Summary of ARR & BSP Filings. Submitted by OPGC. For FY

Similar documents
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN, PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, BHUBANESWAR *** *** ***

ASSAM ELECTRICITY REGULATORY COMMISSION

ASSAM ELECTRICITY REGULATORY COMMISSION

BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION VIDYUT BHAWAN II, PATNA

BEFORE THE MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION BHOPAL

Present : Shri U. N. Behera, Chairperson Shri A. K. Das, Member Shri S. K. Parhi, Member. Case No.74 of 2017 DATE OF HEARING :

TRUE-UP for FY , APR for FY AND REVISED ARR AND TARIFF for FY

GIFT Power Company Limited (GIFT PCL)

TARIFF ORDER. TRUE-UP for FY , APR for FY and. Revised ARR. and. TARIFF for FY

AGGREGATE REVENUE REQUIREMENT AND RETAIL SUPPLY TARIFF ORDER FOR FY

JHARKHAND BIJLI VITARAN NIGAM LTD, RANCHI

CHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION RAIPUR. Chhattisgarh State Power Distribution Co. Ltd... P. No. 66/2017(T)

Main Text & Formats. Submitted to: Joint Electricity Regulatory Commission for Manipur and Mizoram. By:

KS Oils Limited Sale of Wind Energy Assets. SBI Capital Markets Ltd.

FPL Institutional Investor Information. August 2013

SCHEME OF AMALGAMATION BETWEEN FUTURE AGROVET LIMITED WITH FUTURE CONSUMER ENTERPRISE LIMITED AND THEIR RESPECTIVE SHAREHOLDERS

COMPOSITE SCHEME OF. AMALGAMATION OF VINTRON INFRASTRUCTURE & PROJECTS PRIVATE LIMITED (Transferor Company)

PROPOSED DISPOSAL OF MYANMAR INFRASTRUCTURE GROUP PTE. LTD.

ALLIED PROPERTIES REAL ESTATE INVESTMENT TRUST. Financial Statements. Year Ended December 31, 2004

SCHEME OF ARRANGEMENT UNDER SECTION 391 TO SECTION 394 OF THE COMPANIES ACT, 1956 AND SECTIONS 100 TO 103 OF THE COMPANIES ACT, 1956 BETWEEN AND AND

Issues with Tariff based Competitive Bidding under Case I route

ALLIED PROPERTIES REAL ESTATE INVESTMENT TRUST. Financial Statements. For the Period Ended March 31, 2004

Lease Accounting. Dr.T.P.Ghosh Professor, MDI, Gurgaon

March 23, 2006 Anderson ECON 136A 11am Class FINAL EXAM v. 1 Name

Cogeneration and Small Power Production Facilities Rules

DRAFT LEASE DEED Office premises (LIC as a tenant)

CONSOLIDATED FINANCIAL STATEMENTS

Frequently asked questions on business combinations

CH OFFSHORE LTD BAREBOAT CHARTER OF VESSEL WITH CHARTERER S OPTION TO PURCHASE

SAN FRANCISCO WATER DEPARTMENT AND HETCH HETCHY WATER AND POWER. Statement of Changes in the Balancing Account. June 30, 2007

AGREEMENT for an Assured Shorthold Tenancy under Part 1 of the Housing Act 1988

QUEENSLAND NICKEL PTY LTD PURCHASE ORDER TERMS AND CONDITIONS SUPPLY DEPARTMENT

Telangana State Electricity Regulatory Commission

International Accounting Standard 17 Leases. Objective. Scope. Definitions IAS 17

WHITE PAPER ON FUNDS FROM OPERATIONS

SENATE BILL 794. By Dickerson BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF TENNESSEE:

SCHEME OF ARRANGEMENT BETWEEN. THE TATA POWER COMPANY LIMITED ( Transferor Company ) AND

SCHEME OF AMALGAMATION WITH AND THEIR RESPECTIVE SHAREHOLDERS AND CREDITORS

Process. Thomas Dvorsky Director, Office of Electric, Gas and Water New York State Public Service Commission May 23, 2011

SCHEME OF AMALGAMATION

Land: Detail about Land of Amelia Coal Mine is as follows:

