A Guide to Secondary Suites

Similar documents
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

The Secondary Suite Program

The Secondary Suite Program

Regional District of Nanaimo Secondary Suite Program

Attic Floor Bedrooms 1 & 2 Family Dwellings

Secondary Suites Changes between the 2006 ABC and the 2014 ABC Requirements

Secondary Suites Pre-application Workshop. It could be your first step to a secondary suite.

OBTAINING A CERTIFICATE OF OCCUPANCY FOR UNAPPROVED DWELLING UNITS

Tiny House on Wheels A Tiny House

Homeowners Guide to Accessory Dwelling Units

Is the Apartment in my House Legal?

The City of Orillia s Guide to additional Dwelling Units (Apartments in houses) Q.1: Was a Building Permit issued for the apartment in my house?

ACCESSORY DWELLING UNITS

TENANT IMPROVEMENT APPLICATION Page 1 of 4

Lindon City Accessory Apartment Requirements Handbook

BUILDING CODE COMMISSION

ACCESSORY DWELLING UNITS

Please complete the enclosed application and PRINT clearly.

Secondary suites. A guide to developing a secondary suite. Home Improvements. calgary.ca call Helpful, Equitable, Accurate, Responsive.

COUNTY OF DUPLIN BUILDING INSPECTIONS DEPARTMENT PO BOX 950, 209 SEMINARY STREET, KENANSVILLE, NC (910) FAX: (910)

DEVELOPMENT PERMIT APPLICATION BED & BREAKFAST

ACCESSORY DWELLING UNITS

MEMORANDUM September 7, 2018

êéëé~êåü=üáöüäáöüí Code Requirements and Costs of Incorporating Accessory Apartments in Houses

VACATION RENTALS City of Sebastian

Accessory Dwelling Units (ADUs)

VILLE DE / TOWN OF BEAUMONT

APPLICATION PACKET FOR RESIDENTIAL ADDITION COVER SHEET

CHAPTER 4 LIGHT, VENTILATION & OCCUPANCY LIMITATIONS

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

Huntington Building Inspection

CITY OF MOUNT PLEASANT ORDINANCE NO. 1017

130 - General Regulations for Residential Zones and Uses Only

Janet Campbell Howard Hanna Real Estate Services. 85 South Union Street Main Line: (585) Spencerport NY Office Fax: (585)

BUILDING AN ADU GUIDE TO ACCESSORY DWELLING UNITS PLANNING DIVISION

NOTES ON SUBMITTING BUILDING PERMIT APPLICATIONS:

SKYLINER

3795 Burnside Pl. WEBSITE:

Section Low Density Residential (R1) Land Use District

946 Wilmer St. Brandi Pleasants (250)

Example for a Single Family Home Annual Application fee: $50.00 Inspection fee $ (required once every four years) Total fee: $185.

City of Coquitlam Board of Variance Application

ADAPTABLE DESIGN GUIDELINES

346 ARBUTUS AVENUE $1,500,000. Special Features: BRIAN DANYLIW & ASSOCIATES Personal Real Estate Corporation. Direct TF

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

Municipal Tools for Housing Affordability in Canada s Most Expensive City. City of Vancouver s Inclusionary Housing

321 S Mercury Ave, Clearwater, FL 33765

Suite Your Single Family House The Right Way

SPECIFIC GUIDANCE FOR A BEDSIT TYPE HOUSE IN MULTIPLE OCCUPATION (HMO)

Residential Building Permit Application: Renovations/Additions Conversions, Ancillary Buildings TYPE OF APPLICATION:

SKYLINE HOMES OF ARKANSAS CIT Y, KANSAS 24' 28' 32' SERIES

RESIDENTIAL SINGLE FAMILY DETACHED & ATTACHED BUILDING PERMIT APPLICATION SUBMISSION PROCEDURES

1699 Brousson Dr. GORDON HEAD. Located on a quiet cul-de

Subdivision Application Form

VILLAGE OF WEST HAVERSTRAW BUILDING DEPARTMENT RENTAL PROPERTY CODE 186. In-Person: Property Address City Zip

Frequently Asked Questions (& Answers!)

