BUILDING SERVICES ~ FEE SCHEDULE

Similar documents
SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

City of Wausau Building, Housing and Zoning Fee Schedule 2019

City of Wausau Building, Housing and Zoning Fee Schedule

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Fee Resolution

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

CHAPTER 4 BUILDING AND CONSTRUCTION TABLE OF CONTENTS TITLE, STATE BUILDING CODE AND BUILDING PERMIT REQUIREMENTS

The City of Daytona Beach Fee Schedule

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

New Hanover Township

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

City of High Point Development Fee Schedule

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

BUILDING PERMIT SUBMITTAL REQUIREMENTS

EXHIBIT A to Ordinance No PART 1

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

Planning&Development Fee Standards

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

APPLICATION FOR A BUILDING PERMIT

RESOLUTION NO AMENDING RESOLUTION NO TOWN OF BEL AIR S FEE SCHEDULE

Resolution Fee Schedule

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

FEES. Facility Rental/Damage Deposit $ Inspection, review, examine, search for, etc. of a public document

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

APPENDIX A BUILDING PERMIT AND RELATED FEES

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

CONSTRUCTION PERMIT FEE SUMMARY

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Location in Code Subject Fees

10% of Building Permit in addition to the full Building Permit Fee

Approved at the December 5, 2017 Town Board Meeting

FY 2018 FEE SCHEDULE (Effective )

a. Test well for the purpose of community water supply or any other investigatory purpose per Ordinance 124 b. Monitoring Well

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

BUILDING PERMIT FEE SCHEDULE

CHAPTER 1321 Permit and Inspection Fees

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

CHICKEN COOP BUILDING REQUIREMENTS

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

Appendix G Fee Schedule

Schedule of City Fees & Charges

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

LAND USE PERMIT INFORMATION PACKET

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

INFORMATIONAL HANDOUT FOR GARAGES AND ACCESSORY BUILDINGS RESIDENTIAL PROPERTIES ZONED R-3 (SINGLE FAMILY, MIN. LOT 11,000 SQ. FT.

Class of Permits and Fees Schedule A

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

ORDINANCE NO (revised by Ordinance )

~ Please Detach and Save This Page ~

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

11/30/2016. Residential Building Plan submittal:

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

APPLICATION PACKET FOR RESIDENTIAL ALTERATION COVER SHEET

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Fee Schedule for Zoning, Building Permits, and Plan Review Services

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

RESOLUTION NUMBER

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

MUDDY CREEK TOWNSHIP 2019 FEE SCHEDULE RESOUTION #

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION DEVELOPMENT SERVICES

TOWN OF HILLSBOROUGH SCHEDULE OF FEES AND CHARGES SPECIAL TAX, SERVICE CHARGES & OTHER CITYWIDE FEES

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

Department of Public Works Permit Fee Schedule

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

RESOLUTION NO

Peters Township Planning Department Fee Schedule

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

RESIDENTIAL SHEDS LESS THAN 200 SF INFORMATION PACKET

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

MANSE INSPECTION REPORT

Transcription:

Building Services Department W240 N3065 Pewaukee Road Pewaukee, Wisconsin 53072 Phone (262) 691-9107 Fax (262) 691-1798 II. BUILDING/CONSTRUCTION/DEVELOPMENT FEES AND CHARGES A. RESIDENTIAL BUILDING PERMITS/FEES - (Chapter 14 and Chapter 17) 1. Minimum Permit Fee All Permits $60.00 minimum/inspection. 2. State Seal $40.00 3. New Residential Building & Additions, Finished Areas & Garages Unfinished areas attached decks, porches, Basement, crawl spaces. Base Fee $50 plus $0.35/square foot/floor Base Fee $50 plus $0.25/square foot/floor Minimum per item A.1. 4. Detached Accessory Buildings or structures Base Fee $50 plus $0.25/square foot/floor Minimum per item A.1. 5. Plan Review New Residential Buildings $225.00 plus $25.00/unit for multi-family units Additions to Residential Buildings $125.00 plus $25.00/unit for multi-family units Alterations to Residential Buildings $100.00 Accessory Buildings & Structures > 180 sq. ft. $50.00 Minimum per item A.1. 6. Remodel and Alteration to Residential Buildings Base Fee $50 plus $0.30/square foot Minimum per item A.1. 7. Early Start $150.00 8. Occupancy Certification $50.00/unit for new bldg & additions 9. Erosion Control (Sites of less than 1.0 acres and $0.05/square foot of all estimated disturbed a storm water management plan is not required) land surface Minimum $50.00, maximum $2,000.00 10. Park Acquisition/Development Fund $600.00/dwelling unit (formerly the Park Dedication Fee) 11. Impact Fee See Zoning Ordinance (Impact Fee Chart included on last page) Bonds See Section VI (pages 6-7) B. NON-RESIDENTIAL BUILDING PERMITS - (Chapter 14 & 17) 1. Minimum Permit Fee All Permits $100.00 minimum 2. New Buildings/Additions Unfinished Areas/Warehouse Areas, Shells Finished Areas, Office, Retail, etc. Base Fee $100 plus $0.25/square foot/floor Base Fee $100 plus $0.35/square foot/floor Minimum per item B.1. Page 1 of 8

