BAY AREA RESIDENTIAL. CONTACT Oakland California th Street 3rd Floor Oakland CA

Similar documents
CONTACT Mark Devaney LEED AP Principal Direct: Mobile: SELECTED PROJECTS

Langan Qualifications LANGAN QUALIFICATIONS

220 ALICE JACK LONDON DISTRICT OAKLAND CALIFORNIA. Multifamily Urban Infill Transit-Oriented Development OFFERING MEMORANDUM

Letter of Intent May 2017 (Revised November 2017)

A n E x c e p t i o n a l S o u t h o f M a r k e t R e d e v e l o p m e n t O p p o r t u n i t y o r O w n e r / U s e r B u i l d i n g 3 4 H A R

COMMUNITY BENEFIT REQUIREMENTS & IMPACT FEES FOR DEVELOPMENTS IN VARIOUS CITIES

LANGAN JERSEY CITY EXPERIENCE

MARKETWATCH MAY 2017

January 7, Sarah Smith Community Development Director City of Mound 5341 Maywood Road Mound, MN Dear Ms. Smith,

LANGAN INTERNATIONAL MIXED-USE QUALIFICATIONS

CLASS-A OFFICE SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

Ohlone College Mission Blvd Mixed-Use Project OFFERING MEMORANDUM

Notice of Preparation of an Environmental Impact Report

Executive Summary General Plan Amendment, Planning Code Text Amendment and Zoning Map Amendment Initiation

RETAIL SPACE IN BOULDER S NEWEST TRANSIT-ORIENTED DEVELOPMENT Bluff Street and 3390 Valmont Road Boulder, Colorado

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

City of South San Francisco Page 1 of 5

GETTING IT BUILT: OVERCOMING THE IMPLEMENTATION BARRIERS TO SMART GROWTH

HOWARD. For Lease. Presented by Danny Yadegar Lic #

Report to the Plan Commission February 4, 2013

PRELIMINARY PLAT CHECK LIST

Office Development Annual Limit Program Status Update

RESOLUTION NO. FILE NO. PT14-047

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

Preliminary Subdivision Application (Major) (Four (4) lots or more)

Mr. Carl Shannon, Senior Managing Director Tishman Speyer One Bush Street, Suite 450 San Francisco, CA November 21, 2014

EAGLE AVENUE FAMILY HOUSING 2437 Eagle Avenue, Alameda. Corner of Eagle Avenue and Everett Street

Director, Community Planning, North York District NNY 23 OZ Related File Nos NNY 23 OZ and NNY 23 SA

On December 15, 2017, the Board of Supervisors approved the legislative amendments associated with the Pier 70 Mixed Use District Project (Project).

REPORT TO THE SHELBY COUNTY PLANNING COMMISSION From the Department of Development Services Planning Services. February 4, 2019

CITY OF CORNING TENTATIVE MAPS

3.0 Project Description

3000 EL CAMINO REAL PALO ALTO, CALIFORNIA HUDSONPACIFICPROPERTIES.COM

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

Bay Meadows Specific Plan Amendment San Mateo, California

PLANNING COMMISSION REPORT Regular Agenda -Public Hearing Item

CONSTRUCTION PLANS for HALCYON A RESIDENTIAL SUBDIVISION 6100 MIDNIGHT PASS ROAD, SARASOTA, FL 34242

TRANSBAY 8 GROCERY SPACE FOR LEASE. Developed by. ERIKA ELLIOTT lic Contact

Consortium West Builders 611 Anton Boulevard, Suite 675, Costa Mesa CA P F

OFFICE BUILDING INVESTMENT OPPORTUNITY PALO ALTO DOWNTOWN CALIFORNIA. Actual Site

Planning & Development. Background. Subject Properties

Plan Dutch Village Road

CHECKLIST FOR DEVELOPMENT REVIEW

Guide to Preliminary Plans

40 Moccasin Trail and 50 Green Belt Drive - OMB

Watkinsville First Baptist Church Building and Parking Masterplan Norton Road & Simonton Bridge Road Oconee County Georgia

