Southeast Metro Stormwater Authority Fee Schedule

Similar documents
Engineering Staff Report PHASE II REFERRAL

Stroh Ranch Apartment Sites

TOWN OF CASTLE ROCK. Fee Schedules. Development Services MAY 2018

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

DAUPHIN CREEK ESTATES SUBDIVISION

CASE # P DOVE VALLEY V, FILING #13 (REPLAT OF BLOCK 12, LOTS 1 16 AND TRACTS A, B, D) BILL SKINNER, SENIOR PLANNER JUNE 14, 2016

City of Roswell - Fee Schedule

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

Board Summary Report

Compark Village South Filing 2 Submittal Comments from Trakit Reviews tab CLCPKC3.05/SUB Updated as of 11/19/16

MCPC MONONGALIA COUNTY PLANNING COMMISSION 243 High Street, Rm 110, Morgantown, WV Phone Fax

24 x 36 $10.00 per mylar copy, up to 24 x 36 $25 per CD (up to 700 MB) research fee) 1 st hour no charge Subsequent hours $30.

SUBDIVISION REGULATIONS

ARTICLE IV: DEVELOPMENT STANDARDS

ESTES VALLEY STORMWATER MANAGEMENT PROGRAM

Report to the Plan Commission February 4, 2013

GALLATIN COUNTY Land Use Permit Information & Application

Zoning/Building Permit Application

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

WESTMINSTER PARK SUBDIVISION

ZONING COMPLIANCE PERMIT APPLICATION

CHAPTER 5 ENVIRONMENTAL COMPLIANCE PLAN REQUIREMENTS

WESTMINSTER PARK PLACE SUBDIVISION

Canyons South. Annexation Impact Report. September 1, 2015

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

PROTOCOL FOR ZONING PERMIT SUBMITTAL

El Paso County Development Review System Adopted Fee Schedule (2005)

REGULAR FINAL PLAT SUBDIVISION APPLICATION

TOWN OF CASTLE ROCK Development Procedures MANUAL

Township of Collier 2418 Hilltop Road Presto, PA 15142

FINAL PLAT SUBMITTAL CHECKLIST

MUDDY CREEK TOWNSHIP PO BOX 239 PORTERSVILLE, PA SUBDIVISION AND LAND DEVELOPMENT APPLICATION

Remember, PA One-Call before excavating. Simply dial 811 or

Chapter IX Site Grading/Construction

BEFORE THE BOARD OF COUNTY COMMISSIONERS FOR MUL TNOMAH COUNTY, OREGON RESOLUTION NO

Boise County Planning & Zoning Department P.O Box 1300 Idaho City, Idaho Phone (208) Fax (208)

WHEREAS, the staff of The Maryland-National Capital Park and Planning Commission recommended APPROVAL of the application with conditions; and

Zoning Permit Application Cover Page

HB-S RM8-S RS9 RM18 HB-S RS9 DOCKET #: W2872. PROPOSED ZONING: RM8-S (Child Day Care Center) EXISTING ZONING: RS9 and RM8-S

THE BUILDING PERMIT PROCESS FOR SINGLE-FAMILY DWELLINGS REVISED MAY 2006

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

DRAFT Development Application Manual

KENT COUNTY STORMWATER MAINTENANCE DISTRICT

BUILDING PERMIT SUBMITTAL REQUIREMENTS

POLICY. Cancels: ^ I Approved By: Mitchell Brells, P.E. DE POL ROUTING PUBLIC ROAD DRAINAGE TO PRIVATE STORMWATER SYSTEMS

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

Lake County Planning, Building and Development Department

OFFICE OF THE HEARING EXAMINER CITY OF RENTON. And Clarissa Fawcett PO Box 402 Fall City, WA 98024

SUBDIVISION & PLANNING APPROVAL STAFF REPORT Date: December 1, 2016

SUBDIVISION AND LAND DEVELOPMENT. 185 Attachment 20

Plan ID: Plan Date: Rev. Date: No. Pages:

Zoning Permit Application

VICINITY MAP SCALE 1'' = 2000'

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

Exhibit A-1. Piney Creek Bend Planned Development

Cobb County Community Development Agency Zoning Division 1150 Powder Springs St. Marietta, Georgia 30064

MINOR SUBDIVISION APPLICATION

Planning&Development Fee Standards

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

June 23, 2009 Initial Meeting RURAL FRAMEWORK COMMITEE

Project File #: SF Project Name: Jackson Ranch Filing No. 4 Parcel Nos.: , and

Project File #: SF Project Name: Meadowbrook Crossing Filing No. 1 Final Plat Parcel No.:

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

TOWN OF LAKE LURE LAND DISTURBANCE PERMIT (LESS THAN 1 ACRE) Permit Fee Permit No. LDP- (see Fee Schedule below) Approved:

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Veramendi. December 18, 2012

Post Construction Stakeholder Involvement Charles Brown Town of Cary. TOWN Of CARY

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

SPECIAL USE PERMIT APPLICATION

CITY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING STANDARD FEE LIST (Effective July 1, 2017)

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

City of Palm Bay Stormwater Assessment Program. March 30, 2017

Workforce Housing Density Bonus

Chair Theisse and Planning Commission Members. Mike Gaffron, Senior Planner Item #5

LAND DEVELOPMENT CHECKLIST GREEN TREE BOROUGH Green Tree Planning Commission 10 West Manilla Avenue Pittsburgh, PA

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

Approval of a conditional use to allow construction of a rehabilitation hospital at 5115 N. Biltmore Lane in the American Center.