TARIFF ORDER FOR MANIPUR STATE POWER DISTRIBUTION COMPANY LIMITED. Petition (ARR & Tariff) No. 1 of 2018

PROPOSED DIVESTMENT OF 9 TAI SENG DRIVE, GEO TELE CENTRE, SINGAPORE

Ind AS 115 Impact on the real estate sector and construction companies

PS Business Parks, Inc. Reports Results for the Quarter Ended March 31, 2017

LKAS 17 Sri Lanka Accounting Standard LKAS 17

REQUEST FOR SELECTION (RfS)

IN THE HIGH COURT OF HIMACHAL PRADESH AT SHIMLA COMPANY PETITION No. 2 of 2011 IN THE MATTER OF COMPANIES ACT, 1956 AND

IAS Revenue. By:

IN THE HIGH COURT OF KARNATAKA AT BANGALORE PRESENT THE HON'BLE MR. JUSTICE N. KUMAR AND THE HON BLE MR. JUSTICE B. MANOHAR. ITA No.

Sample Real Estate Agreement

will not unbalance the ratio of debt to equity.

(ii) Particulars of land sales used: Date of sale Sale price** Address of property Land sales not used in analysis with reason code** (iii) (iv)

FULL APEX (HOLDINGS) LIMITED (Incorporated in Bermuda) (Company Registration No.: 31906)

State of Palestine Decree Law No (6) of 2014 On Financial Leasing. President of the Palestinian National Authority

PROPOSED DIVESTMENT OF 200 PANDAN LOOP, PANTECH 21, SINGAPORE

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

BEFORE THE NODAL OFFICER, DELHI DEVELOPMENT AUTHORITY (Under the provisions of Delhi Apartment Ownership Act, 1986)

SCHEME OF AMALGAMATION GG REAL ESTATE PRIVATE LIMITED WITH SITASHREE FOODS PRODUCTS LIMITED

COUNTER INDEMNITY FOR BUYER S CREDIT/LETTER OF UNDERTAKING/LETTER OF CONFORT LIMIT. and having its Registered Office at

LONDON LIFE INSURANCE CO. ASSESSOR OF AREA 9 -- VANCOUVER. Supreme Court of British Columbia (A872713) Vancouver Registry

SSAP 14 STATEMENT OF STANDARD ACCOUNTING PRACTICE 14 LEASES

Restoring the Past U.E.P.C. Building the Future

Sri Lanka Accounting Standard-LKAS 17. Leases

WHITE PAPER ON FUNDS FROM OPERATIONS

IFRS 16 LEASES. Page 1 of 21

NATIONAL COMPANY LAW APPELLATE TRIBUNAL, NEW DELHI. Company Appeal (AT) (Insolvency) No. 155 of 2018

IN THE HIGH COURT OF DELHI AT NEW DELHI SUBJECT : DELHI RENT CONTROL ACT, 1958 Date of decision: 10th January, RFA No.

CASE STUDY DEVELOPER CONTRIBUTES LAND AS EQUITY INTRODUCTION

(16.3) License Fee for Residential Accommodation

Tender Document for Sale of Non Performing Assets of Bank of India

M A N I T O B A ) Order No. 118/15 ) THE PUBLIC UTILITIES BOARD ACT ) November 19, 2015

Reg. Section 15a.453-1(c)(2) Installment method reporting for sales of real property and casual sales of personal property

The new IFRS 16 Leases effective as of 1 January 2019

Hkkjr es a vkokl dh izo`fùk,oa izxfr lecu/kh fjiksvz] twu] 2003

Present : Shri U. N. Behera, Chairperson Shri A. K. Das, Member Shri S. K. Parhi, Member

sold under a separate Order. Failure of Seller to deliver any installment shall not entitle Buyer to cancel the balance of the Order. 4.3 Any time quo

PS Business Parks, Inc. Reports Results for the Quarter Ended September 30, 2018

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 10-Q

BEFORE THE NATIONAL COMPANY LAW TRIBUNAL, BENCH AT ALLAHABAD COMPANY APPLICATION NO. 235/ALD/2018

Suite Metering Provisions Under the Residential Tenancies Act, 2006 and the Energy Consumer Protection Act, Consultation Paper

KEPPEL LAND LIMITED (Co. Reg. No ) (Incorporated in Singapore)

FORM 91 ANNUAL CERTIFICATES OF BALANCES (Referred to in paragraph of the CPWA Code) For the year ended 31 st March, 20..