UCSF Mission Bay Community Task Force Meeting #1

San Francisco Bay Bridge proximity

MEADOWBROOK FLATS SPECIAL USE PERMIT APPLICATION

III. PROJECT DESCRIPTION

COUNTY OF EL DORADO DEVELOPMENT SERVICES PLANNING COMMISSION STAFF REPORT TENTATIVE MAP

Puyallup Downtown Planned Action & Code Changes. January 10, 2017

ORDINANCE NO (As Amended)

TRANSBAY JOINT POWERS AUTHORITY

W12 W12 GROCERY / FITNESS / RESTAURANT / OPPORTUNITIES WEBSTER & 12TH OAKLAND, CA. ±23,000 SF Retail City Block Development 339 Residences

The Corporation of The Town of Richmond Hill. Schedule of Conditions. Draft Plan of Subdivision. File 19T(R) Town of Richmond Hill

SHORE DRIVE CORRIDOR: PAST, PRESENT, & FUTURE APRIL 19, 2018 BAYFRONT ADVISORY COMMISSION

Church Street and Gloucester Street - Rezoning Application - Preliminary Report

City and County of San Francisco

Zoning Permit Application

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

Subject: Addendum No. 2 Request for Expressions of Interest (RFEI) for Development of Brooklyn College School of Business.

FOR LEASE 388 MARKET STREET SAN FRANCISCO, CA

Floodplain Development Land Use Review

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Development Plan DP13-3 (Arlington Lofts) Planning and Zoning Meeting Date: Document Being Considered: Ordinance

COUNTY OF SAN MATEO PLANNING AND BUILDING DEPARTMENT

Informational Presentation. Planning Commission August 6, 2015

66 Isabella Street Rezoning Application - Preliminary Report

Seth Mallen, Vice President Maximus Real Estate Partners 525 Florida Street, Ste. 150 San Francisco, CA November 10, 2015

Draft Strategy Plan Concepts. CAC Meeting #9

LANGAN QUALIFICATIONS FOR THE CORDISH COMPANIES

S C O T T OFFERING MEMORANDUM 3265 EL CAMINO REAL PALO ALTO CALIFORNIA

1976 Fargo, ND City Directory - R.L. Polk & Co.

May 21, ACHD Board of Commissioners Stacey Yarrington, Planner II DRH /DRH

Approval of a conditional use to allow construction of a rehabilitation hospital at 5115 N. Biltmore Lane in the American Center.

VILLAGE CENTER ARLINGTON, VIRGINIA ADVISORY WORKING GROUP/ PLANNING COMMISSION FOR ORR PARTNERS 01/

PIN , Part 1, Plan SR-713 in Lot 2, Concession 5, Township of McKim (1096 Dublin Street, Sudbury)

LAKE MERRITT STATION AREA PLAN

Glades County Staff Report and Recommendation Unified Staff Report for Small Scale Plan Amendment and Rezoning

Notice of Preparation

Q / Quarterly Office Market Report. Silicon Valley

APPENDIX B. Approved and Pending Development Projects

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

of it all. Dane Hooks Managing Director T: F:

PLANNING BOARD REPORT PORTLAND, MAINE

LANGAN INTERNATIONAL TALL BUILDING QUALIFICATIONS

6.0 DEVELOPMENT OPPORTUNITIES

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

Appendix 3.0. Build Form: Regeneration examples

ADMINISTRATIVE STAFF REPORT 5.1

1750 BROADWAY OAKLAND OFFERING MEMORANDUM. Exclusively Offered By:

Density: The project takes advantage of a very small lot by building 12 well-designed homes, consisting of one-, two- and three-bedroom homes.