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT

SPECIAL EXCEPTION SITE PLAN REVIEW

SPECIAL EXCEPTION SITE PLAN REVIEW

DEVELOPMENT PERMIT PRE-SUBMITTAL MEETING REQUEST FORM. PROPOSED APPLICANT S NAME OR PROJECT NAME:_Chick-Fil- A 1493 Trinity

these areas are compatible with such conditions. [Section (6) (c) C. R. S.]

Final Plats for Major Residential and Commercial Subdivisions Checklist

1.94 acres. Gwinnett Prado, L.P. c/o Brogdon Consulting Duluth, GA Contact: Ted Sandler

CONOY TOWNSHIP 211 Falmouth Road Bainbridge, Pennsylvania Lancaster County Phone: Fax:

County of Ottawa Fillmore Room 141 West Olive, MI (616)

DAUPHIN COUNTY CONSERVATION DISTRICT NPDES PERMIT AND EROSION AND SEDIMENT POLLUTION CONTROL PLAN REVIEW APPLICATION INFORMATION

MEMORANDUM. DATE: November 9, 2016 PC Agenda Item 3.C

Easement Preparation and Submittal Procedures and Checklist

Peters Township Planning Commission Minutes February 14, :00 p.m. Mr. Mills, Mr. Vogel, Mr. Brandstatter, Mrs. Legowik

UDO Advisory Committee Meeting #3 August 18, 2011

AGENDA PUBLIC HEARING MONDAY, DECEMBER 13, 2010, 6:00 P.M. COUNTY COMMISSION HEARING ROOM TANEY COUNTY COURTHOUSE

DAUPHIN COUNTY CONSERVATION DISTRICT NPDES PERMIT AND EROSION AND SEDIMENT POLLUTION CONTROL PLAN REVIEW APPLICATION INFORMATION

PLANNING CLEARANCE. Planning Clearance is required prior to the submittal of most building and development permit applications.

City Of Attleboro Conservation Commission

PURPOSE AND BACKGROUND

NEW SINGLE FAMILY RESIDENTIAL

TURTLE CREEK SUBDIVISION, PHASE THREE

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

Transcription:

Southeast Metro Stormwater Authority Fee Schedule Section I. Annual Stormwater Fees Fee Type Fee or Rate SFR Tier 1 $57.80 SFR Tier 2 $77.48 SFR Tier 3 $100.82 SFR Tier 4 $135.26 SFR Tier 5 $293.86 NSFR 1 $19.83 per 1,000 Sq Ft Impervious NSFR 2 $30.51 per 1,000 Sq Ft Impervious NSFR 3 $41.19 per 1,000 Sq Ft Impervious

Section II. Review and Permit Fees Review Fee Category Fee in City Fee in County Construction Drawings < 1 acre $1,000 $605 1-4.99acres $1,375 $825 5-9.99acres $1,660 $995 10-19.99 acres $1,975 $1,185 >20 acres $2,660 $1,595 Drainage Report Phase III < 1 acre $1,000 $605 1-4.99 acres $1,375 $825 5-9.99acres $1,660 $995 10-19.99 acres $1,975 $1,185 >20 acres $2,660 $1,595 Letter of Compliance / Technical Letter $735 $440 Phase II or Transition < 1 acre $735 $440 1-4.99 acres $1,000 $600 5-9.99acres $1,270 $760 10-19.99 acres $1,475 $885 >20 acres $1,995 $1,195 Phase I < 5 acres $530 $320 5 to 20 acres $665 $400 Greater than 20 acres $800 $475 Operations and Maintenance O&M Manual & Standard Maintenance Agreement $750 $665 GESC Plan and Report Low Impact GESC $250 $250 Small Site or Standard: 0-4.99 acres $1,135 $1,135 Standard GESC Fee: 5-9.99 acres $1,595 $1,595 10-19.99 acres $1,900 $1,900 >20 acres $2,925 $2,925 Water Control Plan Review $1,135 $1,135

