Sample Procurement Plan

Similar documents
Sample Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Procurement Plan. Prior Review Threshold (US$) 1. ICB and LIB (Goods) USD 3,000,000 All 2. NCB (Goods and Nonconsultant prior review by the bank

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

2. Project Implementation Agency: National Bureau of Statistics. 3. Date of the Procurement Plan Approval: June 12, 2018

Procurement Plan. I. General

Sample Procurement Plan

Procurement Plan Governance and Policy Project for Federally Administered Tribal Areas (P156412)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

PROCUREMENT PLAN (Textual Part)

Prior Review Thresholds

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: To Be Initiated.

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

I. General. II. Goods and Works and non-consulting services. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)

PROCUREMENT PLAN (Textual Part)

The Federal Democratic Republic of Ethiopia MINISTRY OF WORKS AND URBAN DEVELOPMENT

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

YESSO 18 Months Procurement

PROCUREMENT PLAN (Textual Part)

Project: Rwanda Stunting Prevention and Reduction Project: P

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Public Disclosure Authorized

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Tel: (617) Fax: (617) OWNER S PROJECT MANAGER GUIDELINES M.G.L. c. 149, 44A1/2

City of Columbia ENgiNEEriNg regulations Part 8: sanitary sewer main EXtENsioN table of CoNtENts Paragraph Description Page No.

TOWN OF MANSFIELD RULES AND REGULATIONS FOR THE EXTENSION OF PUBLIC SEWERS

3 and above Less than 3 Less than 1 Recommended to advertise for 7 days for RFQ above 0.5

Developer Services. Sewerage Technical Team: Fees for April 2018

SEWAGE FACILITIES PLANNING MODULE

BYLAW 5781 ****************

Public Facilities and Finance Element

Procurement Method. Preparatio n of TORs/invi tation

UTTAR PRADESH JAL NIGAM

WARREN TOWNSHIP SEWERAGE AUTHORITY

Charter Township of Shelby Parks & Recreation Department Request for Proposals Gene Shepherd Park Splash Pad

Contract Completed Contract Signed Procurement Ongoing

PROCUREMENT PLAN (P162086)

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects

5. ASSET AND BUSINESS VALUATION SERVICES

MANAGING URBAN EXPANSION: FROM GLOBAL MONITORING TO STAKES IN THE GROUND

BIDDING INSTRUCTIONS FOR SALE

Second Land and Real Estate Registration Project. between KYRGYZ REPUBLIC. and INTERNATIONAL DEVELOPMENT ASSOCIATION

Unregulated water sales information pack Boneo GMU

Request for Qualifications Construction of Multi-Family Housing at the Mill Avenue and State Street Intersection Union Grove, Wisconsin 5/20/15

Results of UN-Habitat s work in Angola, Ethiopia, Mozambique and Rwanda

CITY OF DUNES CITY LANE COUNTY, OREGON ORDINANCE NO. 228

Government Emergency Ordinance No. 54/2006 on the regime of the concession contracts for public assets ( GEO No. 54/2006 );

LAND ADMINISTRATION TO NURTURE DEVELOPMENT (LAND)

Environmental Health Technician: (303) ; Environmental Health Manager: (303) ;

CHAPTER County of Alameda Onsite Wastewater Treatment Systems Ordinance

County Tax Sale PLEASE MARK YOUR ENVELOPE "SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO:

WATER SOFTENING APPLIANCE REGULATION ORDINANCE. (Ord. No ) Brine discharging water softening appliance use regulation ordinance.

NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION POLICY REGARDING THE ACQUISITION AND DISPOSITION OF REAL PROPERTY

New Urban Land File Management System of Ethiopia

Public Disclosure Copy

PPP Projects: Screening, Feasibility, Risk, and Structuring. Presented by: Lloyd Richardson

SEWAGE FACILITIES PLANNING MODULE APPLICATION MAILER

SEWAGE FACILITIES PLANNING MODULE

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA URBAN WATER SUPPLY AND SANITATION. Hawassa Water Supply and Sanitation Project AND

RP607. Summary of Land Acquisition & Resettlement Policy Framework JAMAICA: JM Hurricane Dean ERL Project. A. Introduction. B. Means of Obtaining Land

Town of Waldoboro ADMINISTRATIVE POLICY

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

H. UNIVERSITY PROCUREMENT CODE

CORPORATE STANDARD FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION: 1.0

COUNTY OF TANEY, MISSOURI

PROCUREMENT CODE: What Districts Need to Know

Classification: EXTERNAL DRAFT THE COMPANIES ACT, 2013 (COMPANY LIMITED BY SHARES)

Okinawa Institute of Science and Technology School Corporation Contract Management Stipulations

BROOKLYN BRIDGE PARK CORPORATION POLICY ON THE ACQUISITION AND DISPOSITION OF REAL PROPERTY. Board of Directors Meeting.

New Residential Construction Off-Site Conditions Disclosure 5:36-3 NEW RESIDENTIAL CONSTRUCTION OFF-SITE CONDITIONS DISCLOSURE GENERAL PROVISIONS

STATEMENT OF WORK PORTABLE TOILETS & SEPTIC SYSTEM WASTE REMOVAL SERVICES

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

PRIVATE COMMUNITY WASTEWATER DISPOSAL SYSTEM ORDINANCE

TORONTO MUNICIPAL CODE CHAPTER 849, WATER AND SEWAGE SERVICES AND UTILITY BILL. Chapter 849 WATER AND SEWAGE SERVICES AND UTILITY BILL 1

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

ADDENDUM NO. 4. Modification to Part I, Section 2.0, Item J of the Project Book

RELOCATION ASSISTANCE PROGRAM (RAP) BOOKLET THE 10 MINUTE MANAGER

Procurement Plan. I. General

PUBLIC UTILITIES COMMISSION

Public-private Partnerships in the Road Sector. Caroline Visser International Road Federation 18 April 2008

Attorney Realtor Hub How to join 14/8/2017

Disclaimer. Legal Authority. Purchasing Solutions/Bid Law Update 4/30/2015. Code of Alabama 1975, Section 16-13B- 1, et seq.

STAATSKOERANT, 30 JANUARIE 2009 GOVERNMENT NOTICE DEPARTMENT OF MINERALS AND ENERGY ELECTRICITY REGULATION ACT, 2006 ELECTRICITY REGULATION

SUFFOLK COUNTY LANDBANK CORP ( SCLBC ) SOLICITATION

Central Kentucky Educational Cooperative

Chapter 7 SITE DEVELOPMENT STANDARDS

The District is currently engaged in the following eight service agreements, either directly or via PHWA:

REQUEST FOR PROPOSAL RFP # TOC17-001

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Sample Procurement Plan 1. Bank s approval Date of the procurement Plan Original: February 24, 2017 2. Date of General Procurement Notice: To Be Published 3. Period covered by this procurement plan: August 2017 to February 2019 II. Goods and Works and non-consulting s. 1. Review Threshold: Procurement Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Works (including turnkey, supply and installation of plant and equipment, and Public Private Partnership (PPP) Goods, information technology and nonconsulting s Review Threshold (>=US million) 5 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable. 4. Reference to (if any) Project Operational/Procurement Manual: Project Manual Issued by the Ministry of Water, Irrigation and Electricity, August 2017. 5. Any Other Special Procurement Arrangements: Not Applicable. Summary of the Procurement Packages planned during the first 18 months after project effectiveness 1 2 3 4 5 6 7 Ref. No. Description Cost US$ million Packages Domestic Preference (yes/no) 1.5 Review by Bank ( / ) Com ments July 9, 2010

