COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

Similar documents
CHAPTER 1321 Permit and Inspection Fees

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

FY 2018 FEE SCHEDULE (Effective )

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

BUI L DIN G A ND E L E V A T O R F E ES

Fee Resolution

APPENDIX A BUILDING PERMIT AND RELATED FEES

City of High Point Development Fee Schedule

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

1. Permit Fees for new single family dwellings, duplexes, and multifamily dwellings with eight units or less are as follows:

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

Planning&Development Fee Standards

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

CONSTRUCTION PERMIT FEE SUMMARY

The City of Daytona Beach Fee Schedule

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

DEPARTMENT OF BUILDING AND SAFETY

BUILDING PERMIT FEE ESTIMATE

ORDINANCE NO (revised by Ordinance )

SCHEDULE A TO BY-LAW NUMBER (Amended by By-law ) CLASSES OF PERMITS AND PERMIT FEES

List of Principal Officials

C. For all areas of unincorporated Multnomah County:

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

Fee Schedule Last Updated: November 21, 2017

County of Fresno / Public Works and Planning Master Schedule of Fees for Development Services, Effective January 3, 2008

10% of Building Permit in addition to the full Building Permit Fee

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

This fee structure applies to applications submitted on or after January 1, 2018.

MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION DEVELOPMENT SERVICES

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

Schedule of City Fees & Charges

Application fee (Non-refundable) $20.00 Public Passenger Vehicle Chauffeur's License

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

City of Wausau Building, Housing and Zoning Fee Schedule 2019

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

Class of Permits and Fees Schedule A

SCHEDULE A. Classes of Permits and Fees (Reference By-law No ) 1.) Calculation of Permit Fees (All fees are exempted from HST)

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Administrative Services Department

Permit Fee Estimator Worksheet for New or Replacement Single Family Dwellings

BUILDING SERVICES ~ FEE SCHEDULE

City of Sand Springs, Oklahoma Planning and Development Department Neighborhood Services Office

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

39-1. Enforcing agency established; subcode officials designated.

SCHEDULE OF BUILDING PERMIT FEES

FEE SCHEDULE Construction Services and Permitting

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

CITY OF TARPON SPRINGS, FLORIDA

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Resolution Fee Schedule

APPENDIX A 2018 FEE SCHEDULE

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

Bylaw No Page 1. The Council ofthe City of Bumaby ENACTS as follows: A BYLAW to impose fees in respect ofplanning and Building matters

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

3. COMMUNITY DEVELOPMENT Approved FY 18 19

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

DESCRIPTION FEE UNIT MINIMUM BLDG FEE¹ New Building or Addition All occupancy classifications except

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

RESOLUTION NO

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Three Oaks TWP. (269) FAX THREE OAKS, MICHIGAN MECHANICAL PERMIT APPLICATION

Department of Public Works Permit Fee Schedule

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

VIEW POINTE MAINTENANCE CORPORATION

GENERAL FEE SCHEDULE TOWN OF LOCKPORT RESOLUTION

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

CHARLESTON PLACE TENANT CALCULATION CHECK/DATA TABULATION SHEET(S) Forms must be completed by the Tenant's Mechanical or Electrical Engineer.

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

CITY OF OWOSSO 2013 FEE SCHEDULE. Effective September 1, 2013

Town of Walworth Fee Schedule 2019

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

City of East Bethel 2019 Fee Schedule

6 WHEREAS, Hernando County has established development requirement conditions for

Chapter 101, CONSTRUCTION CODES, UNIFORM [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs as indicated in article

COUNTY OF TAZEWELL DEPARTMENT OF COMMUNITY DEVELOPMENT

Planning, Development, and Building Fees and Charges 2018

County of Ventura - Division of Building and Safety Report of Permits Issued for the Week Ending 1/13/2018

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

EXHIBIT A to Ordinance No PART 1

EXHIBIT B: SCHEDULE OF FEES ( ) COST NOTES

Transcription:

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, 2014 COMMERCIAL FEES Minimum Fee $120.00 - unless stated otherwise 1 Churches and Schools IBC Use Groups A-3 and E.15 cents per square foot 2 Commercial/Industrial IBC Use Groups R-1, R-2, B, H, F, I, A-1, A-2, and A-4.22 cents per square foot 3 Remodeling/Alterations.18 cents per square foot (Minimum Fee $120.00) 4 Shell Building Constructed in Phases Foundation/Shell Only (without c.o. and no slabs) Foundation and Shell Only (without c.o. and slabs placed) Remodeling Only.12 cents per square foot.14 cents per square foot One Half of Square Footage Fee for New Construction IBC Use Group Above 5 Temporary Occupancy 6 Warehouses and Utility IBC Use Groups S, U, and A-5 Up to 250,000 square feet Over 250,000 square feet.18 cents per square foot.15 cents per square foot

