Updated January 19, 2018 TENTATIVE PROJECT SCEDULE / - 2 16-104 FINAL PLAT Manor at Stoney Creek, 2 nd Plat, Lots 42-81 & Tracts C-E; Engineering Solutions, LLC, applicant 4 16-173 FINAL PLAT Winterset Valley, 11 th Plat, Lots 1392A, 1411-1434 & Tract A11; Gale Communities, Inc., applicant 1 17-142 SPECIAL USE PERMIT for a telecommunication tower 465 SE Oldham Pkwy; Skyway Towers, applicant (SM,C) 1 17-143 PRELIMINARY DEVELOPMENT telecommunication tower, 465 SE Oldham Pkwy; Skyway Towers, applicant (SM,C) 2 17-144 PRELIMINARY DEVELOPMENT PLAN Kessler Ridge at New Longview, 2 nd Plat, Lots 56-87 & Tract F; Inspired omes, Inc., applicant (JT,GW,C) 4 17-173 FINAL PLAT Mill Creek of Summit Mill, 7 th Plat, Tract U; Engineering Solutions, LLC, applicant (SM,GW,C) 2 17-174 REZONING from CP-2 to RP-3 and PRELIMINARY DEVELOPMENT PLAN Sienna at Longview, Lot 291; Engineering Solutions, LLC, applicant (SM,GW,C) 3 2 17-175 VACATION OF EASEMENT 3200 SW Pergola Park Dr; Olsson Associates, applicant (JT,SP,C) 17-177 UNIFIED DEVELOPMENT INANCE (UDO) AMENDMENT 63 Article 5 Zoning Districts and Article 6 Overlay Districts, amendment to M-150 Corridor Overlay; City of Lee s Summit (RM) 1 17-178 VACATION OF UTILITY EASEMENT 4508 SW Raintree Shore Dr; Jamie Cox, applicant (CS,GW) 2 17-192 FINAL PLAT Whispering Woods, 1 st Plat, Lots 1-33 & Tracts A-D; Whispering Woods Land, LLC, applicant (JT,GW,MW) (on hold after meeting, until infrastructure is constructed or letter of credit is received) 3 17-203 REZONING from AG to CP-2 and PRELIMINARY DEVELOPMENT PLAN 1850 NE US 40 wy; IAC Life, applicant (S,C) 3 17-205 SPECIAL USE PERMIT for indoor storage facility Oakview Storage, 1410 NE Douglas St; Oakview Capital Partners, LLC, applicant (CS,GW,MW) An item in bold indicates a new item added to the project list. 1 C C D
TENTATIVE PROJECT SCEDULE / - 2 17-206 FINAL PLAT Fascination at New Longview, Lots 1-5 & Tract A; Platform Ventures, applicant (JT,SP,C) (no public infrastructure required with this plat) 3 17-210 VACATION OF EASEMENT 2821 NE Independence Ave; Shafer Kline & Warren, Inc., applicant (CS,SP,MW) 3 17-213 SIGN APPLICATION KC Pain Center and CA Midwest Pain Management, 200 NE Missouri Rd; ightech Signs of Mid-America, LLC, applicant (JT) 2 17-216 SPECIAL USE PERMIT for in-home massage therapy In Good ands Therapeutic Massage, 1508 SW 9 th St; Amy Abbott, applicant (S,DB) 4 17-217 VACATION OF RIGT-OF-WAY a portion of NE Todd George Rd located east of the intersection of NE Todd George Rd and NE Wall St; Darla Anderson, applicant (SM,GW) 3 17-221 VACATION OF RIGT-OF-WAY a portion of NW Gregory Blvd located east of Lee s Summit Rd; City of Lee s Summit, applicant (S) 1 17-228 VACATION OF EASEMENT 4548 SW Raintree Shore Dr; Wesley Fields, applicant (CS)? 3 3 17-234 REZONING from AG to RLL 5261 NE Maybrook Rd; Derek D. Collins Trustee, applicant (CS,GW,MW) 2 17-238 FINAL PLAT Siena at Longview, 4 th Plat, Lots 216A- 218A, 224A & 320-328; Engineering Solutions, LLC, applicant (SM,GW,C) 3 17-243 FINAL PLAT Park Ridge, 6 th Plat; Engineering Solutions, LLC, applicant (JT,GW,MW) (on hold after /18 meeting, until infrastructure is constructed or ) 2 17-247 VACATION OF EASEMENT a 15 utility easement located on Lots 217, 224 and 291 of Siena at Longview, 2 nd Plat; Engineering Solutions, LLC, applicant (SM,GW,C) 2 17-254 SPECIAL USE PERMIT for in-home massage therapy 751 SW Old Pryor Rd; Delane Reed, applicant (JT) An item in bold indicates a new item added to the project list. 2
