Planning & Permit Center Comprehensive Plan Amendment Petition to Rezone Pursuant to SCC and

Similar documents
PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax 360.

BINDING SITE PLAN Checklist

SHORT PLAT Information

BOUNDARY LINE ADJUSTMENT APPLICATION PACKET

Project Information. Request. Required Attachments

PRELIMINARY PLAT Checklist

BOUNDARY LINE ADJUSTMENT

City of Winter Haven Application to Amend Future Land Use Map 451 Third Street, NW Winter Haven, Florida Telephone:

Exempt Segregation. Application Packet. Contents Application Exempt Segregation Regulations Description of Review Process

PLANNING DEPARTMENT Application for a Nonconforming Use Modification

AAR SUBMITTAL CHECKLIST

CITY OF CHELAN WHEN ARE CONFERENCES HELD? ARE ENGINEERED PLANS REQUIRED?

APPLICATION FUTURE LAND USE MAP AMENDMENT PLANNING AND ZONING DEPARTMENT CITY OF INDIAN ROCKS BEACH

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

BOUNDARY LINE ADJUSTMENT

Land Use Application

MIXED USE PROJECT PLAN (MUP)

Land Use Application

BARROW COUNTY, GEORGIA

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION

Instructions and Application Procedures Plan Amendments

Application Instructions Owner-Occupancy Exemption

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Application for Conditional Use Permit CITY OF VALDOSTA PLANNING AND ZONING DIVISION

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Simple Land Division by Love and Affection - Application Checklist

ARTICLE III GENERAL PROCEDURES, MINOR PLANS AND FEE SCHEDULES

CITY OF NORTH PORT Neighborhood Development Services Planning Division Relocation of Easement Packet

WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

CITY OF NEWNAN, GEORGIA Planning & Zoning Department 25 LaGrange Street Newnan, Georgia Office (770) Fax (770)

Description of Zoning Resolution Amendment: (attach additional sheets if necessary)

Form 11.A.9.17 INSTRUCTIONS FOR APPLICATION FOR PLAT WAIVER (Art. 11.A.8)

SUBMISSION REQUIREMENTS AND INSTRUCTIONS FOR VARIANCE APPLICATION TO THE WEST CHESTER TOWNSHIP BOARD OF ZONING APPEALS

Land Use Application

JACKSON COUNTY, MISSOURI PLANNED DEVELOPMENT ZONING APPLICATION

PRELIMINARY PLAT APPLICATION INFORMATION

REZONING, COMPREHENSIVE PLAN AMENDMENT, & UDO AMENDMENT PACKET

BOUNDARY LINE ADJUSTMENT

Temporary Placement of a Manufactured Home

MOBILE CITY PLANNING COMMISSION

Land Use Application

FOR OFFICE USE ONLY BOUNDARY LINE ADJUSTMENT APPLICATION

R e z o n i n g A p p l i c a t i o n S u b m i s s i o n R e q u i r e m e n t s

CITY OF EAST WENATCHEE BOUNDARY LINE ADJUSTMENT FORM

City of Nogales Planning & Zoning Commission Rezoning Application

Buildings for Lease or Rent

APPLICATION FOR REZONING

Note to the Owner, Applicant & Agent:

APPLICATION FOR NOTICE OF PROPOSED CHANGE

CHAPTER 9.06 BOUNDARY LINE ADJUSTMENTS

APPLICATION BOARD OF ZONING ADJUSTMENT (BZA) VARIANCE, SPECIAL EXCEPTION, AND APPEAL OF ZONING MANAGER S DETERMINATION

Chelan County Department of Community Development 316 Washington Street, Suite 301, Wenatchee, WA Telephone: (509) Fax: (509)

