BELGRADE LAND DEVELOPMENT PROJECTS AND CONSTRUCTION 2017. www.beoland.com
CONSTRUCTION CONTRACTS OVERVIEW 2015-2016
MAP OF WORKS 2015-2016 LEGEND EXECUTED WORKS CONTRACTED WORKS
MAJOR PROJECTS
BELGRADE WATERFRONT
BELGRADE WATERFRONT Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Old Sava Bridge Reconstruction Oct. 2017 Design Mid of 2018 Works End of 2019 63.600.000 Tender published and conceptual designs prepared. Urban - architectural design competition on-going. Once the first prize design is awarded, preliminary design to be prepared. After preliminary design, design and build under Yellow FIDIC Book possible. 2 Belgrade Waterfront Approach Roads January 2018 2018-2019 39.200.000 85% of land plot forming completed, Conceptual design prepared. Two New Belgrade building plots CP3 and CP5 under court appeal. Savski Trg design competition of ideas required. Resolving acquisition issues and provision of Location Conditions. Once location conditions are provided, design development will follow, as well as building permit issuance and construction. Tenders will be arranged continuously street by street, aiming at completion of all of the works in 2019. 3 Ada Bridge Tram 1st April 2017 2018 17.200.000 Preliminary design prepared. Building Permit issued. Tender for Construction on-going. Construction 4 Savska - Dunavska Slopes Tunnel Oct. 2017 Design 2018 Works 2021 132.000.000 Detailed Regulation Plan contracted. Variants prepared. It's been decided to go to the next development phase with two variants. Contract for conceptual design including preliminary design elements signed. Development of conceptual designs including preliminary design elements, variant selection, plan completion and tender for the Design for the Building Permit and construction.
1. BELGRADE WATERFRONT OLD SAVA BRIDGE REDEVELOPMENT
2. BELGRADE WATERFRONT APPROACH ROADS
3. ADA BRIDGE TRAM
4. SVASKA DUNAVSKA SLOPES TUNNEL
NORTH ARTERIAL TANGENT ROAD Southern and Western Part
North Arterial Tangent Road (NATR) Southern and Western Part 1 Bridge over the Danube River - Ada Huja to Pancevo Road Commencemen t of Works December 2017 Design Second half of 2018 Construction Completion of Works End of 2021 Investment Value (EUR) 216.000.000 Past and On-going Activities General Design with preliminary design elements was prepared in 2008. Feasibility study with conceptual designs prepared by JETRO for the purposes of the STEP loan by the Government of Japan. Detailed Regulation Plan prepared and approved. Forming of land plots on-going, CM of Krnjaca completed, Srbijavode Company has submitted the appeal. There are 31 claims and 3 complaints in CM of Visnjica. There are 60 facilities on the route between Pancevo Road and Slanacki Road in total. Taking into consideration the situations like this, a request for amendments to the Law submitted to Republic Geodetic and Cadastre Authority. Tender for Preliminary Design and Feasibility Study on-going. Future Activities Preliminary design for bridge construction with accompanying roads. Request for protection of rights submitted, outcome awaited. 2 Borska Lasta Sectors 1 and 2 April 2017 Early 2018 3.000.000 Design for the Building Permit and for construction under preparation. Acquisition issues are being resolved in parallel. During cooperation with Srbijagas Company some new procedural activities emerged. In case acquisition issues are resolved by March 2017, contract signing and commencement of construction will follow. 3 Borska Lasta Sector 3 September 2017 September 2019 7.600.000 Design development and solving of acquisition issues on-going. In case acquisition issues are resolved by June 2017, contract signing and commencement of construction will follow.
