The Lake Anne Land Plan Design Charrette

Similar documents
The Lake Anne Charrette

The Miramar Santa Monica

Item E. Lake Anne Redevelopment Project Land Exchange Public Hearing

bbp A S S O C I A T E S

Frequently Asked Questions

Approval of Takoma Amended Joint Development Agreement and Compact Public Hearing

submitted to: Department of Planning and Zoning County of Fairfax, Virginia

HOUSING ELEMENT GOALS, OBJECTIVES, & POLICIES

Approval of Takoma Amended Joint Development Agreement

3804 Wilson Boulevard (Staples Site) Special General Land Use Plan Study

LAKE MERRITT STATION AREA PLAN

C o u n t y o f F a i r f a x, V i r g i n i a

Re: Item No THE WILLOW TREE TOWER Landmark Building. Landmark Site.

DRAFT Plan Incentives. Part A: Basic Discount

Building Repositioning/Repurposing Board Community Revitalization & Reinvestment Committee

Barbara County Housing Element. Table 5.1 Proposed Draft Housing Element Goals, Policies and Programs

Washington Boulevard + Kirkwood Road Special General Land Use Plan (GLUP) Study "Plus"

Table of Contents. Concept Plan Overview. Statement of Compliance with Design Guidelines. Statement of Compliance with Comprehensive Plan

Silver Line Acceptance

PROPOSED METRO JOINT DEVELOPMENT PROGRAM: POLICIES AND PROCESS July 2015 ATTACHMENT B

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #BroadwayValdez

Director, Community Planning, North York District

Downtown Phase II Plan

County Board Meeting Columbia Pike FBC Redevelopment Proposal

COMMUNITY BENEFIT REQUIREMENTS & IMPACT FEES FOR DEVELOPMENTS IN VARIOUS CITIES

Proposed Transaction between City of Toronto and Lanterra 234 Simcoe Realty Ltd St. Patrick Street (Municipal Carpark 221)

Master Plan Review WESTBARD

Rapid City Planning Commission Rezoning Project Report

Proposed Development at Ajax Plaza Windcorp Grand Harwood Place Ltd.

Town of Cary, North Carolina Site Plan Staff Report Centregreen Park at Weston (13-SP-067) Town Council Quasi-Judicial Hearing April 3, 2014

Implementing Pre-Application Neighborhood Meetings in Prince George s County A Discussion Paper

METRO JOINT DEVELOPMENT PROGRAM: POLICY Updated January 2017

Upcoming Apartment Projects with No On-Site Parking Frequently Asked Questions June 2012

PART ONE - GENERAL INFORMATION

3804 Wilson Boulevard

CPC CA 3 SUMMARY

Appendix A: Guide to Zoning Categories Prince George's County, Maryland

PLANNING AND REGULATING HOUSING OPTIONS FOR CHANGING DEMOGRAPHICS

7. IMPLEMENTATION STRATEGIES

NORTHWEST QUADRANT NEIGHBORHOOD STUDY

Rapid City Planning Commission Planned Development Project Report

10 STEPS TO CREATING A CONVERSATION. Community Design for Affordable Homes and Sustainable Places

UPDATE Board of Selectmen June 20, 2017

Appendix J - Planned Unit Development (PUD)

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division

Site & Architectural Design Study for the Conversion of Parking Lots

Planning Board Worksession No.4: Parklawn South District and Randolph Hills District

SERVICE & IMPROVEMENT PLAN AND ASSESSMENT PLAN:

Zoning By-law and Zoning By-law Amendments to Permit Short-term Rentals

ARLINGTON COUNTY, VIRGINIA

Easton Affordable Housing Trust FY18 CPA Funding Request

Downtown Development Focus Area: I. Existing Conditions

ARLINGTON COUNTY, VIRGINIA

Summary of Presentation and Q&A from January 19, 2016

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

Official Plan & Zoning By-law Amendment Application Preliminary Report

FIRST AMENDMENT TO THE AMENDED AND RESTATED DEVELOPMENT PLAN FOR THE OFFICE BUILDINGS / SPORTS PROJECT WITHIN PLANNED DEVELOPMENT AREA NO.

2018 APPLICATION FOR URBAN DESIGN REVIEW BOARD City of Des Moines, Iowa

CONNECTING ARLINGTON S POLICY FRAMEWORK TO THE RESIDENTIAL PARKING WORKING GROUP

Provide a diversity of housing types, responsive to household size, income and age needs.