HOWARD STREET SAN FRANCISCO, CALIFORNIA SAN FRANCISCO CREATIVE OFFICE OPPORTUNITY

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

Special Use Permit - Planned Unit Development Checklist. Property Address:

City of Sanibel. Planning Department STAFF REPORT

Transcription:

BAY AREA RESIDENTIAL CONTACT Oakland California 501 14th Street 3rd Floor Oakland CA 94612-1420 510.874.7000 510.874.7001

INDIA SPRINGS San Francisco CA Build Inc. Environmental Geotechnical The proposed India Springs development will include residential buildings ranging from two-story townhomes to six-story buildings; some structures may include a partially below-grade level. Langan's scope of work for environmental services for the initial technical phase of the project include updating the Phase I Environmental Site Assessment (ESA); preparing and submitting a San Francisco Department of Public Health (SFDPH) Maher Application; performing a Phase II Environmental Site Characterization of the property; and preparing the required Site Mitigation Plan.

FRUITVALE TRANSIT VILLAGE Oakland California Fruitvale Development Corporation Geotechnical Environmental The Fruitvale Transit Village is a mixed-use transit-oriented development next to the Fruitvale BART station. Locally-owned retail stores occupy the ground floor; office space dedicated to community resources and organizations is on the second floor; and the third floor provides 47 apartments 10 of which are designed affordable units. The village also has landscaped courtyards and at-grade parking. Langan's geotechnical engineers designed the foundation and slabs to resist the effects of the highly expansive surficial soil blanketing the site. Our environmental team conducted Phases I and II Environmental Site Assessments (ESAs) as well as a soil gas investigation and provided a site mitigation program.

BRIDGE DISTRICT TOWNHOMES West Sacramento California Fulcrum Property Geotechnical Langan performed a geotechnical investigation for the Bridge District townhomes project. The site is in an undeveloped portion of the Bridge District near the Sacramento River between the eastern and western parcels of the Bridge District Apartments project. The proposed project consists of construction of four apartment buildings and four townhouse buildings. Langan evaluated subsurface conditions at the site and provided conclusions and recommendations for the geotechnical aspects of the design of the project. We anticipate additional improvements will include new pavements hardscaping and landscaping.

75 HOWARD San Francisco California Paramount Group Inc Skidmore Owings & Merrill LLP (SOM) Site/Civil Environmental Geotechnical Plans for 75 Howard are to build a 20-story residential building with 133 units 102 below-ground parking spaces and 123 bicycle parking spaces. The building will also feature 5 824 SF of ground-floor retail space. A 7-story parking garage with one partially below-grade level currently occupies the site. One important aspect of our services will be to lead the stormwater management design. As the site is tributary to the City of San Francisco combined sewer system the project will be required to reduce peak stormwater quantity both flow and volume to meet the requirements of the Stormwater Management Ordinance. Langan has also performed a preliminary geotechnical evaluation and an environmental site characterization for the site.

875 CALIFORNIA San Francisco California Grosvenor BDE Architecture Site/Civil Environmental Geotechnical Langan is providing multi-disciplinary engineering services for the construction of a multi-story residential building with below-grade parking replacing a surface parking lot and 2-story concrete garage. Located on Nob Hill the 15 548 SF site has very steep slopes and an elevation range exceeding 20 feet across the site. Once built the project will offer 44 condominiums with landscaped gardens and roof terraces.

1314 FRANKLIN Oakland California Carmel Partners Site/Civil Geotechnical This block-sized development at 1314 Franklin Street is part of the Lake Merritt Station Area Plan. Plans are to demolish a 2-story parking garage and construct two buildings: a 27-story residential tower with ground-floor retail and a 5-story wood-frame apartment building. Langan is providing site/civil and geotechnical services for this development.

SILVERY TOWERS San Jose California Full Power Properties LLC Site/Civil Environmental Geotechnical Silvery Towers is a residential development in downtown San Jose. The project features two towers 22 and 20 stories above three basement levels offering retail and residential space including 643 apartment units and associated parking. The three basement levels required excavation of 34 to 38 feet below street grade. Langan provided multi-disciplinary engineering services for design and construction of the project. Data from the geotechnical investigation was used to reduce field exploration costs. We performed field observation and provided weekly reports regarding stormwater compliance per the Storm Water Pollution Prevention Program (SWPPP).

