Risk-Based Registration(RBR)

Similar documents
SPP RE Transition Additional Information Regarding NERC s Proposed Transferee Regional Entities December 15, 2017

Unofficial Comment Form Project Modifications to CIP-008 Cyber Security Incident Reporting

Policies & Procedures

Change of Control Guide

Fire Risk Assessors Register Application Guidance and Fees. Introduction. Policy

Establishing a Wetland Bank in Minnesota

ON LEASING THE LAW ON LEASING CHAPTER I GENERAL PROVISIONS. Article 1. Scope of application

Republika e Kosovës Republika Kosovo-Republic of Kosovo Kuvendi - Skupština - Assembly

Expiration of Transportation Certificate of Concurrency for Application for Minor or Major Development; Approval

Request for Proposals WASTE AND ORGANICS COLLECTION SERVICES RFP# ANM

Administrative Penalty Order (APO) Plan for Buffer Law Implementation

Meaning of words 3. Introduction 5. Further information 6. Scope of the Code 7

BULLETIN AUGUST 1996 COUNTY ZONING AUTHORITY FOR TELECOMMUNICATIONS TOWERS

Arlington County, Virginia. Internal Audit of the Real Estate Assessment Appeals Process Calendar Year Ended December 31, 2014

PART 2.7 DEPARTMENT OF GOVERNMENT SERVICES REAL ESTATE REGULATION

DELAWARE STATE HOUSING AUTHORITY LOW INCOME HOUSING TAX CREDIT QUALIFIED CONTRACT GUIDE

PRELIMINARY AND FINAL PLAT APPLICATION AND REVIEW PROCESS

Change of Control Guide

II. What Type of Development Requires Site Plan Review? There are five situations where a site plan review is required:

MOBILEHOME RENT REVIEW BOARD GUIDELINES

ARCHITECTURAL MODIFICATION GUIDELINES

Notification of Policy. Rawdon Young, SEI Appraisal Program Manager

Glossary... iii. 1 Introduction... 1

IS YOUR LEASE SOLUTION FASB READY? It s here!

The Consumer Code Requirements

IV. REVIEW PROCEDURES FOR MINOR SUBDIVISIONS

Introduction: Model Cows Lease Agreement for Dairy Stock

PROCEDURE FOR REPORTING OF PHARMACOVIGILANCE INSPECTIONS REQUESTED BY THE CHMP. GCP Inspectors Working Group

Right-of-Way Acquisition and

City of Lowell Vacant and Foreclosing Properties Ordinance Chapter 227 Sections 7 16 Planned Revisions

Implementing Pre-Application Neighborhood Meetings in Prince George s County A Discussion Paper

The Consumer Code Scheme

RE: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements (File Reference No )

PLANNED UNIT DEVELOPMENT (PUD)

Non-charitable Deed of Dedication

CARLISLE PLACE HOMEOWNERS ASSOCIATION, INC. RESOLUTION OF THE BOARD OF DIRECTORS

CIG Sub Group CREDIT : Consent = Confirmation

AN ORDINANCE AMENDING AND SUPPLEMENTING THE REVISED GENERAL ORDINANCES OF THE CITY OF BAYONNE THE, CHAPTER 33 PLANNING AND DEVELOPMENT REGULATIONS

Union procedure on the preparation, conduct and reporting of EU pharmacovigilance inspections

UNITED NATIONS CONVENTION ON THE ASSIGNMENT OF RECEIVABLES IN INTERNATIONAL TRADE

CITY OF LOGAN, UTAH ORDINANCE NO

PART ONE - GENERAL INFORMATION

CRYSTAL TOWERS DISPOSITION

Building Control (Amendment) Regulations. ASFP Ireland Fire Protection Module At FMI Conference & Exhibition. RDS 6 March 2013

PREAMBLE. That the Gratiot County Zoning Ordinance be amended as follows:

