CAPE COD COMMISSION MAIN STREET P.O. Box 226 BARNSTABLE, MA FAX:

Similar documents
Extractive Industrial Regulatory Ordinance No. 21 revised Dec. 28, 2010 EXTRACTIVE INDUSTRIAL REGULATORY ORDINANCE TYRONE TOWNSHIP, MICHIGAN

Appendix F - Earth Materials Extraction, Processing and Site Reclamation

CAPE COD COMMISSION MAIN STREET PO Box 226 BARNSTABLE, MA FAX:

MINUTE ORDER BONNER COUNTY COMMISSIONERS PUBLIC HEARING MINUTES AUGUST 6, 2015

APPLICATION PROCEDURE

Fee $1, Property information and location (All lines applicable to this site must be filled in)

ARTICLE 7. SPECIFIC USE STANDARDS

RESOLUTION NO ORDINANCE NO. 02-1

RESTRICTIONS PLAT RESTRICTIONS

DECLARATION OF RESTRICTIONS AND EASEMENTS OF OAKWOOD MEADOWS SUBDIVISION

Upton Site Remediation, LLC. 466 Northeast Main Street Site Plan Review Permit Pursuant to Section 9.4 of the Douglas Zoning Bylaws.

LOCAL LAW NO. 2, 1987 A LOCAL LAW REGULATING EXCAVATION AND TOPSOIL REMOVAL WITHIN THE TOWN OF CAMBRIA

ARTICLE SCHEDULE OF REGULATIONS

ORDINANCE NO. 41. PRIVATE ROAD ORDINANCE As Amended Through April 10, 2008

UPPER MOUNT BETHEL TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA

ARTICLE 5 GENERAL REQUIREMENTS

DECLARATION OF RESTRICTIVE COVENANTS

CAPE COD COMMISSION MAIN STREET P.O. Box 226 BARNSTABLE, MA FAX: DECISION OF THE CAPE COD COMMISSION.

MINOR SUBDIVISION COMMITTEE COUNTY OF MONTEREY, STATE OF CALIFORNIA

The following regulations shall apply in the R-E District:

Ordinance #68. Highlighted items in bold and underline font to be added. Highlighted items in strikethrough font to be removed.

TOWN OF WARNER, NEW HAMPSHIRE EARTH EXCAVATION REGULATIONS

WETLAND PROTECTION BY-LAW

Oil and Gas Operations

Upton Site Remediation, LLC. 466 Northeast Main Street Site Plan Review Permit Pursuant to Section 9.4 of the Douglas Zoning Bylaws

EXCAVATION SITE PLAN REVIEW REGULATIONS

Business Park District Zoning Text Amendment (PLNPCM ) ZONING TEXT AMENDMENT

BECKER COUNTY HIGHWAY DEPARTMENT 200 EAST STATE STREET DETROIT LAKES, MN 56051

CAPE COD COMMISSION MAIN STREET P.O. BOX226 BARNSTABLE, MA (508) FAX (508)

KASSON TOWNSHIP PRIVATE ACCESS ROAD ORDINANCE ORDINANCE NO (EFFECTIVE: MAY 12, 2007)

CITY OF FERNDALE HEARING EXAMINER

Protective Covenants. Large Rail Site Phase 1

SECTION 4: PRELIMINARY PLAT

CCPEDC IS NOW THE CAPE COD COMMISSION CAPE COD PLANNING AND ECONOMIC DEVELOPMENT COMMISSION

ARTICLE 13 CONDOMINIUM REGULATIONS

PROTECTIVE COVENANTS DEED RESTRICTIONS SPENCER BUSINESS/INDUSTRIAL PARK August 11, 1999 Amended, March 3, 2014

New Private Way Ordinance Westbrook Planning Board Workshop , Planning Board Public Hearing Definitions

ARTICLE 7: PLOT PLANS AND SITE PLAN REQUIREMENTS AND REVIEW

TOWNSHIP OF WANTAGE ORDINANCE #

Site Alteration By-law

GUIDELINES FOR LEASING UNDER SLO RULE 5

Condominium Unit Requirements.