645 TEXAS San Francisco California Trumark Urban BDE Architecture Site/Civil Environmental Langan provided site/civil and environmental engineering services for the 91-unit 4-5- story residential building with below-grade parking. It is on the edge of the Potrero Hill and Dog Patch neighborhoods. Various commercial and residential buildings formerly occupied the unique trapezoidal lot. This project had several technical challenges including steep slopes along Texas and Mississippi streets and a water line extending along Texas Street which must meet San Francisco Fire Department standards.

3877 EL CAMINO Palo Alto California Zijin LLC EID Architects Site/Civil Plans for 3877 El Camino are to develop a mixed-use podium-style building with 11 000 SF of retail space 17 residential units and an underground garage. As the site/civil engineer Langan provided site layout grading and utility and stormwater management design services. Working with the City of Palo Alto's utility and stormwater departments we coordinated off-site infrastructure upgrades and designs to meet project demands. Part of our scope includes addressing the City of Palo Alto's comments on stormwater hydraulics and hydrology and stormwater treatment. We are implementing an integrated approach - with input from the entire design team - to divert storm waters into biofiltration planters instead of directly into storm drain systems which was part of the initial design.

MISSION BAY 360 BLOCKS 5 & 11 San Francisco California An Essex Company (formerly BRE Properties) Site/Civil Geotechnical Environmental The two distinct apartment communities for Mission Bay 360 contain 4 stories over retail and parking space. Altogether this $189 million project adds 360 apartment units to the neighborhood as well as retail and common space amenities. Total GSF is 396 200. Langan performed a geotechnical investigation conducted Phase I and II Environmental Site Assessments (ESAs) designed the methane mitigation system and prepared the Storm Water Pollution Prevention Plan (SWPPP) and the Soil Erosion and Sediment Control Plan.

MOUNTAIN VIEW AT MIDDLEFIELD (555 WEST MIDDLEFIELD) Mountain View California AvalonBay Communities Inc. BDE Architecture Site/Civil Geotechnical Environmental This 7-acre multifamily residential project - including a community center and a park - is an addition to low-density residential buildings built on this 14.5-acre campus. The infill development will create two residential lots with 345 residences 974 parking spaces 150 000 SF of open space and 25 000 SF of residential amenity space. Per an agreement with the City of Mountain View a 1.48 acre park will be given to the city for a community benefit. The project is pursuing LEED for Homes certification as well as various sustainable measures. Our site/civil team is providing services for a new bike lane city-owned trail the site/sidewalk layout grading of off-site site/sidewalks and at-grade level podium courtyards drainage utilities and stormwater management. Our geotechnical team is evaluating subsurface conditions and potential geologic hazards at the site. while our environmental team completed a Phase I Environmental Site Assessment (ESA).

PARKMERCED San Francisco CA Parkmerced Investors LLC Geotechnical Langan is providing geotechnical consulting services for the Parkmerced Vision Plan Implementation - Phase 1 which will pioneer a complete transformation from the existing resource-consumptive neighborhood to a vibrant pedestrian-focused efficient community for the future. The site is currently a 3 221-unit rent-controlled apartment community with a mix of low-rise garden apartments and mid-rise towers. Over a period of 20 to 30 years the project will replace 1 538 existing garden apartment homes and construct 5 679 new residences bringing the whole neighborhood to a total of 8 900 residences with a mixture of rental and for sale.

MODERA SAN PEDRO SQUARE San Jose California Mill Creek Residential Trust LLC Environmental Site/Civil Geotechnical Modera San Pedro Square is an infill mixed-use. A surface parking lot and retail space will be demolished to develop the 180 000 SF 8-story mixed-use building with 201 residential units 12 000 SF of commercial and retail space and an integrated four-story parking garage. Langan services include: geotechnical investigation Environmental Site Assessment Environmental Site Characterization soil and groundwater investigations Soil Management Plan leaking underground fuel leak investigations environmental compliance and Stormwater Pollution Prevention Plan (SWPPP).