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

Ontario Energy Board Decision on Installation of Smart Sub-Metering Systems in Rental Residential Buildings

CRITERIA FOR DETERMINATION OF ELIGIBILITY

APPLICATION INFORMATION Site Information Parcel Number Street Address Applicant Information Name Street Address City State Zip

Charter Township of Lyon P.A. 198 Industrial Facilities Tax Exemption Tax Abatement Guidelines

Condominium Ownership Management Act

Request for Proposals HQS Inspection Services May 21,

Section SKETCH PLAN REVIEW

Amsterdam, October Re: Draft escrow agreement Escrow4all. Dear Sir, / Madam, Thank you for your interest in Escrow4all s solutions.

Agenda Project Overview Project Objectives Registration Service Re-Engineering System Overview

NIGERIAN ELECTRICITY REGULATORY COMMISSION AN OVERVIEW OF CONTRACT MARKET AND GENERATION ADEQUACY (NERC-MPSC PARTNERSHIP) DR HALIRU DIKKO June 2010

STORM WATER CREDIT MANUAL CITY OF BLOOMINGTON, ILLINOIS ENGINEERING DEPARTMENT

AN ORDINANCE ALLOWING SHORT-TERM RESIDENTIAL RENTALS IN THE CITY OF BOSTON

CONDOMINIUM GOVERNANCE FORM

Landlord s Application for Assistance to The First-tier Tribunal for Scotland (Housing and Property Chamber)

Request for Proposals for Professional Services. Affordable Housing Administrative Agent

The Private Rented Housing Panel

Foreclosure and Blighted Property: Tools for Municipal Officials

The OESC 27 th Edition Proposals for Ontario Amendments

ORDINANCE NO. 626 (As Codified in Chapter 224)

Alternative plans review and inspection.-- (1) As used in this section, the term:

Request for Proposals For Outdoor Advertising - Billboards. At the Following Locations. TelPosta Towers: Roof Top on Tower 2 (Kenyatta Avenue)

OPERATIONS MANUAL CHAPTER 3 ACQUISITION AND PROPERTY MANAGEMENT

Explanatory Notes to Housing (Scotland) Act 2006

CHAPTER 51-A. APPRAISAL MANAGEMENT COMPANY LICENSING AND REGULATION ACT

LLANO CENTRAL APPRAISAL DISTRICT REAPPRAISAL PLAN FOR TAX YEARS 2017 & 2018 AS ADOPTED BY THE BOARD OF DIRECTORS

CITY OF NEWCASTLE. Boundary Line Adjustment & ACTION APPLICATION OVERVIEW

Monitoring of Grantees by HUD

Buffer and Soil Loss Statutes, as amended in 2017 by Laws of Minnesota 2017, Chapter 93 (S.F. 844)

Effective Date: July 21, 2017 Page 1 of 8. Reference: DBC Admin 132.9, IEBC 407.1, Ordinance No , Series of 2017

Dispute Resolution Services Residential Tenancy Branch Office of Housing and Construction Standards Ministry of Housing and Social Development

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

STCP 26-1 Issue 001 Active Network Management

ALLEGHENY COUNTY HEALTH DEPARTMENT ADMINISTRATIVE HEARING

ILLINOIS COMMON INTEREST COMMUNITY ASSOCIATION ACT

File Reference No Re: Proposed Accounting Standards Update, Leases (Topic 842): Targeted Improvements

CALGARY ASSESSMENT REVIEW BOARD DECISION WITH REASONS

Memo to the Planning Commission JULY 12TH, 2018

Submission Instructions and Requirements for a FINAL DEVELOPMENT PLAN

Village of Richton Park Special-Use/Rezoning Petition Packet

These can be obtained at the City s Engineering Department or on the City s website (

Quality Improvement of the Real Estate Cadastre in Serbia

Recommendation to Approve Dominion Virginia Power s Request for an Easement along Route 606 at Washington Dulles International Airport.