INDUSTRIALIZED BUILDINGS/MANUFACTURED HOMES 1 Industrial Buildings/Manufactured Homes with Third Party Inspection Seal (includes all permits plumbing, electrical, and mechanical) Finished Basements (includes all permits plumbing, electrical, and mechanical) Unfinished Basements.30 cents per square foot.40 cents per square foot (IRC Structures).10 per square foot IBC Commercial Fee Based on Use Classification MISCELLANEOUS FEES 1 Annual Elevator Inspection Fee Per Elevator Additional Fee for Beyond 30 days & written notification is sent $25.00 2 Annual Permit (4 inspections per year) $150.00 3 Carnivals (amusement rides) Per Location (not to exceed VUSBC cost per ride) $100.00 4 Certification of Occupancy for Existing Buildings Under USBC, Part III, Maintenance of Existing Structures Code $ 75.00 for Residential $120.00 for Commercial 5 Change of Use $120.00 6 Decks/Porches/Handicap Ramps/Awnings (not associated with new homes) *Decks/Landings 16 square foot or less are fee exempt up to 120 square feet plus.10 cents per square foot for square footage above 120

7 Demolition IRC $65.00 IBC 8 Escalator or Elevators (per floor) $25.00 9 Fences (Only required for pools and safety issues) 10 Inspection of work started prior to permit issuance Per work hour or portion thereof 11 Masonry Fireplaces, Chimneys, Relining Additional flue liner within Masonry Fireplace, Chimneys $55.00 $25.00 12 Minimum Fees (Unless Stated Otherwise) Or as determined by the Building Official 13 Pro-rates of Permits Issued Figured by the number of inspections left to complete (each inspection is per inspection) or current permit fee (whichever is lower) 14 Radio Towers & like Structures - 50 in height or less Above 50 in Height or 50 in Diameter Each Antenna connected to Existing (regardless of height) $ 50.00 $300.00 $ 50.00 15 Refunds Due to the cost of processing permit applications, the non-refundable processing fee for all permit is: 20% of the permit fees paid or $35.00 minimum, whichever is greater.

16 Re-inspection Fee 17 Renewal of Permits First Year Each six month period after expiration (not to exceed permit fee) 18 Re-review of plans and stamping of additional plans First 25 pages Each additional page beyond 25 $25.00 $ 1.00 19 Re-roofing First 10,000 square feet Each additional 10,000 square feet 20 Re-shingling and Residing IBC First 10,000 square feet Each additional 10,000 square feet (IRC not permitted unless requested) 21 Retaining Walls Each 100 length of wall or partition there of 22 Return Check Fee (per Treasurer s Office) $35.00 23 Signs Signs - Engineered 24 State Surcharge Currently 2 percent

25 Swimming Pools Residential (Private) In-ground Above Ground Swimming Pools Commercial (Public) $120.00 $ 50.00.10 cents per sq. ft./minimum Fee $120.00 26 Tanks Listed Above Ground/In-ground Tanks Over 500 Gallons Non-listed Tanks constructed on site are Utility Commercial Fee First Listed Tank $25.00 Each Additional Listed Tank (Tanks 500 gallons or less are included with the mechanical permit for gas/fuel piping permit; tanks over 500 gallon are required to have a separate building permit as structures) 27 Tents 900 square feet and under Over 900 square feet No Permit Required 28 Woodstoves (Solid fuel furnaces or boiler with ducts or hydronic piping Requires a mechanical permit) RESIDENTIAL FEES 1 Accessory Buildings, Pole Buildings, Garages, Carports, and Shelters (detached or additions to detached accessory buildings, pole buildings, garages, carports. and shelters) 257 square ft. 600 square ft. - $90.00 600 square ft. and over - $90.00 +.10 cents per each square foot over 600) (Above 3,000 square feet Commercial IBC Fee)

2 Additions & Remodeling (upgrades or relocation of service due to addition/remodeling will be no additional fee if done at time of addition/remodeling) Over 600 sq. ft. -.40 cents per square foot (includes all permits plumbing, electrical, & mechanical also includes chimneys, fireplaces and woodstoves); additional fees for porches, decks, garages, etc. Minimum charge up to 200 square ft. - $100.00 200 square ft. 600 square ft. - $240.00 3 Basements Finished Unfinished.40 cents per square foot (includes all permits plumbing, electrical, & mechanical).10 cents per square foot 4 Footing/Foundation 5 One & Two Family Dwellings, & Townhouses (this includes all attached garages, carports, decks, porches, storage units, chimneys, fireplaces, woodstoves, indoor swimming pools/whirlpools & retaining walls).40 cents per square foot (includes all permits plumbing, electrical, & mechanical) Construction pole service requested before the building permit has been issued will have to pay fee for electrical permit, however, if requested after the permit has been issued there will be no additional fee. 6 Temporary Occupancy

