MCGM AUTODCR PROJECT

Similar documents
Block Number 8th Floor Building Name Piramal Tower. Street Name Ganpatrao Kadam Marg Locality Lower Parel (W)

Presentation on DCR By Shri Manoj Daisaria

REVISED DRAFT DCR 2034

REGISTRATION NO P AFFORDABLE HOUSING AT DABHA, NAGPUR

Accessible drinking fountain does not have a clear 30 wide floor space centered on the drinking fountain (centerline to the counter edge is 12 ).

PACKAGE DEAL AGREEMENT FOR SALE OF FLATS IN BULK TO A PURCHASER. THIS AGREEMENT made at... on... this

A By-law to amend Zoning and Development By-law No regarding Laneway Houses

Etobicoke York Community Council Item [#], as adopted by City of Toronto Council on [date] Draft Zoning By-law Amendment (March 20, 2019)

MAHA RERA Application

INVITATION FOR OFFER

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

Law No. (27) of 2007 Concerning Ownership of Jointly Owned Properties in the Emirate of Dubai

Toronto and East York Community Council Item TE33.3, as adopted by City of Toronto Council on June 26, 27 and 28, 2018 CITY OF TORONTO BY-LAW -2018

Sr. No This option is applicable for Options Remarks / Details required

2014 OSSC CHAPTER 10 - MEANS OF EGRESS TABLE OF CONTENTS

Affordable Homes PROPOSED VIEW

Bank of Baroda Regional Office, T D Road, Ernakulam Website :

VIEW POINTE MAINTENANCE CORPORATION

ORDINANCE NO City Attorney Summary

Bank of Baroda Regional Office, T D Road, Ernakulam Website :

Tender Id: LUC

H. H. The Ruler s Court Government of Dubai Law No. (27) of 2007 Concerning Ownership of Jointly Owned Properties in the Emirate of Dubai

5. Turnover Condition : Bare Shell, rough flooring, fire sprinkler and smoke detectors for installation., Fan Coil Units provided

Riddhi Siddhi a project by Durga Associates

Bank of Baroda Zonal Office, Anand Bhawan,4 th Floor, Sansar Chandra Road, Jaipur INVITATION FOR OFFER

MAHA RERA Application

OFFER DOCUMENT HIRING OF PREMISES TWO BID SYSTEM

INFO-PACK. KUBE The Luxury Apartments. Kube Info Pack Page 1

AMORE PREMIUM SERVICED RESIDENCES

REQUIREMENT OF BRANCH PREMISES

Chargeback Reports: From CAD Drawings to Database Report

Natural Light & Ventilation. Sources. Regulation 45 (1) & 45 (2) A Public road with right of way. A Courtyard or Open Space within the site.

TENANT DESIGN MANUAL UPDATED JULY 2015

Sec. 3-1 Single Family R- Use Districts.

Formats of Certificates of Architect, Engineer and Chartered Accountant:

C-5, C-5A and C-6 Districts Schedule

CITY OF TORONTO. BY-LAW No

India Infrastructure Finance Company Limited Registered Office: 8 th Floor, HT House, 18 & 20, K. G. Marg, New Delhi

St Johns Road, Isleworth

BUILDING SPECIFICATIONS

TENDER FOR HIRING OFFICE ACOMMODATION AT DELHI

THE TAMIL NADU APARTMENT OWNERSHIP RULES, 1997 (G.O.Ms.No.150, Housing and Urban Development (HB) 5(1) dated 7 th April 1997)

MUNICIPAL CORPORATION OF GREATER MUMBAI RULES FOR FIXING CAPITAL VALUE OF LANDS AND BUILDINGS

1) What is the product? Expat Genesis is a gated, residential community project situated in Wadhmukwadi on the Alandi Road in Pune.

FACT SHEET SANDTON GATE PHASE 1

Andraus high-rise, Sao Paulo, Brazil, February 1972

FOR SALE or LEASE 2086 New Danville Pike, Lancaster, PA Pequea Township

Guidelines for the Approval of New Homes Sales Offices (Building Permits, Agreements, Securities)

BUILDING GUIDELINE MEASUREMENT. Appraisal Institute of Canada 403 ~ 200 Catherine Street Ottawa, Ontario K2P 2K9

Urban Planning and Architectural Standards for Social Housing Architectural Design

A club of your own. A dream of your own.