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

An Ordinance to provide regulations for private roads and driveways.

BRISTOL CONSERVATION COMMISSION INLAND WETLANDS AGENCY FORM IW-1 (Application for a Wetlands Permit)

BEAR CREEK TOWNSHIP EMMET COUNTY, MICHIGAN. PRIVATE ROAD ORDINANCE Ordinance No. 11A-99. (to replace prior Private Road Ordinance No.

CHAPTER SHORT SUBDIVISIONS

City of Prior Lake APPLICATION FOR REGISTERED LAND SURVEY

Planning Department Permit Application

(b) The location of principal and accessory buildings on the lot and the relationship of each structure to the other.

555 CHESTERFIELD DRIVE 14-ZB-19V PISCATAWAY, NJ 08854

PERMIT FEES Within the shore impact zone (Includes Rip-Rap and Sand Blankets) $ Over 51 cubic yards $100.00

SPRING BROOK TOWNSHIP 966 STATE ROUTE 307 SPRING BROOK TOWNSHIP, PA PHONE (570) FAX (570)

SUBDIVISION APPLICATION

CHAPTER 13 WINCHESTER WETLANDS BYLAW

SECTION 10 STANDARD PLATS

Town of Middleborough Conservation Commission 2014 Policy

RESIDENTIAL CLUSTER DEVELOPMENT DISTRICT SPECIAL PERMIT RULES AND REGULATIONS OF THE PLANNING BOARD OF THE TOWN OF COHASSET, MASSACHUSETTS

City of Prior Lake APPLICATION FOR COMBINED PRELIMINARY AND FINAL PLAT

Town of Lincolnville Subdivision Ordinance

DRIVEWAY/ACCESS PERMIT APPLICATION INSTRUCTIONS Douglas County Trunk Highways

By-Law of The Corporation of the City of Oshawa

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

-MENDOCINO COUNTY PLANNING AND BUILDING SERVICES- DIVISION OF LAND REGULATIONS TITLE 17

CONDITIONAL USE PERMIT APPLICATION FOR AN EXCAVATION/BORROW PIT

CHAPTER 26 PLANNING AND ZONING ARTICLE VII. MOBILE HOMES AND RECREATIONAL VEHICLE (RV) PARKS. Recreational Vehicle (RV) Park Development Standards

Preliminary Subdivision Application (Major) (Four (4) lots or more)

CHAPTER 14 PLANNED UNIT DEVELOPMENTS

CHAPTER 30 BUILDING CODE

ARTICLE A. MULTIPLE USE, AGRICULTURE AND RURAL RESIDENTIAL DISTRICTS

MAJOR SUBDIVISION PRELIMINARY PLAT CHECKLIST

CHARLOTTE PLANNING COMMISSION FINDINGS OF FACT AND DECISION IN RE APPLICATION OF

Guide to Permitting Town of Groton, MA

ARTICLE XVII SCHEDULE OF REGULATIONS

ALBEMARLE COUNTY CODE CHAPTER 18 ZONING SECTION 32 SITE PLAN

ARTICLE 4 PERMITS REQUIRED FOR DEVELOPMENT OR CONSTRUCTION 4.1 AUTHORIZATION REQUIRED FOR LAND DISTURBANCE OR DEVELOPMENT ACTIVITIES

CONSERVATION EASEMENT AND RESTRICTION

CHAPTER 14: DRIVEWAYS, TOWN HIGHWAYS, AND PRIVATE ROADS

GRANT OF TRAIL ACCESS EASEMENT, COVENANTS AND RESTRICTIONS

STAFF REPORT FOR COASTAL DEVELOPMENT CDP# STANDARD PERMIT June 11, 2013 CPA-1. Victor Suarez Fern Drive Mendocino, CA 95460

PREPARED BY PLANNING DEPARTMENT ORANGE COUNTY NORTH CAROLINA

Chapter 136. SOIL EROSION

Understanding the Conditional Use Process

Main Street Auto & Towing, LLC. 120 Gilboa St., Douglas, MA Site Plan Review Permit. State

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Whitewater Point & Barber Acres

Salem Township Zoning Ordinance Page 50-1 ARTICLE 50.0: PUD PLANNED UNIT DEVELOPMENT

LEGISLATIVE COUNSEL'S DIGEST

ARTICLE VII. NONCONFORMITIES. Section 700. Purpose.

