Planned & Reactive Maintenance of Premises Policy. Register No: Status: Public

Similar documents
Consulted With Individual/Body Date Head of Finance Financial

Electrical Safety Policy

STATUTORY COMPLIANCE REPORT

Housing Programme (Level 3) CIH L3 Housing Certificate NVQ L3 in Housing Functional Skills (L2 English and Maths) Information.

Guidance on the Scope of Practice Of Property Service Providers JANUARY 2017

HAVEBURY HOUSING PARTNERSHIP

RENT SETTING & SERVICE CHARGES

Building Control (Amendment) Regulations. ASFP Ireland Fire Protection Module At FMI Conference & Exhibition. RDS 6 March 2013

Building Control (Amendment) Regulations 2013 Legal implications. Deirdre Ní Fhloinn Consultant Reddy Charlton Solicitors

Aboriginal Communities Rent Policy v1.3

DUE DILIGENCE PROCEDURE

Historic Environment Scotland Àrainneachd Eachdraidheil Alba

Animal Products (Export Requirement: Inspection Agencies Ante-Mortem and Post-Mortem Inspection) Notice 2009

Owners Association Management Services Asset & Facilities Management Services IT & Software Support Service

PLANNED AND RESPONSIVE MAINTENANCE POLICY

RECOMMENDATIONS OF SECTION 8 TASK FORCE TO TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS JULY 18, 2000

DAM SAFETY RISK MANAGEMENT WORKSHOP DAM SAFETY INSPECTION SYSTEM

Scheme of Service. for. Housing Officers

HOUSING (SCOTLAND) BILL

ADOPTION OF 2018/19 FEES AND CHARGES FOR REGULATORY SERVICES

Policy: FP022 Rent Accounting and Arrears

AFFORDABLE HOME OWNERSHIP ALLOCATION POLICY

NHS England Medical Appraisal Policy. Annex I: Suggested appraisal team structure the appraisal office

Historic Environment Scotland

PROJECT INITIATION DOCUMENT

Tenancy Policy Introduction Legal Framework Purpose Principles Policy Statement Tenancy Statement...

HEATING SERVICES PROCEDURES SOLID FUEL SERVICING

Quality assurance of appraisal: guidance notes

CIC Approved Inspectors Register (CICAIR) Code of Conduct for Approved Inspectors

Document control. Supercedes (Version & Date) Version 2 February 2017

Leasehold management policy

Leasehold Management Policy

Shared Equity Policy

Starter Tenancy Policy

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool

PROPOSED DISPOSAL OF ALLOCATED HOUSING SITE AT STIRCHES, HAWICK TO EILDON HOUSING ASSOCIATION FOR THE DEVELOPMENT OF EXTRA CARE HOUSING.

Welsh Government Housing Policy Regulation

Useful Information for home owners. Service Charge Accounts

The OESC 27 th Edition Proposals for Ontario Amendments

Scottish Parliamentary Working Group on Tenements: Inspections Sub-Group

IAF/ILAC-A4:2004. Guidance on the Application of ISO/IEC 17020

GOOD PRACTICE GUIDE JULY 2004 HOUSING ASSOCIATIONS AND MANAGING AGENTS

Medical Appraisal and Revalidation Report

INTERNAL AUDIT DIVISION REPORT 2017/062. Audit of oversight and support of property management in field missions by the Department of Field Support

COMMERCIALISM INTEGRITY STEWARDSHIP. Data Exchange Policy & Guidance

Rent Setting. Date: March 2015 Version: 1. Document Reference: Document Owner: Bill Henderson. See also: Date last reviewed: March 2015

Paradigm Housing Group Tenure Policy

TRANSACTIONS POLICY. Approved by Shetland NHS Board: October Review Date: October Finance

SUMMARY REPORT. Meeting: Title: Authors: Accountable Directors: Meeting Date: 28 March 2019 Agenda Item: Enclosure Number: 15

ASSESSMENT OF STATE AGENCIES WITH RESPONSIBILITIES FOR LANDS AND OTHER REAL PROPERTIES

ADAPTATIONS POLICY 2012

Community Occupancy Guidelines

Policy: Property & Land Management

Proposed Framework for Multi-Residential Rental Property Licence. Tenant Issues Committee Licensing and Standards Committee

CPPDSM4003A Appraise property

Landlord Fees RENT COLLECT

Capital Assistance Scheme Call for Proposals 2016

Mandatory Requirement for Certification Bodies in Assessing Free, Prior and Informed Consent (FPIC) in New Planting Procedures

1014 FINANCE AND PROPERTY

Performance, Audit and Review Group Strategy and Plans

Compulsory Land Acquisition Delegations

JOB DESCRIPTION MANAGEMENT EXCLUSION

Lesson 11: Property Management 1 of Property Management. Real Estate Principles of Georgia. Property Management

Qualification Snapshot CIH Level 3 Certificate in Housing Services (QCF)

2. The Purpose of the Estates Strategy

Review of Readiness for Medical Revalidation

Continuing Professional Development (CPD)

Landlord Fees FULLY MANAGED

Housing York Inc. Rent Collection Audit Report

Do I Need a Licence? Interpreting the Definition of Providing Condo Management Services.