Authority: Ontario Municipal Board Decisions/Orders issued June 26, 2014, August 24, 2015 and July 13, 2016 in Board File PL CITY OF TORONTO

CITY OF TORONTO. BY-LAW No (OMB)

HOUSING CODE CHECKLIST FOR RENTAL INSPECTIONS

Hundreds of home owners trust in Prisunic for their

Ref: 8235/PMD/ROF/P-56 /2016 Date:

CITY OF TORONTO BY-LAW NO. ~-20~

Ku-ring-gai Local Environmental Plan No 194

Smart Home with Nature Unlimited

CITY OF MERCED SMALL LOT SINGLE-FAMILY HOME DESIGN GUIDELINES

Access to and use of buildings

Penina, Algarve, Portugal An impressive property on Penina for sale. Asking Price 1,295,000. Utility room 5 bedrooms 4 bath/shower rooms Office

Element Z General Design Requirements Owner Standards and Other Requirements

Bickleigh Cottage Bickleigh, Tiverton, Devon. savills.co.uk

Emma Grand Mixed-use Building 100, 108 & 114 Emma St. South Grand Valley, Ontario

Feelwood Village. Baabdat. Technical specifications for the buildings on lots # 569 & Baabdat

550,000 inc. of agency fees

Authority: Etobicoke York Community Council Item 25.2, as adopted by City of Toronto Council on April 6, 2009 Enacted by Council: April 30, 2009

Marsh House Bartwood Lane Pontshill ROSS ON WYE Herefordshire HR9 5TA 375,000

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT, ENGINEERING, AND SUSTAINABILITY DEPARTMENT

General Provisions. 4.1 Accessory Dwelling Units. 4.2 Accessory Uses. Part Residential Zones

Sequoia Park Hatch End HA5 4BS

Part 4.0 DEVELOPMENT REGULATIONS

Germany - Census of Population, Occupation, Dwellings and Buildings IPUMS Subset

INFO-PACK. Knight s Court Info Pack Page 1

Kent Cottage guide price 815,000 Pound Green Buxted East Sussex TN22 4JR

Article 2. Rules of Interpretation

2018 CSBC / 2018 CSFSC Part III. Chapter #10. Means of Egress. Table of Contents. Based on the 2015 IBC and the 2015 IFC.

SECTION SITE SURVEYS

BUILDING PERMIT APPLICATION

Homes close to all that you love.

Residential Square Footage Guidelines

Castles treasured with ultimate luxury, elegance, serenity, friendly neighbourhood and security. PREMIUM LUXURY VILLAS IN VAKATHANAM WITH EXCELLENT

A Contemporary Arts & Culture Neighbourhood

FACT SHEET. Name of the Project: CHIRPING WOODS Location : Harlur Road, Off Sarjapur Road Land Extent : 16 acres Type : 75% Apartment & 25%Villament

IGHTHAM MOTE ACCESS INFORMATION

Tenements (Scotland) Bill [AS PASSED]

M infra. 2, 3 & 4 B H K L u x u r i o u s F l a t. BORN WITH BETTERMENT K P Residency. A Project by

Ontario Municipal Board Decision/Order issued on July 2, 2014 in Board File No. PL CITY OF TORONTO. BY-LAW No (OMB)

TENANT DESIGN MANUAL UPDATED JULY 2015

This material is only for internal use and is not to be shared or re-printed.

UNIVERSITY OF HONG KONG LIBRARY. This book was received in accordance with the Books Registration Ordinance Section 4

Hassan Centenary Terraces

B Application example

ARTICLE VIII DEVELOPMENT STANDARDS

CHAPTER 11 GENERAL REQUIREMENTS AND PROPERTY DEVELOPMENT STANDARDS

VALUATION REPORT FOR PROPERTY BELONGING TO MR. & MRS. WINSTON LEWIS LOCATION: ROSE COTTAGE, VILLA ST. VINCENT AND THE GRENADINES

114 Cedric Street STIRLING

S U K H W A N I F A C T F I L E

PREPARED FOR: ADI DEVELOPMENT GROUP INC.

