A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

Similar documents
A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017 with a targeted completion in 2019.

A complete renovation of the 5-story, 75,000 sf building. Internal demolition began in summer 2017.

The redevelopment began in March 2016 and is slated to complete in phases from

A complete renovation and modernization of the 5-story, 75,000 sf building.

The redevelopment began in March 2016 and is slated to complete in phases from

Ariel Property Advisors Presents. The Revitalization of the

Midtown Detroit, Inc. Efforts in the North & South Cass Neighborhoods (updated February 2016)

PRE-DESIGN STUDY 2401 COLE PLACE. Mixed Use Development. 10 Attached Residential Units Parking Garage. and Retail Space

VISION PARK 128 VISION PARK DR. SHENANDOAH, TX

PRE-DESIGN STUDY 6/26/ COLE PLACE ARSHIA ARCHITECTS 550 N LARCHMONT BLVD #100 LOS ANGELES, CA

Studio $3875 $3875 $7, bedroom single $4125 $4125 $ bedroom double $3200 $3200 $6400

MICRO LIVING: DESIGN CONSIDERATIONS FOR SMALL SPACES

DRAFT For Discussion Only

Site Modification Process for Alcova Reservoir and Pathfinder Reservoir, Natrona County, Wyoming Leaseholders Revised October 6, 2016

DRAFT 1. GENERAL INFORMATION 2. APPLICATION INSTRUCTIONS

VeloCity An Active Community. History

Board of Regents Meeting November 30-December 1, 2006 Agenda Item #32 Arizona State University EXECTIVE SUMMARY Page 1 of 8

MOTION NO. M Beacon Hill Station TOD Property Final Transaction Agreements PROPOSED ACTION

Procedure for an Permit Application For a Park Model Home or Mobile Home

ACCESSORY DWELLING UNIT ORDINANCE

AGBH, 1 Lochside View Space planning & Atrium options

US Route 15 & Monocacy Boulevard Northeast Bypass Interchange

Orion Park, Northfield Avenue, Northfields, Ealing, London W13 9SJ

Downtown J Street Apartments

PROPOSAL Architectural Services

SAMPLE SELLER PROPERTY QUESTIONNAIRE ADDENDUM

404 South M Street. 2 Units at 404 South M Street, Lake Worth FL, Martin Goldstein Russell Goldstein

Beecher Neighborhood Stabilization Plan

Myra / Manzanita Neighborhood Coalition 939 Manzanita Street Los Angeles, California

HAMILTON STREET CORRIDOR

I n v. e s t m e n t. i l d i n g. 3 - B u. Downtown Mixed-Use. o i. S a l. e P

HISTORIC PRESERVATION FINANCIAL INCENTIVES

1309 N J St Apartments

1309 N J St Apartments

HISTORIC PRESERVATION FINANCIAL INCENTIVES

REQUEST FOR PROPOSALS

DES PLAINES ZONING BOARD MEETING SEPTEMBER 29, 2015 MINUTES

CITY OF NANAI MO BYLAW NO A BYLAW TO AMEND THE CITY OF NANAIMO "ZONING BYLAW 2011 NO. 4500"

Las Casitas 30-Units 801 S. 17 th Ave. Phoenix, AZ 85007

Room Selection FAQ s

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

Strategic Planning for RAD Conversions. Thursday, April 6, 2017

DEVERON APARTMENTS N. 45 th Place Phoenix, AZ PRICE: $1,890,000 COVERED RESERVED PARKING CENTRAL ARCADIA LOCATION

TO LET. Town Centre Retail Premises. Shop Unit 10, Manchester Chambers, Oldham OL1 1LF.

FY18 DCS Grant Round Announced

YEAR IN REVIEW High Street Boston, MA

MAP REFERENCE HANDBOOK

Single Drawer Accountability (SDA) (NON POS) R2 and R4 Hour Offices Conversion Guide Instructions

Ben Moberg ~

Keystone Preservation Group

MacroHomes Design Competition - Call for Submissions. Prize: $10,000 & potential collaboration on a large scale multifamily project

TOWN OF BASHAW. Bylaw A bylaw to regulate the development and use of land and buildings

VILLAGE OF STURTEVANT TH STREET STURTEVANT, WI 'OWNER: LOCATION ADDRESS: 'OWNER'S PHONE CONTRACTOR CONTRACTOR ADDRESS: CONTRACTOR PHONE:

MULBERRY APARTMENTS 16-UNITS

TO LET. Town Centre Offices Flexible Terms. First & Second Floor Offices, Manchester Chambers, Oldham OL1 1LF.