City of Midland Application for Site Plan Review

CHAPTER 3 PRELIMINARY PLAT

CITY OF PRINCE GEORGE SOIL REMOVAL AND DEPOSIT BYLAW NO. 8772, A Bylaw of the City of Prince George to regulate the removal and deposit of soil.

CITY PLANNING COMMISSION COMPREHENSIVE PLAN AND REVIEW CRITERIA

City of San Juan Capistrano Supplemental Agenda Report

THE SUBDIVISION PROCESS:

A Minor Land Excavation Operating Permit is used to:

PLYMOUTH PLANNING BOARD APPLICATION FOR A MINOR SUBDIVISION OR MAJOR SUBDIVISION

SECTION 822 "R-1-A" AND "R-1-AH" - SINGLE FAMILY RESIDENTIAL DISTRICTS

TEMPORARY USE APPLICATION Sec and Temporary Housing

5. That the Owner shall agree that all development Blocks shown within the Draft Plan will be connected to full municipal services.

Transcription:

CAPE COD COMMISSION 3225 MAIN STREET P.O. Box 226 BARNSTABLE, MA 02630 508 362 3828 FAX: 508 362 3136 1 DATE: TO: FROM: RE: APPLICANT: December 5, 1991 Mr. Preston A. Landers, P.A. Landers, Inc. P.O. Box FF Hanover, MA. 02339 Cape Cod Commission Development of Regional Impact Application Cape Cod Commission Act, Section 12 P.A. Landers, Inc. TR# 91054 PROJECT: The mining of 27 4, 941 cy of sand and gravel and the establishment of a sand and gravel processing plant. Map 53, Parcel's E4 and E2 2, 33.3 Acres (Kiah's Way), Sandwich, MA. DECISION OF THE CAPE COD COMMISSION SUMMARY The Cape Cod Commission (the Commission) hereby approves with conditions the application of PA Landers, Inc., for a Development of Regional Impact under Section 12 (c)(6) of the Commission Act (the Act), c. 716 of the Acts of 1989, as amended for the removal of sand and gravel and the establishment of a sand and gravel processing plant. The decision is rendered pursuant to the vote of the Commission on December 5, 1991. PROJECT DESCRIPTION The Landers property is located south of the Mid-Cape Highway between Telegraph and Discovery Hills in Sandwich. The property has frontage on Kiah's Way which is a gravel road used by existing gravel removal and construction equipment firms. The combined 33.3 acre site (Assessors parcels E4 + E2-2) is presently split by Kiah's Way. The sand/gravel removal operation is proposed on 13 acres of the northern portion of the site. The sand/gravel processing plant is proposed on 5 acres within the aforementioned 13 acres. The site is within the Water Resource Overlay District and is split between the residential Ridge District and the Industrial Limited District. The majority of the site is covered with scrub pine and oak trees and is part of the Sandwich Moraine. The identified soil types are all well sorted stratified sand and gravel (PxC, PvD and PvC). The rear portion of the site is identified as a critical wildlife habitat area. The proposed earth removal operation is shown to be over 700 feet away from a crftical wildlife habitat area.