COMPREHENSIVE PLAN FUTURE LAND USE MAP AMENDMENT APPLICATION

Septic Tank / Drainfield / Holding Tank Permit Application

SUBDIVISION APPLICATION: RECOMBINATION PLAT or EXEMPT PLAT

LAND SPLIT APPLICATION AND SUBMITTAL REQUIREMENTS

LAND DIVISION APPLICATION

CITY OF PAHOKEE SITE PLAN SUBMITTAL REQUIREMENTS

SMALL CELL TECHNOLOGY in the Right-of-Way ADMINISTRATIVE VARIANCE APPLICATION Community Development Department

APPLICATION FOR FARMSTEAD SPLIT

APPLICATION FOR LOT SPLIT

Township of Collier 2418 Hilltop Road Presto, PA 15142

CERTIFICATE OF EXEMPTION APPLICATION FOR OFFICE USE ONLY

Planning Department Filing Fee of $ up to 3 lots $75.00 per each additional lot (subject to change) payable to Archuleta County.

APPLICATION PACKET SUBDIVISION PLAT REVIEW TENTATIVE PRELIMINARY PLAT

SPECIAL USE (ALCOHOLIC BEVERAGE PERMIT) (WAIVER REQUIRED)

City State Zip City State Zip. 1. Proposed Amendment Modifies Article or Section Numbers. 4. Describe the purpose of the proposed amendment

APPLICATION FOR MAJOR SUBDIVISION APPROVAL (FINAL PLAT)

Marion County Board of County Commissioners

CONDITIONAL USE PEMIT

Umatilla County Department of Land Use Planning

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Land Use Application

Commercial Requirements Packet Sheridan, Indiana Hamilton County

Applications will be received on business days between 9:00 AM and 3:00 PM

HOME OCCUPATION Conditional Use Permit Application Packet

Planning Application. Comprehensive Plan Amendment (Amendment to the Land Use Map or Text of the Comprehensive Plan)

CHECKLIST FOR CUSTOMER Lawful Lot Determination

TOWNSHIP OF GEORGIAN BLUFFS APPLICATION FOR AMENDMENT TO THE ZONING BY-LAW

VARIANCE FROM THE DEVELOPMENT STANDARDS APPLICATION PROCEDURES

City of St. Pete Beach Community Development Department 155 Corey Avenue St. Pete Beach, Florida

EASEMENT ACCESS INSTRUCTION SHEET

City of Desert Hot Springs Planning Department

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

DEFERRED IMPACT FEES INFORMATION AND APPLICATION

PLANNING DEPARTMENT Application for a Type 2 Use through the Board of Adjustment & Appeals

ZONING BOARD OF APPEALS TOWN OF WILTON, CONNECTICUT Town Hall Annex, 238 Danbury Road, Wilton, CT HELPFUL INFORMATION FOR VARIANCE APPLICATIONS

Residential Subdivision Preliminary Plat Application

Right of Way Vacation

PLANNED UNIT DEVELOPMENT APPLICATION

APP. FEE: $ DATE & TIME LOCATION: 1/4 SECTION SECTION TOWNSHIP RANGE STREET ADDRESS AND GENERAL LOCATION OF PROPERTY CITY, STATE PHONE (DAY):

ACCESSORY DWELLING UNITS

CITY OF NORTH PORT Neighborhood Development Services Planning Division Rezoning Packet

District Formation Instructions ORS Chapter 198. Instructions for Filing an Application by Individuals

WILTON ZONING BOARD OF APPEALS - RESIDENTIAL VARIANCE APPLICATION - ZBA#

REZONING APPLICATION COVER SHEET

ZONING MAP AMENDMENT. Department of Development Services ADVISORY PLAN COMMISSION ZONING MAP AMENDMENT. 61 N. Green Street Brownsburg, IN 46112

APPLICATION PACKET ARC SIGN REVIEW. COMMUNITY DEVELOPMENT DEPARTMENT CHARTER TOWNSHIP OF PLYMOUTH 9955 N. Haggerty Road Plymouth, MI 48170

Transcription:

Planning & Permit Center Comprehensive Plan Amendment Petition to Rezone Pursuant to SCC 14.16.900 and 14.08.020 PL#: Date Received Please submit the following Special Use application requirements. 1. Application/Fees. Fully signed, completed and acknowledged special use development application and all applicable review fees. 2. Fact Sheet. Fully completed fact sheet. 3. Assessor s Map. Please include a full scale (18 X 24 ) Assessor s section map purchased from the Assessor s office. Please identify the subject property on the map. 4. Ownership Certificate. 5. Pre-application verification form or waiver form. 6. Lot of record certification. If available, submit with the petition to rezone/change the comprehensive, otherwise the lot certification will be required with a development permit application. 7. Site Plan. Applications for a special use must include a site plan drawn to a scale of not less than 1" = 40', to clearly show: dimensions of all property lines; location and dimensions of existing structures, proposed buildings and additions; access points; off street parking; existing and proposed landscaping; location of septic tank and drain field including the distances from all structures existing and proposed, from property lines, and each other. 8. SEPA Checklist. A fully completed, signed and acknowledged environmental checklist for projects subject to review under the State Environmental Policy. (Note: SEPA not required for Temporary Manufactured Home request) 9. Pre-addressed/Stamped Envelopes of Owner(s) of Record with 300 Feet of the Proposal. Pursuant to 14.06.150, the applicant shall provide pre-addressed and stamped envelopes for owner(s) of record within 300 feet of the proposal. The information shall be updated within 3 months of the date public notice is required. 10. Policy Amendment. A petition for a policy amendment shall include, at a minimum, the following information. Please state each item and address in a narrative statement. a) A detailed statement of what is proposed to be changed and why. b) A statement of anticipated impacts to be caused by the change, including geographic area affected and issues presented. c) A demonstration of why existing Comprehensive Plan policies should not continue to be in effect or why existing policies no longer apply. d) A statement of how the amendment complies with the Comprehensive Plan s community vision statements, goals, objectives, and policy directives. e) A statement of how adopted functional plans and Capital Facilities Plans support the change. Page 1 of 8

f) A statement of how the change affects implementing development regulations SCC Title 14 and the necessary changes to bring the implementing development regulations into compliance with the Plan. g) A summary of any public review of the recommended change. 11. Map Amendment. A petition for a map amendment shall include, at a minimum, all of the requirements for a policy amendment, plus the following additions. Please state each item and address in a narrative statement. a) A detailed statement describing how the map amendment complies with Comprehensive Plan land use designation criteria. b) Any proposed Urban Growth Area boundary changes shall be supported by and dependant on population forecasts and allocated urban population distributions, existing urban densities and infill opportunities, phasing and availability of adequate services, proximity to designated Natural Resource Lands and the presence of critical areas. c) Any proposed Rural areas and Natural Resource Land map designation changes shall be supported by and dependent on population forecasts and allocated non-urban population distributions, existing rural area and Natural Resource Land densities and infill opportunities. d) Any proposed Natural Resource Land map designation changes shall recognize that Natural Resource Land designations were intended to be longterm designations and shall further be dependent on one or more of the following: a) A change in circumstances pertaining to the Comprehensive Plan or public policy. b) A change in circumstances beyond the control of the landowner pertaining to the subject property. c) An error in initial designation. d) New information on natural resource land or critical area status. 12. Additional submittal requirements for rezones. a) A detailed statement of how the proposal meets the applicable approval criteria; and b) A 1-inch equals 100 feet map showing the subject property and property lines and land use designations for all properties within 500 feet of the site. 13. Additional approval criteria for rezones. Please list and address each of the following criteria on a separate sheet: a) The property can meet the detailed standards in SCC 14.16 applicable to the proposed zone. b) For rezones from a commercial zone to RI, RVR, and RRv, all vacant lots within the proposed rezones shall be consolidated. c) All Comprehensive Plan amendments/rezones to a commercial or industrial zone shall require a development project be commenced for the entire re-designated/rezoned area within 2 years of the re-designation/rezone, unless development is phased. For the purposes of this Section, "commenced" shall mean either 1) a commercial or industrial operation permitted by the re-designation/rezone has been established or 2) a complete building permit has been filed with the Planning and Permit Center for the principal building which will allow the commercial or industrial operation. Upon building permit approval, the principal building shall be completed (i.e., final inspections completed) within 3 years. Those portions of the re-designated/rezoned property which are not included within the development area and where the above timeframes are not met shall automatically revert to the original designation and zoning, unless a phasing plan is appro ed pursuant to Subsections a) and b), below. For purposes of this Subsection, Page 2 of 8

