Sutton Senior Building

Similar documents
Design and Access Statement Volume III Part 6 of 9 Plot A1. May 2018 Allies and Morrison

MOUNT GRAVATT- CAPALABA ROAD

LITTLE MOUNTAIN ADJACENT AREA REZONING POLICY

Harmony Row Dublin 2. Dublin 2

York Conferences DIVERSE VENUES

RETROFIT OF BUILDINGS BY DUBLIN CITY COUNCIL. Matt Carroll, City Architects Division DUBLIN CITY COUNCIL

Equality and Access Plan The Abbey School, Reading

Dr Sun Yat-sen Museum, Mid-Levels

THE OPPORTUNITY BACKGROUND HIGH ST MONTREAL ST ROYAL FREMANTLE GOLF CLUB STEVENS ST CARRINGTON ST HOPE ST YALGOO AVE NANNIE AVE WATKINS ST SOUTH ST

RedStone Private Country Estate architectural guidelines

Multi-unit residential uses code

paddington house words by Tom Rubenach

DESIGN, ACCESS & PLANNING STATEMENT

Checker Building Architectural Design and Details

INDEX PACKAGE SUMMARY...39

introducing our design practice

Renovating older apartment buildings A multi-disciplinary international project. Architectural design & construction

OPERABLE ALL-GLASS BALCONY GLAZING SYSTEMS. NanaGlass SL25

INFO-PACK. KUBE The Luxury Apartments. Kube Info Pack Page 1

Figure 1. The chart showing how the effort and cost of the design changes are affected as the project progresses (Anon.) Simulation tools are a key co

U P L A N D S W A L K S U P P O R T I V E H O U S I N G

Architectus Brisbane and HDR Rice Daubney as Sunshine Coast Architects. Mitti Street House James Russell Architect House of the Year *

BEAM UP YOUR BUSINESS

Together with Tenants

Signed Sealed Delivered

BUILDING SPECIFICATIONS

Q&A DOCUMENT. Location Felix Street, Lutwyche Qld 4030

City of Edinburgh Council - Rising School Rolls Phase 3 James Gillespies Primary School. Stakeholder Meeting 1 Thursday 05 June 2014

PROVIDENCE (BOLLARD BULRUSH SOUTH) LOCAL DEVELOPMENT PLAN. 2263Rep146E


Energy consumption in an old residential building before and after deep energy renovation

multi-residential apartments

501 Adelaide Street East: Closing Report

The Lakes Estate Serpentine Court Regeneration Group. 5 December 2017

Furniture Design Brief

2. The Purpose of the Estates Strategy

3 STEP BUYERS GUIDE STEP FINANCE STEP LAND STEP HOME

The Terrace, Lincoln, by Bauman Lyons Architects

Construction information

Hotel and Multi Storey Cycle Park Two The Square, Station Square, Cambridge

Angel Building is the re-invention of an unloved early 1980 s commercial building located on one of London s historic focal points where City Road

Community Affairs and Planning Committee Paul Allore, MCIP, RPP Director of Planning and Development Services

Proposals for the Redevelopment of the Magistrates Court & Police Station, Normandy Street / Orchard Lane, Alton

The Pinnacle, Willenhall

EOI: NEW BUILDING FOR FACULTY OF ARCHTECTURE, BUILDING AND PLANNING May Page 1

Units A 181-A 183-A LEARN MORE EASTWILBUR.COM

poul kjærholm pk1 pk52 pk52a

PINES PROMENADE 46 Pine Road, Richlands QLD

Renovation Toolbox. Introduction

St Mary s Church Hall Refurbishment

ZA and ZA Zoning Change and Concept / Site Plan Preliminary Plat Delta Southlake Center

Covenant A relating to Stage 7 Riemore Downs, Tamborine Page 1 of 8 TABLE OF CONTENTS INTRODUCTION 3 1. WATER SUPPLY 3 2.