PUBLIC UTILITIES COMMISSION

EXPRESSION OF INTEREST FOR SHOP SELECTION BY JHARKHAND STATE BEVERAGES CORPORATION LIMITED

PFC Consulting Limited (A Govt. of India Undertaking) 9 th Floor, Statesman Building, Barakhamba Lane, Connaught Place, New Delhi

EITF Issue No EITF Issue No Working Group Report No. 1, p. 1

COMMERCIAL PROPERTY ASSESSED CLEAN ENERGY ( C-PACE ) AGREEMENT

MANAGEMENT AGREEMENT TERMS AND CONDITIONS

GUJARAT URJA VIKAS NIGAM LTD.

Q EPRA KEY METRICS

CDW HOLDING LIMITED (Incorporated in Bermuda) (Company Registration No )

Revenue recognition for real estate developers Indian GAAP vs ICDS

FIRST SPONSOR GROUP LIMITED (Incorporated in the Cayman Islands) (Company Registration No. : AT )

Revenue Recognition- Real Estate Companies

Direction for General Regulation Concerning Jointly Owned Properties. Chapter One Definitions and General Provisions

INDIAN OVERSEAS BANK SMALL AND MEDIUM ENTERPRISES SME-7 APPLICATION FORM FOR CREDIT FACILITIES OVER Rs.50 lacs & UPTO Rs.2 Crores

NOTES TO THE FINANCIAL STATEMENTS FOR THE YEAR ENDED 31 MARCH 2017

GENERAL CONDITIONS OF SALE BETWEEN PROFESSIONALS PARIS GASTRONOMY DISTRIBUTION

SAMPLE ONLY. Property Investment Anaylsis Example. Free Call: INVEST REAL ESTATE FINANCE DEVELOP SUMMARY

Transcription:

Summary of ARR & BSP Filings Submitted by OPGC For FY 2018-19 0

Summary of OPGC ARR & BSP Filings for FY 2018-19 GENARATION TARIFF PROPOSAL OF OPGC FOR THE FY 2018-19 1. Odisha Power Generation Corporation Limited (herein after referred as OPGC ) is a company incorporated under the Companies Act, 1956 and having its registered office at Zone-A, 7 th floor, Fortune Towers, Chandrasekharpur, Bhubaneswar, Odisha-751023. GRIDCO Limited ( GRIDCO ) had entered into Bulk Power Supply Agreement ( PPA ) with OPGC dated August 13, 1996, for purchase of power from its Generating Units 1 & 2, having capacity of 420 MW (210 MW x 2) of IB Thermal Power Station. OPGC, GRIDCO and Government of Odisha signed a Tripartite Agreement dated October 18, 1998 providing certain further amendments to existing PPA and other provisions including those concerning the establishment of Units 3 & 4 of IB Thermal Power Station by OPGC. Further, Escrow and Security Agreement dated November 30, 1998 was entered between OPGC, GRIDCO and Union Bank of India. 2. Subsequently, certain disputes had arisen between the parties on issues arising from the terms of the PPA, Tripartite Agreement and other agreements between the Parties. In order to resolve these disputes, Government of Odisha constituted a Task Force vide Resolution No. 3895 dated May 7, 2007 for resolving disputes regarding tariff and other related matters. Government of Odisha, based on the recommendations of Task Force, issued Notification No. 7216 dated June 21, 2008 for resolving all such disputes on terms and conditions contained therein in regard to Unit 1 & 2 and also in regard to setting up of Unit 3 & 4, as overall settlement of all such disputes. After that, OPGC and GRIDCO agreed to amend existing PPA and Tripartite agreement based on Government of Odisha Notification dated June 21, 2008. Accordingly, an agreement was signed on September 6, 2012 as Supplemental to the Tripartite agreement executed on October 18, 1998. Subsequently, OPGC and GRIDCO signed an amendment to existing PPA on December 19, 2012 by amending certain clauses related to Plant Load Factor, Revision in tariff, etc. 3. Hon ble OERC vide its Order dated April 27, 2015 approved the Amended PPA and directed OPGC to file an application for determination of Generation Tariff, as per approved Amended PPA, for rest of the control period starting from FY 2016-17 onwards since tariff for FY 2014-15 and FY 2015-16 has already been approved by Hon ble OERC in ARR of GRIDCO. The Commission, vide its Order dated March 21, 2016 determined the Generation Tariff of Units 1 & 2 of IB Thermal Power Station for FY 2016-17, in accordance with the terms and conditions of OERC Generation Tariff Regulations, 2014. 4. Aggrieved by the said Order, OPGC filed Appeal No. 126 of 2016 before the Hon ble Appellate Tribunal for Electricity ( APTEL ) against the Tariff Order for FY 2016-17. Hon ble APTEL vide its Judgment dated April 6, 2017 in the stated Appeal upheld the Commission s Tariff Order for FY 2016-17. Aggrieved by the Judgment of Hon ble APTEL, OPGC filed Civil Appeal No. 9485 of 2017 before the Hon ble Supreme Court, which has been admitted by the Hon ble Supreme Court and is pending Adjudication. The present Petition is being filed without 1