"development area" shall mean all portions of the site needed to meet UDC requirements, such as lot coverage and setbacks. i. If an Applicant desires to phase development of a commercial or industrial rezoned property, a phasing plan shall be submitted and reviewed as part of the Comprehensive Plan amendment/rezone application. When an amendment/rezone includes a phasing plan, the initial phase shall be commenced and completed within the timeframes articulated above. Subsequent phases shall be commenced and/or constructed within the timeframes established in the phasing plan, or within a 6-year period. Otherwise, the commercial designation/zoning shall expire and the redesignation/rezoning shall revert to its previous designation for those portions of the property where these requirements are not met. ii. Where a redesignation/rezone did not initially include a phasing plan, but prior to the automatic designation/zone reversion an Applicant desires the phasing of the operation, a phasing plan may be submitted to the County for consideration. This plan shall be reviewed through a Level II review process and be reviewed for compliance with the rezone criteria. iii. The time limits established above shall be tolled pending resolution of any appeals, and may be extended by the Board of County Commissioners upon a showing that the Applicant is diligently taking actions to obtain necessary permits and approvals to establish the use. [Please Print] Amendment Application Page 3 of 8

Applicant/Contact: Mailing Address: FOR OFFICE USE ONLY Application Received (stamp) City: State: Zip: Phone: Fax: Owner: Mailing Address: City: State: Zip: Phone: Fax: Site Address: City: Zip: Property ID#: Lot Size: Assessor's Account #: Section: Township: Range: Is the property in a special taxation or land-use program? No Yes (specify) Current Comprehensive Plan Designation: Requested Comprehensive Plan Designation: Received by Assigned to Minimum Application Fee, ($500 ) SEPA Checklist & Fee *, ($200) if required Site Map, Questionnaire, Assessor's Map, Ownership Certificate, Pre-Submittal Review, Date / / Staff Application Complete *, Date / / Staff * Note: This application may be considered complete without payment of the SEPA fee. The SEPA fee and checklist, if required, are due within 20 business days of approval for further consideration by the BCC. By signing this form, the applicant agrees to pay a minimum application fee of $500 and, if applicable, For review that requires more than 10 hours of staff time, the applicant will be billed at a rate of $50/hr. If the application is approved for further consideration by the Board of County Commissioners, the applicant may be required to submit a State Environmental Policy Act (SEPA) checklist and an additional fee of $200. Payment of fees does not guarantee final approval. The applicant acknowledges that the deadline for a completed application is the last business day of July of each year. Incomplete or late applications will be returned to the applicant. Applicant Signature: Date: OWNERSHIP CERTIFICATION I,, hereby certify that I am the major property owner or officer of the corporation owning property described in the attached application, and I have familiarized myself with the rules and regulations of Skagit County with respect to filing this application, and that the Page 4 of 8

statements, answers and information submitted presents the argument on behalf of this application and are in all respects true and correct to the best of my knowledge and belief. Address City and State Phone Signature for (give corporation or company name) ACKNOWLEDGMENT State of Washington ) ss. ) County of Skagit ) On this day personally appeared before me known to be the individual described in and who executed the within and foregoing instrument and acknowledged to me that signed the same as free and voluntary act and deed for the uses and purposes therein mentioned. Notary Public in and for the State of Washington Residing at Date: Other property owners in this application must be listed below: Name Signature Address City/State Zip Page 5 of 8

II. Page 6 of 8