- CODE OF ORDINANCES Chapter 48 - PROPERTY MAINTENANCE ARTICLE III. ONE AND TWO UNIT DWELLING RENTAL PROPERTIES

STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION DIVISION OF FLORIDA CONDOMINIUMS, TIMESHARES AND MOBILE HOMES

VOLUNTARY SALES ASSISTANCE PROGRAM CONSISTING OF TWO OPTIONS:

Charter Township of Redford

Request for Proposals

City of Dayton, Ohio Zoning Code

BID/PROPOSAL # NT

Chapter 11. Competitive Negotiation: Procedure

Intangibles Goodwill and Other (Topic 350), Business Combinations (Topic 805), and Not-for-Profit Entities (Topic 958)

COOPERATIVE UNIT OWNER RIGHTS AND RESPONSIBILITIES

IMPORTANT INFORMATION BEFORE FILING AN ETHICS COMPLAINT Many ethics complaints result from misunderstanding or a failure in communication.

THE HOUSING AUTHORITY OF THE CITY OF BOULDER dba BOULDER HOUSING PARTNERS

Transcription:

Risk-Based Registration(RBR) Webinar Terry Brinker, Manager of Registration Services, NERC Pete Heidrich, Manager of Standards & Registration, FRCC December 17, 2015

Overview Risk-Based Registration (RBR) Update NERC-led Review Panel Materiality assessment Registration matters LSE Funding Compliance matters Q & A 2

RBR Update 3

RBR Update FERC approves LSE removal on October 15, 2015 LSE removal from the NCR began November 16, 2015 Notification letters specify LSEs are still responsible party for funding Functional model is not being modified; LSEs will remain 4

NERC-led Review Panel 5

NERC-led Review Panel NERC ROP Section 500 Organization and Registration and Certification Section 501.1 1.7 NERC shall establish a NERC-led, centralized review panel, comprised of a NERC lead with Regional Entity participants, in accordance with Appendix 5A, Organization Registration and Organization Certification Manual, Section III.D and Appendix 5B, Statement of Compliance Registry Criteria. 6

NERC-led Review Panel Registration Matters for Review All requests for deactivation of, or decisions not to register, an entity that meets Sections I through IV of the Registry Criteria or requests to add an entity that does not meet (i.e., falls below) Sections I through IV of the Registry Criteria Disputes regarding the application of Sections I through IV of the Registration Criteria and requests for a sub-set list of applicable Reliability Standards (which may specify the Requirements/sub-Requirements) will be sent to NERC 7

NERC-led Review Panel Validation Criteria Complete the NERC-led Review request form NERC will respond to the requester within 10 days of receipt of request Materiality Assessment Panel Members The panel will typically be organized with the following members: o NERC - Manager, Registration Services o NERC - Engineer, Registration and Certification o Eight (8) Regional Entity Representatives Meeting Schedule Will meet on an as-needed basis Regional Entity panel members will be required to recuse themselves from agenda items from their respective region 8

NERC-led Review Panel Review Panel Requirements The timelines as outlined in Appendix 5A Section III shall be adhered to. The NERC-led review panel will render its decision within 60 days of the final submission to the panel. NERC may extend timelines for good cause shown Approval of Registration Review Qualifies for deactivation or not to register To be added to the NCR even though it does not meet the Registry Criteria Dispute regarding the application of the Registration Criteria is resolved Qualifies for a subset list of applicable Reliability Standards 9

NERC-led Review Panel Disapproval Listed any key contra indicating facts and circumstances leading to the conclusion that the Entity in the NERC-led Review Request does not have sufficient basis for the request A summary listing will be posted on the NERC Registration website providing the following information: (1) Entity name; (2) NCR number; (3) Date NERC-led Panel decision was made; (4) Conclusion summary of the NERC-led Review Panel (Does or does not (1) qualify for deactivation or not to register; (1.1) to be added to the NCR even though it does not meet the Registry Criteria; (2) dispute regarding the application of the Registration Criteria is resolved; (3) qualify for a subset list of applicable Reliability Standards.) 10

