By: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC

Similar documents
DESIGN BUILD PROJECTS

What/Who Determines that an Appraiser is Qualified in our Program?

Appraisal / Appraisal Review Challenges with Design-Build Program

Improving the Process. Michael C. McCall, MAI. McCall Valuation Concepts, LLC. Paul E. Zembruski, SR/WA

State Revolving Fund Loan Programs Guidance for Project Land Acquisition For SRF Financed Projects

RESIDUAL ANALYSIS PRINCIPLES AND PROCEEDURES

OFFICE OF REAL ESTATE

VOLUNTARY SALES ASSISTANCE PROGRAM CONSISTING OF TWO OPTIONS:

Provider Course Name QE CE/E CE Delivery Method. Accurate Sketching Made Easy 3.00 Classroom 8/5/2017

Obstruction Removal Projects:

THE WAIVER OF APPRAISAL

Australian Standard. Inspection of buildings. Part 1: Pre-purchase inspections Residential buildings AS

Right of Way Acquisition

Organizational Project Management


Accelerated Right-of-Way Process for Sidewalks

Frequently Asked Questions From the Certification of R/W Training Sessions

Thinking of becoming a developer?

ED-900C EDA Application Supplement for Construction Programs

GSE FOCUS. Visit WorkflowGeeks.com for more free titles. Sponsored by Mercury Network

etrac Guide Enhanced Appraiser Scoring Global DMS, 1555 Bustard Road, Suite 300, Lansdale, PA , All Rights Reserved.

Phase I Environmental Site Assessments for Corridors

What Raters Need To Know About Appraisals

Locally Administered Projects Overview

86 years in the making Caspar G Haas 1922 Sales Prices as a Basis for Estimating Farmland Value

Sidewalk Program Policy Revised: 06 November 13

The High Cost of What You Don t Buy

Hank's Exchange Road Bridge Replacement Project

The Nuts & Bolts of Public-Private Partnerships

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

USPAP Update & The Difficult and Unusual RW Appraisal Assignments

RIGHT OF WAY LIFE CYCLE

Potential Property Impacts Lawrence to Bryn Mawr Modernization

Accelerated ROW Process for Sidewalks FAQ s

Ohio Department of Transportation. Division of Engineering. Office of Real Estate. Synergy. Real Estate Business Analysis

City of Lake Elmo Planning Commission Meeting Minutes of January 26, 2015

OCEAN INDUSTRIES BUSINESS PARK 11 Acadia Street, Dartmouth, Nova Scotia. Partnership. Performance.

The Buyer Consultation: Demonstrating & Articulating Value. Interactive Workshop. Student Workbook

RELOCATION ASSISTANCE PROGRAM (RAP) BOOKLET THE 10 MINUTE MANAGER

APPRAISAL REVIEW REPORT. April 7, Yasmi Govin, Director of Business and Property Management Broward County Aviation Department

MIAMI-DADE EXPRESSWAY AUTHORITY PROPERTY ACQUISITION POLICY

OHIO DEPARTMENT OF TRANSPORTATION OFFICE OF REAL ESTATE. Kevin O Grady, Manager Appraisal Unit. Changes and Updates to the Real Estate Manual

Major Retail Shopping Centre Performance - A Presentation by John Highman

Effective: September 19, In general, these final regulations apply to taxable

MAAO Sales Ratio Committee 2013 Fall Conference Seminar

Real Estate Development 46th Annual Basic Economic Development Course

DWR REAL ESTATE COORDINATION PLAN

Buying or selling your property?

Part 5 - Accommodating Utility Facilities Within Public Freeway Rights-of-Way and Public Railroad Rights-of-Way

Noise Mitigation Plan

Purpose: Intended Audience: Introduction: Federal Regulation: 29 CFR Equipment.

A D D E N D U M # 2. This Addendum is issued to the above referenced to RFP make the following changes, additions, deletions, and/or clarifications:

RIGHT OF WAY DATA SHEET (Form #)

Your Homeowners Association Property Improvement Handbook

REQUEST FOR PROPOSALS FOR SUBSTATION ENGINEERING SERVICES REBUILD OF TYGH VALLEY AND NEW CONSTRUCTION OF EASTSIDE SUBSTATIONS

CITY OF FORT COLLINS NATURAL AREAS AND CONSERVED LANDS EASEMENT POLICY

Donations of Personal Property

IC Chapter 7. Real Property Transactions

Future Canadian Embassy, Current state 130 rue du Faubourg Saint-Honoré, Paris

JOB DESCRIPTION MANAGEMENT EXCLUSION

2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services

Paragraph 47 National Planning Policy Framework. rpsgroup.com/uk

ASA MTS CANDIDATE REPORT REVIEW CHECKLIST INSTRUCTIONS (Effective as of January 01, 2018) Basic Report Requirements and General Report Quality

The High Performance Appraisal Process Unveiled By Sandra K. Adomatis, SRA, LEED Green Associate

Franklin County REQUEST FOR QUALIFICATIONS. Engineering and Real Estate Acquisition Services for

