Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $725.

Similar documents
Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $200.

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft. or less Site Area More than 25,000 sq. ft.

REZONING REQUESTS. Rezoning to: Site Area 25,000 sq. ft or less Site Area More than 25,000 sq ft

ZONING VARIANCES - ADMINISTRATIVE

ZONING VARIANCES ADMINISTRATIVE

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Caroline County, Maryland Department of Planning & Codes FEE SCHEDULE Tel: Fax:

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

CDA Combined Fees FEE / DEPOSIT APPLICATION TYPE / SERVICE. AGENCY FEES (See Resolution )

ORDINANCE NO. 5 CASE NO. ORA THIRD SET OF OMNIBUS AMENDMENTS TO THE KOOTENAI COUNTY LAND USE AND DEVELOPMENT CODE

Land Use Application Fees

Stroh Ranch Apartment Sites

LOT CONSOLIDATION (for contiguous lots)

LINCOLN COUNTY, NORTH CAROLINA PLANNING & INSPECTIONS DEPARTMENT FEE SCHEDULE ADOPTED AUGUST 15, 2016 EFFECTIVE SEPTEMBER 6, 2016

EASEMENT VACATIONS/ RIGHTS-OF-WAY VACATIONS

El Paso County Development Review System Adopted Fee Schedule (2005)

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

SECTION 6. RESIDENTIAL DISTRICTS

Type C Application Form (1-2B) For PCD Office Use:

PERMIT FEES DOUBLED FOR CONSTRUCTION WITHOUT THE BENEFIT OF A PERMIT

ALBEMARLE COUNTY CODE CHAPTER 18. ZONING SECTION 12. VILLAGE RESIDENTIAL - VR

Introduction. Proposed Land Use and Development Code (LUDC):

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

Pierce County CONDITIONAL USE PERMIT Application

2018 Town User Fees and Escrow Deposits Schedule for the Town of Hyde Park

PUTNAM TOWNSHIP. Schedule of Development Review Fees. As adopted by the Putnam Township Board August 16, 1995 Effective September 22, 1995

APPLICATION FOR A BUILDING PERMIT (To be completed by applicant) (Please Print or Type)

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

Land Use Determination Procedures

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

MENARD COUNTY ZONING PERMIT APPLICATION (PLEASE READ BEFORE PROCEEDING WITH APPLICATION)

Information Needed for a Building Permit

RESOLUTION NO

Highlands County, Florida Special Exception Application

STEP 1: SOIL EVALUATION

SUBDIVISION APPLICATION (CHECK THE BOX THAT APPLIES)

Highlands County, Florida Variance Application

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

> Electric: Shenandoah Valley. > Gas: No underground gas available; > Potential Uses: Retirement, Business Convention,

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

Larimer County Planning & Building Dept. Procedural Guide for NON-RESIDENTIAL DISTRICT SIGNAGE Information and Requirements

Fees--Residential Development (1 or 2 units) Effective January 1, 2014

Community Development Department Fee Schedule

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR FARMSTEAD EXEMPTION IN THE A1 DISTRICT

Fees--Residential Development (1 or 2 units) Effective August 1, 2017

LYON COUNTY TITLE 15 LAND USE AND DEVELOPMENT CODE ZONING REGULATIONS CHAPTERS October 19, 2017 Ordinance Draft DRAFT

Community Services Department BOUNDARY LINE ADJUSTMENT APPLICATION

Office of the Zoning Administrator and Planner. Saugatuck Township Planning and Zoning Applicants. Notice of Information for PC and ZBA Applicants

Marion County Board of County Commissioners

AGENDA PENNINGTON COUNTY PLANNING COMMISSION August 14, 9:00 a.m. County Commissioners Meeting Room - Pennington County Administration Building

FIGURE 3-5 DEVELOPMENT STANDARDS MATRIX 1 (MAXIMUM ZONED DENSITY, HEIGHT LIMITS, SITE AREA, SITE COVERAGE, WALLS/FENCES)

ABILENE ZONING REGULATIONS TABLE OF CONTENTS

FEES AND COST DEPOSITS FOR SUBDIVISIONS, LAND DEVELOPMENTS AND DEVELOPMENT MATTERS SKETCH PLANS

Planning Commission Hearing Date: 2/21/2017 Board of County Commissioners Hearing Date: 3/8/2017

Type D Application Form (1-2C) For PCD Office Use:

15.02 PERMITTED USES: The following uses and no other shall be deemed Residential, R-1, uses and permitted in all R-1 districts:

Fees--Commercial Development (includes Residential 3 units or more) Effective August 1, 2017

Fees--Commercial Development (includes Residential 3 units or more) Effective January 1, 2019

SECTION 8 - GENERAL RURAL DISTRICT

Schedule of City Fees & Charges

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

COLUMBIA COUNTY RESOLUTION

Buildings for Lease or Rent

2018 DEVELOPMENT APPLICATION FEES Effective January 1, 2018

SUBSEQUENT APPLICATION, INSPECTION/RENEWAL BOND, ESCROW OR FEE REQUIRED INITIAL APPLICATION BOND, ESCROW OR FEE REQUIRED PRE-APPLICATION MEETING

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

ARTICLE 5 AG AGRICULTURAL AND RURAL DISTRICT Updated

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

Town of Truckee. Contents. Article I - Development Code Enactment and Applicability. Chapter Purpose and Effect of Development Code...

