Conceptual Review Agenda

Similar documents
Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

Jerome Street Mixed Use

Penny Flats North 323 N Mason

Conceptual Review Agenda

Conceptual Review Agenda

WORK SESSION ITEM City Council

Conceptual Review Agenda

Conceptual Review Agenda

Conceptual Review Agenda

AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO

AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO. October 7, Proclamations and Presentations 5:30 p.m.

PLANNING, DEVELOPMENT & TRANSPORTATION SERVICES October, Monthly Report

2008 Buildable Lands Inventory and Capacity Analysis

Hansen Farm Project Development Plan 2 nd Neighborhood Meeting Notes (12/13/2017)

Submittal Requirements: Subdivision Plat (Final)

{{t:t;r:n;o:"signer 2";l:"Date";}}

AGENDA ITEM SUMMARY January 2, 2018 City Council

Fort Collins Areas with Redevelopment and Infill Potential

COMMUNITY DEVELOPMENT & NEIGHBORHOOD SERVICES PLANNING DIVISION June Monthly Report DEVELOPMENT REVIEW ACTIVITY SUMMARY

City of Fort Collins Current Development Projects by Project Name

AGENDA OF THE COUNCIL OF THE CITY OF FORT COLLINS, COLORADO. September 18, Proclamations and Presentations 5:30 p.m. Regular Meeting 6:00 p.m.

CHECKLIST FOR DEVELOPMENT REVIEW

Conceptual Review Agenda

SKETCH PLAN REVIEW SPECIAL EXCEPTION, SPECIAL REVIEW,

NONCONFORMITIES For Uses & Buildings/Structures

Bull Creek RV Park for SALE

Paper copies & an electronic copy (pdf) of the following drawings or plans: 1 full size scalable certified survey and 1 (11 x 17) copy

Residential Major Subdivision Review Checklist

2012 COMMUNITY INFORMATION

CITY OF OCOEE LAND DEVELOPMENT CODE SUFFICIENCY TABLE WITH NOTES

Larimer County Planning Dept. Procedural Guide for 1041 PERMITS

Conditional Use Sketch Plan Application Non-Residential Zone

Application Procedures for Easements or Rights of Way on City of Fort Collins Natural Areas and Conserved Lands March 2012

FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin County Treasurer.

APPLICATION PROCESS FOR PROJECT REVIEW

Neighborhood Meetings January - March 2009

ARTICLE XXI GENERAL SITE DEVELOPMENT PLAN REQUIREMENTS

Residential Minor Subdivision Review Checklist

SITE PLAN REVIEW ADMINISTRATIVE REVIEW. Please Note: Once submitted to the County, all application materials become a matter of public record.

City of Ferndale CITY COUNCIL STAFF REPORT

RECOMMENDATION: Approval of the Project Development Plan with Conditions

Applicant Alicia Elliott. Address Vicinity of 1319 Dickinson Ave. NW, Olympia, WA 98502

APPLICATION PROCESSING. CHECK WITH STAFF - Development Services Staff will explain the requirements and procedures to you.

TOWN OF EASTCHESTER BUILDING AND PLANNING DEPARTMENT PLANNING BOARD APPLICATION PACKAGE SUBDIVISIONS

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

CITY OF ST. PETERS RESIDENTIAL SANITARY SEWER LATERAL REPAIR PROGRAM APPLICATION. Daytime Phone: Evening Phone: Tenant Name: Tenant Phone:

FINAL PLAT CHECKLIST

Staff Review. Staff Review. Description. Shepard 2/16/2011. Emma McArdle 2/2/2011. Courtney Rippy 2/23/2011

WASHINGTON COUNTY CUP SUBMITTAL CHECKLIST

RESIDENTIAL DEVELOPMENT ORDER APPLICATION Application Fee $ PLEASE READ THE FOLLOWING INFORMATION CAREFULLY

Filing 6. The replat includes eliminating the alley load tract and widening other lots. The site is zoned Low Density Mixed Use Residential.

Staff Review. Staff Review. Description. Shepard 2/16/2011. Emma McArdle 2/2/2011. Courtney Rippy 2/23/2011

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

Plat Checklist PLAT TYPES AND DESCRIPTIONS

LOT CONSOLIDATION (for contiguous lots)

FOR SALE GAINESVILLE OFFICE BUILDING SW 13 th Street Gainesville, FL 32608

ACCESSORY STRUCTURE DEVELOPMENT ORDER APPLICATION (WITH RESTROOM PLUMBING)

City of Sanibel. Planning Department STAFF REPORT

Application for Sketch Plan Review

CONDITIONAL USE PERMIT Application Packet

APPLICATION PROCEDURE

CONDITIONAL USE PERMIT

SUBMITTAL REQUIREMENTS: The number indicates the number of copies for submittal (if applicable).