Putting it all together. Presented by: RIGHT OF WAY SERVICES

Bandera Corridor Conservation Bank: a conservation story

Real Estate Process 101: A Presentation to Explain the Basics

ADDENDUM #1 TO BID # BID NUMBER: ISSUE DATE: Wednesday, March 21, 2018

SECTION 1 - OVERVIEW OF RESEARCH ACTIVITIES & EXPECTED OUTCOMES

Developing DITA Expertise Across Your Virtual Team. Martha Morgan Architect, Information Engineering October 14, 2009

Managing NSP2 Programs For Success. Key Success Factors in NSP1. Typical NSP1 Market Strategies. Lessons Learned from NSP1

Precondemnation Procedures: Acquiring Right of Way in a New World October 9, Presented by David Graeler and Brad Kuhn

Engineering & Operations Committee Item 7-3 July 10, 2017

A Guide to the Municipal Planning Process in Saskatchewan

and NSP 5/4/2011 U.S. Department of Housing and Urban Development

MULTIFAMILY PROPERTY MANAGERS

2016 LANDU Course Descriptions. Agricultural Land Brokerage and Marketing

APPRAISAL MANAGEMENT COMPANY

SECTION 4(F) & CHAPTER 26. TxDOT Environmental Conference 2017

CHAPTER Committee Substitute for Committee Substitute for House Bill No. 437

ISC: UNRESTRICTED AC Attachment. Attainable Homes Acquisition and Development Cycle Audit

PROJECT SCORING GUIDANCE. Introduction: National Proiect Selection:

Collateral Underwriter Overview. National Association of REALTORS January 23, 2015

Council Policy Name: Policy Statement and Rationale: Scope: Council Policy No.: C205 CAO 044. Date Approved by Council: May 26, 2015

BUSI 398 Residential Property Guided Case Study

Belfast Municipal Airport Airspace Obstruction Analysis

TxDOT Guidebook for Right-of-Way Valuations and Negotiations. Project : Best Practices in Right-of-Way Valuations and Negotiations

REAL PROPERTY DEVELOPMENT & MANAGEMENT

Understand Exhibit A foundational info. Definition Update triggers Value to an airport Sponsor Where we ve been & where we re at today

State of Florida Department of Transportation EXHIBIT A, SCOPE OF SERVICES

Sound Transit. Performance Audit Report Real Property Acquisition

MITIGATION POLICY FOR DISTRICT-PROTECTED LANDS

Interagency Guidelines Web seminar, February 10, 2011

Interagency Appraisal and

EMERGING ALTERNATE DELIVERY LEASE LEASEBACK FOR COMMUNITY COLLEGES CCFC 21 ST ANNUAL CONFERENCE SEPT 9 TH, TUESDAY 10:25 AM 11:40 AM WORKSHOP #1 (CC

FOR SALE: 1236 White Oaks

Amended Noise Mitigation Plan

LEGAL PITFALLS OF RIGHT OF WAY : DELAYS IN ACQUISITION. Darby F. Venza, ROW Attorney

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool

Transcription:

By: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC

ROW in the Fast Lane! Design-Build Project Velocity

Design-Build Projects are Schedule-Driven

Appraisal is the Keystone

Without a Well-Supported Appraisal When Appraisal Consistency is not present, it threatens to topple the entire Right of Way Process.

Project Delivery Differences Traditional Design/Bid/Build vs. Design-Build Design/Bid/Build Handing Off The Baton

Project Delivery Differences Traditional Design/Bid/Build vs. Design-Build Design-Build Simultaneous Combustion

Comparison to Design/Bid/Build Traditional Design/Bid/Build Process

Comparison to Design/Bid/Build The Design/Build Process

Essential Collaboration The Design/Build Process The Relationship between the Developer s Design Engineer and the Appraisers

Information Provided by the Design Engineer Roadway Plans and Profiles for Individual Parcels Access to Individual properties: Before and After project completion Schematics and Aerial Drawings Any Exhibits illustrating how the project impacts individual properties Drainage easements and Structures affecting individual properties Any Permanent, Temporary Easements or other Interests impacting individual properties

How do you create Appraisal Consistency Conscientiousness? Ensure it is defined in the CDA(Comprehensive Development Agreement) with the Developer and is a priority Make certain the Developer s Right of Way Service Provider or Consultant understands the significance of Appraisal Consistency Require the Developer s Appraisers are pre-qualified to perform appraisals according to your DOT Appraisal Standards and Manual If the Developer is using Fee Appraisal Reviewers be clear about Appraisal Consistency rests with them

How Federal Regulations Can Help? 710.313 Design-build projects 23CFR Ch. I (4-1-11 Edition) 710.401(1)(i) The design-builder must submit written acquisition and relocation procedures to the STD for approval prior to commencing right-ofway activities. These procedures should contain a prioritized appraisal, acquisition and relocation strategy as well as checkpoints for STD approval

Additional CFR Support 710.401(1)(ii) Accordingly, the time frames estimated for right of way acquisition will not be compressed in the event other necessary actions preceding right-of-way acquisition miss their assigned due dates. 710.401(2)(i) The design-builder must establish a project tracking system and quality control system. This system must show the appraisal, acquisition and relocation status of all parcels.