STRATEGIC PLAN

2015 Downtown Parking Study

On December 15, 2017, the Board of Supervisors approved the legislative amendments associated with the Pier 70 Mixed Use District Project (Project).

30 Widmer Street and Adelaide Street West - Zoning Amendment Application - Preliminary Report

Trenton Train Station Redevelopment Process. Applying the Principles of Successful Transit Oriented Development

ARLINGTON COUNTY, VIRGINIA

Real Estate Development 46th Annual Basic Economic Development Course

TOD and Equity. TOD Working Group. James Carras Carras Community Investment, Inc. August 7, 2015

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES STAFF REPORT APPLICATION FOR A SPECIAL USE PERMIT

4 June 11, 2014 Public Hearing

32-50 Forest Manor Road - Official Plan and Zoning Amendment Application - Preliminary Report

Rapid City Planning Commission Rezoning Project Report

Real Estate and Social Responsibility

WIREGRASS RANCH DRI/MPUD MASTER ROADWAY PLAN CONDITIONS OF APPROVAL PDD DRC

Community Advisory Committee (CAC) Meeting #7 West Anaheim Youth Center May 26, 2016

Phase III. Proposed Plan. SEA Consultants, Inc. Desman Associates Bonz & Company, Inc. Webster Block Planning & Urban Design Study

Chapter 7 Riverfront District

STAFF REPORT. Report To: Board of Supervisors Meeting Date: April 5, Staff Contact: Lee Plemel, Community Development Director

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA NOVEMBER 1, 2016, 2016 MEETING

Using Performance Measures to Improve Parking Policies & Livability

ARTICLE OPTIONAL METHOD REGULATIONS

Chapter 5: Testing the Vision. Where is residential growth most likely to occur in the District? Chapter 5: Testing the Vision

Request for Expansion of Target Investment Zone Boundaries in Hagerstown December 7, 2006

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of November 17, 2018

Yonge Street, 5-9 St. Joseph Street and 11-19, 25 St. Nicholas Street Rezoning Application - Preliminary Report

COUNTY OF ALBEMARLE PLANNING STAFF REPORT SUMMARY

WELCOME! TO THE UNIVERSITY ENDOWMENT LANDS BLOCK F PUBLIC OPEN HOUSE

INFORMATION SUBJECT: UPDATE ON COMMUNITY ENGAGEMENT PLAN FOR PROPOSED GOOGLE DEVELOPMENT AT DIRIDON STATION

State Policy Options for Promoting Affordable Housing

1.0 Introduction. November 9, 2017

Berry/University Form Based Code and Urban Residential Development

Northwest Quadrant. Aerial Photographs. I th Ave Atlantic Ave 1 st St. SW 10 th /Atlantic SW 8 th /Atlantic

H-POLICY 1: Preserve and improve existing neighborhoods. Ensure that Prince William County achieves new neighborhoods with a high quality of life.

Galloway Road and 4097 Lawrence Avenue East - Zoning Amendment Application - Preliminary Report

Downtown Plano. Creating a Transit Village

Chapter URBAN VILLAGE ZONING DISTRICTS

PORTLAND, OR MANUFACTURED HOME COMMUNITIES IN. Manufactured Housing Metropolitan Opportunity Profile: Policy Snapshot DECEMBER 2015

Columbia Development Tracker

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES STAFF REPORT APPLICATION FOR A SPECIAL USE PERMIT

REQUEST FOR PROPOSAL FOR SERVICED APARTMENTS FOR: 1. CONCEPT DESIGN CONSULTATION AND/OR 2. OPERATION OF SERVICED APARTMENTS, FOR,

Transcription:

The Lake Anne Land Plan Design Charrette Plan and Program Options Presentation Saturday June 18, 2005 Prepared for the Lake Anne Village Area Stake Holders

Presentation Elements 1 Introductions 2 Purposes of the Charrette 3 Key Background Information and Updates 4 The Charrette Tasks 5 Defining the Goals 6 Developing Options

Presentation Elements 7 Five options 8 Traffic / Transportation / Parking 9 Management & Marketing 10 Development Decisions Advocacy 11 Time Frames Forward 12 Summary Next!! Selecting a Best Plan and Program