TENTATIVE PROJECT SCEDULE / - 1 17-259 VACATION OF EASEMENT 4801 SW Raintree Pkwy; Chad Potter, applicant (SM,GW,C) 17-260 UNIFIED DEVELOPMENT INANCE (UDO) AMENDMENT 64 Amendment to establish regulations for short-term residential rentals; City of Lee s Summit (JJ) 1 17-261 SIGN APPLICATION ush Lash Studio, 602 NE M- 291 wy; A to Z Sign & Custom Neon, applicant (SM) 3 2 18-002 SIGN APPLICATION B&B Theater New Longview 7, 3201 SW Fascination Dr; ollis & Miller Architects, applicant (CS,C) (FT) 4 18-003 SPECIAL USE PERMIT for in-home massage therapy 1613 SE 2 nd Ter; Rona Schwarz, applicant (JT) 1 18-008 PRELIMINARY DEVELOPMENT PLAN Animal Control Facility solar installation, 1991 SE amblen Rd; City of Lee s Summit, applicant (JT,DB) 18-012 UNIFIED DEVELOPMENT INANCE (UDO) AMENDMENT 65 Article 7 Design Standards, proposed amendments to lighting standards and trash enclosure gate requirements; City of Lee s Summit (RM) 2 18-013 VACATION OF RIGT-OF-WAY portions of SW Longview Blvd and SW Fascination Dr; City of Lee s Summit, applicant (JT,GW,C) 18-014 UNIFIED DEVELOPMENT INANCE (UDO) AMENDMENT 66 Article 12 Parking, amendment to clarify and move standards for storage and parking of RVs, boats, and utility trailers from Article 12 of the UDO to Chapter 16 of the Lee s Summit Code of Ordinances; City of Lee s Summit (JJ) 4/5 An item in bold indicates a new item added to the project list. 3
APPLICATIONS ON OLD TENTATIVE PROJECT SCEDULE Description Date Put on old 15-063 UNIFIED DEVELOPMENT INANCE (UDO) AMENDMENT 53 Article June, 2015 on hold 13 Signs creating a definition and establishing regulations pertaining to murals (RM) 16-026 VACATION OF EASEMENT 512 NW ope Ln; John Knox Village, applicant (RS,GW,MW) March 22, 2016 on hold after 3/26 meeting, until relocated infrastructure is relocated and in service 16-027 VACATION OF EASEMENT 512 NW ope Ln; John Knox Village, applicant (RS,GW,MW) March 22, 2016 on hold after 3/26 meeting, until relocated infrastructure is relocated and in service 16-045 VACATION OF RIGT-OF-WAY a section of SW Flintrock Dr south of SW June 16, 2016 on hold after 6/16, until infrastructure is relocated and in service Napa Valley Dr, located within the Napa Valley subdivision; Toscano Investments, LLC, applicant (RS,GW,DB) 16-056 REZONING from CP-2 and TNZ to PMI all of the block bounded by SW March 22, 2016 on hold Jefferson St on the west, SW Market St on the east, SW 2 nd St on the north and SW 3 rd St on the south; City of Lee s Summit, applicant (RM) 16-102 FINAL PLAT Raintree Pointe, Lots 1-7 and Tracts A thru D; Landrock Development, LLC, applicant (CS,GW,C) March 14, 2017 on hold after 4 meeting, until infrastructure is constructed or 16-118 FINAL PLAT Monticello, 3 rd Plat, Lots 69-108 & Tracts G-I; Engineering Solutions, applicant (JT,GW,DB) August 9, 2016 on hold after 8/9 meeting, until infrastructure is constructed or 16-136 VACATION OF EASEMENT 251 SW Greenwich Dr; Cosentino s Food Stores, applicant (RS,GW,MW) September 13, 2016 on hold after 9/13, until water line improvements are made to revert the water service line from public to private 17-011 FINAL PLAT Eagle Creek, 15 th Plat, Lots 661-707 and Tracts O, P and Q; unt Midwest Real Estate Development, Inc., applicant April 11, 2017 - on hold after 4/11 meeting, until infrastructure is constructed or 17-034 FINAL PLAT Aldersgate Methodist Church, Lots 3-5 & Tract A; Engineering Solutions, applicant April 11, 2017 - on hold after 4/11 meeting, until infrastructure is constructed or 17-046 FINAL PLAT awthorn Ridge (previously Arborwalk North), 1 st Plat, Lots 1-100 & Tracts A-E; CM Parks, Inc., applicant April 25, 2017 - on hold after 4/25 meeting, until infrastructure is constructed or 17-053 FINAL PLAT Creekside at Raintree, Lots 1-31 & Tracts A-F; Landrock Development, LLC, applicant May 9, 2017 on hold after 5/9 meeting, until infrastructure is constructed or letter of credit is received 17-054 VACATION OF EASEMENT a portion of an easement generally located at the southeast corner of SW Raintree Pkwy and SW Raintree Dr for the May 9, 2017 on hold after 5/9 meeting, until infrastructure is relocated and in service proposed Creekside at Raintree residential subdivision; Landrock Development, LLC, applicant 17-065 FINAL PLAT Saddlebrook Farm, Lots 11A and 12A-12I; Ben Sharp, applicant August 22, 2017 on hold after 8/22 meeting, until infrastructure is constructed or 17-089 FINAL