CHAPTER 4: DISTRICT REGULATIONS

Part 4, C-D Conservation District

Charlotte-Mecklenburg Planning Department Review Fees

MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. June 3, 2011

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

TABLE OF CONTENTS. Township of Clyde i

City of Wausau Building, Housing and Zoning Fee Schedule

FEES MUST BE PAID UPON SUBMISSION OF THIS APPLICATION

Secondary Dwelling Unit

BUILDING SERVICES ~ FEE SCHEDULE

SUBDIVISION EXEMPTION (SUBX) SUBMITTAL CHECKLIST

SECTION 5: ACCESSORY USES

BYLAW OF LAC LA BICHE COUNTY

Land Use Application

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

TABLE OF CONTENTS MORAN TOWNSHIP ZONING ORDINANCE

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

Chapter YAKIMA COUNTY FEE SCHEDULE

Fee Schedule for Zoning, Building Permits, and Plan Review Services

Location in Code Subject Fees

Planning, Zoning and Building Fee Schedule

CITY COUNCIL VOTING RESULTS

ARTICLE Encourage well planned, efficient development.

Transcription:

COMMUNITY DEVELOPMENT DIVISION P.O. Box 1190 Fort Collins, CO 80522-1190 Planning (970) 498-7683 Building (970) 498-7700 Planning Fax (970) 498-7711 Building Fax (970) 498-7667 http://www. larimer.org/planning Multiple fees shall be charged for multiple requests in a single application (except for a Special Review and Rezoning application) at the public hearing stage. For example: a parcel of land with a Rezoning and Subdivision application will be charged the Subdivision and Rezoning fee at the public hearing submittal. Multiple requests in a single application at Sketch Plan Review will only be charged the single Sketch Plan Review Fee. Sign and advertising costs are included in the application fees. Recording fees will be collected at the time of recording. 1041 Domestic Water/Sewer Transmission Line $5,800.00 Electrical Substation $3,000.00 Electrical Transmission Line $5,800.00 Electrical Transmission Line Upgrade $3,000.00 Natural Gas/Petroleum Pipeline $5,800.00 Natural Gas/Petroleum Storage Facility $3,000.00 Power Plant $5,800.00 Wind Power Plant $5,800.00 Any combination of Power Plant/Transmission Line or Substation $7,500.00 Solar Energy Power Plant $3,000.00 Additions/Alterations $1,500.00 Appeal $600.00 Add-On-Agreement $100.00 + Rec. Fees Amended Plat $885.00 + Rec. Fees Appeals to the Board of County Commissioners Code standard as part of a project review Code standard without a project submittal $725.00 Fee Appeal Appeals to anything else (process, interpretation, etc.) $725.00

Boundary Line Adjustment $675.00 + Rec. Fees Cell-Towers Administrative Review $3,350.00 Colorado Geological Survey Fee - please make checks payable to the Colorado Geological Survey Very Small Residential Sub (1-3 dwellings & less than 100 acres) $600.00 Small Subdivision (more than 3 dwellings & less than 100 acres) $950.00 Large Subdivision (100-499 acres) $1,550.00 Very Large Subdivisions (500 acres or more) $2,500.00 Condominium Map Review $285.00 + Rec. Fees Conservation Development *2nd Step Preliminary Plat - Public Hearing Submittal This fee is based upon building lots Up to 6 lots $3,000.00 7-50 lots $4,000.00 Over 50 lots $5,000.00 Colorado Geological Survey Fee - see section 'Colorado Geological Survey Fee' *3rd Step Final Plat *4th Step $3,600.00 + Rec. Fees Development Construction Permit (Obtained from the Engineering Dept.) Per Single Family Unit $150.00 Per Duplex Unit $75.00 Per Multi-Family Unit $50.00 Per Commercial Unit $400.00 Preliminary Plat Time Extension $600.00 Easement Vacation $100.00 Extended Family Dwelling (Administrative Review) Extended Family Dwelling (BCC Review) - For reasons other than age or disability, or on lots/parcels containing fewer than 4 acres $300.00 + Rec. Fees $925.00 + Rec. Fees

Farmstead LARIMER COUNTY DEVELOPMENT REVIEW $350.00 per d/u + Rec. Fees Fire District Fee (applied at initial submittal) Loveland Fire Rescue Authority-Land Division, Rezoning $200.00 Site Plan Review, Special Exception & Special Review Applications Any other application, example (PSP), referred to Loveland Fire Rescue $100.00 (Please make checks payable to Loveland Fire Rescue Authority) Poudre Fire Authority - Land Division, Rezoning $100.00 Site Plan Review, Special Exception & Special Review Applications Any other application referred to Poudre Fire Authority $50.00 (Please make checks payable to Poudre Fire Authority) Flood Plain Review Board Flood Plain Map Revision Request established by FEMA $200.00 + Applicable Fees Variance $200.00 Special Review $400.00 Appeal to the Board of County Commissioners $50.00 General Development Plan *2nd Step Public Hearing Submittal $2,000.00 Location & Extent Review - projects for review that are $950.00 funded by the Larimer County General Fund are exempt from this review Lot Consolidation Minor Land Division With existing uses on all proposed lots Creating a vacant lot with proposal $600.00 + Rec. Fees $1,000.00 + Rec. Fees $1,700.00 + Rec. Fees Minor Special Review $875.00 Nonconformities $700.00 Plat Vacation $100.00

