Domain Mountain View 1984 El Camino Real, Mountain View, CA

Similar documents
TOHIMU (Transit-Oriented Higher-Intensity Mixed Use)

467 FIRST STREET Three-Story Class A Boutique Office Plaza Development

223 23rd Street Redevelopment

Model of Camino Crossroads: (a) Looking north and (b) looking south.

SPAR SUBMITTAL COMMENT RESPONSES - NOVEMBER 3, 2016

BYLAW NO. 15/026 A BYLAW OF THE REGIONAL MUNICIPALITY OF WOOD BUFFALO TO AMEND THE LAND USE BYLAW NO. 99/059

MACK URBAN SITE 1 & 1a (VTT-72702) PROJECT DESCRIPTION (REVISED )

NC 54/I-40 Corridor Master Plan Draft Land Use Blueprint

The Lofts. Where convenience, comfort and community make your home an expression of your lifestyle.

WALNUT CREEK DESIGN REVIEW COMMISSION STAFF REPORT. AGENDA: July 6, 2016 ITEM 4b.

DEVELOPMENT STANDARDS FOR RESIDENTIAL PROJECTS RESIDENTIAL BUILDING TYPES: APPROPRIATE ZONES AND DENSITIES 2-1

A 290-UNIT RESIDENTIAL DEVELOPMENT IN DOWNTOWN SAN JOSE

5.1 Site Planning & Building Form

EMERYVILLE PLANNING COMMISSION STAFF REPORT. Study Session II: Marketplace Redevelopment Project, Theater Site (FDP14-003)

ATTACHMENT A REQUEST/BACKGROUND INFORMATION VENTURA/TYRONE REDEVELOPMENT PROJECT PROJECT OVERVIEW/REQUEST BACKGROUND Ventura Boulevard

The demolition required for the project came before the Landmark Preservation Commission (LPC) on November 3, 2016, where no action was taken.

Sherwood Forest (Trinity) Housing Corporation. Urban Design Brief

PLANNING COMMISSION MAY 3, 2018 PUBLIC HEARING

S C O T T OFFERING MEMORANDUM 3265 EL CAMINO REAL PALO ALTO CALIFORNIA

GETTING IT BUILT: OVERCOMING THE IMPLEMENTATION BARRIERS TO SMART GROWTH

MEMORANDUM. C3A District Shoreland Overlay District 32,055 square feet / 0.74 acres. West Calhoun, adjacent to Cedar-Isles-Dean

4 DEVELOPMENT STANDARDS FOR

Penny Flats North 323 N Mason

Bethesda Downtown Design Advisory Panel Submission Form

25 N 23rd STREET COMMERCIAL-RESIDENTIAL DEVELOPMENT

Planning Commission June 25, Lincoln Boulevard

ENCORE RIVERWALK SAN ANTONIO, TX

Bay Meadows Specific Plan Amendment San Mateo, California

exclusive development offering

CITY COUNCIL STUDY SESSION MEMORANDUM

Fountain District Urban Village

WESTPORT CUPERTINO GENERAL PLAN AMENDMENT APP STEVENS CREEK BLVD, CUPERTINO, CA. KT Urban PRELIMINARY PLANTING PLAN 1" = 40'-0" 0' 10' 25'

1935 ADDISON STREET PRELIMINARY DESIGN REVIEW

Wesley Housing Development Corporation Trenton Street Residential

San Pablo Ave C I T Y O F B E R K E L E Y P L A N N I N G D E PA R T M E N T BASE BUILDING DESIGN PROPOSAL

1950 ADDISON. Berkeley, CA December 17, Design Reivew. Westwood BayRock Addison, L.P. c/o BayRock Multifamily, LLC

5 to 25 Wellesley Street West and 14 to 26 Breadalbane Street - Zoning Amendment Application - Preliminary Report