Floodplain Modification Analysis Floodplain Modification Study/CLOMR $3,195 $3,195 LOMR $1,595 $1,595 Floodplain Modification Study Only (no CLOMR) $2,395 $2,395 No Impact Analysis 1 $450 $450 1 Analysis is defined as submittal and staff time required to determine if "No Impact" Legal Description and Exhibit & Standard Easement Agreement Easements $665 N.A. Review Fee Category Fee in City Fee County Agreements Public Improvement Agreement (PIA) & Engineer's Cost Estimate $800 N.A. License or Offsite Agreement $550 N.A. Non-Standard Agreement (Including Intergovernmental Agreement, Easement & $550 + Actual Cost (Attorney) (Per agreement) N.A. Maintenance) Site Plans and Plats Site Plans $1,000 N.A. Plats $400 N.A. Expedited Reviews Half of Assigned Time 2 x the review fee 2 x the review fee Recordation Charges PIAs, O&M Manuals, Agreements, Easements, and other documents will be assessed the recording fees charged by the Permit Fee Category Fee in City Fee in County Grading, Erosion & Sediment Control (GESC) Low Impact GESC $470 $470 Annual Dry Utility: Single Site $500 $500 Multiple Sites $2,500 $2,500 Annual Park & Metro District: Multiple Sites $3,500 $3,500 GESC Permits: < 1 acre $1,135 $1,135 1-4.99 acres $1,760 $1,760 5-9.99 acres $2,620 $2,620 10-19.99 acres $3,460 $3,460 20-49.99 acres $4,485 $4,485 >50 acres $4,485 + $20/acre $4,485 + $20/acre Stormwater Public Improvement Permit (SPI) Cost from Engineers Estimate: Percent of SPI Cost Percent of SPI Cost 0-$24,999 7.7% N.A. $25,000-$49,999 5.3% N.A. $50,000-$99,999 3.3% N.A. $100,000-$149,999 2.7% N.A. $150,000-$199,999 2.3% N.A. $200,000-$249,999 2.2% N.A. >$250,000 1.7% N.A. Floodplain Development Permit No Impact Permit $315 $315 Standard Permit $720 $720 Annual Permit (No Impact Only): Multiple Sites $500 $500

Miscellaneous Fees Applies to Fee Category Fee in City Fee in County GESC Permit SPIP FPDP Permit Fees ½ permit value/day of Failure to obtain ½ permit value/day of work work without permit permit without permit (max)* (max) Yes Yes City Only Permit Renewal 1/2 current permit fee prior to Initial Close Out (ICO) or Probationary Acceptance (PA); $250 after ICO or PA; $0 if GESC Low Impact 1/2 current permit fee prior to Initial Close Out (ICO) or Probationary Acceptance (PA); $250 after ICO or PA; $0 if GESC Low Impact Permit Transfer $250 $250 Permit Amendment 1/2 current permit fee 1/2 current permit fee Permit Reinstatement Site Re-inspection Fee Weekend or After Hours Inspections 2x current permit fee (max) 1 st occurrence: $160; 2 nd : $500; 3 rd : $1,000 2x current permit fee (max)* Yes Yes City Only 1 st occurrence: $160; 2 nd : $500; 3 rd : $1,000* Yes Yes City Only $80.00/hour, 2 hour $80.00/hour, 2 hour minimum* minimum Yes Yes City Only Plan Renewal GESC Plan, Drainage Report & CDs $250 (per document) $250 (per document)* GESC Plan, Drainage Report & CDs Plan Amendment ½ current plan review fee (per document) ½ current plan review fee (per document)* *For projects in Arapahoe County jurisdiction, this fee only applies to GESC Definition of Terms: Transfer : Change in responsible party Reinstatement : Permit renewal after Stop Work Order and/or Notice of Renewal : Re-approval after expiration (no Amendment: Re-approval due to plan changes

Section III. SDF and ECF Fees Basin p Impervious Acre ($) Basin p Impervious Acre ($) Basin Group 1 Basin Group 2b SDF ECF Bear Creek $10,620 Dove Creek $1,684 $5,239 Big Dry Creek Lone Tree Creek $1,599 $6,496 Coon Creek $10,620 Windmill Creek $1,117 $6,201 Dutch Creek Greenwood Gulch $10,686 East Toll Gate Creek Basin Group 3 Lee Gulch $8,458 Unnamed Creek $2,017 Little Dry Creek West Toll Gate Creek $732 Little's Creek SJCD(N) $11,968 $10,620 Coal Creek Basin Group 4 $867 SJCD(S) $10,620 First Creek $7,876 Slaughterhouse Gulch Murphy Creek UDFCD ID 66 $10,620 Sand Creek UDFCD ID 67 $10,620 Lower Senac Creek $4,995 Willow Creek $5,844 Upper Senac Creek $7,548 Basin Group 2a Basin Group 5 Antelope Creek $9,222 5000 Cottonwood Creek $4,806 Harvard Gulch Happy Canyon Creek $9,642 Lower Cherry Creek Piney Creek $9,222 Lower Goldsmith Gulch Saddle Rock Ranches $9,222 Westerly Creek Sampson Gulch UDFCD ID 4406 Upper Cherry Creek Upper Goldsmith Gulch $9,222 $7,742 $5,349 $9,690