148,000 sq ft. Net area of Grade A Office Accommodation

WIN A home battery storage system from Enphase ECOVILLAGES COME TO TOWN. Valuing green features Home lighting design Family home on a budget

Wilson Bridge Corridor Zoning. Department of Planning & Building

Residencial El Prado - "Viviendas desde *. Plaza y Trastero Incluido" Ensanche de Vallecas (caseta nº 1)

AIREDALE HOUSE LEEDS LAST SUITE REMAINING 2,718 SQ FT (252.5 SQ M) Airedale House, Albion Street, Leeds, LS1 5AP

Upper Dublin Public Library. Master Plan Presentation for: 520 Virginia Drive

LAKESIDE URBAN HOUSES

8 MINT WALK CROYDON CR0 1EA BERNARD WEATHERILL HOUSE

STUDIO SPACES FOR THE CREATIVE INDUSTRIES NOTTING HILL

APPLICANT CONSENTS TO PERSONAL INFORMATION BEING RELEASED Yes No. APPLICANT S SIGNATURE: 15 September 2015

+44 (0) John Bryce Malcolm Jones +44 (0)

A different viewpoint. PROPERTY OF DMCI HOMES

1.- THE LOCATION 2.- DESIGN. The Melaku Center will be a new learning center, and projection work in Ethiopia.

OVERVIEW PROJECT SUMMARY

127 Portland Street. West Village

2 Bank Street Hemsworth, Pontefract WF9 4JX

ACCESSORY DWELLING UNITS

GMB ARCHITECTS AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS

The Carpenter Center for Visual Arts, Harvard University Analysis 4 th and 5 th Floor Studio Spaces

3510 Plan Two Story Approx. 2,382 Sq. Ft. 3 Bedrooms 2.5 Baths Kitchen with Island Great Room Loft Covered Loggia 2 Bay Garage

Governing Body 323rd Session, Geneva, March 2015

9.3.5 Dual occupancy code


A Luxury Lifestyle Within Your Reach

Requirements for accepted development and assessment benchmarks for assessable development

URGENT 1 MOTION. 1. Temporary Modular Housing Design Guidelines

Facilities. A Brief Overview: How to Secure a Facility for Your. Charter School

RA6.01. Building Area: 6,620 SF. Cost per Square Foot: Withheld at Owner s Request. Construction Cost: Withheld at Owner s Request

RESIDENCES EFFORTLESS LUXURY IN ONE OF CANBERRA S MOST PRESTIGIOUS SUBURBS BY VILLAGE BUILDING CO. 15 CURLEWIS CRESCENT GARRAN

LRC Parking parking building in city centre

HOW TO MAKE POSITIVE CHANGE AROUND YOUR APARTMENT BUILDING

Les Saisons Sai Wan Ho Building Journal, June 2002

Visit the website for plans and further details: M B

PROPOSED ACCOMMODATION DESIGN HALLS DEVELOPMENT BY 2022

LOCATION ORIENTATION ARCHITECTURAL UNIQUENESS STATE OF CONSERVATION RETURN ON INVESTMENT

IRLANDA.Projects 7. IMMA at Earslfort Terrace. Hotel at Grand Canal Square Dublin, Ireland Aires Mateus Architects hotel, housing

Waverley Elementary School Feasibility Study

THE SPECTRUM BUILDING BRISTOL

The BSF project, September to December A photo timeline by Jack and Jacob Harris

1 Star Hotel Classification Assessment Form

Visit the website for plans and further details: M B

VILLAGE CHIC. Traditional longhouses serve as the unusual inspiration for this suburban family home. Projects. words Zoey Moo. Images Sanjay Kewlani

H6 Residential Terrace Housing and Apartment Buildings Zone

CASTLES OF CALEDON URBAN DESIGN REPORT

Grade A Offices Nottingham

classic exterior contemporary interior

ST. TERESA S GARDENS REGENERATION PARTNERSHIP

Ramp. Bikes Ramp. Landing. Lift. Bikes. Stairs. Bedrm 1 Bedrm 2. Living Rm HWC m 2. Utility. Bthrm. Kitchen.