Transcription:

MCGM AUTODCR PROJECT DRAWING PROTOCOL DOCUMENT AUTODCR: AUTOMATING BUILDING PLAN APPROVAL Prepared by: SoftTech Engineers Pvt. Ltd.

About The Document MCGM has planned to automate the building plan approval process by introducing AutoDCR system. AutoDCR software reads the CAD drawings submitted by architects and automatically produce the deviation report based on the control regulations prescribed by MCGM. The purpose of this document is to establish a set of guidelines to Architects for preparation of drawings to be submitted for taking Planning Permit and Building Permit from MCGM. Uniformity in the process of drafting of the drawings to be submitted for approval is required for automation of building approval system by introducing AutoDCR system. The consultants/architects should prepare the drawings keeping specific objects in specific layers with specific colors and text. The layers required to create with explanation of what is required to be drawn on which layer is described in this document. How to Read this Document This document should be read in conjunction with the building bye-laws which will be applicable for approval of a proposal. The reader of this document should have understood the applicable bye laws for scrutiny of a proposal as well as should be familiar with AutoCAD terminology and environment for better understanding. How to Refer following Table User can prepare drawing in any Computer aided design software which file extension would be.dwg by using this document few steps are given below. If user is using an AutoCAD: Step 1: Open AutoCAD on your desktop Step 2: open layer dialog to create layer like this 2

Note: In above dialog selected color would be by default color of this layer Once create layer then need to draw in drawing Step 3: If Color need to change any entity then goes to AutoCAd tool bar and select color Step 4: Type required text by referring Text column from table below, Select line type mentioned in the line type table below. Refer remarks column to avoid pre-formatting errors. 3

Sr. No. Layer Name Color/ Color Index Text Line type Drawing Domain 1 _Amenity cyan AMENITY AMENITY- SURRENDERED 2 _ArchProj 21 F.BED HIDDEN 21 CHAJJA HIDDEN 21 CORNICE HIDDEN 21 PARGOLA HIDDEN and 21 LOFT HIDDEN overlapp 21 CANOPY HIDDEN ed with 21 GARBAGE HIDDEN Outer SHAFT Wall 21 ORNAMENTAL HIDDEN PROJECTION 21 ORNAMENTAL HIDDEN GLAZING 21 PORCH HIDDEN 21 OTTA HIDDEN 21 STEPS HIDDEN 204 REVAS HIDDEN PROJECTION 21 WEATHER HIDDEN SHADE 4 _Balcony 230 (ENC) BALCONY and 25 FIRE BALCONY overlapp 25 BALCONY ed wit Outer Wall Remark(s) If Amenity is Surrendered All types projection to drawn on same layer like chajja, Flower bed, cornice, loft, paragola, etc. Balcony projection to be drawn on _balcony Layer with respective text and color. 5 _Building 52 A (BUILDING) Outside 6 _BuildingLine 100 NA /Outer Wasll 7 _CarpetArea 191 101, 102, etc. / Outer Wall Provide building name with matching with its proposed work which is shown in layout. Give text of tenement no If normal tenements. 233 101 (SALE) Give text of tenement no if it is sale tenements. 113 101 (REHAB) Give text of tenement no if it is Rehab tenements. 145 101 (PAP) Give text of tenement no if it is Project Affected portion tenements. 191 SPLIT 01, SPLIT 02, etc. Give text of tenement no if it is split tenements. 4

8 _Chowk 180 CHOWK / Outer Wall 9 _Column 101 NA 29 / Building Line 10 _CommOuterWall 150 NA 11 _CompoundWall 252 1.50m High Comp Wall. Overlap on layer 12 _CRZBoundary 91 CRZ Boundary 13 _Deadwall Yellow Dead Wall & overlap on PropWor 14 _Door 114 D1, D2, D3, etc. 15 _ElectricLine 241 33 KV High Tension Line k layer /Outer Wall /Substru cture /in tersect 16 _Elevation 44 Elevation Within building 17 _ExStructure 242 Existing 143 building1, 2, Blue etc. 18 _ 153 GROUND FLOOR PLAN, FIRST FLOOR PLAN, Etc. 19 _InSection 132 GROUND FLOOR, FIRST FLLOR, Etc. 163 SLAB THICKNESS Bylayer building Section/ building Need to mention compound wall height in its text. Text should be on same layer and color. Give text on same layer and same color Need to provide D1, D2, D3, text to calculate no of doors and its text should be inside door poly. Mentioned how much voltage line it is in its text. name must be matched with its section on floor in section Section floor name must be matched with its floor plans. Draw slab thickness on same layer and give text 5