Welcome to 530 Salmon Road 2 acres Waterfront Saanich Inlet

FOR SALE $5,100,000. Bill Goold Realty 1525, 1527, 1529, 1595 Boundary Crescent, Nanaimo

PART A (To be completed by applicant. Print clearly.) Map page Block Lots Zone

ANNUAL PARSONAGE REVIEW REPORT

LOT SUBDIVISION LOT BLOCK SIZE

Building Permit Application Instructions Please read and sign Town of Worcester (1) A land use permit is required prior to a building permit

Accessory Dwelling Units

Application Form Development Proposal

NEBRASKA REAL ESTATE COMMISSION SELLER PROPERTY CONDITION DISCLOSURE STATEMENT Residential Real Property

Single Room Accommodation Permit for Canadian North Star (5 West Hastings Street)

5.0 Specific Use Regulations

Accessory Coach House

RT-11 and RT-11N Districts Schedules

ACCESSORY APARTMENTS OLDER THAN FIVE YEARS

Luxury Lives Here And you can too

Development Permit Application

Heritage Alteration Permit Information and Application

6160 Genoa Bay Road Maple Bay BC Canada

Section 9.5. Design of Areas, Spaces and Doorways

ILLUSTRATIVE EXAMPLES

PARK COUNTY DEVELOPMENT PERMIT APPLICATION

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

RESIDENTIAL PLAN APPROVAL AND INSPECTION FEES. 2. Inspection fee $.25 per sq. ft. Minimum Inspection Fee of $25.00

RM-7, RM-7N and RM-7AN Districts Schedules

AVALON PARK. A South E ast Las Veg as Community SBHLV.COM

City of South Portland Office of the City Clerk 25 Cottage Road South Portland, ME Registration of Short-Term Rental Checklist

LOCATION: LUC AND UNDERLYING ZONING: OCP DESIGNATION:

LUC AND UNDERLYING ZONING: OCP DESIGNATION:

COMPLIANT LANDLORD APPLICATION

APPLICATION FOR BUSINESS TENANT CHANGE or BUSINESS TENANCY CHANGE OF USE

2.1 Alarm Source How was the alarm reported? UCT 911/ Phone, ERS, Class-3, BARS, Verbal.


PERMIT APPLICATION CHECKLIST

Duplex, Carriage House & Secondary Suite Multi-Residential Intensive Residential

FICO Realty Group Presents 485 Washington Street Woburn MA 01801

Zoning Options. Key Questions:

PROPERTY CONDITION CHECK LIST FOR A LICENCED HMO

Township of Georgian Bay (Name of municipality, upper-tier municipality, board of health or conservation authority)

BUILDING PERMIT APPLICATION

Kerrisdale West 39 th Avenue, Vancouver. Premier West Side Location Renovated to Condo-like Quality

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Rezoning. Rezone a portion of the property from CD to RF-9 to allow subdivision into approximately 8 small single family lots with rear lane access.

Development Requirements in the Residential Zoning Districts

Transcription:

A Guide to Secondary Suites

Introduction Building on the Saanich Official Community Plan (OCP) that supported secondary suites as a form of affordable housing, studies were undertaken in 2009 and in 2014. The studies resulted in secondary suites being permitted in single family residential zones (RS zones only) in Saanich. Some exceptions are areas outside the Urban Containment Boundary (UCB) and the Broadmead neighbourhood, where there are restrictive covenants (see map). The intent of this brochure is to aide homeowners, designers and builders to construct secondary suites within permitted areas. Urban Containment Boundary RURAL SAANICH PATRICIA BAY HWY Note: For information on detailed boundaries see gis.saanich.ca Urban Containment Boundary BROADMEAD WILKINSON RD BLENKINSOP MCKENZIE AVE Municipal Boundary TOLMIE AVE Kilometres 0 1 2 3 4 FOUL BAY RD Area where secondary suites are allowed by permit process What is a secondary suite? A secondary suite is a self-contained dwelling unit located within a single family dwelling that includes cooking, sleeping and washroom facilities. The installation of a secondary suite in a new or existing single family dwelling is permitted subject to meeting the BC Building Code, the Saanich Zoning Bylaw, the Saanich Building and Plumbing Bylaw and any other requirements.