1 Summary of the ICB (Works) 2 Summary of the ICB (Goods) 3 Summary of the NCB (Works) 4 Summary of the NCB (Goods) 32 2 To be Determined 10.2 6 To be Determined 19.4 5 No 0.28 1 No III. Selection of Consultants 1. Review Threshold: Selection decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: 2. Type of Procurement Review Threshold (>=US million) Consultants: firms 0.5 Consultants: Individuals 0.2 2. Short list comprising entirely of national consultants: Short list of consultants for s, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not Applicable. 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment 1 Summary of number of contracts that will be let under QCBS 2 Summary of number of contracts that will be let under QCBS 3 Summary of number of contracts Cost US$ million Packages Review by Bank ( / ) 3.5 3 11.8 14 Comments 10.1 31 CQS/IC July 9, 2010

July 9, 2010 that will be let under other methods

Page 1 PROCUREMENT PLAN Ethiopia : Second Ethiopia Urban Water Supply and Sanitation Project General Information Country: Ethiopia Banks Approval Date of the Original Procurement Plan: 2017-08-20 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-02-21 Project ID: P156433 GPN Date: 2018-02-02 Project Name: Second Ethiopia Urban Water Supply and Sanitation Project Loan / Credit No: Executing Agency(ies): Addis Ababa Water and Sanitation Development and Rehabilitation Project Office, Ministry of Water Irrigation and Electricity, WSS Program Management Unit WORKS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award ET-AAWSA-43105-CW-DIR / Procurement of kality sanitary sewer trunk mains for remaining work Direct Selection Direct 24,528,903.54 0.00 2018-03-01 2018-03-06 2018-05-01 2019-05-01 ET-AAWSA-45501-CW-DIR / Procurement of Kality wastewater treatment plant rehabilitation and expansion for remaining works Direct Selection Direct 10,336,166.03 0.00 2018-02-28 2018-03-14 2018-04-25 2019-04-25 GOODS Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award ET-MOWIE-43004-GO-DIR / Supply of pipes and fittings for the remaining work of Dire Dewa City Water Supply and Sanitation Project Direct Selection Direct 1,897,466.00 0.00 Under 2018-01-12 2018-01-17 2018-02-24 2018-05-25 NON CONSULTING SERVICES Procurement Prequalification (Y/N) Amount Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific Procurement Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award CONSULTING FIRMS Contract Type Amount Status Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Issued Proposals / Minutes Proposal Negotiated Contract UWSSP- II/AAWSA/CON/01/2017 / feasibilty study,deatil design and construction supervision for eastern addis Ababa waste water treatment plant 0.00 Under Open - International 4,656,175.00 2017-08-18 2017-08-18 2017-08-31 2017-10-16 2017-11-15 2018-01-15 2018-02-19 2023-02-09 ET-AAWSA-42137-CS-QCBS / A Comprehensive Groundwater Sustainable Management System establishment, water extraction management and ground water modeling Open - International 6,456,740.00 0.00 2018-02-28 2018-03-21 2018-05-19 2018-07-03 2018-08-17 2018-10-06 2018-11-10 2019-11-10 ET-AAWSA-42833-CS-QCBS / Supervision Consultancy for operation and maintenance of existing waste water treatment plants (chefe, koye fache, kaliti and decenteralized package waste water treatment plants) found in different location of addis city. Open - International 5,000,000.00 0.00 2018-02-28 2018-03-21 2018-05-04 2018-06-15 2018-07-15 2018-08-19 2018-09-23 2023-09-22 ET-AAWSA-42834-CS-QCBS / ESIA of Eastern Catchment Waster Water Treatment plant and Swere line Open - International 1,000,000.00 0.00 2019-01-05 2019-01-26 2019-03-11 2019-04-08 2019-05-08 2019-06-12 2019-07-17 2020-07-16 ET-AAWSA-42881-CS-CQS / updating of AAWSA Business Plan and Hiring of individual consultant for support in the preparation of branch level AAWSA Business Plan Consultant Qualification Selection 0.00 Open - National 100,000.00 2019-02-28 2019-03-21 2019-05-04 2019-06-03 2019-07-08 2020-07-07 ET-MOWIE-43059-CS-QCBS / Feasibility Study and Detail Design of Waste Water Management system for Deghabur cities by Deghabur city utility 0.00 2018-07-04 2018-07-25 2018-09-14 2018-10-12 2018-12-11 2019-01-22 2019-03-05 2019-11-30 ET-MOWIE-43193-CS-QCBS / Town Sanitation plan for Jimma Town by Jimma town water 2018-03-20 2018-04-10 2018-06-30 2018-07-28 2018-09-26 2018-11-07 2018-12-19 2019-09-15