PLAT The Grove of Lee s Summit, 1 st Plat June 13, 2017 - on hold after 6/13 meeting, until infrastructure is constructed or 17-094 REZONING from AG to RP-4 and CP-2 and PRELIMINARY DEVELOPMENT PLAN West Ridge at the Lake, approximately 23 acres located at the southwest corner of NE Bowlin Rd and NE Jamestown Dr; Sallee omes, September 21, 2017 application remanded to the Planning Commission for consideration of a revised plan. Planning Commission schedule is dependent on submittal of a revised plan for staff review. applicant (JT,MW) 17-123 FINAL PLAT Arborwalk, 10 th Plat, Lots 242-308 Inclusive and Tract A-10; Inspired omes, LLC, applicant (SM,GW,C) August 8, 2017 - on hold after 8/8 meeting, until infrastructure is constructed or 17-131 FINAL PLAT Legacy Wood, 7 th Plat, Lots 246-278 and Tracts M & N; Wood Family Development, applicant (JT,SP,DB) August 8, 2017 - on hold after 8/8 meeting, until infrastructure is constructed or An item in bold indicates a new item added to the project list. 4
TENTATIVE PROJECT SCEDULE 17-152 FINAL PLAT Pergola Park, 4 th Plat; Inspired omes, LLC, applicant (JT,SP,C) 17-172 REZONING from PI and PO to PMI and CONCEPTUAL DEVELOPMENT PLAN approximately 94 generally located at the northwest and southeast corners of NE Tudor Rd and NE Sloan St; LOWCAP, LLC, applicant 17-176 CONCEPTUAL DEVELOPMENT PLAN West Pryor Village, generally located at the northwest corner of NW Chipman Rd and NW Pryor Rd; City of Lee s Summit, applicant (RM) 17-182 FINAL PLAT Manor at Stoney Creek, 3 rd Plat, Lots 82-108; Engineering Solutions, LLC, applicant (JT,SP,DB) 17-183 FINAL PLAT Reserve at Stoney Creek, 3 rd Plat, Lots 60-110 & Tracts L-N; Engineering Solutions, LLC, applicant (JT,SP,DB) 17-196 FINAL PLAT North Park Village, 2 nd Plat, Lots 53-93 & Tract F; Engineering Solutions, LLC, applicant 17-223 SPECIAL USE PERMIT to allow the keeping of therapy animals in the R-1 district approximately 11 total acres inclusive of the properties addressed as 6 NW O Brien Rd, 100 NW O Brien Rd, 413 NW Donovan Rd and 415 NW Donovan Rd; Mark Farhner, applicant (JT) 17-207 REZONING from AG to RP-1 and PRELIMINARY DEVELOPMENT PLAN ook Farms South, approximately 77 acres located at the southwest corner of SW ook Rd and SW Pryor Rd; unt Midwest Real Estate Development, Inc., applicant (SM,GW,C) 17-257 SPECIAL USE PERMIT for automobile sales and major auto repair Genuine Auto Repair, 520 SW 3 rd St; Gary Serville, Jr., applicant September 12, 2017 on hold after 9/12 meeting, until infrastructure is constructed or October 3, 2017 on hold awaiting plan resubmittal in order to place on / public hearing schedule October 19, 2017 item remanded back to the Planning Commission, to a date uncertain, by the City Council at the 10/19 Council meeting with the direction that area outside of PMI zoning be omitted from the conceptual development plan. October 25, 2017 on hold after 10/24 meeting, until infrastructure is constructed or October 25, 2017 on hold after 10/24 meeting, until infrastructure is constructed or November 29, 2017 on hold after meeting, until infrastructure is constructed or November 22, 2017 on hold January 3, 2018 application placed on hold per applicant s request January 12, 2018 application placed on hold pending submittal of complete application LEGEND Planning Commission C Continued item W Withdrawn City Council C Continued public hearing D Application Denied Continued meeting dates (no hearing held) Tentative date of ordinance Non-advertised item is scheduled CA Consent Agenda Advertised public hearing is scheduled FT Fast Tracked item S, JT, CS, SM, VN, GW, SP, MA, DB, C, MW, JJ Initials identify the planner, engineer and project manager assigned to the project. RES Resolution Council District 1 item shaded in green Council District 2 item shaded in pink Council District 3 item shaded in yellow Council District 4 item shaded in purple An item in bold indicates a new item added to the project list. 5