Transcription:

2012 Exhibition of School Planning and Architecture Sutton Senior Building St Paul s School, 34 Strathpine Rd, Bald Hills, QLD Australia High School Senior Building Project of Distinction New Construction Towill Design Group

Sutton Senior Building Main Exterior Image SOUTHERN ELEVATION

Southern Elevation Community Environment The Sutton Senior Building was designed to replace two one storey 1960 s weather board buildings which w e r e both scheduled for demolition under the School s Master Plan. The original Sutton building accommodated Students Services including counselling with the location not favourable with staff as well as students. Therefore a building located i n heart of the school was refurbished with a purposely designed f a c i l i t y. The new Senior Building also replaced another aging building which accommodated English, history and geography - t h i s building also contained asbestos t h e r e f o r e no m a t e r i a l s could be salvaged. The Sutton building opens to address the Senior Courtyard which was previously used as a thoroughfare due to the lack of landscaping and seating. The landscaping f o r the Senior Building has now revitalised the existing Courtyard, providing additional trees and communal tables for the senior students as well as reinstating a strong axial pathway connection past the Senior Building down to the Junior School, making the new Sutton building at an integral location of the college as students pass i t to both the senior and junior school. The schools flag pole has now been relocated to t h i s courtyard to enable national services such as ANZAC day ceremonies, proudly flying the nation s flag in a p r o m i n e n t position.

Café + Communal Space Community Environment: Continued One significant part of the design brief was to include an area f o r the school community, families, staff and senior students to gather informally, therefore the design of a c a f e was created. The cafe i s run by the Parents Association and provides an area f o r parents to meet, as well as staff with parents to speak informally and senior students to socialise with one another. The cafe also has the ability to be used f o r the hospitality students to serve patrons and develop students skills within a realistic environment. The cafe services a large covered outdoor deck which complements the sub tropical Brisbane climate and r e c e i v e s good a i r f l o w from the north east. T h i s area not only provides seating for customers but also provides a meeting area for many school community committees instead of a meeting room within a building. Music students also perform i n the covered outdoor area with the inclusion of power and lighting to practice their performance skills to audiences. The whole building has been designed to encourage access by students, parents and visitors by providing good visual access internally and externally, and providing a destination for creating a closer school c o m m u n i t y.

Senior Classroom Learning Environment: The architects held extensive workshopping with senior staff, discussing and challenging the evolving teaching & learning methods used within the school. I t was important that the design of classrooms reflected spaces used i n tertiary education ; resulting i n a combination of flexible arrangements (four of the ten classrooms can be merged together through operable walls), providing smaller break out areas for smaller group activities, and a lecture theatre styled learning environment for up to 50 students, providing the students with a presentation platform similar to r o o m s at u n i v e r s i t i e s. The Sutton Senior B u i l d i n g houses: Ten l e a r n i n g areas ( i n c l u d i n g a m i n i l e c t u r e r o o m ), Break out l e a r n i n g zones, International school reception, Staff workshops, Hospitality teaching space Cafe & external seating area The design brief was to reflect the staffs teaching methodology; i n the workshop sessions, the design team challenged the traditional single desks i n rows with front of room delivery. Different design scenarios and questionnaires w e r e provided to the staff which developed discussions on how the traditional learning environment can change. There was initial reluctance from staff to think how they could d e l i v e r i n f o r m a t i o n i n d i f f e r e n t methods.

Classroom + Ground Floor Corridor Learning Environment: But by accommodating their concerns with design solutions, staff began to realise they had a Voice and we were listening. Areas of concerns were challenging as design solutions were tested to address more than one issue. For example, the visual access from large learning spaces to small group areas provided supervision that staff required but also provided natural light into these areas. Not only were various room sizes and orientation created for various subjects, but also furniture layouts were equally as important. The design team tempted teaching staff with large round tables for discussions, smaller tables for groups of one or two and tables that can be broken into different sizes. The feedback from students has been positive - the differing layouts has changed their learning experience, the environment provides more independence than experienced in middle school and therefore an increased level of m a t u r i t y. The Students involvement within the design was crucial to the buildings success and design team workshopped with students to discover who inspired them as a group and as individuals, incorporating stories into a graphics strip which runs through the building under the Schools motto Create your own story. This enabled the students to make a mark on t h e i r b u i l d i n g a n d t h e r e f o r e c r e a t e d r e s p e c t f o r t h e i r t e a c h i n g e n v i r o n m e n t.