accordingly which will be inside floor s section. 121 BEAM Draw Beam on same layer and give text accordingly which will be inside floor s section. 240 TDR Section floor name must be 41 ROAD WIDENING 20 _GroundLevel 63 GROUND LEVEL ByBlock Section matched with its floor plans and color will be accordingly if whole floor BUA is from TDR or Road wideing. 21 _IndOuterWall 163 NA 22 _IntDPRoad 61 10.0m Wide DP Road /in tersectin Text should be start with its width. g with. 23 _InternalRoad Green 6.0m Wide Int. Road Text should be start with its width. 24 _LiftWell 110 LIFT (P) Lift if it is free from BUA with premium. 171 LIFT /Outer Lift if it is taken in BUA 110 HYDRAULIC LIFT (P) Wall / Parking / Lift if it is hydraulic and free from BUA with premium. 171 HYDRAULIC LIFT Terrace Lift if it is hydraulic taken in BUA. 110 CAR LIFT (P) Lift if it is for car and free from BUA with premium. 171 CAR LIFT Lift if it is for car and taken in BUA with premium. 171 FIRE LIFT Lift if it is for fire purpose. 25 _LocationPlan 211 LOCATION PLAN building 26 _ White MAIN PLOT Outside of the building polyline 27 _MainRoad 20 12.0 M Wide Main Road Overlap on layer 28 _MarginLine 253 NA Should Overlap on Main Plot Should overlap on either MainRoad/IntDPRoad/Right OfWay, etc. Text should be start with its width. 6

layer 29 _Nala-WaterCourse 65 NALA Overlap/i nside with layer 30 _NDZ Blue NDZ 31 _NETPLOT 145 NA Overlap on layer 32 _NotInPossession 141 NOT IN POSSESSION 33 _Parking 60 Parking & If parking floor is present. 62 CP-L Individual Large Car is 63 CP-S Individual Small Car is 52 SC Individual Scooter is 53 Cy Individual Cycle is proposed then text and color should be accordingly 70 VCP-L Individual Visitor Large Car is 70 VCP-S Individual Visitor Small Car is 70 VSC Individual Visitor Scooter is 70 VCY Individual Visitor Cycle is 54 AMB Individual Ambulance is 55 MINBUS Individual minibus is 56 BIGBUS Individual Big Bus is 34 _Passage 110 PASSAGE (P) / If covered passage is free from BUA with premium. 243 PASSAGE Outer If covered passage is taken 7

35 _Pathway 50 1.50 M wide pathway 36 _PhasedProgram 154 Phased Program Wall in BUA. 243 OPEN If passage is open to sky. CORRIDOR 243 PASSAGE If normal passage proposed. 243 FIRE PASSAGE If passage is for fire purpose Text should be start with its width. & 37 _Podium 50 PODIUM 38 _PrintAdditionDetail 223 NA 39 _PropWork 210 A-1 (BUILDING) Red A-1 (BUILDING) 40 _RailLine 170 RAILLINE Should intersect 41 _Ramp 135 10.20 M Long and 1.2 M High Ramp 42 _RecreationalGnd Yellow RECREATIONA L GROUND- PAVED Yellow RECREATIONA & L GROUND 43 _RefuseArea 79 REFUSE AREA 44 _RefuseChember 184 REFUSE CHEMBER 45 _RefuseChute 156 REFUSE CHUTE 46 _ReservArea 62 RESERVE AREA 47 _ResiOuterWall 190 NA Enter name/number of Phased Program on same layer and color Text must be matched with building layer s text. If building is centrally air conditioned then color should be Text must be matched with building layer s text same layer and color while insertion point should be on RailLine. Length and height must be mentioned in its text. If Paved Recreation ground is proposed same layer and color 8

