General Information RETAIL AND RESTAURANT

Similar documents
TWELVE OAKS GENERAL INFORMATION (BUILDING E ONLY)

TWELVE OAKS GENERAL INFORMATION (BUILDINGS A, B, C, and D ONLY)

GENERAL INFORMATION. Landlord s Tenant Coordinator

FAIR OAKS GENERAL INFORMATION

TENANT DESIGN MANUAL UPDATED AUGUST 2015

TENANT DESIGN MANUAL UPDATED DECEMBER 2018

FOR LEASE. Capitol Hill Corner Cafe/Restaurant Space th Avenue, Seattle, WA Please call brokers for more information:

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

DESCRIPTION OF LANDLORD'S WORK & TENANT'S WORK

TENANT DESIGN MANUAL UPDATED JULY 2016

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

Exhibit C - Shops 1 & 2

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

TENANT DESIGN MANUAL UPDATE JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

3435 MAIN 3435 Main Street Kansas City, MO RESTAURANT SPACE Available for Lease 1. BUILDING LOCATION

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JANUARY 2016

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015

The Promenade at Casa Grande 1005 N Promenade Pkwy Casa Grande, AZ 85294

TECHNICAL CRITERIA ARROWHEAD TOWNE CENTER THE PLACE TO SHOP

LANDLORD WORKLETTER EXHIBIT C-1 CONSTRUCTION REQUIREMENTS AND STANDARDS GREY SHELL ONLY

TENANT DESIGN MANUAL UPDATED JUNE 2016

TENANT DESIGN MANUAL UPDATED AUGUST 2016

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

TENANT DESIGN MANUAL UPDATED MAY 2016

COLD DARK SHELL LEASE EXHIBIT

14400 Bear Valley Road, Victorville, CA 92392

San Tan Village 2218 E. Williams Field Rd. #235, Gilbert, AZ 85295

Construction Document Criteria

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED OCTOBER 2016

Construction Document Criteria

EXHIBIT C. Leasehold Improvements Work Letter

TRIALLIANCE COMMERCIAL REAL ESTATE SERVICES COLUMBIA STATION Route 108, Old Annapolis Road Columbia, MD 21045

TENANT DESIGN MANUAL UPDATED JULY 2015

Construction Document Criteria

Tenant Design Criteria Section t Technical Criteria Updated: August Wilton Mall at Saratoga 3065 Route 50, Saratoga Springs, NY 12866

Construction Document Criteria

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED FEBRUARY 2017

ARLINGTON S COOLEST SQUARE BLOCK HAS RISEN TO ITS EXPECTATIONS. #HQCOOL

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

CONSTRUCTION CRITERIA

TECHINICAL CRITERIA DEPTFORD MALL THE PLACE TO SHOP

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

TENANT DESIGN CRITERIA V. Technical Criteria 34

LOUIS JOLIET MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

th Street Boulder CO 80301

PLAZA WEST COVINA TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

a) Tenant shall require its Contractor to provide and maintain the following insurance coverage:

Design and Construction Document Criteria

Bangor Mall Bangor, ME

Restaurant Addendum to Tenant Construction and Design Criteria. Restaurant Criteria. Replace Existing Tenant

Tenant Design Criteria Section rd Restaurant Design Criteria Updated: June E. Camelback Road, Scottsdale, AZ 85251

Submission Procedures

I-94 Office Building

TENANT MANUAL 5 January 2006

Tenant Design Criteria. gi1. General Mall Information. Section gi General Information Criteria Updated: March 2017

The Shops at Montebello Montebello Town Center Dr, Montebello, CA 90640

SOUTHLAKE MALL. Southlake Mall Tenant Design & Construction Criteria TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

THE PLACE TO SHOP TOWNE MALL

Fee Resolution

Tiny House on Wheels A Tiny House

FOR LEASE MID-CITY RETAIL SPACE ON THE LAFITTE GREENWAY

TECHNICAL CRITERIA THE PLACE TO SHOP LOS CERRITOS CENTER

Tenant Design Criteria Section gi General Information Criteria Updated: June Stonewood Center 251 Stonewood St.

MIDTOWN S CLASS-A BOUTIQUE OFFICE TOWER, PROVIDING BUSINESS WITH FIRST-CLASS OFFICE SPACE AND UNPARALLELED SERVICE

GENERAL GROWTH PROPERTIES, INC.