prejudice to OPGC s rights under law and its contentions taken in Civil Appeal No. 9485 of 2017 before the Hon ble Supreme Court in respect of the applicability of the terms and conditions of tariff set out in the Amended PPA for the determination of OPGC s tariff. 5. Regulation 2.7 of OERC Generation Tariff Regulations, 2014 requires OPGC to file an application for determination of tariff by November 30th of every year and Regulation 2.13 of the OERC Generation Tariff Regulations, 2014 requires OPGC to file an application each year for truing up of the previous year with respect to capital expenditure including additional capital expenditure incurred up to last day of the previous year. 6. In light of the above, the instant Petition for truing up of FY 2016-17 and determination of Generation Tariff for FY 2018-19 is being filed under Sections 62 and 86 of the Electricity Act, 2003 ( the Act ) read with the OERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014 and OERC (Conduct of Business) Regulations, 2004. Truing up for FY 2016-17 7. OPGC has filed the truing up of FY 2016-17 in accordance with the Regulation 2.13 of the OERC Generation Tariff Regulations, 2014 as detailed in the following paragraphs. Capital cost and additional capitalization 8. The Commission in its Tariff Order for FY 2016-17 had approved the opening capital cost of OPGC Ltd. as Rs.1060 Crore. Further, the Commission, in the tariff order, has mentioned that in case any expenditure is incurred during FY 2015-16 satisfying the conditions of the Regulations, the same shall be considered in subsequent years by the Commission. In accordance with the Commissions observation, OPGC claimed the additional capitalization for FY 2015-16 and FY 2016-17 in accordance with Regulation 3.4 of the OERC Generation Tariff Regulations, 2014 under this Petition. 9. The total actual additional capitalisation incurred for FY 2015-16 was Rs. 18.13 Crore. Out of the same, the additional capitalisation of Rs. 17.82 Crore is claimed in FY 2015-16 for arriving at the opening GFA for FY 2016-17 along with approved capital cost of Rs. 1060 Crore. Accordingly, the opening GFA for FY 2016-17 has been claimed as Rs. 1077.82 Crore. 10. The total actual additional capitalisation incurred for FY 2016-17 was Rs. 23.62 Crore and out of the same, the additional capitalisation claimed for truing up of FY 2016-17 is Rs. 22.04 Crore. Hence, the closing GFA for FY 2016-17 has been claimed as Rs. 1099.86 Crore. Debt-equity Ratio 11. The additional capitalisation in FY 2015-16 and FY 2016-17 was funded by the internal resources of OPGC. However, in accordance with the Regulation 3.8, the debt-equity ratio of the additional capitalisation in FY 2015-16 and FY 2016-17 2