NERC-led Review Panel Review Panel Determinations Within 21 days of receipt of the determination, the entity can appeal the decision to the NERC Board of Trustees Compliance Committee (BOTCC) If an entity is accepted for reduced set of standards, FERC will be notified of the determination and has 60 days to determine if an official Commission review is warranted NERC will post the results of the determination to the NERC Registration website 11

Materiality Assessment 12

Materiality Assessment Opportunity for the registered entities to further evaluate whether the entity has a material impact on the Bulk Electric System (BES) The expectation is that an entity would utilize the existing processes to determine their registration status prior to seeking any potential relief through a materiality assessment Application of the BES definition o If the entity believes the BES Element is not necessary for the reliable operation BES Exceptions Process ROP Appendix 5C Candidates for Registration o Registry Criteria ROP Appendix 5B 13

Materiality Assessment Registered Entity believes that the Functional Registrations are not appropriate and seeks relief through either: De-registration, De-activation, or Implementation of a subset list of Standards/Requirements for the applicable registered functions A Materiality Assessment may be conducted with the results subject to evaluation by the applicable Regional Entity and the NERC-led Review Panel 14

Materiality Assessment The Registered Entity bears the burden of proof with respect to the Materiality Assessment. The NERC-led Review Panel: Will take into account several considerations to evaluate Materiality Assessments May request additional information if the initial submittal does not include sufficient information to evaluate the assessment At the request of the NERC-Led Review Panel, the evaluation of Materiality Assessments may require some level of system analysis by the Regional Entity in addition to the information provided by the registered entity 15

Materiality Assessment Considerations for Evaluations: Unique characteristics (system topology, critical loads or facilities, or facilities associated with a major metropolitan area) Real-time authoritative control of BES Elements Identified in the emergency operation plans and/or restoration plans Normal operation, misoperation or malicious use of: o BES Elements, o Cyber Assets, or o Protection Systems Aggregate effect of eliminating Functional Registrations and/or reducing the compliance obligations 16

Materiality Assessment Considerations for Evaluations (cont.): In order to ensure a consistent approach to assessing materiality, a nonexclusive set of factors for consideration are presented in: o Appendix 5B of the ERO Rules of Procedure: Statement of Compliance Registry Criteria, and o NERC Risk-Based Registration Implementation Guidance document This only a subset of factors for consideration 17

Materiality Assessment The NERC-led Review Panel may take one of the following actions if the panel believes based on a valid Materiality Assessment that reasonably demonstrates that the entity does not have a material impact on the reliability of the BES: De-registration, De-activation, or Implementation of a subset list of Standards/Requirements for the applicable registered functions All decisions must be made in accordance Appendix 5A and 5B to the NERC Rules of Procedure 18

Registration Matters 19

LSE Funding Funding Authority NERC Rules of Procedure Sections 1102, 1106 and 5B NERC By-laws Federal Power Act Section 215 20

LSE Funding 1106. NERC and Regional Entity Billing and Collections NERC shall request the Regional Entities to identify all Load-Serving Entities 3 within each Regional Entity and the NEL assigned to each Load- Serving Entity, and the Regional Entities shall supply the requested information. The assignment of a funding requirement to an entity shall not be the basis for determining that the entity must be registered in the Compliance Registry. 5B Presence on or absence from the Compliance Registry has no bearing on an entity s independent responsibility for funding NERC and the Regional Entities. 21

Compliance NERC ROP Section 400 Compliance Enforcement Section 403 11.1 For an entity registered as a Balancing Authority, Reliability Coordinator, or Transmission Operator, the Compliance Audit will be performed at least once every three years. For other Bulk Power System owners, operators, and users on the NERC Compliance Registry, Compliance Audits shall be performed on a schedule established by NERC. 22

23