CITY COUNCIL VOTING RESULTS

Innsbruck Val Moritz AFP of Lot 46, Lot 47, & Amended Lot 48 Block 17 Amended Final Plat Adjustment of Interior Lot Lines

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

APPLICATION for MINOR SUBDIVISION REVIEW for CONCEPT and FINAL PLAT within COALVILLE CITY. Project Name: Project Address or Area: Name of Owner:

Septic Tank / Drainfield / Holding Tank Permit Application

1224 Red Cedar Cir - Self Red Cedar Cir Construct self-strage facility with small office. NW corner of Linden and Jefferson

PLANNING & ZONING DEPARTMENT 401 South Rogers Street Waxahachie, Texas (469)

CITY OF SOUTH SAN FRANCISCO PLANNING DIVISION 315 Maple Avenue, South San Francisco, CA (650)

City of La Puente E. Main Street, La Puente, CA Telephone (626) Fax (

WORK SESSION ITEM City Council

BOSSIER CITY PARISH METROPOLITAN PLANNING COMMISSION 620 Benton Rd. Bossier City, LA Phone: Fax: PRELIMINARY PLAT

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

2008 Administrative Public Hearings

City of Ferndale CITY COUNCIL STAFF REPORT

REQUEST FOR PLANNING COMMISSION ACTION

Marion County Board of County Commissioners

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

CROSSWATER CONDOMINIUM OWNERS ASSOCIATION

FARMLAND AUCTION Rouse Farm Dunklin County, Missouri

Special Land Use. SLU Application & Review Standards

CASH FOR GRASS REBATE APPLICATION

RESIDENTIAL OR COMMERCIAL DEVELOPMENT LAND OPPORTUNITY

TOWN OF NORTHWOOD, NEW HAMPSHIRE

Incorporated Village of Lattingtown 299 Lattingtown Road P.O. Box 488 Locust Valley, New York

Site Development Review for

HARMONY & STRAUSS CABIN SUBDIVISION FILING NO. 1

APPLICATION PROCESSING STEPS STEP 1 CHECK WITH STAFF


Land Uses, Maps, Illustrations and Locations

Transcription:

Conceptual Review Agenda Schedule for 06/07/18 to 06/07/18 281 Conference Room A Thursday, June 7, 2018 Time Project Name Applicant Info Project Description 9:30 10:15 1314 Red Cedar Circle CDR180035 2155 Midpoint Dr CDR180036 Stacy Kubeldis (626) 826-9321 stacy.kubeldis@gmail.com Deanne Frederickson (970) 534-9095 deanne.frederickson@baselinecorp.com This is a request to add an additional 10 feet to an existing 90 foot tall cellular tower with exposed mounted antennas. The additional 10 feet would accommodate a 3 foot diameter dish. The proposed project is within the Industrial (I) zone district and is subject to Administrative (Type 1) review. This is a request to construct an open lean-to structure at 2155 Midpoint Dr (parcel #8720220002). The proposed facility would be used store and distribute building materials. A u-shaped access drive is proposed with two connections to Midpoint Dr. The property is currently developed. The proposed project is within the Employment (E) zone district and is subject to Administrative (Type 1) review. Planner DRC Planner DRC Ted Shepard Todd Sullivan Clay Frickey Tenae Beane 11:00 OTAC Crossfit CDR180037 Krisin Slattery (970) 690-2213 kristin.slattery@colostate.edu This is a request to construct a two-story, 7,000 square foot indoor recreation facility at 748 N College Ave (parcel #9701319002). The proposed project would be accessed along the north by extending Pascal St to the west. Twenty-one parking spaces are located along the west and south. The proposed project is within the Service Commercial (CS) zone district and is subject to Administrative (Type 1) review. Planner DRC Pete Wray Brandy Bethuem- Harras Agenda as of 05/30/18 at 8:50 am Page 1 of 1

Taft Hill Lemay Timberline 1314 Red Cedar Circle Cellular Equipment 287 Vicinity Map UV 14 «1 Douglas 25 Aerial Site Map ^_ Mountain Vista Vine Bristlecone Dr 287 Mulberry Prospect Hibdon Ct Shields Drake N College Ave Horsetooth Harmony 25 Trilby 287 25 1 inch = 16,667 feet Zoning Map MMN CS Bristlecone Dr «287 Red Cedar Cir «14 I Blue Spruce Dr Red Cedar Cir Hickory St CCN 1 inch = 417 feet 1 inch = 175 feet These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours, property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification of all data contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether direct, indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.