has been considered as 70:30. The debt-equity claimed for truing up for FY 2016-17 is shown in the Table below. Table 1: Debt-Equity for FY 2016-17 (Rs. Crore) FY 2016-17 Debt Equity Particulars Gross amount pertaining to opening capital cost Approved in Tariff Order 3 Claimed for Truing up Approved in Tariff Order Claimed for Truing up 610.00 610.00 450.00 450.00 Outstanding balance as on April 1, 2016 pertaining to 0.00 0.00 450.00 450.00 opening capital cost Opening balance (gross) carried forward from 0.00 12.47 0.00 455.35 previous year Addition during FY 2016-17 0.00 15.43 0.00 6.61 Closing balance (gross) 0.00 27.90 450.00 461.96 Return on equity 12. In accordance with Regulations 4.5 and 4.6 of the OERC Generation Tariff Regulations, 2014, RoE base shall be computed in rupee terms, on the equity base and RoE shall be computed @ 16% of the Equity Capital. Accordingly, the RoE for FY 2016-17 has been claimed considering the opening equity of Rs. 455.35 Crore and the equity portion of the additional capitalization on half yearly basis. Hence, Rs.73.38 Crore has been claimed as ROE against Rs 72 Crore approved in the tariff order. Interest on loan capital 13. According to gross loan capital of Rs. 610 Crore, there is no outstanding loan balance. For the normative loan pertaining to the additional capitalisation, the loan repayment for the year has been considered as equal to depreciation and accordance with Regulation 4.13, the interest rate has been considered as 10.71% which is the actual weighted average rate of interest of the generating company as a whole (on the ongoing loan draw down for OPGC Units 3 &4 being availed from PFC and REC). The interest on loan of Rs. 1.82 Crore has been claimed on the normative average loan for the year by applying the rate of interest. Additionally, Rs. 9.77 Crore paid to Government of Odisha as guarantee fees has been claimed by OPGC. Depreciation 14. The OERC Generation Tariff Regulations, 2014 specifies the rates of depreciation for each asset class. If the depreciation rates as per the OERC Generation Tariff Regulations, 2014 is applied for computing the depreciation, OPGC will not be able recover the entire depreciable value of the assets capitalised from FY 2015-16 onwards by the end of the term of the PPA (FY 2025-26). Hence, OPGC

requested to allow the recovery of depreciable value of the assets capitalized from FY 2015-16 onwards, by equally spreading the same during each year from the year of capitalisation, and up to FY 2025-26. The depreciation claimed was Rs. 3.44 Crore for FY 2016-17 as true up. Interest on working capital 15. The working capital requirement for FY 2016-17 has been computed in accordance with Regulation 4.24(a) of the OERC Generation Tariff Regulations, 2014. The rate of interest on working capital has been considered in accordance with Regulation 4.26 of the OERC Generation Tariff Regulations, 2014. The interest on working capital for truing up of FY 2016-17 is given in the table below. The interest on working capital has been claimed as Rs. 13.58 Crore in true up against Rs. 13.13 Crore approved by the Commission. Table 2: Interest on working capital for FY 2016-17 (Rs. Crore) Particulars Norms Approved in Tariff Order Claimed for Truing up Cost of Coal 1 Month 27.78 27.78 Cost of Secondary Fuel Oil 1 Month 0.87 0.87 O&M expenses 1 Month 9.63 10.14 Maintenance spares 20% of O&M 23.10 24.34 Receivables 1 Month 45.37 47.29 Total Working Capital Requirements 106.75 110.43 Interest rate 12.30% 12.30% Interest on working capital 13.13 13.58 FY 2016-17 Rationale for truing up claim As approved in the Tariff Order As approved in the Tariff Order Normative O&M expenses as approved in the Tariff Order plus water charges Normative O&M expenses as approved in the Tariff Order plus water charges Based on the truing up claim of AFC SBI Base Rate + 300 basis points Operation and maintenance (O&M) expenses 16. The O&M expenses of Rs. 115.50 Crore as approved by the Commission, has been considered for truing up of FY 2016-17. Annual fixed cost 4

17. Based on the above, the AFC claimed for truing up of FY 2016-17 is given in the table below. OPGC requested the Commission to allow the recovery towards under-recovery of AFC to the extent of Rs. 16.87 Crore along with carrying cost. Table 3: AFC for FY 2016-17 (Rs. Crore) FY 2016-17 Particulars Approved in Tariff Order Claimed for Truing up Return on Equity 72.00 73.38 Interest on loan capital 0.00 11.59 Depreciation 0.00 3.44 Interest on working capital 13.13 13.58 O&M expenses 115.50 115.50 Total AFC 200.63 217.50 Under recovery 16.87 Total impact of truing up 18. Along with under-recovery of AFC, OPGC submitted several other claims in the true up application also. The same is given in the table below. Table 4: Total impact of truing up for FY 2016-17 (Rs. Crore) Particulars FY 2016-17 Under-recovery of AFC 16.87 Impact of Revised Auxiliary Consumption on Energy Charge 2.47 Difference in Incentive entitlement and Incentive billed during FY 2016-17 on account of additional 0.5% 0.78 Auxiliary consumption Under-recovery of ED 2.07 Under-recovery of income tax 1.76 Total 23.95 Recovery of impact of truing up 19. In accordance with the Judgment of the Hon ble APTEL dated 8 April, 2015 in Appeal No 160 of 2012, OPGC requested to approve the truing up for FY 2016-17 along with carrying cost considering the rate of interest on working capital for the respective years. The total impact of truing up claimed by OPGC for FY 2016-17 is Rs. 29.38 Crore, the details are given below. 5