THE PLACE TO SHOP CHANDLER FASHION CENTER

Building Rules & Regulations

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

AIRPORT DINING & RETAIL PREVENTIVE MAINTENANCE PROGRAM MANUAL

HUDSON COUNTY NEW CONSTRUCTION MULTI-FAMILY RESIDENTIAL: NEWARK AVE JERSEY CITY, NJ BLOCK:11010, LOT:4. Design:

Tenant Design Criteria Section gi General Information Criteria Updated: January Dale Rd., Modesto, CA 95356

Cascade Mall 201 Cascade Mall Drive, Burlington, WA 98233

Request for Proposal (RFP) Goodwill Industries of Greater Detroit (Goodwill) for OAKLAND COUNTY MICHIGAN WORKS! PONTIAC June 12, 2018

14797 and Murdock Street, Chantilly, VA

Charles Kozminski Elementary Community Academy

320 Bay Street TORONTO ONTARIO. Tracy Macdonald Vice President,

Procedures on Maintenance Services and. Required Inspections for the ADR Tenants. Seattle Tacoma International Airport.

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

MERRILLVILLE CORPORATE CENTER BUILDING FACTS & AMENITIES

GENERAL INFORMATION CRITERIA

NOW LEASING RETAIL SPACE OVERBROOK PLAZA SHOPPING CENTER NORTH LITTLE ROCK, ARKANSAS

! August!19,!2013! Artspace)Hamilton)Lofts) Narrative)on)work)scope)and)schedule)!

Young Quinlan Building 9th & Nicollet

8000 Cooper Avenue, Glendale, NY 11385

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Transcription:

General Information RETAIL AND RESTAURANT Landlord s Tenant Coordinator The role of the Tenant Coordinator is to serve as liaison between Landlord and the Tenant, Tenant's architect and Tenant's contractor. All plans and correspondence concerning Tenant's construction are to be submitted to the Landlord's Tenant coordination Department. Tenant Coordination Main Phone: (248) 258-6800 City Creek Center Fax: (248) 258-7301 Livia Owens, Senior Tenant Coordinator Direct Phone: (248) 258-7455 200 East Long Lake Road Email: lowens@taubman.com P.O. Box 200 Bloomfield Hills, MI 48303-0200 Mall Address City Creek Center Phone: (801) 238-5320 Management Office Fax: (801) 238-5321 68 S. Main Suite B-100 Salt Lake City, UT 84101 Facilities Director: Jack Romaine Phone: (804) 740-1518 Address (see address protocol on tenant coordination website for more specifics): 50 South Main Street (Block 76) and 51 South Main Street (Block 75) Salt Lake City, UT 84150 Safety Health & Project Access Control Coordinate with Facility Management Building Information: Construction Type: 1B fully sprinkled Zoning Classification: The Retail Center is classified as a non-separated, mixed use occupancy that will include Assembly, Business, Mercantile, and Storage occupancies. Delivery Hours: Construction Hours: Coordinate with Facility Management and Tenant Coordination 48 hours prior to delivery. 7:00 a.m. until 9:00 pm Monday Saturday. The Site will be closed on Sunday. Coordinate with Facility Management and Tenant Coordination. Building Heights: First to Second Floor: 19-0, +/- 13-4 clear from Top of concrete to equipment (Field Verify) Second to Third Floor: 18-0, +/- 13-4 Block 76 and +/- 13-3 Block 75 clear from Top of Concrete to equipment. (Field Verify) Third Floor to Roof: TBD 18-0, 13-4 clear from Top of Concrete to equipment (Field Verify) Page 1 of 7

Floor Construction Level: Block 75 and 76 Conditions vary by location. Refer to base building structural drawings for more information and field verify all structural conditions.) One or more of conditions listed below may apply. 1. Approximately 3 1/2 concrete over 3 composite steel deck. 2. Approximately 4 concrete over polystyrene foam fill. Foam thickness varies. 3. Approximately 6 concrete over 3 composite steel deck. Design Load: Subject to landlord approval. First Floor: 100 psf (live load) Second Floor: 100 psf (live load) Roof: 30 psf + snow load Demising Wall Construction One layer 5/8 gypsum board tenant side only on metal studs. Completed wall system will be 1 hr. fire rated. Service Corridor Vestibule Required Yes One layer of 1/2 fire-retardant treated plywood 4-0 high with 4 metal corner guards 8 high to be installed inside service vestibule recess to match Landlord corridor finish. Utility Services and Points of Connection Electrical: Watt Density: Service available to premises: 277/480 volt, 3 phase 4 wire, 60 hertz. Retail Tenants: 14 watts/sq. ft. Restaurant (sit down style) 24 watts/sq. ft. Tenants will connect using Landlord supplied conduit from premises to distribution centers located in close proximity as determined by Landlord at Tenant expense. Telephone Tenant to extend telephone service in Landlord supplied conduit from premises to Landlord s designated telephone closet as determined by Landlord at Tenant s expense. Page 2 of 7

