Village of Baxter Estates Fee Schedule

Similar documents
Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

9. Public (Federal, State, or local

ORDINANCE NO

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Building Permit & Plan Check Fees

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

FEE SCHEDULE Construction Services and Permitting

TOWN OF WOODWAY FEE SCHEDULE EFFECTIVE JANUARY 8, 2019

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

EXHIBIT A to Ordinance No PART 1

INCORPORATED VILLAGE OF GARDEN CITY

CONSTRUCTION PERMIT FEE SUMMARY

Worcester Township Fee Schedule

MASTER FEE SCHEDULE ATTACHMENT TO CITY ORDINANCE 102. Alcoholic Beverages:

Land Use Permit Fee Residential Commercial/Industrial Cost per $1, $ 6.00 $ 6.00

Planning & Development Services Application Fee Changes - Effective January 1, 2017

This fee structure applies to applications submitted on or after January 1, 2018.

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

Planning&Development Fee Standards

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

TOWN OF HILLSBOROUGH SCHEDULE OF FEES AND CHARGES SPECIAL TAX, SERVICE CHARGES & OTHER CITYWIDE FEES

City of Maple Plain Ordinance 302 Exhibit A. City of Maple Plain Fee Schedule

WASHINGTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY Appendix A Rate Schedule

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

DEER RIVER COMMERCIAL PARK SUBDIVISION

Fee Schedule for Zoning, Building Permits, and Plan Review Services

AGENDA NO: 2008/Mar/ /03/08 Department Head Date City Manager Date

BY-LAW NO NOW THEREFORE the Council of The City of Brandon, in open session assembled, enacts as follows:

ARTICLE 24 SITE PLAN REVIEW

CITY OF MADISON HEIGHTS OAKLAND COUNTY, MICHIGAN. RESOLUTION regarding FEE SCHEDULE FOR COMMUNITY DEVELOPMENT DEPARTMENT SERVICES

RESOLUTION NO

RESOLUTION NO. 29 OF Town of Clinton Fee Schedule

RESOLUTION NO. 778 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

THE BOARD OF COUNTY COMMISSIONERS

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

THE CORPORATION OF THE CITY OF MISSISSAUGA ROAD OCCUPANCY, LOT GRADING, MUNICIPAL SERVICES PROTECTION DEPOSIT BY-LAW

City of Leavenworth REMODELS / ADDITIONS / ROOFS / PLUMBING / MECHANICAL

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

Location in Code Subject Fees

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

Commissioners to enact, amend, and enforce technical construction and building codes; and,

New Hanover Township

ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DALY CITY REPEALING AND REPLACING CHAPTER RE: INCLUSIONARY HOUSING

CHAPTER REAL PROPERTY DEVELOPMENT FEES. Sections:

City of Georgetown. Inspection Services

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

Appendix G Fee Schedule

Chapter CONSTRUCTION CODES

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

RESOLUTION NO. 701 BOROUGH OF MALVERN CHESTER COUNTY, PENNSYLVANIA

2018 FEE SCHEDULE. Chapter 8 Animals, Article ll Dog License Dog at Large $75.00

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

Chapter 806 Fees Zoning Certificate Fee Schedule Refund of Permit Fees

Ordinance Page 1

ORDINANCE NO AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF PORT ARANSAS, TEXAS, BY ADOPTING A NEW CHAPTER

CITY OF MAPLE PLAIN ORDINANCE NO. 297 AN ORDINANCE AMENDING THE COST OF A PERMANENT FENCE PERMIT ON THE FEE SCHEDULE FOR THE CITY OF MAPLE PLAIN

BUILDING PERMIT FEE SCHEDULE

Community Development Fees (as of March 2015)

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

ORDINANCE NO (revised by Ordinance )

1. Areas within perimeter boundary of city No fee. 2. Annexation agreements $100.00

DEMOLITIONS LICENSING REQUIREMENTS APPLICATION PROCESS. 1 of 2

Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

TOWNSHIP OF O HARA ALLEGHENY COUNTY, PENNSYLVANIA

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Application for a Building/Zoning Permit

Zoning Permit Application

CITY OF FORT CALHOUN LOCAL FEES SCHEDULE

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

SCOPE All fees associated with and referenced in the 2016 Building Code of the City and County of Denver ( Code ) are as set forth in this policy.