3. Remodel/Alterations/Build-outs Base Fee $100 plus $0.30/square foot Minimum per item B.1. 4. Detached Accessory Building and/or Structures Base Fee $50 plus $0.25/square foot/floor Minimum per item B.1. 5. Plan Review New Non-Residential Buildings $300.00 Additions, Accessory Buildings & Structures & Alterations $150.00 6. Agricultural Buildings and Additions $0.25/square foot Minimum per item B.1. 7. Early Start $300.00 8. Occupancy Certification $50.00/unit 9. Erosion Control (Sites of less than 1.0 acres and $0.05/square foot of all estimated disturbed a storm water management plan is not required) land surface Minimum $75.00 maximum $2,000.00 10. Impact Fee See Zoning Ordinance (Impact Fee Chart included on last page) C. PLUMBING PERMITS (Chapter 14) Bonds See Section VI (pages 6-7) 1. Minimum Permit Fee All Permits $60.00/inspection 2. GENERAL a. 1&2 Family New Building Base Fee $125.00 each b. 1&2 Family Addition Base Fee $ 75.00 each c. 1&2 Family Alteration Base Fee $ 50.00 each d. 3or More family Residential Building New/ Additions Base Fee $150.00 plus $5.00 per unit e. Non-Residential/Commercial Building New Or Addition Base Fee $250.00 each f. Non-Residential/Commercial Building Alteration Base Fee $125.00 each 3. WATER SYSTEM a. Water Service Lateral $60.00/inspection b. Back Flow Device Fire, R.P. Valves, etc. $60.00/inspection c. Water Distribution System (domestic) $60.00/inspection 4. SANITARY SYSTEM a. Sanitary Sewer Lateral $60.00/inspection b. Sanitary Building Drain Underground - Interior $60.00/inspection c. Sanitary Drain & Vent System - Interior $60.00/inspection 5. STORM SEWER SYSTEM a. Storm Sewer Lateral $60.00/inspection b. Sewer Drain System Interior $60.00/inspection Page 2 of 8

6. PLUMBING FIXTURES a. All plumbing fixtures including, but not limited to, faucets, lavatories, toilets, tubs, AAV s, dishwashers, hose bibs, etc. $12.00/fixture 7. MISCELLANEOUS PLUMBING a. Re-inspections, Special Inspections $75.00/inspection b. Private Well Inspection Inspection or or Abandonment $125.00/inspection c. Fire Suppression Check Valves $50.00/inspection D. ELECTRICAL PERMITS (Chapter 14) a. Minimum Permit Fee All Permits $60.00 minimum/inspection b. All Building Types New Buildings & Additions $100.00 base fee plus $0.07/sq. ft./floor, not including electric service c. Alterations $50.00 base fee plus $0.07/sq.ft./floor d. Services & Feeders $75.00 first 200 amps $10.00 per 100 amps above 200 amps e. Low Voltage-Multi-Family & Non- $50.00 plus $0.01/sq.ft. Residential Buildings E. HEATING, VENTILATION AND AIR CONDITIONING (HVAC) PERMITS (Chapter 14) a. Minimum Permit Fee All Permits $60.00/inspection b. All Building Types New Buildings, Additions & Alterations to distribution system $50.00 base fee plus $0.05/sq. ft./floor c. New Furnace unit, additions or replacements $50.00/unit d. New A/C unit, additions or replacements $50.00/unit e. Fireplaces, Wood burning Appliances $50.00 each f. Commercial Exhaust Units $150.00 first unit $25.00 each additional unit g. Commercial Application/Review New or additions to commercial buildings $75.00 Page 3 of 8