KENECT DENVER 2136 LAWRENCE OPTIONAL CONCEPT REVIEW ARAPAHOE SQUARE DESIGN ADVISORY BOARD FEBRUARY 20, 2018

RESIDENTIAL DESIGN STANDARDS AND GUIDELINES

Chapter URBAN VILLAGE ZONING DISTRICTS

Truax Park Apartments

307 Sherbourne Street - Zoning Amendment Application - Preliminary Report

Development Standards

Director, Community Planning, North York District NNY 23 OZ and NNY 23 RH

Cambridge Ordinance Committee Zoning Submission Overview 8/2/2017

320 Maple Mixed Use PDR Narrative Fort Collins, CO Project # 1525

TOWNHOUSE. TYPICAL UNIT SIZE 1,200 to 1,600 square foot average unit (two to three stories) DENSITY dwelling units/acre without cottages

A APPENDIX A: FORM-BASED BUILDING PROTOTYPES

AGENDA SLOT HOME EVALUATION & TEXT AMENDMENT. 5:30 - Welcome

OFFICE BUILDING INVESTMENT OPPORTUNITY PALO ALTO DOWNTOWN CALIFORNIA. Actual Site

per unit Live/Work 1 per unit None mentioned. MF 1 2 bdrms. MF 2+ bdrms* (Transit Oriented MU District) Single Unit, Two Unit, Multi Unit &

Provide a diversity of housing types, responsive to household size, income and age needs.

1265 Montecito Avenue Mountain View, California

SECTION 2 - PROJECT DESCRIPTION

Cozy by Design Communities for the 21 st Century

3000 EL CAMINO REAL PALO ALTO, CALIFORNIA HUDSONPACIFICPROPERTIES.COM

220 ALICE JACK LONDON DISTRICT OAKLAND CALIFORNIA. Multifamily Urban Infill Transit-Oriented Development OFFERING MEMORANDUM

20 Edward Street Zoning Amendment Application - Preliminary Report

Requested Information for 6701 W Sunset 2 messages

THE DEAN. 480 San Antonio Road, Mountain View, El Camino Real

From Policy to Reality

MEMORANDUM. I1 District Industrial Living Overlay District 110,703 square feet / 2.54 acres

Director, Community Planning, Etobicoke York District

Creative Approaches to Land Acquisition

PUBLIC NOTICE* Studies Requested: Parking analysis. Other Required Permits: Building Permit, Site Development Permit

FOR SALE > MULTIFAMILY/COMMERCIAL REDEVELOPMENT OPPORTUNITY

MEMORANDUM. B4S-2 Downtown Service District DP Downtown Parking Overlay District 42,390 square feet / 0.97 acres. DMNA; adjacent to North Loop

8150 SUNSET BOULEVARD 8150 SUNSET BLVD., LOS ANGELES, CA ALTERNATIVE 9 DRAWING SET MAY 13, 2016

OFFERING MEMORANDUM. Infill Redevelopment Site Los Altos, CA 4896 EL CAMINO REAL LOS ALTOS, CA

Notice of Preparation

GATEWAY TO LOS ALTOS

Cambridge Planning Board Zoning Submission Overview 7/25/2017

Chair to close public hearing. Review Deadline: 60 Days: 8/18/ Days: 10/17/2017

Boston East. Fort Point Associates, Inc. Urban Planning Environmental Consulting Project Permitting. May 31, 2013

River Glen Apartments

CapitolStation65,LLC SUMMARYBOOKLET. Township9

Policy and Standards for Public Local Residential Streets And Private Streets

PROJECT INFORMATION BUILDING INFO: TYPE OF CONSTRUCTION: V-B GRND. FLR. GARAGES NUMBER OF UNITS: REQ'D & PROVIDED EXITS: (2) TWO (NO CHANGE)

Bunker Hill Part II Urban Design. Specific Plan. Case No. CPC SP TABLE OF CONTENTS

DRAFT Plan Incentives. Part A: Basic Discount

Kassner Goodspeed Architects Ltd.