2 PROCEDURAL HISTORY The project was referred to the Commission by the Sandwich Planning Board on June 24, 1991. A DRI application was filed by the applicant on July 19, 1991. A site visit was conducted by the subcommittee, staff and the applicant on August 5, 1991. The public hearing was opened on August 15, 1991 and continued on September 12th and 26th. The public hearing was closed on October 10, 1991 and two additional public meetings were held on November 4th and 21st to finalize wording of the proposed conditions. The subcommittee report was presented to the full Commission on November 21, 1991. A. Materials submitted by the applicant 1. Request for a reduction in fees 2. DRI Application 3. Landscape and site layout plan 4. Potential benefits from the facility 5. Wildlife Habitat Assessment 6. Vibration and sound monitoring 7. Hydrologic Assessment 8. Revised Landscape/ site layout plan 9. Methodology for wildlife assessment 10. Phase Plan "Phasing" MATERIALS SUBMITTED FOR THE RECORD Prepared by Jonat11an D. Fitch July 1, 1991 Prepared by Jonathan D. Fitch July 19, 1991 Prepared by John McElwee Dated 4/4/9 revised 6/25/91 Prepared by Jonathan D. Fitch Sept. 23, 1991 Prepared by IEP Sept. 26, 1991 Prepared by GZA Sept. 26, 1991 Prepared by GZA Sept. 26, 1991 Prepared by John McElwee Dated 9/13/91 revised1 0/7/91 Prepared by Stanley M. Humphries Oct. 10, 1991 Prepared by J.D. Fitch from site plan Nov. 1, 1991 B. Materials submitted by the Town: 1. Comments from the Fire Dept. 2. Comments from the Town Engineer 3. Comments from the Town Planner 4. Comments from the Conservation Commission 5. Comments from the Board of Health 6. Comments from the Police Dept. 7. Comments from the Water District 8. Comments from the Conservation Commission 9. Comments from the Police Dept: 10. Comments from the Town Engineer 11. Comments from the Planning Board 12. Comments from the Executive Secretary 13. Comments from the Fire Dept. C. Materials submitted by the public: 1. A letter from Mr. and Mrs. Pierson 2. A letter from Peggy Sloan (APCC) June 4, 1991 June 11, 1991 June 24, 1991 Aug. 13, 1991 Aug. 14,1991 Sept. 12, 1991 Sept. 23, 1991 Nov. 1, 1991 Aug. 7, 1991 Aug. 14, 1991 Oct. 21, 1991 The Commission also received oral testimony from public officials and members of the public as described in the minutes of the subcommittee public hearing(s) dated August 15,1991, September 12,1991, September 26, 1991 and October 10, 1991. The application and notice of public hearings relative thereto, the Commission's staff's reports, notes and

3 exhibits, minutes of all hearings and all written submissions received in the course of the proceedings are incorporated into the record by reference. JURISDICTION The proposed sand and gravel removal operation and processing plant qualifies as a Development of Regional Impact under Section 12(c)(6) of the Act, because it is a "outdoor commercial space greater than forty thousand square feet". FINDINGS The Commission has considered the Development of Regional Impact application of P.A. Landers, Inc., for the proposed sand/gravel removal operation and a sand/gravel processing plant. Based on consideration of such application, the information presented and Commission staff recommendations, the Commission makes the following findings pursuant to Sections 12 and 13 of the Act: 1. As conditioned in this decision, the project is consistent with the minimum performance standards as identified in the Regional Policy Plan. The Commission also noted that the town has not developed a local comprehensive plan at this time. 2. The Zoning By-law of the Town of Sandwich allows by special permit the proposed uses in both the Ridge and Industrial districts. 3. At this time there are no Districts of Critical Planning Concern in Sandwich. Therefore, this review standard is not applicable to the proposed project. 4. The project provides 22 acres of open space and an undisturbed buffer of approximately 700 feet between the limit of work and the critical wildlife habitat/wetland area. The project also provides a buffer area between the operations and the abutting town owned properties. 5. The fuel used to operate the sand and gravel sorting machinery is classified as a hazardous material. However, the amount to be stored on the site is at a household level (275 gallons, approximately one week's supply) and the provision for an impervious fueling pad will safeguard against accidental spills from fuel, motor oil or solvents. 6. The revised site plan will discourage trespassing and vandalism due to the gates, lights, stones and dense thorny plantings proposed. 7. The proposed improvements (an acceleration lane) to the intersection of Route 130 and Kiah's Way not only address the concerns raised by the Commission and local officials but provides a substantial benefit for traffic flow and safety to the regional and local road network. B. The site location was appropriate due to the distance from residential abutters. CONDITIONS Based upon the findings above, the Commission hereby concludes that the proposed gravel operation