What are the basic requirements? Secondary suites must comply with all of the following requirements outlined below: The property must be located within the defined secondary suite area (see map on opposite page). The property must be zoned for single family use; RS Zones only. Conditions of the relevant zone must be met (i.e. Maximum floor area/floor space ratio). The Secondary suite must be wholly contained within the single family dwelling and may not be connected to the house by a breezeway or enclosed hallway. No more than one (1) secondary suite per lot or per single family dwelling. The registered owner of the property must occupy the main dwelling unit or the secondary suite as their principal residence (a signed affidavit is required). An Occupancy Permit must be issued by the Saanich Inspections Services Division, based on the requirements. One (1) additional on-site parking space must be provided. Tandem parking on the driveway is permitted. No more than two (2) kitchens are permitted per lot or per single family dwelling. Boarders are not permitted within the secondary suite. Maximum allowable floor area of suite is 40% of the dwelling up to a maximum of 90 sq.m. (968 sq.ft) of finished living space. Note: some properties may have covenants registered on title that restrict secondary suites. For a complete list of documents registered on your property, verify your title document or request a title search at the Land Title Office. Inspection Services staff is available to discuss the requirements for your secondary suite, as each situation may differ.

What is the process to construct? Existing and New Single Family Dwelling Review the requirements to make sure you are able to comply with them Complete and submit a Building Permit Application for Renovations or Additions to a Single Family Dwelling (see checklist for further details) New Developer Built Home The Secondary Suite will not be legal until such time that the owner submits a signed owner affi davit confi rming that they occupy either the main dwelling or the secondary suite as their principle residence. If you sell the property in the future, the new owner will need to complete and sign a new affi davit confi rming that they will occupy either the single family dwelling or the secondary suite as their principal residence. What documents do I need? To make application for a secondary suite the following documents are required: Application drawings (See Checklist for further details) Completed Building Permit Application Completed Agent Authorization form (if required) Completed Plumbing Permit Application Application fee Completed owner affi davit

What is required on my drawings? Application drawings must include the following: Site Plan Full dimensions of lot, north arrow and scale. All existing and proposed buildings with dimensions from property lines. Geodetic elevations of existing Natural Grade shown at all external corners of proposed buildings (must be determined by a BCLS).* Easements, Covenants and Rights-of-Way identified and dimensioned.* On-site parking spot allocated for tenant. Trees on the property or boulevard, including species and diameter. Location of driveway Floor Plans All rooms labelled with intended use and dimensions, including door and window dimensions and locations. Floor areas of each floor. Foundation and crawlspace details. Secondary suite areas identified. For renovations provide existing floor plans and revised floor plans. *Addition permit s only. Top Floor Bottom Floor (suite)

What is required on my drawings? (continued) Elevation Plans Elevation drawings of all sides of building Labelled North, South, East, West or Front, Rear, Left Side and Right Side. Geodetic elevations of existing Natural Grade, proposed Finish Grade, Average Grade and main floor.* Basement and non-basement area identified with horizontal dashed line. Height calculations - From Natural Grade and Single Face.* Cross-Section Complete cross-section drawing(s) with reference on floor plans as to the location. Details of framing, sheathing, rainscreen, interior and exterior finishes, insulation, ventilation and roof materials.* Engineered designed elements Letters of Assurance and sealed drawings. *Addition permit s only.

Common questions Can I build a secondary suite in a duplex? No, only in a single family house. Is a common laundry room included in the gross floor area (GFA) of a suite? No, common spaces such as laundry rooms, storage areas or egress areas that are used by both units are not included in the suite s gross fl oor area. Do I need to hire an architect to create a secondary suite? Your secondary suite does not need to be designed by an architect or building designer, but all plans and drawings must be accurate and to scale with dimensions shown. Specifi cations must be suffi ciently detailed to establish that the construction will comply with the BC Building Code, the Saanich Zoning Bylaw, the Saanich Building and Plumbing Bylaw and any other requirements. Does my secondary suite get a separate mailing address? Yes, the civic address remains the same and the District will assign units A and B to the property and will be recognized by Canada Post. Do I get a second garbage can? If you require extra garbage cans they are available at additional cost from greenergarbage@saanich.ca or 250-475-5533. Do I need extra parking? Yes, one extra parking space is required. Tandem parking on the driveway is permitted. The additional parking space must be entirely on the property containing the secondary suite. Additional Parking Stall In Back Additional Parking Stall In Front Tandem Parking Single Detached Dwelling with Secondary Suite Single Detached Dwelling with Secondary Suite Single Detached Dwelling with Secondary Suite Lane