City of Surrey ADDITIONAL PLANNING COMMENTS File:

< UJ. strong and welcome statement of federal pur pose in a place that will always figure in our

Residence Hall Room Lease & Board Contract,

APPLICATION. Fee Simple Subdivision Bare Land Strata Conversion of Existing Building into Strata Units

Palmaire 12-Units 7602/7606 W Palmaire Ave. Glendale, AZ 85303

BOUNDARY LINE ADJUSTMENT

Alabama AGC Presentation. August 15, 2017 COME BUILD WITH US.

MULBERRY APARTMENTS 16-Units 1820 W. Mulberry Dr. Phoenix, AZ 85015

Planning Rationale in Support of an Application for:

Reclaimed Land A guide for developers applying for an interest in reclaimed land under the Marine and Coastal Area Act 2011

City of Richmond Rent Control and Just Cause for Eviction. Fact Sheet

CITY COUNCIL STUDY SESSION MEMORANDUM

48,72;9,3$1$0(5,&$1$5&+,7(&785(%,(11$/( %$4 ³)((//$7,1$0(5,&$1$5&+,7(&785( WR1RYHPEHURI

Strategies for Funding Farmland Preservation

Access Statement for Bovey Castle

407 Walmer Road PH me: See my website:

COUNTY OF SANTA BARBARA

How to Make Auctions of Public Land

DES PLAINES PLAN COMMISSION MEETING AUGUST 31, 2015 MINUTES PLAN COMMISSION

Screening of Residential Land: Questions and Answers

STAFF REPORT - SUMMATION. South Park Estates 9 th Filing Final Plat Process. CASE NUMBER(s): UDC SUBDIVISION CODE: SPKE 09

Contents. 15 Stout Street, Wellington 6011 w: Tel: PO Box 1473, Wellington 6140, New Zealand

Opportunity Description: Assistant Property Manager Location: Office in Menlo Park, CA

2018 Awards of Excellence

Welcome to Riverfront Residence Hall!

Accessory Dwelling Unit (ADU) Permanent Regulations (Revisions to TMC and 13.06)

Barnstable Municipal Airpolt Commission. Barnstable Municipal Airport Improvements Project Barnstable Municipal Airport

GRADUATE HOUSING CONTRACTS

University of Colorado Design Review Board Meeting Notes

Uptown Medical Office for Lease 8010 Mountain Road NE Suite 300, Albuquerque, NM 87110

Now That We re Poor: The New Economics of Land Use

MEMORANDUM. To meet the goal established in the Amendment to the Resolution to provide 10% workforce housing, we offer the following:

Staff Initiated Discretionary Review Full Analysis HEARING DATE NOVEMBER 29TH, 2012

STAFF REPORT. Yin Smith, Director of Planning and Building. Accessory Dwelling Unit Regulations

City of Surrey PLANNING & DEVELOPMENT REPORT File:

94 Crescent Road Townhouse 7

Flower Apartments 22-Units

DDD Commission Meeting September 13, 2016, 8:00 a.m. St. James Episcopal, Parish Hall, 208 N. Fourth Street

19 Whitney Avenue ~ Rosedale ~

Habitat for Humanity Greater San Francisco Application Meeting: 1009 Mission Street, San Francisco

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES

Sea House Apartments 601 S Ocean Drive, Hutchinson Island, FL. Martin Goldstein Russell Goldstein

The Heritage Hill Association s 2015 Report to Neighbors

Approval to Sell Property at Glenmont Station to Montgomery County

City of Surrey 3 RD ADDITIONAL PLANNING COMMENTS File:

Transcription:

Dwntwn Develpment Fact Sheet Cmpiled by the Dwntwn Bstn BID Updated July 2018 Under Cnstructin Inside The BID: 115 Winthrp Square (Winthrp Square Garage redevelpment): Millennium Partners current prpsal calls fr a 664-ft, 50-stry, 1.592 millin sq.-ft. mixed-use twer including 500 residential units (715,000 sq.-ft.), 750,000 sq.-ft. f cmmercial space, a 550-space parking garage, a 12,000 sq.-ft. Great Hall, and additinal restaurant/retail amenities. The prject was apprved by the BPDA and ZBA in spring 2018 and the demlitin f the preexisting garage tk place in summer 2018 as a preliminary t the cnstructin. 399 Washingtn Street Renvatin: A cmplete renvatin f the 5-stry, 75,000 sf building. Internal demlitin began in summer 2017 with a targeted cmpletin in 2019. One Milk Street Renvatin: Cmplete renvatin f this 6-stry, 36,500 sq.-ft. building launched in Octber 2017, with a targeted cmpletin date f December 2018. Cngress Square Develpment (54-82 Devnshire St.): A transfrmative $105 millin, 458,300 sq.-ft. redevelpment f the frmer Fidelity Investments-wned blck that includes 92,700 sq.-ft. f prpsed new develpment. The preexisting buildings t be renvated/readapted include: Residential: 15-19 Cngress Street (51,350 sq.-ft., 13 flrs, 35 units) Htel: 54-68 Devnshire Street (85,700 sq.-ft., 13 flrs, 165 rms) Office/Retail: 40 Water Street (286,400 sq.-ft., 14 flrs) The redevelpment began in March 2016 and is slated t cmplete in phases frm 2018-2019. High Street Place (160 Federal St./100 High St.): A 18,500 sq.-ft. fd hall being develped fr the lbby space cnnecting 160 Federal Street and 100 High Street. The fd hall will feature 22 fd vendr stalls/kisks and seating fr 400. It is slated t pen in spring 2019.

Apprved Fr Cnstructin Inside The BID: 30 Winter Street Renvatin: A partial, street-level renvatin f the 12-stry, 87,900 sf building. The majrity f the renvatin will cnsist f sheathing in glass the area currently cvered by the verhang. Preliminary site preparatin wrk began in July 2018. Develpment Prpsals Pending Inside The BID: 172 Tremnt Street Renvatin: Emersn Cllege plans t renvate the 4-stry, 17,800 sf building. The prpsal calls fr a new mixed-use student supprt services center that includes a cultural center, health services ffice, spiritual life area, meeting space, and cunseling area. The renvatin is prpsed t cmmence in summer 2018 and cmplete in late 2019. One Brmfield Street Develpment (1 Brmfield St.): Prpsal calls fr a 683-ft, 59-stry mixed-use twer including 30,000 sq.-ft. f retail. The prpsed 419 residential units include 300 apartments (54 f them affrdable) and 119 cnd units. The prject is currently being redesigned fllwing the initial rund f cmmunity review. Apprved Fr Cnstructin Adjacent T The BID: 47 LaGrange Street: Prpsal calls fr a 21-stry, 240-ft, 157,000 sq.-ft. residential twer featuring 260 units, including studis, ne-bedrm, and tw-bedrm units. The twer wuld be built n the 8,800 sq.-ft. parking lt that is behind 48 Bylstn St. Under Cnstructin Adjacent T The BID: 48 Bylstn Street renvatin: The renvatin f the 40,500 sq.-ft. frmer BYMCU building int an affrdable husing cmplex is slated t include the fllwing: 46 affrdable husing apartment units; 11,000 sq.-ft. f ffice space; and 3,800 sq.-ft. f retail space. Cnstructin began in January 2018. Bulfinch Crssing (Gvernment Center Garage): This six-building, 2.9 millin sq.-ft. redevelpment f the preexisting Gvernment Center Garage is set t include 812 residential units, 196 htel rms, 1.15 millin sq.-ft. f ffice space, and 85,000 sq.-ft. f retail. Wrk began in January 2017 with cnstructin f the 45-stry, 486-unit apartment twer cmpnent f the mixed-use develpment. The prject is slated t cmplete in September 2019. Emersn Cllege Little Building Renvatin (80 Bylstn St.): This renvatin f the preexisting student drmitry cmplex at 80 Bylstn St. will add an additinal 294 student beds t the current stck f 750 student beds. In additin, renvatins are being made t flrs 2-12 f the building and a new 13 th flr is being cnstructed, t be screened-back behind the preexisting parapet. Cnstructin began in spring 2017 and is slated t cmplete in summer 2019 in time fr students t