Commence ment of Works North Arterial Tangent Road (NATR) Southern and Western Part Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 4 Patrijarha Pavla Street (from ICSRR to Pionirska Street) Patrijarha Pavla Street (from Pionirska Street 5 to Pere Velimirovica Street) 6 Pere Velimirovica Street 1st September 2017. March 2018 End of 2018 14.560.000 Mid of 2019 11.440.000 2019 2020 2.000.000 Design documents prepared, location conditions issued. Land plots formed. Design sent to Republic Audit Committee for review. Acquisition issues under resolution. Design documents prepared, location conditions issued. Some of the land plots have not been formed yet due to the appeals. Acquisition issues are being resolved for the land plots formed. Building plot formed and resolving of acquisition issues commenced. Road Main Design including infrastructure prepared. Since there is a legalized building the value of which is estimated to EUR 5 million the route has been reconsidered and variants prepared. Amendments to the Plan possible so as to avoid solving of acquisition issues in the current scope. Once the acquisition issues are resolved, contract signing and construction will follow. Once the acquisition issues are resolved, contract signing and construction will follow. Changes to DRP, land plots forming and design development. 7 Borska Street June 2018 End of 2019 6.160.000 Land plots forming started in 2010, land plots P2, P3, P4 and part of P1 formed, and another part is under the appeal against previous requests made in 2005 and on, in CM of Stara Rakovica. Once land plots are formed solving of acquisition issues and design will follow.
8 Commence ment of Works Borska Lasta Sectors 6, 7 2019 North Arterial Tangent Road (NATR) Southern and Western Part Completion of Works Investment Value (EUR) 2020 5.200.000 Past and On-going Activities Building plots formed, solving of acquisition issues on-going. One of the building plots formed is currently under error correction in Cadastre. Possibility for exception from the planning document is currently reconsidered so as to avoid exhumation of illegal graves in Mokri Lug cemetery and demolition of part of the operating building of GSP "Kosmaj". Future Activities Planning document amendment possible or allotment design development in order to avoid exhumation of illegal graves in Mokri Lug cemetery and demolition of part of the operating building of GSP "Kosmaj". Solving of acquisition issues, design documents preparation subject to Revision Committee's review, issuance of the building permit and construction to be continued. 9 NATR from highway to Bulevar Kralja Aleksandra (King Alexandar Boulevard) 2021 2024 20.000.000 Preliminary Design prepared in 2008. DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues, design and construction will follow. 10 NATR from Bulevar Kralja Aleksandra (King Alexandar Boulevard) to Belgrade 20 Power Substation 2021 2024 24.000.000 Preliminary Design prepared in 2008. DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues, design and construction will follow. 11 NATR from Beograd 20 Power Substation to Slanacki Put 2020 2021 24.000.000 Preliminary Design prepared in 2008. DRP adopted. Land plots division on-going. Once land plots are divided, solving of acquisition issues will follow.
PROKOP
PROKOP STATION APPROACH Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Approach from Level 105 September 2016 June 2017 3.000.000 Building Permit issued, Construction Contract signed with the most favourable Contractor. Construction on-going. 2 Approach from the highway 2018 2019 Invitation to Tender published and land plots division contracted. Site visited. 68 flats and approximately 1500m2 of business space to be resettled. There are 93 previous requests submitted to the Republic Geodetic Authority. Urgent steps taken, land plots division not started. Taking into consideration situations like this, a request for amendments to the Law has been submitted to the Republic Geodetic and Cadastre Authority Once land plots are formed solving of acquisition issues, provision of location conditions and design development will follow.