Minor Subdivision or Annexation Plans... $1,500.00

CITY OF MASCOTTE SERVICE FEES. One or Two Sided Copy not more than 8 ½ x 11 per page.15. One Sided Copy or Two sided 8 ½ x 14 per page.

BUI L DIN G A ND E L E V A T O R F E ES

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

TOWN OF HAVERHILL, NH

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

BUILDING PERMIT / ZONING USE PERMIT APPLICATION

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

Chapter 25 ESCROW FEE REQUIREMENTS

THE CORPORATION OF THE CITY OF MISSISSAUGA ROAD OCCUPANCY, LOT GRADING, MUNICIPAL SERVICES PROTECTION BY-LAW

Zoning Variances. Overview of

City of Pleasant Hill. Master Fee Schedule

Grass Lake Charter Township 373 Lakeside Drive, P.O. Box 216 Grass Lake, Michigan 49240

City of Georgetown. Inspection Services

Fee Resolution

WASHINGTON SELLER S RESIDENTIAL PROPERTY DISCLOSURE STATEMENT

2018 FEE SCHEDULE. Storm Water Utility Uniform Base Fee. Street Light/Tornado Siren Utility Fee

Transcription:

Village of Baxter Estates Schedule Table of Contents A. Buildings Department s...1 A.1. Construction Permit s...1 A.1.a. Construction Valuation...1 A.1.b. Plan Review...1 Basic Plan Review...1 Additional Plan Review...1 A.1.c. Construction Permit Schedule...1 Full Plan Review...1 Other than Full Plan Review i...1 A.1.d. Construction Permit Amendment...2 A.1.e. Construction Permit Extension or Renewal...2 A.1.f. Legalization of Non-permitted Construction...2 A.1.g. Additional Stand Alone Permits...2 A.2. Annual Inspection s...2 A.3. Certificate of Occupancy, Certificate of Completion s...2 A.4. Letters in Lieu of a Certificate of Occupancy...3 A.5. Document Search and Copy s...3 B. Board of Zoning Appeals (BZA) s...3 B.1. BZA Permit Application s...3 B.2. BZA Application Deposits...3 C. Planning Board s...4 Endnotes...5

Page 1 A. Buildings Department s A.1. Construction Permit s A.1.a. Construction Valuation The value to be used shall be the total value of all construction work for which the permit is issued, as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fireextinguishing systems, and any other permanent equipment. A.1.b. Plan Review Basic Plan Review Upon submittal of a plan for plan review, a plan review fee (60% of the total construction permit fee, as calculated in the Construction Permit Schedule) shall be collected. When the permit is issued, the balance of the total permit fee will be due. Additional Plan Review Where plans are incomplete or changed so as to require additional plan review, an additional plan review fee shall be charged at the Building Inspector's hourly rate. A.1.c. Construction Permit Schedule Full Plan Review i Structures requiring a full plan review, including new buildings, additions, alterations, remodels, fire repairs, and other structures: Total Valuation ii $1 to 1000 $325.00 $1,001 to 2,000 $400.00 $2,001 to 250,000 $400.00 + (.0125 x valuation over $2000) $250,001 and greater $3500.00 + (.0100 x valuation over $250,000) Other than Full Plan Review i Plumbing, electrical, mechanical, and structures not requiring a full plan review, including sidewalks, structural replacement of windows and doors, re-roofing, hot tubs, air conditioners, fireplaces, fire sprinklers, elevators, cesspool replacement, septic tank replacement, oil tank replacement, oil/gas conversions, boilers, and demolition: Total Valuation ii $1 to 1,000 $150.00 $1,001 to 20,000 $150.00 + (.0125 x valuation over $1000) $20,000 and greater $387.50 + (.0075 x valuation over $20,000)