Common questions (continued) Will I be fined for acknowledging an existing secondary suite? If you have an existing secondary suite and you would like to upgrade the suite to current requirements, you will not be fined for having an illegal suite. One of the main purposes is to encourage homeowners to ensure existing suites meet the minimum Health and Safety Standards established by the BC Building Code. How do I legalize my secondary suite or construct a new one? If a property owner wishes to legalize an existing secondary suite or construct a new suite, the construction of the suite must conform to the Saanich Building and Plumbing Bylaw No. 8627 and the provisions of Section 9.37 of the BC Building Code. What is the permitting process to legalize a suite? After confirming that you meet the requirements for ownership, lot size, zoning and location, you can apply to the District of Saanich for a Building Permit. As part of the Building Permit Application process, the following is required: 1. Property Title Search. The property owner must provide a current title search and copies of any charges registered against the title. You must review this title search to ensure there are no restrictions registered on the title of your property prohibiting a secondary suite. The District will also conduct its own review of the documentation. 2. You must obtain a Building Permit Application Form and complete it to the satisfaction of the District. 3. You must provide two copies of the plans for your secondary suite including a site plan of the principal dwelling showing the location of all buildings on the site, required setbacks, an additional parking space for the suite, the building elevations and the floor plans. 4. You must obtain an Owner Occupancy Declaration Form from the District of Saanich, complete the declaration to the satisfaction of the District and submit it as part of the Building Permit Application. What if I already have a suite? Existing suites will need a Building Permit to ensure that they comply with the BC Building Code requirements for secondary suites. Owners of properties containing existing suites that do not meet code requirements will have to make necessary changes (i.e. upgrades).

What is an Owner Occupancy Declaration? It is a legal document which confirms that the registered owner of the parcel on which the secondary suite is situated resides in either the primary unit within the single family dwelling or the secondary suite. The owner must reside in the single family dwelling to ensure that the property is well maintained and the tenants are respectful of the neighbourhood. The Owner Occupancy Declaration Form is available at the Inspection Services counter at the Municipal Hall. Will the value of my property increase if I have a suite? Having a suite may positively affect the assessment of your property. Please contact BC Assessment Authority for further information regarding this. Do I need a permit? Yes, all secondary suites will require a Building and Secondary Suite Permit to be legal. During the Building Permit Review Process the Secondary Suite Design will be checked for compliance with requirements of Zoning Bylaw #8200 as well as the BC Building Code. Once a Building Permit has been obtained, building inspections are performed to ensure compliance with the BC Building Code. Once code compliance has been confirmed through a building permit, then the applicant must complete whatever zoning requirements have been identified, such as parking. A plumbing permit will be required if there is any alteration to the plumbing system. When is a suite considered legal? A secondary suite is considered legal when the owner has obtained an occupancy permit for a secondary suite from the District of Saanich. A permit will only be issued if the secondary suite has been inspected by the municipal Building Inspector and has been found to meet the requirements of Section 9.37 of the BC Building Code, the Zoning Bylaw, Building and Plumbing Bylaw and all other municipal bylaws and regulations.