Development Review Guide STEP 2 of 8 CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City Staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Please be aware that any information submitted may be considered a public record, available for review by anyone who requests it, including the media. Conceptual Reviews are scheduled on three Monday mornings per month on a first come, first served basis. One 45 meeting is allocated per applicant and only three conceptual reviews are done each Monday morning. Conceptual Review is a free service. Complete applications and sketch plans must be submitted to City Staff no later than 5 pm, two Tuesdays prior to the meeting date. Application materials must be e-mailed to currentplanning@fcgov.com. If you do not have access to e-mail, other accommodations can be made upon request. At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. *BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc) Consultant Business Name (if applicable) Mastec Your Mailing Address 3350 E. Birch Street #101 Brea, CA 92821 Phone Number Email 626-826-9321 Address stacy.kubeldis@gmail.com Site Address or Description (parcel # if no address) 1314 Red Cedar Circle Fort Collins, CO 80525 Description of Proposal (attach additional sheets if necessary) Purposed Scope of Work: 10' extension to an existing cell tower 3' dish at 95' with 2 runs of EW-90 Cabling. Proposed Use Existing Use Existing Cell Tower Total Building Square Footage S.F. Number of Stories Lot Dimensions Age of any Existing Structures Tower was built 8/31/2001 Info available on Larimer County s Website: http://www.co.larimer.co.us/assessor/query/search.cfm If any structures are 50+ years old, good quality, color photos of all sides of the structure are required for conceptual. Is your property in a Flood Plain? Yes x No If yes, then at what risk is it? Info available on FC Maps: http://gisweb.fcgov.com/redirect/default.aspx?layertheme=floodplains. Increase in Impervious Area N/A all work is withing the existing lease area, please refer to site plans S.F. (Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site) Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements (buildings, landscaping, parking/drive areas, water treatment/detention, drainage), existing natural features (water bodies, wetlands, large trees, wildlife, canals, irrigation ditches), utility line locations (if known), photographs (helpful but not required). Things to consider when making a proposal: How does the site drain now? Will it change? If so, what will change? Community Development & Neighborhood Services 281 N College Ave Fort Collins, CO 80522-0580

S Timberline Rd Taft Hill Lemay Timberline S Timberline Rd 2155 Midpoint Dr Construction Materials Distribution 287 Vicinity Map UV 14 «1 Douglas 25 Spring Creek Mountain Vista Aerial Site Map Vine 287 Mulberry Prospect Shields Drake Horsetooth ^_ 25 Harmony Midpoint Dr Trilby 287 25 1 inch = 16,667 feet Zoning Map Mountain Sage Community School E Prospect Rd Spring Creek Specht Point Rd Midpoint Dr E I Jessup Dr Jessup Dr T 1 inch = LMN 500 feet 1 inch = 167 feet These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours, property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification of all data contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether direct, indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.

Development Review Guide STEP 2 of 8 CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City Staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Please be aware that any information submitted may be considered a public record, available for review by anyone who requests it, including the media. Conceptual Reviews are scheduled on three Monday mornings per month on a first come, first served basis. One 45 meeting is allocated per applicant and only three conceptual reviews are done each Monday morning. Conceptual Review is a free service. Complete applications and sketch plans must be submitted to City Staff no later than 5 pm, two Tuesdays prior to the meeting date. Application materials must be e-mailed to currentplanning@fcgov.com. If you do not have access to e-mail, other accommodations can be made upon request. At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. *BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc) Business Name (if applicable) Your Mailing Address Phone Number Email Address Site Address or Description (parcel # if no address) Description of Proposal (attach additional sheets if necessary) Proposed Use Existing Use Total Building Square Footage S.F. Number of Stories Lot Dimensions Age of any Existing Structures Info available on Larimer County s Website: http://www.co.larimer.co.us/assessor/query/search.cfm If any structures are 50+ years old, good quality, color photos of all sides of the structure are required for conceptual. Is your property in a Flood Plain? Yes No If yes, then at what risk is it? Info available on FC Maps: http://gisweb.fcgov.com/redirect/default.aspx?layertheme=floodplains. Increase in Impervious Area S.F. (Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site) Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements (buildings, landscaping, parking/drive areas, water treatment/detention, drainage), existing natural features (water bodies, wetlands, large trees, wildlife, canals, irrigation ditches), utility line locations (if known), photographs (helpful but not required). Things to consider when making a proposal: How does the site drain now? Will it change? If so, what will change? Community Development & Neighborhood Services 281 N College Ave Fort Collins, CO 80522-0580