1. Introductions The Stakeholders The Clients The Charrette Team The Many Sponsors

The Charrette Team David Wilcox Planner / Economist ERA John Stutsman Transportation Planner KAKU Associates Sameer Chadha Architect / Urban Designer Field Paoli Architects Dennis Dornan Architect / Urban Designer Field Paoli Architects Steele Knudson Planner / Attorney NVRC

In Cooperation with Supervisor Catherine M. Hudgins Hunter Mill District Supervisor Fairfax County Department of Housing and Community Development The Northern Virginia Regional Commission The Reston Community Reinvestment Corporation

2. Purposes of the Charrette To Retain and Strengthen the Signature of Lake Anne To Define the Best Land Use Components for the Future To Identify possible Design Options To Join Plans and Programs for Implementation To Seek Consensus for plans and Programs for the Near Future

3. Key Background Information and Updates Recent Studies now Available: The Economics Analysis March, 2005 The Focus Group Findings June 2005 Properties Intentions: Lutheran Church Sale for Residential Reuse Possible Replacement of Crescent Apartments

3. Key Background Information and Updates Intention to Form a Business Improvement District Among Merchants at Lake Anne Village Preliminary Results from the Survey by Lake Anne Village Advocates Initiatives Underway by the Lake Anne Village Condominium Association

4. The Charrette Tasks Engage All Stakeholders Gather All inputs Clarify Priorities Identify Property Conditions, Intentions, and Desired Qualities

4. The Charrette Tasks Focus upon Preservation of Lake Anne Village and the Balance Required to Sustain its Success Develop Realistic options For Land Uses and Design Concepts Facilitate Selection of a Best Plans and Programs Mix for Implementation

5. Defining the Goals Preserve the Character of Lake Anne Village Achieve Innovation equivalent to original design Balance between buildings and spaces Enhance pedestrian experience Revitalize commercial uses; carefully increase residential density; maintain quality

5. Defining the Goals Supportive of Human Scale Diversity must be extended across income, age, culture, and housing opportunities Emphasize the unique character of Lake Anne Village as an Attraction and a Destination Gather new uses, such as a bakery, an organic foods store, and an arts cinema

6. Developing Options Define the study area done Understand the Status of Properties Observe the Conditions and Relationships Look Down / Walk About / Return Again LISTEN!! Engage the Stakeholders in the land/design elements Formulate the Vital Few three or more options?

6. Developing Options Other Plan Ideas from the Charrette The Dense Plan with office buildings facing Baron Cameron Ave and additional retail floor space adjacent there to. The Jewel Plan by Patrick Kane, with the J building as the Jewel, supported by higher density nodes of mixed uses in: The West parking area West of Heron House The Village parking area North of the plaza Office / Residential at the Lutheran Church Site A surface water flow channel which could connect the upper village parking area through to the village plaza, providing a path of white noise and flow energy to follow

7. Five Options About Scale, Location, Densities Quality of Space and Experience About the Village and Adjoining Properties Adding management and marketing Improving Transportation / Traffic / Parking

7. Five Options Option A Moving Along As Is Option B Option A Plus Adjusting Uses in the Village Option C parts of Options A & B Plus incremental Opportunities in the Village, with more Parking Support Option D More Ambitious Infill and Access Modifications Option E Prefferred Gateway tower, enhanced pedestrian access

Scheme A

Option A Area 1. - Landscape and parking enhancements - Better bus drop off - Lighting and Signage enhancements Area 2. - Flowering trees and signage on median Area 3. - Main project signage Area 4. Crescent Apartments - 4 story residential buildings, wrapping 3 story parking structures - Buildings follow contours and cascade down the hill - Vehicular access is off Barron Cameron Avenue - Pedestrian network links residential open spaces to Village Center Area 5. Lutheran Church - 5 story high apartments over structured parking

Scheme B

Option B Area 1. - Retail along an extended Village Road - Village Road slopes down to meet the Village Center plaza level - Water elements follow street - New east-west street cuts across North Shore Drive oxbow - Small grocery/anchor occupies community center - The ASBO building and the convenience store are relocated Area 2. - Surface parking extends north - Parking is generously buffered from Village Road Area 3. Baptist Church - Church is converted into some civic use community center, library, post office - New Church building is located to the west of the old Church, on axis with plaza - Extra parking is laid out on Church property - Pedestrian link to the tennis courts and swimming pool is strengthened Area 4. Crescent Apartments - 4 story residential buildings, wrapping 3 story parking structures - Buildings follow contours and cascade down the hill - Vehicular access is off Barron Cameron A venue - Pedestrian network links residential open spaces to Village Center Area 5. Lutheran Church - 5 story high apartments over structured parking