Table 5: Truing up for FY 2016-17 including carrying cost (Rs. Crore) Particulars FY 2016-17 FY 2017-18 FY 2018-19 Opening Gap/(Surplus) 0.00 23.95 23.95 Gap/(Surplus) addition during the year 23.95 0.00 0.00 Closing Gap/(Surplus) 23.95 23.95 23.95 Cumulative Gap/(Surplus) 23.95 Rate of Interest 12.30% 11.00% 10.95% Carrying cost on opening balance 0.00 2.64 1.32 Carrying cost on Addition 1.47 0.00 0.00 Total carrying cost 1.47 2.64 1.32 Cumulative carrying cost Total Gap/(Surplus) including carrying cost 5.43 29.38 Generation Tariff for FY 2018-19 20. OPGC proposed the Generation Tariff for FY 2018-19 in accordance with the OERC Generation Tariff Regulations, 2014. In accordance with Regulation 4.3 of the OERC Generation Tariff Regulations, 2014, the Annual Fixed Cost (AFC) of a generating station comprises of the following components: Return on Equity; Interest on loan capital; Depreciation; Interest on working capital; Operation and maintenance expenses. Capital Cost and additional capitalization 21. OPGC has considered the closing capital cost for FY 2016-17 as opening capital cost for FY 2017-18 and proposed Rs. 50.37 Crore as additional capitalization for FY 2017-18. The additional capitalisation is proposed for Construction of Ash Pond C and Ash Pond C HDPE Lining. Similar Rs. 55.99 Crore has been estimated as additional capitalization for FY 2018-19 for modification of Electro Static Precipitator (ESP) to meet the prescribed emission standard. 22. The additional capitalisation proposed is towards the additional works some of which are towards compliance to the Change in Law and other works have 6

become necessary for efficient and successful operation of the generating station. OPGC requested the Commission to approve the additional capitalisation claimed for FY 2017-18 and FY 2018-19 under the provisions of Regulation 3.4 (b) and (d) of the OERC Generation Tariff Regulations, 2014. The details of additional capitalization are given below. Table 6: Capital cost for FY 2018-19 (Rs. Crore) FY 2017-18 FY 2018-19 Particulars Revised proposed Claimed for Tariff Opening capital cost 1099.86 1150.23 Additional capitalisation 50.37 55.99 Closing capital cost 1150.23 1206.22 Debt Equity Ratio 23. OPGC considered the debt-equity ratio as 70:30 for additional capitalization. The closing balances of gross loan and equity claimed for truing up of FY 2016-17 have been considered as the opening balances for FY 2017-18. The closing balances of gross loan and equity of FY 2017-18, after considering additional capitalization during FY 2017-18, have been considered as the opening balances for FY 2018-19. The total debt-equity claimed by OPGC for FY 2018-19 is shown in the table below. Table 7: Debt-Equity for FY 2018-19 (Rs. Crore) FY 2017-18 FY 2018-19 Particulars Debt Equity Debt Equity Revised proposed Claimed for Tariff Gross amount pertaining to opening approved capital cost 610.00 450.00 610.00 450.00 Outstanding balance as on April 1 pertaining to opening 0.00 450.00 0.00 450.00 approved capital cost Opening balance (gross) carried forward from previous 27.90 461.96 63.16 477.37 year Addition during the year 35.26 15.31 39.19 16.80 Closing balance (gross) 63.16 477.07 102.35 493.87 Return on Equity 24. In accordance with Regulations 4.5 and 4.6 of the OERC Generation Tariff Regulations, 2014, RoE shall be computed in rupee terms, on the equity base and RoE shall be computed @ 16% of the Equity Capital. Accordingly, OPGC claimed Rs. 77.67 Crore as RoE for FY 2018-19. 7