48 _RightOfWay 181 1.20 M RIGHT OF WAY 49 _RoadWidening 232 ROAD WIDENING 67 ROAD WIDENING 50 _Room 72 LIVING (AC), KITCHEN (AC), etc. 72 LIVING, KITCHEN, etc. 51 _Sanitation 119 URINAL, Water closet, Kitchen sink, etc. overlap / with /MainRo ad/intdp Road & should overlap on MainRoa d / Carper Area 52 _Section 75 SECTION-A-A Building and Outside 53 _ServiceDuct 112 SERVICE DUCT /Outer Wall 54 _SewageLine 10 SEWAGE LINE be inside and intersect the same. 55 _SitePlan 50 SITE PLAN building 56 _SmokeVent 184 SMOKE VENT 57 _SpecialUseOuterWall 213 NA Width must be mentioned in its text on same layer and color. If road widening area is taken in BUA Normal layer as well as text to be shown on same layer and color If room is air conditioned then AC word must be come in its text. If normal room without AC then text should be on Other than residential, commercial and industrial use of building to be drawn on same 58 _StairCase 120 FIRE STAIR If staircase is for fire 9

be the same with color 231. 59 _SubStructure 32 ELECTRIC METER ROOM / purpose. 120 FAB/SPIRAL STAIR Outer Wall/ If stair case if Spiral or fabricated. 120 STAIR Parking/ If stair case taken in BUA 110 STAIR (P) Terrace If staircase is free from BUA with premium. 110 STAIR (U) If staircase free from BUA without premium. Treads to be drawn as open poly line inside main staircase poly and stair case intermediate landing should open poly with color 161 and floor landing should 32 WATCHMAN CABIN 32 SOCIETY OFFICE 32 SERVANT ROOM 32 SANITARY BLOCK & If Electric Meter Room is same layer If Watch Man Cabin is same layer If Society office is proposed If Servant Room is proposed If Sanitary Block is same layer 32 COVERED If Covered Garage Block is same layer 32 OPEN GARAGE 32 RAIN WATER HARVESTING 32 AC PLANT ROOM 32 COVERED SWIMMING POOL 32 FIRE CONTROL If Open Garage is proposed If Rain Water Harvesting is same layer If AC Plant Room is same layer If Covered Swimming Pool is same layer If Fire Control Room is 10

ROOM same layer 32 BOILER ROOM If Boiler Room is proposed 32 PUMP HOUSE If Pump House is proposed 32 SEPTIC TANK If Septic Tank is proposed 32 TELEPHONE INSTALLATIO N RM 32 MILK/TELEPH ONE BOOTH If Telephone Installation Room Block is proposed If Milk/Telephone Booth is same layer 32 LETTER BOX If Letter Box is proposed 32 STORE ROOM If Store Room is proposed 32 CHIMNEY If Chimney is proposed then draw it on same layer and provide text 32 AHU If AHU is proposed then draw it on same layer and provide text 32 WELL If Well is proposed then draw it on same layer and provide text 32 ENTRANCE GATE 60 _SurrenderToCorpo 130 SURRENDER TO CORP If Entrance gate is proposed 32 CLUB HOUSE If club house is proposed of Either / polyline 11

61 _SurrenderToMHADA 210 SURRENDEE TO MHADA of Either / polyline 62 _Tank 133 TANK (O/H) & TANK(U/G) should be same. 63 _TempStructure 53 TEMP STRUCTURE Over head Water tank text should be Over head Water tank text should be Water Tank must be provided in floor plan as well in section and both text 64 _Terrace 96 TERRACE 30 1.50 SLOPPING TERRACE 65 _Tree Green TREE 66 _UpperSetBack 80 FIRST UPPER SETBACK 203 SECON UPPER SETBACK of Either PropWor k/ polyline 67 _Void 111 VOID /Outer Wall/ Parking / Terrace If terrace to be free from BUA above on sops then its slop must be mentioned in its text. 68 _WaterLine 131 WATERLINE 69 _Window 115 W1, W2, V1, V2, etc. /Outer Wall / Substruct ure Need to provide W1, W2, V1, V2, text to calculate no of windows and its text should be inside window poly. 12