Seth Mallen, Vice President Maximus Real Estate Partners 525 Florida Street, Ste. 150 San Francisco, CA November 10, 2015

County of Sonoma Agenda Item Summary Report

25 St. Dennis Drive - Zoning By-law Amendment Application - Preliminary Report

Submission 1 - April 21, 2015

SCANDINAVIAN DESIGNS - CORTE MADERA

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

40-58 Widmer Street - Zoning Amendment Application - Preliminary Report

Anacortes, WA. 718 commercial ave. FOR lease. 2,320 +/- sf retail space in a 10,820 +/- sf building. Located in historic downtown Anacortes

LAND USE, ZONING, & DEVELOPMENT STANDARDS

The Forecaster Building Notice of Project Change

Navigating the Garage Entry into Gate 4

OCEANSIDE DEVELOPER S CONFERENCE

th Avenue NW Early Design Guidance Meeting - SDCI # EDG Meeting

CAN TRADITIONAL ZONING ACHIEVE OUR GOALS FOR DOWNTOWN ANN ARBOR?

PROJECT DESCRIPTION STATION 1300

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES PLANNING COMMISSION

900 ALBERT STREET PLANNING RATIONALE ADDENDUM NO. 2

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

URBAN DESIGN COMMISSION REVIEW AND APPROVAL

Transcription:

Project Information Project Description Vicinity Map 1) Zoning Latham Parcel: R.1 l Camino Parcel: CRA ) APN 154-7-00, 014 & 017 6) Residential Density and Unit ummary Latham 5 units/acre (49 units /1.9 acres) This mixed-use project will be a catalyst for the Grand Boulevard Initiative, bringing places for residents to live, work, shop and play along. Located on a large city block on l Camino between scuela and Rengstroff Avenues, the development will create 18 residences and approximately 4,00 F of neighborhood-serving retail to Mountain View. an Antonio Caltrain tation ) Lot Area Latham Parcel: 7,604 F (1.67 acres) l Camino Parcel A 1,80 F ( 0. acres) l Camino Parcel B: 7,86 F (0.87 acres) Combined: 14,70 F (.85 acres) 4) ite Coverage Building Footprint: 94,600 F ite Coverage: 76.1% 5) Floor Area Ratio Calculation Latham Including garage:.8 17,600 sf/60,475 sf Not including garage: 0.99 (17,600 sf - 77,850 sf)/60,475 sf Including garage:.95 187,90 sf/6,765 sf Area Tabulation: Type Circulation - Horiz. 1,545 sf Circulation - Vert. 6,900 sf Common / Fitness 4,05 sf Garage 7,86 sf Leasing / Lobby,705 sf Residential 159,555 sf Retail 4,0 sf ervice,97 sf tor. / Bikes 6,11 sf 5,51 sf 91 units/acre (1 units /1.46 acres) Unit Tabulation: Unit Type Area tudio 550 sf 1 BR - A 650 sf 1 BR - B 70 sf 1 BR - C 790 sf BR 50 sf BR 150 sf 7) Parking ummary Required Parking/Unit Type tudio (@1 /unit) 1 BR - A (@1 /unit) 1 BR - B (@1 /unit) 1 BR - C (@ 1 /unit) BR (@ /unit) BR (@ /unit) Residential Parking Retail Parking: (@ 1/180 sf) Total Guest Parking: (15% of parking spaces required for residential use to be assigned for guest) 8) Open pace Calculation Count 9 14 65 44 41 9 18 (4.9%) (7.7%) (5.7%) (4.