $40 Over 600 volts Signaling, Communication and Alarm Systems 1 to 10 devices $50 Each additional $1.50 Minimum fee applies $55 Residential ; Mechanical & Plumbing New construction use finish wiring fee $1 per hp, kva or kvar two times above fees -3-

All appliances and fixtures including, but not limited to, sinks, water closed, bath tub, shower, washing machine, hose bib, floor drains, dish washer, drinking fountain, cater heater, air handlers and any fuel burning device (gas, oil, wood, or coal) Per appliance or fixture $9 Utility service connections (water or sewer), boiler, grease traps, sewer pumps, refrigerator units, water-cooled air conditioners, etc. Per appliance $55 Alterations and Repairs Plumbing $30 plus $8 per device Mechanical Commercial ; Mechanical & Plumbing $30 plus $20 for each $1,000 of cost (must provide contract) All appliances and fixtures including, but not limited to, sinks, water closet, bath tub, shower, washing machine, hose bib, floor drain, dish washer, drinking fountain, water heater, air handlers and any fuel burning device (gas, oil, wood, or coal). Per appliance or fixture. $9 Utility service connections (water or sewer), boiler, grease traps, sewer pumps, refrigeration units, water-cooled air conditioners, etc. Per appliance $50 The following fees are exempt from 11(a) of the contract Court Appearance Should Building Inspection Underwriters of PA have to appear in court on behalf of the Township of Leet. The fee will be $75 for the first hour then $18.75 per 15 minutes thereafter. Code Enforcement Building Inspection Underwriters of PA will provide code enforcement inspections at the fee of $55 per inspection which includes one re-inspection. Every re-inspection thereafter will be at the rate of $55. Occupancy Inspections Zoning Building Inspection Underwriters of PA will perform occupancy inspections for the Township of Leet for the following fees: 1 & 2 family dwellings $55 per unit Apartments Re-inspections Commercial $45 per unit $35 per unit for every reinspection $75 per unit Building Inspection Underwriters of PA will perform zoning inspection for the Township of Leet for $55 per application/inspection. The fee for zoning hearings/meetings will be at the rate of $55 for the first hour then $13.75 for every additional 15 minutes.

HOUSING licensing and inspection of rental units registration requirements fees one-family rental unit $50 two-family rental unit $75 multi-family 3 to 10 $100 multi-family over 10 rooming houses, dormitories, and hotels subsequent fee for annual license one- and two-family units multi-family units 3 to 10 rooming houses, dormitories and hotels LICENSES, PERMITS AND GENERAL BUSINESS REGULATIONS alarm devices fees permit $25 permit for a commercial establishment $50 private communications systems compensation for license compensation and license fees transient retail merchants license application appeals yard sales for a 1 week permit $100 for a 1 month permit $400 appeal fee $300 fee for permit first permit issued -5- $125 plus $10 per unit $125 plus $10 per unit $25 per unit $20 per unit $15 per unit $1 per linear foot for each diameter inch or less of underground conduit or wire or each ¼ diameter inch or less of aerial wire per annum. In no event shall the fee be less than $250 per annum no fee

second permit issued $5 protocol and fees for intermunicipal liquor license transfer fee PARKS AND RECREATION permit fees application fee $500 issuance of an alcohol permit $10 for residents for nonresidents number of people STREETS AND SIDEWALKS openings in new streets $60 Deposit No fee 1 25 $60 Deposit $50 Fee 25+ $60 Deposit $100 Fee opening by special action of the Engineer $75 street openings, excavations and pavement cuts permit fee $50 SUBDIVISION AND LAND DEVELOPMENT ZONING procedures fee schedule minor subdivision, sketch plans and final plans subdivision review/site plan review street, sanitary and storm sewer inspection cost of purchasing copy of code book resident $40 nonresident $50 exceptional uses lien letters $25 occupancy permit $55.00 sexually oriented business operations fees annual permit fee $500 $100 or actual costs incurred by the Township, whichever is greater. $300 or actual costs incurred by the Township, whichever is greater. $50 or actual costs incurred by the Township, whichever is greater. $500.00 non-fundable plus any charge to cover notices or advertising

Zoning Hearing Board Variance Hearing Appeals $500 non-refundable plus the costs of notices and advertisements The cost of the stenographer is equally shared between the applicant and the Board. The cost of building permits and occupancy permits, as established in Res. 2014-8, solely the responsibility of the applicant. Original transcript will be paid for by the Board, and subsequent copies to be paid by the applicant. $500.00 non-refundable plus cost of notices and advertisements The cost of the stenographer is equally shared between the applicant and the Board. The cost of building permits and occupancy permits as established in Res. 2014-8 solely the responsibility of the applicant. Original transcript will be paid for by the Board, and subsequent copies to be paid by the applicant. RESOLVED this 8th day of February, 2016. ATTEST: Township of Leet /s/wayne Hyjek Township Manager /s/gary L. Bradel Chairman, Board of Commissioners -7-