4 and processing plant will not have a significant impact on the environment and natural resources, including groundwater supply/quality and protection of a critical wildlife habitat area, provided that the following conditions are imposed on the project. These conditions shall apply to the Applicant, his heirs, successors or assigns, and any owner or tenant: 1. The applicant shall be allowed to have a fuel storage tank with a capacity of no more than 275 gallons to be placed on a spill pad as shown on the Landscaping and Site Layout Plan dated September 13, 1991 and revised October 7, 1991. The impervious pad shall be constructed with a berm to contain a spill of 275 gallons. The applicant shall be required to post an emergency spill response plan on site and file a copy with the Sandwich Fire Department. The material safety data sheet (msds) for the fuel should also be part of the plan. The plan shall identify the professional emergency response team to be contacted in case of a spill and phone numbers of both the clean up firm and the fire department. 2. A water truck shall be available during the hours of operation for the control of dust. 3. The applicant has proposed improving the intersection of Kiah's Way and Route 130. The intersection improvements include the construction of an acceleration lane on Route 130 northbound from Kiah's Way. Alter securing the approval of the Town of Sandwich, the applicant shall design the proposed improvements, initiate and guide (as appropriate) the Massachusetts Department of Public Works (MDPW) permit application and thereafter construct, with due diligence, the improvements. Such improvements shall be constructed in accordance with a plan that shall be approved by the Commission. All design standards shall be governed by the MDPW Highway Design Manual. In addition, vegetation within the layout of Route 130 which now restricts sight distance to the south of Kiah's Way intersection shall be cleared as required by the MDPW. If this intersection is to be converted to two-way flow for truck traffic, the design shall be subject to Commission approval. All improvements shall be completed prior to any excavation or earth removalfrom the site, unless the Town of Sandwich definitively denies the improvements. 4. The applicant shall limit exposed areas of active gravel removal to an area 200 feet in length x 200 feet in width x 30ft. in depth. The exposed area shall be restored to the state identified in condition number 5. 5. The applicant shall restore the mined area by establishing a maximum slope of two (2) ft. horizontal to one (1) ft. vertical. This area shall be covered with six (6) inches of loam, fertilized, seeded and maintained to create a vegetated cover. 6. The applicant shall, stake or mark all phase areas where work and restoration have been completed, the phase area currently being worked, and any phase areas for which subsequent work is planned. These boundary markers shall be maintained though the life o! the operation. 7. A buller zone (ten (1 0) feet in width) in which natural vegetation and soil are left undisturbed shall be maintained from all abutting property lines. The undisturbed buffer shall be forty (40) feet in width along Kiah's Way. 8. In addition to the buffer zone in condition #7, the applicant shall create a ten (1 0) foot area in width along the buffer zone as shown on the Landscaping and Site Layout Plan dated September 13, 1991