%) (.5%) (4.9%) Parking Required/Provided 9 14 65 44 8 18 6 provided 4 4 provided 56 60 provided 5 in Garage Common Usable Open pace Active Court:,95 F Mews: 8,750 F Plaza:,400 F l Camino etback Open pace: 4,75 F Passive Court: 8,500 F ntertainment Court:,700 F Total: 50,650 F Common Usable Open pace/ ite Area = 50,650 F/ 14,70 F = 41% of ite Area Private Usable Open pace: Balconies & Patios: 9,00 F Conceptually, the building massing is broken into distinct volumes creating a varied street presence. The building steps down from -stories of residential over retail at with a step back at the top most level. Along Latham treet it steps back to stories which will relate to the existing neighboring - and -story apartment buildings on the block. The retail will be highly visible to north-bound traffic on, will be set back ten feet from the property line, more than doubling the width of the existing sidewalk, and will include large glass storefront, awnings and bladesigns, to create a lively interaction with the street. Adjacent to the retail will be the main lobby and leasing offices for the residences, which will open onto a plaza between the retail and leasing office also providing direct access from retail and guest parking. A private pedestrian mews provides a pedestrian linkage between and Latham treets, culminating into a public plaza at the. Ground level units will have access to the mews, on-grade and podium level courtyards and Latham treets via raised porches. A grade level active court and a podium passive courtyard will top the retail/ guest parking garage and an entertainment courtyard with pool and barbeque area will be situated on the roof of the residential garage. This medium-to-high-density project will be located close to several bus stops and will be within a mile of the an Antonio Caltrain tation. The design will feature 18 secure residential bicycle parking spaces as well as visitor bicycle parking. It will incorporate a series of complementary sustainable strategies, such as energy efficiency measures, drought-tolerant landscaping, and landscaped bio-swales for storm-water management, to achieve a high level of LD certification. Project Team Owner West, LLC 1745 hea Center Drive, uite 00 Highlands Ranch, CO 8019 Tel. 70.8.619 Contact: Don MacKenzie () Development Consultant Four Corner Properties 1 mbarcadero Center, 7th Floor an Francisco, CA 94111 Tel. 650.79.5000 Contact: Dave Wilbur Architect teinberg Architects 98 Battery treet, uite 00 an Francisco, CA 94111 Tel. 415.68.000 Contact: eema Mhaskar Civil ngineer HMH 1570 Oakland Road an Jose, CA 9511 Tel. 408.487.00 Contact: Ray Hashimoto Landscape Architect The Guzzardo Partnership, Inc. Landsacpe Architects Land Planners 181 Greenwich treet an Francisco, CA 94111 Tel. 415.4.467 Contact: Paul T. Lettieri an Antonio hopping/ Transit Center Bus top VTA Lines 4/5 &40 Bus top VTA Lines /5 1/4 mile radius 1/ mile radius heet Index IT 1 Project Info General Plan & Zoning ite Plan ite Context Photos 4 Conceptual Plans - treet Level & Level 1 5 Conceptual Plans - Levels + 6 Conceptual Plans - Level 4 7 Conceptual Design - Diagram 8 View - Lobby & Retail @ 9 View - Residential Transition (Latham t.) Building ections 11 olar tudy 1 Design Precedents 1 Landscape Plan Castro Park Project Info heet number 1 (0% cale @ 11x17) 01-09-04