What are the building code requirements? Fire Separation A fire separation having a fire resistance rating (FRR) must be created between the main dwelling and the secondary suite. The FRR must be 45 minutes for 1 storey buildings and 1 hour for 2 storey buildings. Fire Separation 45 min Wall and 60 min Ceiling Minimum 2x4 Studs @ 24 o.c. 5/8 Type X Gypsum Wall Board Each Side Wall Separation Fire Separation 30 min with Interconnected Smoke Alarm Minimum 2x4 Studs @ 24 o.c. 1/2 Gypsum Wall Board Each Side Wall Separation Finish Floor Finish Floor Sub Floor Ceiling Separation Sub Floor Ceiling Separation Floor Joist Floor Joist Minimum 2 Layers of 5/8 Type X Gypsum Ceiling Board Minimum 1/2 Gypsum Ceiling Board (a) conforms to opening height and width requirements; does not conform to opening area requirements. (b) and (c) conform to height, width and opening area requirements. To reduce the required 1 hour or 45 minute fire separation between the secondary suite and main dwelling to 30 minutes, a solid wired interconnected photo-electric smoke alarm shall be installed in each suite. The doors and frames between the suite and the main dwelling must be self closing and are required to have a 20 minute fire resistance rating if the fire separation is 30 minutes or 45 minutes, or a 45 minutes fire resistance rating if the fire separation is 1 hour. Horizontal service chases must have a fire resistance rating equal to the other FRR. Safe Exiting Hinged exit door (min. 32 ) with door viewer or clear glass. Required minimum bedroom window opening size (minimum 15 width/height, minimum 3.77 sq ft area). Headroom must be not less than 2.0 m throughout the path of travel to the exit.

Ventilation Principal ventilation systems are required to exhaust from kitchens and bathrooms and to supply air to bedrooms and living areas. Principal ventilation fans must run continuously, controlled by a dedicated switch and with a sound rating not to exceed 1.0 sone. If the building includes a heated crawl space, it must be connected to floor above Bedroom Windows by at least Fire one Separation transfer grille 45 min Wall and 60 min Ceiling 25 sq cm for each 30 sq m Minimum 2x4 Studs @ 24 o.c. of crawlspace area. 5/8 Type X Gypsum Wall Board Each Side Minimum 2 Layers of 5/8 Type X Gypsum Ceiling Board Wall Separation Plumbing Shut-offs shall be installed where the water supply Finish enters Floor each dwelling unit, so that when one suite is Sub Floor shut off, the water to the Ceiling Separation Floor Joist remainder of the building is not interrupted. Smoke Alarms Smoke alarms must be installed on all floors and inside all new bedrooms and between the bedrooms and the remainder of the storey. These smoke alarms need not be interconnected between suites but must be interconnected within each suite. Bedroom Windows (a) conforms to opening height and width requirements; does not conform to opening area requirements. (b) and (c) conform to height, width and opening area requirements. (a) conforms to opening height and width requirements; does not conform to opening area requirements. (b) and (c) conform to height, width and opening area requirements. Hardwired carbon monoxide alarm(s) are required in each sleeping room or within 5 m of all bedroom doors where there is a fuel-burning appliance or an attached garage in the building (alarms must be interconnected throughout the building). Forced air ducted heating systems servicing both dwelling units must be equipped with a system designed and installed to prevent the circulation of smoke upon a signal from a duct-type smoke detector. A furnace or HVAC that services the main dwelling must not be located in the suite. Ion (must be other Downs

Need More Information? District of Saanich Planning Department Zoning Inquiries 250-475-5471 Inspection Services 250-475-5457 770 Vernon Ave. Victoria BC V8X 2W7 www.saanich.ca Other Resources: Land Title Office - Victoria Office 110-1321 Blanshard St. Victoria, BC V8W 0B7 1-877-577-5872 www.ltsa.ca BC Safety Authority - Victoria Office 310-771 Vernon Ave. Victoria BC V8X 5A7 1-866-566-SAFE (7233) www.safetyauthority.ca www.thinkpermit.ca BC Assessment 400-3450 Uptown Blvd. Victoria BC V8Z 0B9 1-866-825-8322 www.bcassessment.ca HPO (Homeowner Protection Office) Suite 2270-1055 West Georgia St. PO Box 11132 Royal Centre Vancouver BC V6E 3P3 1-800-407-7757 www.hpo.bc.ca Vancouver Island Health Authority 201-771 Vernon Ave. Victoria BC V8W 1B4 250-519-3401 www.viha.ca WCB (Workers Compensation Board of BC) PO Box 4700 Station Terminal Vancouver BC V6B 1J1 1-888-621-7233 www.worksafebc.com