5 and Revised October 7, 1991. This area shall have a finished grade of three (3) horizontal feet to one (1) vertical feet which shall be planted with Russian Olive and Multifora Rose in two rows of sufficient density to serve as a natural fence, screen and wildlife habitat. 9. The applicant may transport clean sand and gravel materials onto the property for processing. No solid waste, sludge, asphalt, cement, road construction debris, demolition debris and/or tree stumps not shown on the approved site plan shall be brought onto or deposited on the property. 10. All soil recovered from operations on the site which are suitable for cover material shall be stockpiled on site and retained for future use in the reclamation of the affected area. 11.The depth of excavation shall be limited to an elevation one hundred and sixty live (165) feet above mean sea level in the base of the proposed drainage swale as shown in the Landscape and Site Layout Plan dated September 13, 1991 and revised October 7, 1991. The lowest elevation olthe floor olthe gravel removal and processing operations shall be one hundred and sixty eight (168) feet above mean sea level. 12. A yearly report certified by a Massachusetts registered professional engineer shall be provided to the Commission on each anniversary date of the DRI approval. The first report shall be filed with the Commission by December 1993. This report shall state the amount of material removed, areas restored and overall condition of the site (noting any erosion, pollution, noise or dust problems that have taken place and/or complaints filed with the Town officials during that year). A current site plan certified by a registered surveyor shall be included in the yearly report. The plan shall show areas under removal operation, revegetated and future phases. The yearly report (including site plan) must be deemed acceptable by the Commission within thirty (30) days of receipt by the Commission for the DRI approval to remain valid. The applicant shall be granted a thirty (30) day correction period prior to a vole of the Commission. 13. The gravel removal operations must commence within seven (7) years of the approval date. The approval shall be valid for a maximum of ten (1 0) years from the date of approval by the Commission. 14. The applicant and property owner agree to allow the Commission or its representative(s) free access to the site to conduct inspections to determine compliance with the conditions of this approval at any lime. 15. The Commission shall be notified of any transfer of ownership or legal interest or change in contractual interest in the subject property, including a change in the current or subsequent earth removal operator deriving income resulting from such work on said property, within ten (1 0) days of such transfer or change. Failure to do so will render this approval null and void. 16. To ensure compliance with the conditions olthe DRI approval the applicant shall be required to post a cash deposit or surety bond, in an amount and form acceptable to the Town of Sandwich. Such amount shall be sufficient to meet the estimated cost of the required reclamation work. Said Bond amount shall be filed with the Town of Sandwich prior to commencement of work. Within six (6) months of the completion of operations or the expiration of the approval, the land shall be restored in accordance with the conditions of the DRI approval. 17. The applicant shall notify the Commission at the completion of each phase of work. Upon notification,

6 the Commission shall issue a partial certificate of compliance for the phase if all work and restoration has been completed in accord with plans and conditions above. The next phase of excavatipn shall not commence until a partial certificate of compliance has been issued for the preceding phase. 18. Monumentation as shown on the September 13, 1991 Landscape and Site Layout Plan revised October 11, 1991 shall be established prior to the commencement of earth remov<!l. Monuments shall be numbered 1-6 starting with the southwestern corner of the property {Kiah's Way, Landers and Knight's properties) and heading north to the intersection of the Landers, Knight's and Town of Sandwich properties. 19. The amount of area left disturbed after the completion of the earth removal {phases 1-3 ) and during the crushing and processing operation {phase 4), shall be a maximum of five {5) acres in size. The phases of the approval shall be as shown on the Phase Plan, dated September 13, 1991 and received by the Commission on October 10, 1991. 20.The remaining 20 acres of land shall be kept in its existing natural state as open space. The applicant may file future applications for further use of the property. 21. Applicant shall obtain all necessary local permits. CONCLUSION Based on the findings above, the Cape Cod Commission hereby concludes: The project is consistent wtth the Commission's Regional Policy Plan. This conclusion is supported by finding # 1 listed above. The project is consistent with local development by-laws. This conclusion is supported by finding# 2 and condition# 21 listed above. The project is not located within a District of Critical Planning Concern. This conclusion is supported by finding #3 listed above. The benefits of the proposed project outweigh the detriments resulting from the development. This conclusion is supported by findings# 4, 7 and 8 listed above. The Commission hereby approves with conditions a Development of Regional impact Application for P.A. Landers, Inc., pursuant to Section 13 of the Act. Richarllf!:!!i:~::;rman /J-(<,-)7 ( Date IJ-Is}q 1 Date I I