mve in fr the fall semester. Marritt Mxy Htel (240 Tremnt St.): This 23-stry, 125,000 sq.-ft. htel prject is set t include 346 micr-htel rms. Cnstructin began in December 2016 and is slated t cmplete in late 2018. Cmpleted Prjects/Inside The Dwntwn Bstn BID: 2018: The Exchange At 100 Federal Street: 2017: This 10,000 sq.-ft. transparent glass atrium, lcated n the Cngress Street Plaza side f 100 Federal St., is set t include 6,000 sq.-ft. f retail space and 4,000 sq.-ft. f cmmn area. Cnstructin began in December 2016 and is slated t cmplete in March 2018. 35-41 Winter Street Renvatin: 2016: Cmplete renvatin f this 8-stry, 29,300 sq.-ft. building. Renvatin cmpleted in Octber 2017. The Cnrad (6 Hamiltn Pl.): A renvatin f 17-33 Winter St. int a 27-unit, 29,000-sq.-ft. apartment building. The Cnrad includes: nine 2-bedrm apartments; six 3-bedrm apartments; and twelve 4-bedrm apartments. The Gdfrey Htel (505 Washingtn St.): An $83 millin renvatin f the frmer 59 Temple Pl. ffice twer int a 243-rm, 135,000 square-ft butique htel with grund-flr restaurant & cffee shp. Opened January 2016. Millennium Twer Develpment (1 Franklin St.): 2015: A landmark $495 millin redevelpment f the frmer Filene s int a 650-ft, 442-unit mixed-use residential twer with 95,000 sq.-ft. f retail. The twer pened fr residents in July 2016. The restaurant/retail cmpnent (including PABU sushi restaurant and Old Navy anchr department stre) is slated t pen in the fall. Burnham Building Restratin (10 Summer St.): A $120 millin restratin f the histric Burnham Building int a 285,000 sq.-ft. ffice/retail space. Building timeline: August 2014: lead ffice tenants Havas/Arnld Wrldwide and AOL mve int upper levels, ccupying apprx. 125,000 sq.-ft.

May 2015: a flagship Rche Brs. supermarket pened n the Burnham Building s street level and n the Dwntwn Crssing subway cncurse, ccupying apprx. 25,000 sq.-ft. September 2015: the first Nrth American Primark department stre pened n the first fur flrs f the Burnham Building, ccupying apprx. 112,000 sq.-ft. 44 Winter Street Residences: 2014: A $3 millin residential cnversin f an ffice building int a 14-unit apartment building, cnsisting f a mix f eight 4-bedrm (1,300 sq.-ft.), three 3-bedrm (1,200 sq.-ft.), and 3 micr (400 sq.-ft.) units. Opened July 2015. Fx Residences (407 Washingtn St.): Renvatin f upper stries int 14 apartments ranging frm 700-1,000 sq. ft. Full restratin f histric façade/street-level retail space. Opened spring 2014. Lafayette City Center (2 Ave. de Lafayette): A $5 millin lbby renvatin, including new security desk, tuchdwn area, lunge seating, and elevatr area. Cnstructin began in June 2013; cmpleted spring 2014. Winter Place Residences (1-3 Winter Pl.): 2013: A $6 millin renvatin f upper stries abve frmer Lcke-Ober restaurant int six cnds, ranging in size frm 2,000-3,300 sq. ft. Opened fr residents in spring 2014. Millennium Place III (580 Washingtn St.): A $220 millin, 15-stry, 265-unit, 390,705-square-ft mixed-use residential twer with apprx. 12,000-square-feet f grund-flr retail pened fr residents in fall 2013. Fidi Dwntwn 103 Residences (103 Arch St.): A $4 millin, 5-stry, 18-unit renvatin, pened Nvember 2013. Hamiltn Crssing (8 Winter St.): A $8.5 millin renvatin f a 12-stry, 50,000-square-ft building int 48 apartments. Opened fr residents in July 2013. Hyatt Regency (1 Ave. de Lafayette): A $13 millin renvatin f htel public areas, meeting rms, lbby & bar, frnt entrance, and guest rms. Cmpleted February 2013. Old Suth Meeting Huse (310 Washingtn St.): An $800,000 restratin f the histric museum s windws, exterir wdwrk, and steeple. Cmpleted December 2013.