A.1.d. Construction Permit Amendment An approved building permit may be amended for a time based fee of $120/hour multiplied by the number of hours or fraction thereof required by the Building Inspector to review and make a determination on the proposed amendment. A.1.e. Construction Permit Extension or Renewal Page 2 Construction permits expire one year from date of issuance. A construction permit for work in process may be extended upon application at least 30 days prior to expiration, at a fee equivalent to 50% of the original issue fee. Only one extension of nine months duration is allowed, after which a new construction permit is required. An expired construction permit for work not started may be renewed within one year of expiration at a fee equivalent to 50% of the original issue fee. A.1.f. Legalization of Non-permitted Construction When construction without a permit is discovered, a fee of $600 plus current construction permit fees based on current valuation is required to determine building code compliance. The structure must be made compliant with the current building code. New construction needed to achieve building code compliance will require an additional construction permit and fee based on the valuation of new construction. A.1.g. Additional Stand Alone Permits Permit Tree Removal Permit iii One or two: $50.00; each additional is $25.00. Fence Permit Sign Permit Dumpster Permit Curb Cut Permit $250.00 $150.00 for new; $125.00 for replacement. $100.00 plus $2.50 per square foot $75.00 for duration of construction project Street Opening Permit $350.00 plus surety bond of $5000.00 Sewer Connection Permit $175.00 Swimming Pool Permit Non-Structural Replacement of Windows A.2. Annual Inspection s Construction Permit plus $5000.00 surety bond. $75.00 for any number of windows during one project Outdoor Pool and/or Hot Tub $100.00 valid through December 31 st A.3. Certificate of Occupancy, Certificate of Completion s Certificate Pool $150.00 New dwelling $225.00

Page 3 Certificate Addition/alteration to dwelling or property $175.00 New commercial building $375.00 Commercial addition, alteration, or change of occupancy $275.00 A.4. Letters in Lieu of a Certificate of Occupancy Structures built prior to 1953 may be inspected, and if found to be conforming structures a Letter in Lieu of a Certificate of Occupancy will be issued. Any additions or alterations made to the structure after 1953 require certificates, and may be legalized as described above to have certificates issued. The inspection fee is $250.00 for residential structures and $375.00 for commercial structures. A.5. Document Search and Copy s Documents All contents of a property folder (including documents such as Certificate of Occupancy, Property Title, Surveys, Permits, Applications, Notice of Disapprovals, Orders to Remedy, Building Plans) Copy of Ordnance Book $65.00 B. Board of Zoning Appeals (BZA) s B.1. BZA Permit Application s Application Search and Copy $75.00 plus actual reproduction cost of oversized documents (larger than 8.5 x11 ) Residential / Commercial Variance $270.00 B.2. BZA Application Deposits In addition to the non-refundable BZA Application, an initial deposit to cover stenographic, legal, administrative, and other related services is required and be must be replenished as needed. Any monies not expended will be refunded to the applicant. Notwithstanding the foregoing, with respect to each application for which a public hearing is required, in the event that said public hearing is adjourned to a second or subsequent session, the applicant shall make an additional deposit, which must be received prior to the re-opening of the adjourned public hearing, in an amount equal to the sum of (i) all amounts incurred by the Village with respect to such application for which the applicant is responsible that exceed all deposits previously made by such applicant for such application, plus (ii) $1,000; provided, however, that the BZA Chairperson may waive the requirement for the additional $1,000, in the Chairperson s reasonable discretion Property Type Deposit Residential $1,000.00 Commercial $2,000.00

C. Planning Board s Page 4 Planning Board applications for a subdivision of property require a $500 application fee and a $2,000 deposit to cover stenographic, legal, administrative, and other related services is required. Any monies not expended will be refunded to the applicant. Notwithstanding the foregoing, with respect to each application for which a public hearing is required, in the event that said public hearing is adjourned to a second or subsequent session, the applicant shall make an additional deposit, which must be received prior to the re-opening of the adjourned public hearing, in an amount equal to the sum of (i) all amounts incurred by the Village with respect to such application for which the applicant is responsible that exceed all deposits previously made by such applicant for such application, plus (ii) $1,000; provided, however, that the Planning Board Chairperson may waive the requirement for the additional $1,000, in the Chairperson s reasonable discretion.

Page 5 i Determined by the Building Inspector. ii Rounded up to the next multiple of $1,000. iii Trees over 20 inches in circumference require a removal permit.