Page 2 ET-MOWIE-43198-CS-QCBS / Town Sanitation plan for Nekemt Town by Nekemt town water 2018-03-20 2018-04-10 2018-05-24 2018-06-21 2018-08-20 2018-10-01 2018-11-12 2019-08-09 ET-MOWIE-43200-CS-QCBS / Town Sanitation plan for Gambella town by Gambella Town 0.00 ET-MOWIE-43203-CS-QCBS / Town Sanitation plan for Gonder Town by Gonder Town water ET-MOWIE-43206-CS-QCBS / Town Sanitation plan for Dessie town by Dessie Town Water Supply and Sewerage Service ET-MOWIE-43208-CS-QCBS / Town Sanitation plan for Debreberhan Town by Debreberhan Water supply and sewerage 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09 ET-MOWIE-43209-CS-QCBS / Town Sanitation plan for Sodo town by Sodo Town water supply and sewerage ET-MOWIE-43212-CS-QCBS / Town Sanitation plan for Assella town by AssellaTown water ET-MOWIE-43213-CS-QCBS / Town Sanitation plan for Aossosa town by Assosa Town 0.00 ET-MOWIE-43214-CS-QCBS / Town Sanitation plan for Adegrat town by AdegratTown water ET-MOWIE-43216-CS-QCBS / Town Sanitation plan for Semera town by Semera Town water ET-MOWIE-43218-CS-QCBS / Town Sanitation plan for Dire Dewa town by Dire Dawa Town ET-MOWIE-43222-CS-QCBS / Town Sanitation plan for Bahir Dar town by Bahir Dar Town 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-07-28 2018-09-08 2018-10-20 2019-07-17 ET-MOWIE-43227-CS-QCBS / Town Sanitation plan for Mekelle town by Mekelle Town water ET-MOWIE-43231-CS-QCBS / Town Sanitation plan for Adama town by Adama Town water 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09 ET-MOWIE-43234-CS-QCBS / Town Sanitation plan for Hawassa town by Hawassa Town 2018-03-20 2018-04-10 2018-05-31 2018-06-28 2018-08-27 2018-10-01 2018-11-12 2019-08-09

Page 3 ET-MOWIE-43237-CS-QCBS / Town Sanitation plan for Jijiga town by JijigaTown water supply and sewerage ET-MOWIE-43239-CS-QCBS / Town Sanitation plan for Shashemene town by shashemene Town water supply and sewerage ET-MOWIE-43241-CS-QCBS / Town Sanitation plan for Bishoftu town by Bishoftu Town water ET-MOWIE-43244-CS-QCBS / Town Sanitation plan for Harar town by Harar Town water supply and sewerage ET-MOWIE-43248-CS-QCBS / Town Sanitation plan for Arbaminch town by ArbaminchTown water supply and sewerage ET-AAWSA-43920-CS-QBS / procurement of Consultancy Service on the Assessment on the Impacts of Industrial Waste Water discharge on municipal wastewater treatment plants and associated structures Quality Based Selection 0.00 2018-09-17 2018-10-08 2018-11-21 2018-12-19 2019-01-18 2019-02-17 2019-03-24 2020-03-23 INDIVIDUAL CONSULTANTS Contract Type Amount Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-AAWSA-45503-CS-CDS / Procurement of supervision consultancy Kaliti sanitary sewer trunk mains & treatment plant rehabilitation and expansion for remaining work Direct Selection Direct 1,180,528.92 0.00 2018-03-01 2018-03-29 2018-05-10 2019-05-08 ET-AAWSA-46275-CS-CDS / Individual consultancy for groundwater flow and solute transport modeling of addis ababa area and its suburbs for the remaining works Direct Selection Direct 18,000.00 0.00 2018-02-28 2018-03-10 2018-05-14 2018-11-10