Planned Land Division *2nd Step -Preliminary Plat - Public Hearing Submittal This fee is based upon building lots Up to 50 lots $3,600.00 Over 50 lots $5,500.00 Rezoning concurrent with a Planned Land Division $1,000.00 *3rd Step Final Plat *4th Step (required when the uses requested are not permitted uses in the existing zoning district) Colorado Geological Survey Fee - see section 'Colorado Geological Survey Fee' $4,000.00 + Rec. Fees Development Construction Permit (Obtained from the Engineering Dept.) Per Single Family Unit $150.00 Per Duplex Unit $75.00 Per Multi-Family Unit $50.00 Per Commercial Unit $400.00 Preliminary Plat Time Extension $600.00 Property Status Information Public Site Plan $700.00 Right-of-Way Vacation $200.00 Rezoning *2nd Step Public Hearing Submittal Within a Growth Management Area $4,000.00 Outside a Growth Management Area $3,600.00

LARIMER COUNTY DEVELOPMENT REVIEW Rural Land Plan: Application $500.00 Public Hearing $50.00 per home site Final Plat $500.00 Building Permit $1250.00 per home site Site Plan Review: If the site plan review is for an addition and the addition is more than 75% of the existing structure, the fee amount will be calculated on the gross square feet of the existing structure plus the gross sq. feet of the addition *Structures NOT adding square footage but requiring Site Plan Review (such as): Change of Use $400.00 Preliminary Site Plan-part of a CD/PLD/Special Review Temporary Permit for Public Construction Site $200.00 No Buildings or Buildings less than 10,000 gross sq ft $1,300.00 Buildings 10,000-25,000 gross square feet $2,800.00 Buildings more than 25,000 gross square feet $5,000.00 Tenant Finish on previously approved Site Plan $60.00 Resubmittal - First Time Second Time $50.00 Third Time or more $100.00 Amended Site Plan per Section 6.6 of the Land Use Code $100.00 Request for written approval of minor change to an approved site plan $50.00 Special District $500.00 Special Exception *2nd Step Public Hearing Submittal $1,500.00 Special Exception Extension/Modification $600.00

FEE SCHEDULE - cont. Special Review *2nd Step Public Hearing Submittal (unless use is listed below) $1,500.00 Special Review for the following uses: $5,800.00 Airport, Cell Tower, Commercial Poultry, Country Club, Feed Yard, Golf Course, Heliport, Jail/Prison, Land Fill (private), Manufactured Housing Park, Mining, Radio and TV Transmitter, Recreational Vehicle Park/Campground, Retreat, Resort Lodge/Cabins, and Seasonal Camp Special Review Extension/Modification $600.00 Subdivision *2nd Step Preliminary Plat - Public Hearing Submittal $3,000.00 Colorado Geological Survey Fee - see section 'Colorado Geological Survey Fee' Fire District Fee - see the section labeled 'Fire District Fee' *3rd Step Final Plat *4th Step $3,600.00 + Rec. Fees Development Construction Permit (Obtained from the Engineering Dept.) Per Single Family Unit $150.00 Per Duplex Unit $75.00 Per Multi-Family Unit $50.00 Per Commercial Unit $400.00 Preliminary Plat Time Extension $600.00 Temporary Agricultural Uses $180.00 Yearly renewal without significant change $90.00 Variance (Zoning) Variance $1,200.00 Extension or Modification of Approved Variance $125.00 Administrative Variance $300.00 Appeal of an Administrative Decision to the Board of Adjustment $50.00

Zoning Compliance Review Fee: **The following fees will be collected at building permit application only if review is required: Accessory Living Structure $85.00 Accessory Structures (i.e. sheds, barns, decks, 8' fences, garages, pools, porches, etc.) Less than 35 acres $30.00 35 acres or greater $15.00 Barn without a Principle Structure $100.00 Cell Towers - New/Additions/Alterations $180.00 Commercial Structures - New $180.00 Commercial Structures - Additions/Alterations $180.00 Fireworks Stands $180.00 Garage without a Principle Structure $100.00 Mobile Home - temporary during construction $65.00 + zoning compliance fee Residential Structures - New $85.00 Residential Structures - Additions $65.00 Residential Structures - Alterations $15.00 Signs - In Non-Residential, Residential and Rural Districts $85.00 Temporary Commercial $25.00 Temporary Construction & Project Marketing $85.00 Storage Building without a Principle Structure $100.00 Zoning Determination