F. CONSTRUCTION SITE EROSION CONTROL PERMITS - (Chapter 19) a. For sites less than 1.0 acre of disturbance See sections II.A. and II.B. of this resolution or 15 or less cubic yards of fill or excavation, a storm water management plan or permit is not required. b. For sites disturbing more than 1.0 acres or $50 base fee plus a fee equal to the actual cost to more than 15 cubic yards of fill, or the City for all work incurred in connection with the review of the submittal or as otherwise requiring a storm water management plan. specified in a developers agreement 2. LETTER OF CREDIT OR CASH BOND* a. For sites less than 1.0 acre of disturbance See sections II.A. and II.B. of this resolution. or 15 or less cubic yards of fill or excavation, a storm water management plan is not required. b. For sites disturbing 1.0 to 10.0 acres or more $2000.00, or as otherwise specified in a than 15 cubic yards of fill or excavation, developer s agreement. requiring a storm water management plan. c. For sites disturbing 10.1 to 25.0 acres, $3500.00, or as otherwise specified in a developers agreement. a storm water management plan. d. For sites disturbing in excess of 25.0 acres, $5000.00, or as otherwise specified in a developers agreement. requiring a storm water management plan. G. STORM WATER MANAGEMENT - (Chapter 19) a. For sites less than 1.0 acre of disturbance See sections II.A. and II.B. of this resolution. or 15 or less cubic yards of fill or excavation, a storm water management plan is not required. b. For sites disturbing in excess of 1.0 acres or $50 base fee plus a fee equal to the actual cost to 15 cubic yards of fill or excavation, the City for all work incurred in connection with the review of the submittal or as otherwise requiring a storm water management plan. specified in a developers agreement. 2. LETTER OF CREDIT OR CASH BOND* a. For sites less than 1.0 acre of disturbance - See sections II.A. and II.B. of this resolution. storm water management plan is not required. b. For sites disturbing in excess of 1.0 acres, As set forth in Sections or as otherwise specified in a developers agreement. requiring a storm water management plan. *PLEASE NOTE: ALL OR PART OF CASH PERFORMANCES BONDS MAY BE REIMBURSED IF NO COST HAS BEEN INCURRED BY THE CITY. Page 4 of 8

H. MISCELLANEOUS BUILDING/STRUCTURE FEES a. Razing of Buildings i. Principle Buildings $200.00 ii. Accessory Buildings > 180 sq. ft. $75.00 b. Moving of Buildings > 180 sq. ft. $300.00 Submit bond plus proof of insurance c. Miscellaneous Permits minor repairs $60.00/inspection d. Re-inspections $60.00 e. Special Inspections $100.00 $80.00/hour f. Pools i. Above ground pools $100.00 ii. In-ground pools $150.00 g. Re-roofing or Residing $50.00 h. Erosion Control - Development i. Major Land Division > 5 lots $500.00 ii. Minor Land Division < 5 lots $200.00 i. Misc. Land Division over 2000 sq. ft. $100.00 j. Foundation repairs/damp-proofing $100.00 k. Filling Permit ( 6.10(4)) $100.00 l. Culverts $150.00 PLEASE NOTE: Fees double if work is begun without a permit. IN ADDITION: A Minimum Permit Fee is $60.00 per inspection unless otherwise stated. Building square footage calculations shall include all floor levels, crawl spaces, basements, open and closed porches. The measurement shall be outside perimeter dimensions. Accessory structures are structures without roofs and walls such as decks. Accessory buildings are structures with roofs and/or walls such as gazebos, sunrooms, porches, garages, and sheds. Applicable City impact fees will be assessed at time of building permit application. Page 5 of 8