First Floor Corridor Physical Environment The Sutton Building has been designed with a strong responsibility to the environment. I t aims to reduce maintenance costs and energy use but importantly p r o v i d e s a safe e n v i r o n m e n t f o r staff & students. The building minimises excavation by following the natural contours, uses steel faced sandwich panels providing a high insulation value for the walls and r o o f, reverse brick veneer i s used f o r the upper floor to reduce fluctuation i n temperatures and robust materials have been selected for the building p e r i m e t e r to r e d u c e maintenance. The Senior Building responds to its neighbours through its scale and uses materials i n a modern manner (such as the playful coloured brick façade, use of corrugated metal & recycled timber cladding) to t i e i n existing b u i l d i n g s i n the school. The landscape architect designed the new landscaping, new senior courtyard & connecting pathways to reinstate a stronger axial connection between junior and senior school.

Senior Classroom Physical Environment Continued Environmental Considerations: Floors : exposed concrete with 30% Fly Ash and sealed i n water based sealer Walls: Double masonry to the ground floor and reverse b r i c k v e n e e r to the upper f l o o r Roof & Sun Shading & Southern Facade: Steel faced sandwich panel R. 5. 35 Ceiling: Fixed hoop pine panels serve as cable trays f o r s e r v i c e s & provide acoustics treatment Windows: Comfort Plus Glazing (Low Emission G l a z i n g ) Building Management System (BMS) : controls windows, louvers & air conditioning via a weather station. The BMS has the ability to collect data f o r water and energy usage & can be used a learning tool f o r students & t e a c h e r s. Natural Ventilation: through operable windows & louvers, connected back to the BMS. Water Harvesting & Reuse: collected by rain water tanks f o r toilet flushing & i r r i g a t i o n. Dematerialisation : avoids excessive layering by exposing materials & limiting finishes. T h i s expressive nature m a k e s the building a sustainable learning tool f o r students, staff and parents. Material Selection: materials robust i n nature & assessed by their content & location, also ensuring the products, materials & adhesives a r e not harmful to g r o w i n g c h i l d r e n and staff. Energy: Solar Hot Water System & PV panels 7K W system to be installed i n 2012

Corridor + Break Out Space Planning Process: Narrative Principal s Brief: To design a teaching facility that embraces the concept of 21 st century learning and meets the needs of the International School within the budget P a u l B r o w n i n g Headmaster To compile a return brief, Towill Design Group director Rachel Towill and architect Louise Booth conducted staff workshops and reviewed the master plan to establish the f o l l o w i n g f a c i l i t i e s w e r e r e q u i r e d : 2x t e a c h e r s work r o o m s B e v e r a g e production workshop International School r e c e p t i o n 4 x International classrooms 7 x G e n e r a l purpose classrooms Toilet f a c i l i t i e s Storage 3x Break out teaching spaces Cafe with Covered outdoor area with access to the l i b r a r y The design team workshopped with staff to understand their needs for teaching and learning, and the building itself. These workshops also created discussions for developing new teaching and learning methodologies. The school team leaders were Donna Wright, Julie Bryce, Debbie Hansen and C h r i s Jimmieson.