Taft Hill Lemay Timberline 748 N College Ave OTAC CrossFit 287 Vicinity Map UV 14 «1 ^_ 287 Douglas Alpine St 25 Mountain Vista Vine Mulberry Aerial Site Map Jerome St Osiander St Cajetan St Prospect Shields Drake Horsetooth 25 Harmony «287 Woodlawn Dr Trilby 287 25 1 inch = 16,667 feet «14 N Mason St Pinon St Zoning Map Alpine St CS Jerome St Osiander St N College Ave Cajetan St Woodlawn Dr N College Ave CCN Pascal St 287 E Vine Dr E Vine Dr Cache la Poudre River CCR Future Whitewater Park «14 West Coy Pond East Coy Pond Cache la Poudre River Lee Martinez Community Park POL Lee Martinez Community Park CCR 1 inch = 500 feet Old Fort Collins Heritage Park Future Whitewater Park West Coy Pond 1 inch = 167 feet These map products and all underlying data are developed for use by the City of Fort Collins for its internal purposes only, and were not designed or intended for general use by members of the public. The City makes no representation or warranty as to its accuracy, timeliness, or completeness, and in particular, its accuracy in labeling or displaying dimensions, contours, property boundaries, or placement of location of any map features thereon. THE CITY OF FORT COLLINS MAKES NO WARRANTY OF MERCHANTABILITY OR WARRANTY FOR FITNESS OF USE FOR PARTICULAR PURPOSE, EXPRESSED OR IMPLIED, WITH RESPECT TO THESE MAP PRODUCTS OR THE UNDERLYING DATA. Any users of these map products, map applications, or data, accepts same AS IS, WITH ALL FAULTS, and assumes all responsibility of the use thereof, and further covenants and agrees to hold the City harmless from and against all damage, loss, or liability arising from any use of this map product, in consideration of the City's having made this information available. Independent verification of all data contained herein should be obtained by any users of these products, or underlying data. The City disclaims, and shall not be held liable for any and all damage, loss, or liability, whether direct, indirect, or consequential, which arises or may arise from these map products or the use thereof by any person or entity.

Development Review Guide STEP 2 of 8 CONCEPTUAL REVIEW: APPLICATION General Information All proposed development projects begin with Conceptual Review. Anyone with a development idea can schedule a Conceptual Review meeting to get feedback on prospective development ideas. At this stage, the development idea does not need to be finalized or professionally presented. However, a sketch plan and this application must be submitted to City Staff prior to the Conceptual Review meeting. The more information you are able to provide, the better feedback you are likely to get from the meeting. Please be aware that any information submitted may be considered a public record, available for review by anyone who requests it, including the media. Conceptual Reviews are scheduled on three Monday mornings per month on a first come, first served basis. One 45 meeting is allocated per applicant and only three conceptual reviews are done each Monday morning. Conceptual Review is a free service. Complete applications and sketch plans must be submitted to City Staff no later than 5 pm, two Tuesdays prior to the meeting date. Application materials must be e-mailed to currentplanning@fcgov.com. If you do not have access to e-mail, other accommodations can be made upon request. At Conceptual Review, you will meet with Staff from a number of City departments, such as Community Development and Neighborhood Services (Zoning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning) and Poudre Fire Authority. Comments are offered by staff to assist you in preparing the detailed components of the project application. There is no approval or denial of development proposals associated with Conceptual Review. At the meeting you will be presented with a letter from staff, summarizing comments on your proposal. The more info provided, the more detailed your comments from staff will be. Contact Name(s) and Role(s) (Please identify whether Consultant, Owner, etc.) Business Name (if applicable) Mailing Address Phone Email Address Site Address (parcel # if address in not available) Description of Proposal (attach additional sheets if necessary) Proposed Use Existing Use Total Building Square Footage Number of Stories Lot Dimensions Age of any Existing Structures Info available on Larimer County s Website: http://www.co.larimer.co.us/assessor/query/search.cfm If any structures are 50+ years old, good quality, color photos of all sides of the structure are required for conceptual. Is your property in a Flood Plain? Yes No If yes, then at what risk is it? Info available on FC Maps: http://gisweb.fcgov.com/redirect/default.aspx?layertheme=floodplains. Increase in Impervious Area (Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site) Suggested items for the Sketch Plan: Property location and boundaries, surrounding land uses, proposed use(s), existing and proposed improvements (buildings, landscaping, parking/drive areas, water treatment/detention, drainage), existing natural features (water bodies, wetlands, large trees, wildlife, canals, irrigation ditches), utility line locations (if known), photographs (helpful but not required). Things to consider when making a proposal: How does the site drain now? Will it change? If so, what will change? S.F. Community Development & Neighborhood Services 281 N College Ave Fort Collins, CO 80522-0580