Plumbing 1 ¼ 3 Cold Water stub located above the premises for First and Second floor tenant s and below the floor for third floor tenants, in a location determined by Landlord. Location of larger size stubs must be verified in field and at Tenants expense. 4 Sanitary Sewer and Plumbing Vent stubbed to a location determined by Landlord. 4 Kitchen waste stubbed to a location below the Tenant s premises for Food Court Tenant s and Restaurant spaces. Provide heat tracing on all pipe subject to freezing. Gas Utility Company meter manifolds locations as determined by Landlord. A gas line will only be provided to food and beverage tenant spaces designated by the land lord in the shell design. 2 gas line per space. Tenant required to provide pressure regulators with vent limiting device per code. The Maxitrol 325 SAL600 has been accepted by the city for this installation. Water Meter shall be available in 5/8"x3/4", 1", 1-1/2", 2". This meter will take 6 weeks from order date to receipt. All water heaters shall be electric; some food and beverage tenants will be permitted to use gas if allowed for in shell design and construction. This must be approved during land lord review of construction drawings. HVAC Condenser Water Pipe Connections stubbed to a location within or in close proximity to tenant s premises. Fire Protection Sprinkler system is a hydraulically calculated fire protection system. Tenants to connect to Fire protection sprinkler system main using Landlord contractor at Tenant expense. Must use schedule 40 pipe. Thin wall pipe is not permitted. Smoke detectors required Tenant shall provide and install any required occupant notification system. Tenants to connect to Fire Alarm System using Landlord contractor at Tenant expense Toilet Facility requirements Any tenant outside of the 300 foot travel distance measurement will provide facilities interior to their space as follows: a. Tenant less than 800 SF will have employee restroom installed by the tenant, no public facilities required. b. Tenant greater than 800 SF will have public facilities installed by the tenant. Each TI will include an overall floor plan identifying where their space is located in relation to the restroom to confirm compliance with the 300 foot travel distance measurement (again measured from the central facility to the tenant storefront). Exiting Requirements One exit required in tenant spaces less the 1470 sf and with an occupancy load less than 50. All other spaces require a minimum of two exits. Page 3 of 7

Construction and Merchandising Debris Removal Prior to Grand Opening, Landlord will provide Construction and Merchandising Debris dumpsters for intermingled materials. If separation of material is required for LEED participation, all additional costs will be at tenant expense. CONSTRUCTION PREREQUISITES Please refer to the Construction Rules and Regs FOOD COURT Food Court Address Food Court Address: 28 South State Street Salt Lake City, UT 84150 Facilities Director: Jack Romaine Phone: (804) 740-1518 Safety Health & Project Access Control Prior to accessing the Project all contractor employees are required to attend a site specific safety orientation and participate in Substance Abuse Testing conducted by the site controlling contractor (Big D Construction) Orientations are approximately one and one half hour long and are held Monday through Friday-7am at Big D Construction s City Creek Center Offices located at 135 S. Regent Street Salt Lake City, UT. Big D Construction may be contacted at (801) 505 4500. Substance Abuse Testing: Employees are not permitted onsite until the result of the test is reported by the testing laboratory and then verified by the Tenant Coordinator. Therefore, employers are encouraged to make arrangements to have their employees complete the substance abuse test several days in advance of when employees are to report to the project. Building Information Construction Type: 1B/Fully Sprinkled (403.31) Zoning Classification: Mercantile Delivery Hours: Construction Hours: 6:00 9:00 p.m., Monday Saturday 7:00 a.m. 10:00 p.m., Monday Saturday coordinate with onsite manager Building Heights First to Second Floor: 17-6, Clear Height to underside of structure: +/- 15-0, field verify Second to Third Floor: 17-6, Clear Height to underside of structure: +/- 15-0, field verify Third Floor to Roof: 19-0, Clear Height to underside of structure: +/- 16-0, field verify Allowable Ceiling Height: 12-0 Food Court: 18-0, Clear Height to underside of structure: +/- 16-0, field verify Page 4 of 7