Scheme C

Option C Area 1. - Grand Spanish Steps extend Village Road dow n into pedestrian retail space - Water element follows steps and pedestrian spine - Retail has lofts/tow nhouses above - Eastern block has 2 level parking deck - The ASBO building and the convenience store are relocated Area 2. - Bank building is redesigned to w iden entrance to Village Center - Small grocery/anchor occupies community center Area 3. Baptist Church - Church is rehabilitated into some other use - New Church building is located to the w est of the old Church - Some tow nhouses are added - A new civic space is designed behind the old Church building Area 4. - 2 story Tow nhouses line North Shore Drive - Some tow nhouses are above parking deck Area 5. Crescent Apartments Site - 15 story apartment tow ers - Buildings follow contours and cascade down the hill - Vehicular access is off Barron Cameron Avenue - Pedestrian netw ork links residential open spaces to Village Center Area 6. Lutheran Church - 5 story high apartments over structured parking Area 7. - Pedestrian link to the tennis courts and sw imming pool is strengthened

Scheme D.

Option D Area 1. - North Shore Drive is realigned closer to the Village Center - The street slopes dow n to the grade of the Village Center plaza Area 2. - Sensitively scaled entry blocks w ith retail and office above announce the entrance - A bay of parking is camouflaged w ith landscape behind the buildings Area 3. - Village Road slopes dow n to meet the Village Center plaza level - Buildings have retail on street level w ith tow nhouses above - A 2 level parking structure is tucked behind the retail - Tow nhouses sit on the parking decks Area4. - Bank building is redesigned to w iden entrance to Village Center - Small grocery/anchor occupies community center Area 5. Baptist Church - Church is rehabilitated into some other use - New Church building is located to the w est of the old Church - Some tow nhouses are added - A new civic space is designed behind the old Church building Area 6. Crescent Apartments Site - 15 story apartment tow ers - Buildings follow contours and cascade down the hill - Vehicular access is off Barron Cameron Avenue - Pedestrian netw ork links residential open spaces to Village Center Area 7. Lutheran Church - 5 story high apartments over structured parking

Scheme E

Option E Area 1. - New cross walk with pedestrian refuge in median for safe access to parks on North side of Baron Cameron Ave - Residential Tower marks the entrance to Lake Anne Village Drive - Grand Spanish Steps extend Village Road down into pedestrian retail space - Water element follows steps and pedestrian spine - Retail has lofts/townhouses above - Eastern block has multi level parking deck - The ASBO offices are relocated to new tower at Bank site and the convenience store is relocated Area 2. - Bank building is redesigned to widen entrance to Village Center and to add additional floors for office / retail - Small grocery/anchor occupies community center Area 3. Baptist Church - Church is rehabilitated into some other use - New Church building is located to the west of the old Church - Some townhouses are added - A new civic space is designed behind the old Church building Area 4. - 2 story Townhouses line North Shore Drive - Some townhouses are above parking deck Area 5. Crescent Apartments Site - 4 apartment towers combined with - 4 story residential buildings, with integrated parking structures - Buildings follow contours and cascade down the hill - Vehicular access is off Barron Cameron Avenue - Pedestrian network links residential open spaces to Village Center Area 6. Lutheran Church - 5 story high apartments over structured parking Area 7. - Pedestrian link to the tennis courts and swimming pool is strengthened

Summary of Concepts Common to All Options Signage Lighting Landscaping Enhance Pedestrian Connections Bus Drop off Multi-Tenant management BID Partnerships Branding Marketing

Summary of Concepts A B C D E New Retail 20,000 24,000 50,000 24,000 Community Space 7,200 5,000 5,000 5,000 New Housing Crescent 600 Lutheran 110 Crescent 600 Lutheran 110 Crescent 720 Lutheran 110 Village 40 Crescent 720 Lutheran 110 Village 40 Crescent 720 Lutheran 110 Village 130 New Office 20,000 70,000 Or live/work New Surface Parking 160 40 150 New Deck Parking Crescent 960 Lutheran 176 Crescent 1150 Lutheran 176 Retail/ Office 260 Crescent 1150 Lutheran 176 Retail/ Office 500 Crescent 1150 Lutheran 176 Retail/ Office 720