889 MCLELLAN (1309 MISSION) South San Francisco California Environmental Innovations in Design (EID) Architects EID Architects Site/Civil This mixed-use development consists of 4 stories over a basement level garage on an approximate 17 592 SF site. Scope of services included site layout and design ADA compliance and stormwater management design. Our team worked with the developer architect and City to ensure the layout was desired by the client and meet the Cities requirements and standards. During construction we coordinated the storm drainage sanitary sewer and water connections and worked with the MEP/Joint Trench consultants to coordinate the gas electric and telecommunications. We also coordinated with PG&E. Our team prepared the title sheet and plans for site demolition grading layout (dimension control) stormwater control utilities and street improvements.

525 HARRISON San Francisco California Hines SCB (Soloman Cordwell Buenz) Site/Civil Environmental Geotechnical Langan provides multi-disciplinary services for design development through to construction administration for the new 16-story residential development above two to four basement levels for below grade parking. The building will occupy the entire site. The first basement level will approximately match the grade at the site's west end and will extend below grade towards the east; the site slopes upward from west to east. We lead the stormwater management design and sidewalk legislation - two of the project's most crucial aspects - to comply with the City's Stormwater Management Ordinance and Street Improvement requirements.

AVA - 55 NINTH San Francisco California Avalon Bay Communities SCB (Soloman Cordwell Buenz) Site/Civil Environmental Geotechnical Earthquake/Seismic AVA 55 Ninth is a 17-story residential building with two underground parking levels in the SOMA district. The building's northern portion has two below grade parking levels while the remaining development has one below grade parking level. Excavations extend up to 25 feet below existing street grade. Amenities include a fitness center and a 10 000 SF courtyard. Langan performed multi-disciplinary engineering services from schematic design through construction. We worked closely with the client and design team to come up with effective and economical foundation shoring seismic design and dewatering systems. The San Francisco Public Utilities Commission (SFPUC) approved our Stormwater Control Plan and the project became one of the first to comply with the City of San Francisco Stormwater Management Ordinance.

706 MISSION & MEXICAN MUSEUM San Francisco California Millennium Partners Handel Architects Partner: Webcor Builders Site/Civil Environmental Geotechnical Earthquake/Seismic The 706 Mission - Mexican Museum project will be a mixed-use high-rise residential tower and museum in the Yerba Buena District. This 47-story tower will house 146 luxury residential units. The Mexican Museum will be within the first four levels of the tower base and existing 1903 Aronson building which will be restored rehabilitated and repurposed. Langan is providing multi-disciplinary services for the design and construction of this project. Some of our services include performing probabilistic and deterministic seismic hazard analyses observing soil handling and disposal and underground storage tank (UST) removal and testing and providing technical support to the design team for the project's LEED certification.

TRANSBAY BLOCK 9 San Francisco California TMG Partners & Essex Properties SOM Site/Civil Environmental Geotechnical Earthquake/Seismic A mixed-use building will be constructed and occupy the entire Transbay Block 9 site. The building includes a 600 000 SF 563-unit residential tower in the site's central portion. The tower will have 42 stories with a maximum height of 440 feet. A 9-story podium will surround the tower which will be constructed above a 7-level basement. Our multi-disciplinary services included leading the design for incorporation of the non-potable ordinance into the project.

399 FREMONT STREET San Francisco CA SCB (Solomon Cordwell Buenz) SCB (Solomon Cordwell Buenz) Geotechnical Site/Civil Environmental The 42-story tower and 9-story podium over one and two basement levels encompasses three parcels in downtown San Francisco. Langan's tasks include updating the geotechnical investigation report and site-specific seismic design criteria to the current building code as well as performing an environmental site characterization and site/civil engineering at the site. AWARDS 2016 Engineering News Record Global Best Projects Residential/Hospitality Award of Merit 2016 Engineering News Record California Best Projects Residential/Hospitality Best Project