2010-2012: Mdern Theatre (525 Washingtn St.): A $45 millin restratin includes 190-bed drmitry, 2,400 square-ft, 185-seat black bx theater; 800-square-ft art gallery/functin space. Opened Octber 2010. Paramunt Center (559 Washingtn St.): An $80 millin, 145,000-sq. ft. renvatin including tw theaters (ne 550-seat, ther 140-seat), 180-seat screening rm, 150-seat restaurant, 262-bed drm. Opened January 2010. 29 Temple Place: A $4 millin [estimated] renvatin f building int 44 rental units, with 6,500-squarefeet f grund-flr retail. Opened in winter 2010. 25 Temple Place: A $1 millin renvatin f building int retail, ffice, and 6 apartments. Opened in summer 2010. One Bstn Place (201 Washingtn St.): A $2 millin renvatin f the grund flr fr cnversin int retail space. 37 Temple Place: 2000-2009: An $8 millin renvatin f building int 20 rental units. Cmpleted 2012. Ritz-Carltn Htel & Residences (1-10 Avery St.): The $600 millin, 1.9 millin sq.-ft. develpment includes: Ritz-Carltn Bstn; Ritz- Carltn Residences (368 cnd units); AMC Lews Bstn Cmmn. Opened in 2000. 45 Prvince Street: A $120 millin, 31-stry, 337,098-square-ft, 137-unit cnd twer with street-level retail, student center, health club, 8-level parking facility. Opened June 2009. Ames Htel (1 Curt St.): A $58 millin redevelpment/renvatin f 1 Curt St. int a 125-rm butique htel featuring Wdward at Ames restaurant/bar. Opened December 2009. Bstn Opera Huse (539 Washingtn St.): A $55 millin restratin f the 2,500-seat theater. The theater debuted in July 2004. Nine Zer Htel (90 Tremnt St.): A $59 millin develpment f an upscale/butique 189-rm htel. Opened in June

10 West Street: 2002. Sld in 2006 fr $71 millin t Kimptn Htels grup, the current peratr. A $25 millin, 274-bed drmitry with 6,500-square-ft grund-flr retail space (ccupied by Back Deck restaurant in July 2012). Opened in 2008. Cmpleted Prjects/Adjacent T The Dwntwn Bstn BID: Archstne Bstn Cmmn (660 Washingtn St.): The $150 millin, 28-stry, 420 unit residential twer pened March 2007. AVA Theater District (45 Stuart St.): $125 millin, 29-stry, 384,000-sq.-ft., 404-unit residential twer pened March 2015. Emersn Cllege Drmitry (1-3 Bylstn Pl.): This 18-stry, 90,000 sq.-ft. student drmitry twer is set t include 380 student beds. Cnstructin began in May 2015 and cmpleted in August 2017. The Kensingtn (665 Washingtn St.): $170 millin, 385-unit, 27-stry, 457,000-sq. ft. residential twer pened Octber 2013. Liberty Tree Lfts (630 Washingtn St.): $15 millin, 40-unit, 5-stry, 52,000-sq. ft. residential building pened September 2015. PBX Residences (8 Harrisn Ave.): An 8-stry, 43,400 sq.-ft. renvatin prject that cnverted a preexisting 143,000 sq.-ft. ffice building int 46 apartment units, f which 6 are designated as affrdable. The mix f units includes 18 studis, 20 ne-bedrm units, and 8 tw-bedrm units. Radian (120 Kingstn St.): A $130 millin, 26-stry, 228,865-square-ft residential twer with 240 residential units and 5,300-square-feet f grund-flr retail space, pened summer 2014.