8. Traffic / Transportation / Parking Essential Improvements to Accommodate Change and Some Growth Safety and Efficiency Despite Curving Roads and Hilly Topography Improved Access to Lake Anne Village Parking The many Clients and Claimants of 237 Surface Parking Spaces Signage that Works

8. Traffic / Transportation / Parking Access from Baron Cameron Ave and Egress From Lake Anne Village and Adjoining Properties Future Connections from the Wiehle Avenue Metro Station

Transportation Recommendations Foster Effective Connection to Metro Wiehle Ave Station Via Direct Dedicated Shuttle Bus; or Piggyback other service Fairfax Connecter Crescent Apts Proposed Shuttle? Market to Metro Riders Town Center Workers

Transportation Recommendations Realign / Widen Village Road Rename as Lake Anne Village Road Provide Median Signage Along Baron Cameron and Reston Parkway Provide New Signalized Intersection to serve Redeveloped Crescent Apartments 3000 new Daily Trips Locate 1000 Feet East of Village Road

Transportation Recommendations Monitor Cut-through Traffic along North Shore Drive Add striping for on street parking and bike lane on North Shore Develop Remedies Traffic Calming Develop Shared Parking Program Re-stripe Surface Lots = 10% gain Enhance pedestrian crossings at North Shore and Lake Anne Village drive

9. Management & Marketing Management Progress on multiple initiatives is underway A. Potential to form a BID among the Commercial / Retail / Restaurant / Office Tenants B. Resolving the maintenance of the many easements C. Identifying upcoming funding sources D. Working with adjoining Property owners

9. Management & Marketing Concerns about escalating costs A. Property valuation driven tax increases B. Construction materials costs escalation C. Potential for costs realignment? D. The costs of Waiting

9. Management & Marketing Marketing The brand of exellence of urban design is unique But who knows about it in 2005? How shall we reposition our approach to the targeted visitor / customer If they come, will they stay and spend?

9. Marketing & Management Marketing: If we have a 1500 person design day maximum holding capacity how often will we seek events of 1000 to 1200 persons? Looking for marketing effort funding support ICP dollars can come to RCRC Next Step: Logo / Maps / Outreach to colleges and design schools / hosting the experience The need for signing there is none!

9. Management & Marketing Simple Firsts Rediscovering the Village Plaza by Farmers Market Attendees Postcards with maps on the back

Housing 10. Development Decisions Advocacy Retaining affordable housing inventory Negotiating for replacement, when changes are proposed Defining opportunity as both rental and ownership Understanding the evolving housing opportunity standards / regulatory procedures / performance requirements

10. Development Decisions Advocacy Proffers on Neighboring Properties: By-right is always open to reasonable considerations Lake Anne Village has many advocates and governmental partners RCRC / RA / Fairfax County Housing mix and affordability should be balanced Traffic generation requires mitigation because of impacts on adjoining existing development There are multiple negotiations necessary with other entities and approvals

11. Time Frames Forward Near Term: 2005 2006 Forming the BID among the Lake Anne Village Merchants Construction may begin on the former Lutheran Church property RCRC may secure ICP grant dollars for marketing / signing Lake Anne Village Association may initiate new cooperative management techniques with adjoining entities of easements A phased replacement program may be initiated by the Crescent Apartments

11. Time Frames Forward 2007 An investor / developer may be found to partner in the incremental change selected for: The Baptist Church Property The ASBO Building Repositioning of portions the village parking lot Improvements for Lake Anne Village Road may be designed and land acquisition for widening may commence Relocation of the Lake Anne Community Center, plus a new smart library, may be authorized for re-use of the Baptist Church site.

Market Demand / Support Housing market is very strong and will remain so Rise in home/condo prices will not mean much more consumer retail expenditures 619 + 120 new housing units (assumption) will add 739 units and about 1850 new residents. This is modest in terms of incremental local retail sales in an already diluted market 20% of the new households are expected to be engaged in enterprises-at-home, which will require business services and internet services. We do not have an investor / developer in sight for the several parking / retail / mixed use ideas which have been generated because the land is not a new build opportunity. At 27,000 sq ft of commercial / retail space the village center is on a very small floor plate.

The Sponsors Oracle Corporation Northrop Grumman Reston Hyatt Regency Hotel Virginia Department of Transportation Dominion Virginia Power Reston Association Fairfax County Department of Housing and Community Development Northern Virginia Regional Commission Reston Community Reinvestment Corporation