Floor Construction Level 1 -Spaces FC102-FC105 on Grade: 5 inch concrete slab on grade with a minimum strength of 3,000 PSI reinforced with #4 @12 o.c. each way on a vapor barrier. Tenant shall provide additional sand fill and remove excess as required. (See Structural Section for additional information) Level 1 -Spaces FC101, FC106, FC110-FC114 over Parking Deck: Approximately 3-1/2 thick lightweight concrete over 3 deep x 18 gauge steel deck (6-1/2 overall-field verify). (See Structural Section for additional information) Design Load: Food Court: 100 psf (reducible) Lobbies: 100 psf (unreducible) Outdoor Plaza: 100 psf (unreducible) Roof: 30 psf + snow drift Demising Wall Construction One layer 5/8 gypsum board Tenant side only on metal studs. Service Corridor Vestibule Required Yes One layer of 1/2 fire-retardant treated plywood 4-0 high with 4 metal corner guards 8 high to be installed inside service vestibule recess to match Landlord corridor finish. Utility Services and Points of Connection Electrical: Watt Density: Service available to premises: 277/480 volt, 3 phase wire, 60 hertz Retail Tenants Food Service Tenants Food Court Tenants Tenants with electrical service requirements of less than 200 amps connect using Landlord supplied conduit from premises to distribution centers located in close proximity as determined by Landlord at Tenant expense. There are no services available for Tenants with service requirements greater than 200 amps. Telephone Tenant to extend telephone service in Landlord supplied conduit from premises to Landlord s designated telephone closet as determined by Landlord at Tenant s expense. Page 5 of 7

Plumbing 3/4 Cold Water stub located above the premises for First and Second floor tenant s and below the floor for third floor tenants, in a location determined by Landlord. Location of larger size stubs must be verified in field and at Tenants expense. 4 Sanitary Sewer and Plumbing Vent stubbed to a location determined by Landlord. Grease traps are required to be installed inside tenant each Food Court tenant space. If the Grease traps are tied to a 3 compartment sink that has a food prep compartment as well the wash and rinse compartments, the wash and rinse compartment must be tied into grease trap using closed system. The sanitary compartment may indirectly drain to a floor sink with proper separation between drain pipe and floor sink per code. 4 Kitchen waste stubbed to a location below the Tenant s premises for Food Court Tenant s and Restaurant spaces. Gas Utility Company meter manifolds locations as determined by Landlord. 1, 5-psi gas line per space. Tenant required to provide pressure regulators with vent limiting device per code. The Maxitrol 325 SAL600 has been accepted by the city for this installation. Water Meter shall be Elster/AMCO C700 (available in 5/8"x3/4", 1", 1-1/2", 2") combined with the Energy Axis Module. This meter will take 6 weeks from order date to receipt. HVAC Condenser Water Pipe Connections stubbed to a location within or in close proximity to tenant s premises. Food Court Tenant s 2000 CFM of make-up air available from the common area HVAC system. Grease Exhaust maximum CFM of 4000 unless reviewed and approved by Landlord and base building mechanical engineer (Van Boerum & Frank Associates Inc.). Tenant shall install a Halton Balancing/Measuring Device that connects directly to tenant s Hood for Air Flow Balancing per Landlord specifications. Air Flow Balancing Test performed by Landlord approved contractor at tenant expense. A Hood Fan -Heat Sensor will be required to be installed inside each grease hood that will turn hood exhaust fans on if cooking occurs after regular center hours. Tenant to contract directly with Landlord Contractor. Fire Protection Sprinkler system is a hydraulically calculated fire protection system. Must use schedule 40 pipe. Thin wall pipe is not permitted. Fire protection systems installed in exhaust hoods are required to be ANSUL R-102 systems. This system will require drawings submitted to and approved by SLC building and fire department. This approval will require a permit and final inspection by SLC fire department. Special inspection fees will be paid at time of inspection by tenant contractor. Smoke detectors required No smoke control occurs in common area (food court) and through tenant ceiling plenums. Tenant shall provide and install any required occupant notification system. Page 6 of 7

Toilet Facility requirements Any tenant outside of the 300 foot travel distance measurement will provide facilities interior to their space as follows: a. Tenant less than 800 SF will have employee restroom installed by the tenant, no public facilities required. b. Tenant greater than 800 SF will have public facilities installed by the tenant Each TI will include an overall floor plan identifying where their space is located in relation to the restroom to confirm compliance with the 300 foot travel distance measurement (again measured from the central facility to the tenant storefront). Exiting Requirements One exit required in tenant spaces less the 1470 sf and with an occupancy load less than 50. All other spaces require a minimum of two exits. Page 7 of 7