External Materials Planning Process: Continued Staff feedback c o l l e c t e d from workshops i n c l u d e d : Senior classes involve a combination of individual work and group work Furniture should be flexible to be able to be moved when teaching styles change The idea of team teaching could be introduced through the use of stack d o o r s where two classes c o m b i n e as one Natural light, natural ventilation and colour i s needed i n classrooms Visibility i s v e r y important teachers need to be able to see students outside of classroom areas Breakout spaces can be used by students for i n d i v i d u a l research The environmental design decisions were discussed with the staff and school council so they could understand how the building will look and operate and of course why. I t was identified that natural ventilation was essential. A heightened corridor space on the First Floor with h i g h l e v e l l o u v e r s allows hot a i r to escape the b u i l d i n g. An automatic controlled window & louver system on a BMS (Building Management System) control allows staff to teach without the need to alter their environment to suit climatic conditions this also helps r e d u c e power usage. L a r g e ceiling fans provide f o r air movement, which can allow occupants to tolerate small increases i n t e m p e r a t u r e s b e f o r e a i r conditioning i s r e q u i r e d. Timeframe: The collaborative workshops were held i n April 2010 with final sketch plans completed by end of July 2010. The project went to tender i n November 2010, with construction beginning March 2011 and completed i n D e c e m b e r 2011. IMAGE

Exhibition of School Planning and Architecture Project Data Submitting Firm : Towill Design Group Project Role Architect Principal Consultant Project Contact Rachel Towill Title Director Address PO Box 693 New Farm QLD 4005 City, State or Province, Country Brisbane, Queensland, AUSTRALIA Phone +61 738523013 Other Firm: Woods & Grieve Engineers Project Role Electrical, Mechanical & Civil Design Project Contact Andrew Bell Title Mechanical Manager Address Level 2, 15 Leichhardt Street, Spring Hill QLD4000 City, State or Province, Country Brisbane Phone +617 3811 4500 Other Firm: AWT Consulting Engineers Project Role Structural Engineer Project Contact Alan Tingcombe Title Senior Structural Engineer Address UNIT 17, LEVEL 2, 18 BRINDABELLA CCT BRINDABELLA BUSINESS PARK City, State or Province, Country CANBERRA INTERNATIONAL AIRPORT ACT 2609 Phone +612 6257 2614 Construction Firm: DGW Group Project Role Principal Contractor Project Contact Darrel Boss Title Site Foreman Address PO Box 341, Wilston Q 4051 City, State or Province, Country Brisbane, Queensland, AUSTRALIA Phone +617 3356 5911

Exhibition of School Planning and Architecture Project Details Project Name Sutton Senior Building City Brisbane, Australia State Queensland District Name Bald Hills Supt/President Principal = Mr Paul Browning Occupancy Date January 2012 Grades Housed Senior Students (Grades 11 & 12) Capacity(Students) Site Size (acres) Gross Area (sq. ft.) Per Occupant(pupil) gross/net please indicate 325 students (110 on Ground Floor, 225 on First Floor) 0.64 acres (immediate landscaped site only, not entire school site) 18083 sq ft 55 sq ft per student Gross (note - excludes any landscaped/decking areas) Design and Build? If yes, Total Cost: Includes: Yes $4.7 million Design & Documentation Fees, Landscaping, Fixtures & Fittings, Loose Furniture, Solar Panels, Physical Building. If no, Site Development: Building Construction: Fixed Equipment: Other: Total: $4.7 million

Supporting/Supplemental files/images MINI LECTURE ROOM STAIRWAY CONNECTING LEVELS WITH GRAPHICS SELECTED BY STUDENTS

Supporting/Supplemental files/images HOSPITALITY TEACHING AREA CAFÉ CONNECTED TO DECK & HOSPITALITY TEACHING AREA

Supporting/Supplemental files/images MAIN ENTRY FROM SENIOR COURTYARD BREAKOUT STUDY AREA IN CORRIDOR UPSTAIRS

Supporting/Supplemental files/images SENIOR CLASSROOM ON GROUND FLOOR LARGE NORTHERN FACING OUTDOOR DECK, CONNECTED TO CAFÉ & CLASSROOMS

Supporting/Supplemental files/images NORTHERN ELEVATION SOUTHERN ELEVATION SKETCH SECTION OF VENTILATION SENIOR CLASSROOM WITH COLOURED JOINERY AND EXPRESSED STRUCTURE