Interest on Loan Capital 25. The normative loan outstanding as on April 1, 2018 has been worked out by deducting the cumulative repayment up to March 31, 2018 from the gross normative loan. The normative loan pertaining to the additional capitalisation has been considered as loan addition during the year. The loan repayment for the year has been considered as equal to depreciation for the year. In accordance with Regulation 4.13 of the OERC Generation Tariff Regulations, 2014 the rate of interest has been considered as 10.55% which is the weighted average rate of interest of the generating company as a whole (on the ongoing loan draw down for OPGC Units 3 &4 being availed from PFC and REC). The interest on loan claimed by OPGC for FY 2018-19 is Rs. 6.54 Crore. The details are given below. Table 8: Interest on loan for FY 2018-19 (Rs. Crore) Particulars FY 2018-19 Gross loan 673.16 Cumulative repayment up to 623.48 previous year Outstanding balance 49.78 Addition during the year 39.19 Repayment during the year 14.78 Closing balance 74.20 Average balance 61.99 Interest rate 10.55% Interest 6.54 Depreciation 26. OPGC requested the Commission to allow the recovery of depreciable value of the assets capitalised from FY 2015-16 onwards, by equal spread during each year, from the year of capitalisation, up to FY 2025-26 (end of the term of PPA). The depreciation claimed by OPGC for FY 2018-19 is Rs. 14.78 Crore. Interest on Working Capital 27. The working capital requirement for FY 2018-19 has been computed in accordance with Regulation 4.24(a) of the OERC Generation Tariff Regulations, 2014. Further, in addition to the normative O&M expenses in accordance with Regulation 4.28(a), the water charges in accordance with the Regulation 4.28(e) has been considered for arriving at the working capital requirement. The rate of interest on working capital has been considered in accordance with Regulation 4.26 of the OERC Generation Tariff Regulations, 2014. OPGC has considered the prevalent MCLR of 7.95% (One Year Tenure) plus 300 basis points as Interest Rate for computing Interest on Working Capital. 28. OPGC claimed interest on working capital as Rs. 13.87 Crore for FY 2018-19. The details are given below. 8

Table 9: Computation of interest on working capital for FY 2018-19 (Rs. Crore) Particulars Norms Amount Cost of Coal 1 Month 32.41 Cost of Secondary Fuel Oil 1 Month 1.08 O&M expenses 1 Month 11.42 Maintenance spares 20% of O&M 27.42 Receivables 1 Month 54.32 Total Working Capital Requirements 126.66 Interest rate 10.95% Interest on working capital 13.87 O&M Expenses 29. Regulation 4.28(a) of the OERC Generation Tariff Regulations, 2014 specifies the normative O&M expenses of Rs. 30.51 lakh/mw for Unit sizes of 210 MW. In addition to the normative O&M expenses, Regulation 4.28(b) of the OERC Generation Tariff Regulations, 2014, specifies special compensation allowance for O&M @ Rs. 0.65 lakh/mw for the projects that have completed 20 years of useful life. Accordingly, the O&M expenses claimed by OPGC for FY 2018-19 is Rs. 130.87 Crore. Summary of Annual Fixed Cost 30. OPGC proposed Annual Fixed Cost of Rs. 243.73 Crore for FY 2018-19. The details are given in the table 10 below. Table 10: Annual Fixed Cost of OPGC for FY 2018-19 (Rs. Crore) Particulars Amount Return on Equity 77.67 Interest on loan capital 6.54 Depreciation 14.78 Interest on working capital 13.87 O&M expenses 130.87 Total AFC 243.73 9