VI. PLANNING REVIEW AND ZONING ADMINISTRATION A. ZONING - (Chapter 17) 1. Zoning ordinance or district map amendment $400.00 plus Cost for Publication, Notice & All Attorney Fees Related to Project 2. Conditional Use Permit $400.00 plus Cost for Publication, Notice & All Attorney Fees Related to Project 3. Zoning Board of Appeals $400.00 plus Cost for Publication, Notice & All Attorney Fees Related to Project 4. Special Meeting with Plan Commission $500.00 5. Signs (requiring a permit) $50.00 plus $2.00/square foot Maximum $500.00 (electric permit not included) 6. Fences $75.00 7. Zoning Compliance Letter $25.00 8. Above Ground Pools $125.00 9. In-ground Swimming Pools $200.00 10. New 1&2 Family Buildings & Additions to 1&2 Family Buildings $250.00 11. New Commercial Buildings & Additions $350.00 12. Accessory Buildings & Structures (i.e. Decks, Gazebos, Boat Houses, Detached Garages) $75.00 13. Lot Line Adjustment, Lot Split or Add Easement Description $150.00 B. LAND DIVISION - (Chapter 18) 1. Preliminary Plat $350.00 plus $20.00 for each proposed lot/parcel created 2. Final Plat $250.00 plus $10.00 for each proposed lot/parcel created 3. Final CSM $250.00 plus $10.00 for each lot or parcel created 4. Replat Same as final plat C. CASH PERFORMANCE BONDS* 1. Occupancy Cash Bond $500.00 All Buildings New & Additions 2. Erosion Cash Bond - 1 & 2 Family $2,000.00 New & Additions Page 6 of 8

3. Erosion Cash Bond Commercial & Other Construction $5,000.00 4. Erosion Cash Bond Major Land Division Plats, Subdivisions $4,000.00 5. Erosion Cash Bond Minor Land Division (CSM) Less than 6 parcels $2,500.00 *PLEASE NOTE: ALL OR PART OF CASH PERFORMANCE BONDS MAY BE REIMBURSED, IF NO COST HAS BEEN INCURRED BY THE CITY. The following are additional fees that may be applicable to doing business with the Building Services Department. Applicable fees may include, but are not limited to those listed here. A copy of the complete City of Pewaukee fee schedule can be provided upon request. I. ADMINISTRATIVE PERMITS AND FEES D. OTHER ADMINISTRATIVE LICENSES/FEES 6. Copy Charge a. Photocopy $0.25 per page plus tax b. CD $10.00 minimum plus staff time c. Cassette $10.00 if no tape supplied(incl. staff time) $5.00 if supply 90min. tape(incl. staff time) 7. NSF or Overdraft charge $29.00 Page 7 of 8

CHAPTER 17 - ZONING SECTION 17.0300 FEES AND PENALTIES CITY IMPACT FEE CHART Please review SIZE OF BUILDING or D.U. (TOTAL SO. FT.) Less than 2,000 2,000-3,000 Over 3,000 Less than 1,500 1,500-2,000 Over 2,000 Less than 1,000 1,000-1,500 Over 1,500. First 50,000 50,001-100,000 Over 100,000 First 50,000 50,001-100,000 Over 100,000 First 50,000 50,001-100,000 Over 100,000 First 50,000 50,001 or more CITY OF PEWAUKEE USE AND/OR ZONING CLASSIFICATION --Single-Family Residential --Single-Family Residential --Single-Family Residential --Two-Family Residential --Two-family Residential --Two-Family Residential. --Multi-Family Residential --Multi-Family Residential --Multi-Family Residential B-4, B-6, M-6, I-1, I-2 and P-1 B-4, B-6, M-6, I-1, I-2 and P-1 B-4, B-6, M-6, I-1, I-2 and P-1 B-1, B-2, B-3, M-1, M-2, M-3 and M-4 B-1, B-2, B-3, M-1, M-2, M-3 and M-4 B-1, B-2, B-3, M-1, M-2, M-3 and M-4 B-5, M-5A and M-5B B-5, M-5A and M-5B B-5, M-5A and M-5B Additions to existing non-residential buildings Note: d.u. = dwelling unit EXAMPLE: 75,000 Sq. ft. Building in M-2 District $0.50 X 50,000 = $25,000 $0.45 X 25,000 = $11,250 TOTAL = $36,250 IMPACT FEE $500 $550 $600 $400/d.u. $450/d.u $500/d u. $300/d.u. $350/d.u. $400/d.u. $0.40/sq.ft. $0.35/sq.ft. $0.30/sq.ft $0.50/sq ft. $0.45/sq ft. $0.40/sq.ft. $0.60/sq.ft $0.55/sq.ft $0.50/sq ft. $0.25/sq. ft. None The information included in this booklet has been compiled from the following: City of Pewaukee Fee Schedule for 2010, adopted by Resolution 09-12-49 on December 21, 2009 Pewaukee Ordinances, Chapter 17 Zoning, last revised 9/2008 Edit Date: 3/1/2010 g:\city\forms\permit fee worksheets\fee schedule ~ 2009 ~ building services edit.docx Page 8 of 8