SLAVIJA SQUARE
SLAVIA SQUARE and VRACAR ROADS Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Roundabout Fountain November 2016 May 2017 2.000.000 Contractor selected. Construction on-going 2 Slavija-Zicka Phase from Slavija Square to Kataniceva Street 2018 2019 5.600.000 Preliminary designs prepared in the past. Land plot formed. Solving of land acquisition issues on-going. Commencement of construction depends on resolution of acquisition issues. 3 Bore Stankovica Street May 2017 December 2017 680.000 Contractor selected. Commencement of Construction
1. ROUNDABOUT FOUNTAIN
2. SLAVIJA-ZICKA PHASE FROM SLAVIJA SQUARE TO KATANICEVA STREET
3.BORE STANKOVICA STREET
BLOCK 42 BUS STATION AND TERMINI
BLOCK 42 BUS STATION AND TERMINI Commencement of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Block 20 Terminus and Branko's Bridge (Design and Build) 2016 Completed 336.000 Des igns prepared, Contractor s elected and Works completed. Works completed 2 Block 42 Terminus at Milutina Milankovica Street (Desigh and Build) Augus t 2017 May 2018 190.000 Land plots forming on-going. The application for transfer of land property rights to the City of Belgrade submitted to the Property Directorate of the Republic of Serbia. Solving of acquisition is sues with a legal entity and transfer of property rights from the Republic to the City to follow. 3 Bus Station Building Underneath ICSRR (Desigh and Build) April 2017 Augus t 2017 1.280.000 Open tender procedure initiated. Tenders were incomplete. Tenderer s elected in the Negotiated Tender Procedure. Des ign development on-going, building permit is suance and construction to follow. 4 Parking Lot Underneath ICSRR July 2017 October 2017 624.000 Design for the parking lot included in the procurement under Item 3 above. Invitation to Tender for parking lot construction works will be made once the data from the Des igner are obtained. Tender for Construction 5 Bus Station Building and Platforms Augus t 2017 2018 3.600.000 It was agreed to arrange tender for bus s tation des ign including s tation platforms for the final position defined in the DRP. Tender procedure conducted and contracting on-going. A Decision made to return the land requested under res titution procedure. After contract signing the des ign development, tender for cons truction works and is suance of the building permit and cons truction will follow.
1. BLOCK 20 TERMINUS AND BRANKO S BRIDGE
TERMINUS BLOCK 42 2. BLOCK 42 TERMINUS AT MILUTINA MILANKOVICA STREET
BUS STATION UNDER THE ICSRR 3. BUS STATION BUILDING UNDERNEATH ICSRR
4. PARKING LOT UNDERNEATH ICSRR
5. BUS STATION BUILDING AND PLATFORMS
ROADS
ROADS Commencemen t of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Reconstruction of Branko's Bridge (Design and Build) March 2017 December 2017 3.000.000 Design documents in the past prepared by "Most Project" and "Mostogradnja" Companies. Tender for construction works including updating of design documents completed. Upon decision on multiyear funding, the decision on initiating the tender and invitation to tender will follow. 2 Reconstruction of Francuska Street March2017 December 2017 Reconstruction method needs to be agreed. Design documents preparation 3 Preliminary Design for ICSRR - Sector III, from Topcider Tunnel exit to the entrance into the Sumice Tunnel Preliminary Design for Detailed Regulation Plan development purposes Development and adoption of the Plan, solving of acquisition issues, design documents preparation and construction.
SEWERAGE
SEWERAGE Commenceme nt of Works Completion of Works Investment Value (EUR) Past and On-going Activities Future Activities 1 Sewerage Pumping Station at Veliko Selo WWTP - putting Interceptor into operation 2017 Design 2018 Construction 336.000 Meetings held with all relevant institutions. Possibility of pumping station (PS) construction prior to construction of the WWTP confirmed. Tender documents for development of the urban planning design, allotment design, preliminary design for the building permit purposes and construction under preparation. Urban planning design and design documents for construction of WWTP Veliko Selo - Phase Ia 2 Sewerage in Krnjaca Settlement - Block Brace Maric March 2017 March 2018 720.000 Tender for construction works including design documents preparation Design and Construction 3 New Storm Water Sewer in Kumodraz Preliminary Design for Detailed Regulation Plan development purposes. Detailed Regulation Plan Development
WASTE WATER TREATMENT PLANTS PLANNED IN THE WIDER BELGRADE CITY AREA
MAP OF SITES