R.1 / MDIUM HIGH DNITY R.1 / MDIUM HIGH DNITY LVL LVL 4 LVL PROPOD GP BOUNDARY CURRNT GP BOUNDARY P - ZON 4/5 LVL 4/5 LVL CRA / MIXD-U CORRIDOR CRA / MIXD-U CORRIDOR 1 Current GP & Zoning Proposed GP & Zoning 1" = 60'-0" 1" = 60'-0" General Plan & Zoning heet number 01-09-04

LATHAM TRT MW TOOP GARAG NTRY NTRTAINMNT ACTIV PAIV MW L CAMINO RAL PLAZA RTAIL LOBBY GARAG NTRY 1 IT 1" = 80'-0" ite Plan heet number 01-09-04

IT IT 1) - Looking Northeast ) - Looking Northwest IT ) Latham - Looking outhwest 4) Latham - Looking Northwest (Opposite ite) ite Context Photos heet number 01-09-04

1 1 15' - 1 1/" LATHAM TRT toops GARAG NTRY 15' - 1 1/" LATHAM TRT GAT GAT TR 58' - 1/" MW MW 0' - 0" ' - 0" PLAZA 45' - 0" LC. MCH. 9' - 0" +0'-0" (87'-0") ACTIV 47' - /4" 8' - 6" RTAIL RAMP DN 18' - 0" 4' - 0" 18' - 0" GAT RAMP UP BAMNT BLOW GUT BIK 8' - 0" 1' - 0" -'-0" (85'-0") 0' - 0" 1' - 0" L CAMINO RAL 8' - 6" BIK 18' - 0" 4' - 0" 18' - 0" 0 PAC (RIDNT) 174' - 6" 59 PAC (4 RTAIL + 5 GUT) 9' - 1 1/" TRAH LOBBY/ LAING RAMP DN -7'-0" (80'-0") RAMP UP -7'-0" (80'-0") +0'-0" (87'-0") LC. MCH./ MAINT. 16' - 6" 16' - 0" GARAG NTRY 58' - 1/" MW MW 0' - 0" ' - 0" PLAZA 45' - 0" ACTIV double height retail PAIV 8' - 0" 1' - 0" RAMP UP RAMP DN 141' - 9" 1' - 0" L CAMINO RAL TORAG 65' - 0 /4" TR double height lobby/leasing RAMP DN 16' - 6" 0' - 1 1/" NORTH 1 Concept Ground Level Concept Level 1 1" = 60'-0" 1" = 60'-0" Conceptual Plans - treet Level & Level 1 heet number 4 01-09-04

1 LATHAM TRT 1 LATHAM TRT 15' - 1 1/" MW MW 0' - 0" ACTIV RAMP DN PAIV TORAG POOL ABOV TR RAMP DN 16' - 6" MW MW ACTIV PAIV POOL NTRTAINMNT 174' - 6" COMMON TR 16' - 0" PLAZA 0' - 1 1/" 18' - 0" ' - 0" 0' - 1 1/" PLAZA 0' - 1 1/" 18' - 0" 0' - 1 1/" 8' - 0" L CAMINO RAL 1 Concept Level Concept Level 1" = 60'-0" 1" = 60'-0" L CAMINO RAL NORTH Conceptual Plans - Levels + heet number 5 01-09-04

1 LATHAM TRT MW MW PLAZA ACTIV 7' - 0" 18' - 0" TPBACK PAIV 1 1 1 POOL NTRTAINMNT FITN 1 TR L CAMINO RAL NORTH 1 Concept Level 4 1" = 60'-0" Conceptual Plans - Level 4 heet number 6 01-09-04

Conceptual Design - Diagram heet number 7 01-09-04

View - Lobby & Retail @ heet number 8 01-09-04

View - Residential Transition (Latham t.) heet number 9 01-09-04

NTRTAINMNT (BYOND) PAIV Roof Level 4 L CAMINO RAL LATHAM TRT CORRIDOR ACTIV CORRIDOR GARAG CORRIDOR RTAIL Level Level Level 1 Ground Level 1 N- ection 1 1" = 0'-0" NTRTAINMNT FITN PAIV Roof Level 4 L CAMINO RAL LATHAM TRT CORRIDOR TORAG POOL GARAG GARAG CORRIDOR COMMON GARAG CORRIDOR LOBBY LAING Level Level Level 1 Ground Level N- ection 1" = 0'-0" Building ections heet number 01-09-04

Latham t. Latham t. Latham t. UMMR 9:00 AM UMMR 1:00 PM UMMR :00 PM Latham t. Latham t. Latham t. QUINOX 9:00 AM QUINOX 1:00 PM QUINOX :00 PM Latham t. Latham t. Latham t. North WINTR 9:00 AM WINTR 1:00 PM WINTR :00 PM olar tudy heet number 11 01-09-04

1) MARKTHOU LOFT ) PALO ALTO COMMON NORTH ) PALO ALTO COMMON NORTH 4) IX - AN DIGO, CA 5) RITA ATKINON RIDNC - UCD 6) RTAIL - 00 IVY TRT, AN FRANCICO, CA Design Precedents heet number 1 01-09-04

heet number 1 01-09-04