Other CDA Consistency Measures Require Sample Appraisals from the Developer s fee appraisers Require Sample Appraisal Review Reports from the Developer s fee review appraisers Review & Evaluate the Sample Reports Check the State Appraisal Certification & Licensing Agency to ensure fee appraisers and fee review appraisers do not have any complaints filed against them

Preparation Before anything else, Preparation is the Key to success. ~ Alexander Graham Bell

Appraisal Consistency Preparation Identify and Study the Project s ROW Acquisitions. Work with the Design-Build Contractor s Design Engineer to determine individual parcel impacts. Meet with the Design-Build Contractor s Acquisition Service Provider regarding the appraiser selection and appraisal assignment process for the project.

Ensure Consistency ROW needs a say in the Project Development Documents, I.E. Technical Provisions. Establish Guidelines for Collaboration. Make Engineering Collaboration with ROW and Appraisers a priority in the scope of services. Include Quality Assurance and Quality Control Methods in ROW appraisal to promote appraisal consistency.

Prior Planning Instill Appraisal Consistency before the Developer and ROW Acquisition Service Provider are selected. Incorporate innovative techniques for maintaining appraisal consistency into the scoring for the project selection. Plan an Appraisal Consistency Workshop right after Developer selection takes place.

Appraisal Consistency = Quality Control Tie Appraisal Consistency to the Developer s Quality Control Plan. Insist the Developer create and maintain an Appraisal Consistency Map for the project. Require every Appraiser and every Fee Appraisal Reviewer have access to the Appraisal Consistency Map. Require each Fee Appraisal Reviewer maintain a Land Value Tracking Spreadsheet.

Developer Tools Appraisal Consistency/Quality Control Land Value Tracking Map Land Value Tracking Spreadsheet Project Appraisal Reviewer ensures appraisal consistency among various fee appraisers and fee review appraisers.

Land Value Tracking Map N $23.00/SF $23.00/SF $23.50/SF $23.00/SF $22.00/SF $23.50/SF $21.00/SF $18.00/SF $12.75/SF $20.00/SF $18.00/SF $20.50/SF XYZ Mall $18.50/SF

Appraisal Appraisal Assignments Assignments Provide guidance to the Developer s ROW Consultant or Acquisition Service Provider. Emphasize the importance of the appraisal assignment process to appraisal consistency. The Developer s appraisers must meet and satisfy minimum appraisal standards. Consistent, reasoned assignments create consistency in appraisals.

Appraisal Consistency Model Appraiser A Appraiser A is an expert in restaurant valuation; he is assigned all restaurants on the project. Review Appraiser B Reviewer Appraiser B is assigned to review all of Appraiser A s restaurant reports. Consistency in Values Restaurant valuation is consistent throughout the project and quality is good.

When Inconsistency Happens Big Bucks County $26.50/SF $18.50/SF $22.00/ SF $17.50/SF $21.50/SF Dinero Road Appraiser A Appraiser B Appraiser A Appraiser B Appraiser C Review Appraiser 1 Review Appraiser 2 Review Appraiser 3

Inconsistency Example Land Value Inconsistency Multiple Appraisers/Multiple Reviewers Three Different Appraisers Three Different Reviewers Five Parcels? Five Different Unit Values Big Bucks County $26.50/SF Dinero Road $18.50/SF $22.00/SF $17.50/SF $21.50/SF

Different Highest & Best Uses Larger Parcel What is the Larger Parcel?

Same Property Two Potential Uses Larger Parcel Two Appraisers/Different Valuations Appraiser A Appraiser B

Critical Points Appraisal Consistency Authoring Consistency writing it in the CDA Creating Design-Build Guidelines ROW Appraisal Hold Pre-Contract Workshops Potential Developers Establish Scoring Criteria ROW Appraisal Consistency Build Consistency Provide Developer and ROW Service Provider Guidance for Appraisal Assignments Request & Evaluate Sample Appraisals & Reviews Hold Post NTP Appraisal Workshops Check Appraisal Consistency Throughout the Project s Life Cycle

Appraisal Consistency Pyramid Developer s Project Review of Values Fee Reviewer s Q.A. & Q.C. of Several Fee Appraisers Values Fee Appraiser s Internal Q.A. & Q.C.

Final Thoughts Build Appraisal Consistency in the CDA (Comprehensive Development Agreement) Ensure the Developer s Appraisers and Review Appraisers are well qualified and able to deliver quality appraisals within the Project Schedule Insist on the Appraisers having all plans, surveys, title work and ESA s before they begin appraisals Make certain the Developer understands the need for collaboration between the Appraisers and the Design Engineers

Questions

Thank You! My Contact Information is: John R. Navratil, ASA, SR/WA, R/W-AC, R/W-NAC Right of Way/Utility Management Atkins, North America, Inc. 18383 Preston Road, Suite 500 3301 Airport Freeway, Suite 100 Dallas, Texas 75252 Bedford, Texas 76021 1-817-508-7610 john.r.navratil@atkinsglobal.com