ELECTRICAL FEES RESIDENTIAL Base fee for electrical permit (includes 1-5 fixtures) $40.00 1 Minor Alterations and Additions (includes appliance and/or appliance outlets) 1-25 outlets Each additional 25 outlets or appliances $40.00 $10.00 2 Single Family Dwelling, Townhouses, Apartments, Detached Structures, Generators, Upgrades, and Reconnects Not over 100 amp service Not over 200 amp service Not over 400 amp service Not over 600 amp service Over 2 Apartments Each Construction Pole Service $40.00 $55.00 $60.00 $85.00 $35.00 $25.00 3 Swimming Pools Private Residential Inground Pool Private Residential Above Ground Pool $20.00 $10.00 COMMERCIAL/INDUSTRIAL Base fee for electrical permit 1 Electrical signs incandescent and electric discharge lighting systems Each sign or system

2 Heating, Cooking Equipment and Similar Appliance 1-5 outlets/fixtures Each additional outlets/fixtures Motors (each) $45.00 $ 9.00 $ 9.00 3 Primary transformer vaults enclosures sub-stations Not over 100 KVA Over 200 to 500 KVA Over 500 KVA NOTE: Above applies to each bank of transformers $55.00 $65.00 $110.00 4 Protective Signaling Systems For the first 15 devices For each additional device $ 1.00 5 Rough Wiring: all switches, lighting, and receptacles to be counted as outlets: 1-5 outlets/fixtures 1-50 outlets/fixtures Each additional 25 outlets/fixtures $95.00 $35.00 6 Service Meter Equipment and Feeders up to 600 volts Not over 225 amps Over 225 amps to 400 amps Over 400 amps to 1000 amps Over 1000 amps $ 45.00 $ 55.00 $ 85.00 $135.00 7 Swimming Pools (Public) $100.00 8 Telephone Wiring First telephone outlet Each additional outlet $15.00 $3.00

PLUMBING FEES Residential Commercial Industrial Base fee for plumbing permit Per Fixture $40.00 IRC Residential IBC Commercial $7.00 1 Irrigation System/Lawn Sprinkler $7.00 2 Installation of air conditioning requiring water connections $7.00 3 New water service $15.00 4 Sewer service, pump, interceptor or separators $15.00 5 Storm Sewer Inspection Fees as Follows: Roof drains (each) Outside leader (each) Manhole Area drain (each) $7.00 $7.00 $7.00 $7.00 6 Water supply to heating systems $7.00 7 Well Pumps and Pressure Tanks $7.00

MECHANICAL FEES Residential Commercial Industrial Base fee for mechanical $40.00 IRC Residential IBC Commercial/Industrail 1 Automatic sprinkler systems -Residential (per floor) -Limited (up to 20 head -Hood Systems - NFPA Systems Plus: 21 and above heads -Fire Pump (each) - Dry pipe add on (each) - Standpipe system only (each) - Underground fire line (each) - Chemical Systems (each) Each device above 20 in system $25.00 $35.00 $1.00 per head $ 1.00 2 Central Air Condition, Refrigeration and Refrigeration Cycle of Air Conditioning Systems: Residential, per unit (per floor) Heat Pumps (each) Geo Thermal Systems (Well water supplied needs DEQ/Health Department Approval) Commercial, first 5 tons Each additional ton Maximum fee per unit $ 30.00 $ 30.00 $ 30.00 $ 5.00 $120.00

3 Central heating, furnace, boiler or incinerator: Residential each fixture includes solar panels Up to 5 fixtures/units Up to 10 fixtures/units Commercial First 100,000 BTU S Each additional 100,000 BTU S Maximum Fee Per Unit $ 15.00 $ 70.00 $125.00 $ 25.00 $ 5.00 $130.00 4 Commercial Hoods and Fans 5 Fans up to 400 CFM Fans over 400 CFM $20.00 6 Fire damper or sub-ducts $5.00 Each 7 Fire hydrants (each) $10.00 8 Gas Piping Residential/Mobile Homes Commercial $10.00 $15.00 9 Generators require an electrical permit only unless LP or natural gas and then they need electrical and gas piping only do not charge as a fixture. Refer to amp service chart under Residential or Commercial for electric fee. (Large packaged units are considered equipment not modulars and need electrical permit only.) 10 Wood Burning Furnace Residential (will also need an electrical permit if high voltage) (Low Voltage is 50 watts or less) $15.00 Solar hot water heater plumbing permit only unless it has electric Solar panels mechanical permit only unless it has electric