Norms of Operation 31. The norms of operation proposed for FY 2018-19 by OPGC in accordance with the OERC Generation Tariff Regulations, 2014 is given in table 11 below. Table 11: Operational Performance Parameters for FY 2018-19 Particulars FY 2018-19 Normative Annual Plant Availability Factor 85% Normative Annual Plant Load Factor 85% Gross Station Heat Rate 2450 Secondary fuel oil consumption 1.00 Auxiliary consumption 9.00% Fuel Prices 32. The price of coal and the price & calorific value of secondary fuel oil have been considered by OPGC based on the actuals for the preceding 3 months of August, 2017 to October, 2017 in accordance with the Regulation 4.25. However, as regards the GCV of coal, OPGC has considered the weighted average GCV of coal for last one year i.e., from November 2016 to October 2017 to smoothen the impact of seasonal variations. The weighted average GCV for last one year works out to 2685.41 kcal/kg as against weighted average GCV of 2520 kcal/kg for last 3 months. 33. Further, OPGC requested to consider determination of energy charges factoring as fired GCV in accordance with Regulation 4.33 of the OERC Generation Tariff Regulations, 2014, and as submitted above. The current OERC Generation Tariff Regulations, 2014 envisage payment of ECR on the basis of as fired GCV. OGC also stated that no generating company, subject to cost-plus tariff determination under Section 62 of the Act, in the country, whether regulated by the CERC or by appropriate state commissions, receives an ECR computed on the basis of GCV as billed by the coal company. Such considered determination of energy charge shall avoid under estimation of working capital/ cash flow requirement for operation of the power plant. 34. Accordingly, the price of coal and oil has been considered as Rs. 1368.91/MT and Rs. 41390/Kl respectively. Energy charges 35. OPGC computed Energy Charge for FY 2018-19 as per norms of operation, GCV and prices of the fuel proposed. The details are given in table 12 below. Table 12: Computation of Energy Charge for 2018-19 Particulars Units Value Gross Generation MU 3127.32 Auxiliary Consumption % 9.00% 10

Particulars Units Value Generation after Aux. Cons. MU 2845.86 Gross Station Heat Rate kcal/kwh 2450.00 GCV of Coal kcal/kg 2685.41 GCV of Oil kcal/ltr. 10000 Specific coal consumption kg/kwh 0.97 Specific oil consumption ml/kwh 1.00 Price of Coal Rs./MT 1368.91 Price of secondary fuel oil Rs./kL 41390 Variable Charge for Coal Rs./kWh 1.37 Variable Charge for Oil Rs./kWh 0.05 Energy Charge Rate Rs./kWh 1.41 Reimbursement of Other Charges 36. OPGC proposed for reimbursement of the different charges and expenses which comprise of Electricity duty, water cess and charges, tax and cess on land, SOC and MOC paid to SLDC, EPRC charges, Income tax and recovery of ARR and tariff petition fees and publication expenses. The details are given in table 13 below. Table 13: Other Charges for 2018-19 (Rs. Crore) S. No. Particulars Amount 1 Electricity Duty 15.48 2 Water Cess and Water Charges 6.21 3 Tax and Cess on Land 0.18 4 SOC and MOC for SLDC 0.33 5 ERPC Charges 0.16 6 Income Tax 39.73 7 Recovery of ARR & Tariff Petition Fees& publication 0.30 expenses Total 62.39 37. OPGC requested to provisionally approve the other charges of Rs. 62.39 Crore. OPGC further requested to direct GRIDCO Ltd. to reimburse the other charges on actual basis during the year. 38. OPGC also requested to allow incentives, if OPGC achieves excess schedule generation (kwh) over energy generation as per NAPLF @ 85% as specified in Regulations 6.9 and 6.10 of the OERC Generation Tariff Regulations, 2014. 39. OPGC requested to approve the recovery of upward or downward variation in Capacity Charge, Energy Charge, Incentive and Other Charges at the end of the 11

FY 2018-19 in accordance with the Regulations 6.3 of OERC Generation Tariff Regulations, 2014. Summary of Generation Tariff for FY 2018-19 40. The summary of Generation Tariff proposed by OPGC for FY 2018-19 is given in table 14 below. Table 14: Generation Tariff for 2018-19 Sr. No. Particulars FY 2018-19 Rs. Crore Rs./kWh 1. Annual Fixed Cost 243.73 0.86 2. Energy Charges 401.92 1.41 3. Tariff for Sale of Power 645.66 2.27 Prayer 41. OPGC has prayed to the Commission to approve the following for FY 2018-19. a. Approve the truing up of FY 2016-17 including carrying cost; b. Approve Annual Fixed Charges for FY 2018-19; c. Approve the recovery of Energy Charge, for FY 2018-19, as per Regulation 4.32, 4.33 & 4.34 of OERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014; d. Approve the other charges to be reimbursed by GRIDCO Ltd. as claimed in the Petition; e. Direct GRIDCO Ltd. to reimburse the other charges on actual basis during the year; f. Approve the recovery of any year-end adjustments; g. Allow the recovery of Impact of Review Order for FY 2017-18 in Case No. 35/2017. 12