SSIP ASSESSOR REGISTER GUIDANCE NOTES

SPORTING AND COMMUNITY LEASING POLICY

Assets, Regeneration & Growth Committee 17 March Development of new affordable homes by Barnet Homes Registered Provider ( Opendoor Homes )

Cross Keys Homes Tenancy Policy

Quality management system. of supplies and services

Appendix A The Homes and Communities Agency Grant Funding Conditions under the Affordable Homes Programme

DIOCESE OF CHELMSFORD DIOCESAN ADVISORY COMMITTEE

Definitions. Article (2)

Real Estate Acquisitions Audit (Green Line LRT Stage 1)

Release: 1. CPPDSM4011A List property for lease

3.1.b Helping local authorities to meet their strategic housing goals. 3.1.d Providing clear information for customers about options / choices

SERVICES REQUEST AUSTRALIAN INDUSTRY CAPABILITY PROJECT MANAGER LEVEL 2 (1 POSITION)

Residential Management Regulations. tenants information

GENERAL CONDITIONS OF PURCHASE

Request for Proposal to Develop a Land Use Master Plan

REIQ Real Estate Agent s Licence Course for Griffith University Students

Staff Housing Policy UNIVERSITY OF EMBU. Staff Housing Policy. Website: Knowledge Transforms. Knowledge Transforms

South African Council for Town and Regional Planners

ANNEX DEFINITION OF THE METHODOLOGY TO BE FOLLOWED BY THE SERVICES OF THE COMMISSION FOR PROSPECTING AND NEGOTIATING FOR BUILDINGS

Inspection & Audit Procedure

To establish the structure and content of contracts.

SSHA Tenancy Policy. Page: 1 of 7

Neighbourhood Management

Briefing: Rent reductions

Review of HSC Trust Readiness for. Medical Revalidation. Summary Report. For Northern Ireland

1. *Does the document clearly specify the aims, objectives and scope of the proposed programme of archaeological work?

Landlord Fees Fully Managed

information sheet Arms Length Management Organisations Tenant Participation Advisory Service

B&NES Additional HMO Licensing Conditions

OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 33 / 23 NOVEMBER 2012, PRISTINA

Transcription:

Planned & Reactive Maintenance of Premises Policy Developed in response to: Contributes to CQC Outcome: Type: Policy Register No: 09089 Status: Public HTM guidance, HVCA, IET Regs, Bldg.Regs, HASAWA, H.S.E. CDM Regs 2007, RegReform(Fire Safety) 2005 Regulation 15 - Premises and equipment Consulted With Post/Committee/Group Date Tony Doyle Projects Manager October 2017 Louise Teare Director of Infection Prevention (DIPC) October 2017 Richard Wilks Senior Fire Officer October 2017 Jo Mitchell Head of Assurance & Compliance October 2017 (EFM) John Allen Hospital Engineer October 2017 Colin Payne Senior Estates Manager PFI October 2017 Phil Robson Head of Maintenance October 2017 Terry Fleming Projects Manager October 2017 Vince Ridings MEHT PFI Bouygues October 2017 Roger Campkin BCH PFI Grosvenor October 2017 Professionally Approved By Carin Charlton, Chief Estates & Facilities Director October 2017 Version Number 4.0 Issuing Directorate Estates and Facilities Ratified by: DRAG Chairmans Action Ratified on: 22nd November 2017 Trust Executive Board Date January 2018 Implementation Date 8 th January 2018 Next Review Date November 2020 Author/Contact for Information Ian Jackson, Principal Engineer Policy to be followed by (target staff) All staff Distribution Method Electronic copy to all Managers, Intranet. Website Related Trust Policies (to be read in conjunction with) Risk Management Strategy and Policy Health and Safety Policy Infection Prevention Policies Control of Contractors Estates Policies Standing Orders and Standing Financial Instructions Document Review History Version Number Authored/Reviewed by ActiveDate 1.0 Chris Churchouse 24/09/2009 1.1 updated Monitoring section Jo Mitchell 15/02/10 1.2 Jo Mitchell 07/06/10 2.0 formal review of policy Chris Churchouse 27/01/2012 3.0 formal review of policy Steve Groombridge 23/10/2014 4.0 formal review of policy Ian Jackson 8 th January 2018 1

Index 1. Purpose 2. Introduction 3. Aim 4. Scope 5. Roles & Responsibilities 6. Operational Systems 7. Monitoring 8. Training 8. Definitions 10. Communications and Implementation 11. Equality and Diversity 12. References 2

1. Purpose 1.1 To lay down a framework for the structure and work processes which ensure the provision of planned and reactive maintenance, regular servicing and compliance with statutory and mandatory requirements. 1.2 The requirement is that all buildings and associated services will be provided and maintained as fit for purpose in accordance with statutory and mandatory obligations and in compliance with relevant policies, Health Technical Memorandums and Key Performance Indicators. 2. Introduction 2.1 The Mid Essex Hospital Trust (the Trust) has the responsibility of providing a safe, high quality healthcare environment for its staff, patients and visitors on all its sites. The main contributor to ensuring that this is achieved and that all hospital premises are maintained to a high standard and comply with all statutory and mandatory requirements and that there is a well managed maintenance regime, for both the Planned Preventative Maintenance (PPM) and Reactive Maintenance services. 2.2 Broomfield Hospital is split into the Retained Estate, and the PFI managed Estate. The Trust also has remote sites. Braintree Community Hospital is serviced via a PFI contract. 2.3 The Trust Estates department is responsible for the Maintenance of the Retained Estate and the remote sites. The Broomfield PFI building is maintained by Bouygues, and the Braintree Community Hospital is maintained by Grosvenor FM. Both PFI contracts have maintenance requirements and standards, both contracts have to abide by statutory requirements, and will change these in the event of a change in the law. The Trust Estates Department monitors and audits the PFI performances. 3. Aim 3.1 The aim of the policy is to ensure that the Trust s buildings and associated services are maintained to a fit for purpose standard in accordance with statutory and mandatory obligations, also in compliance with relevant policies, Health Technical Memorandums and Key Performance Indicators. 4. Scope 4.1 To include all owned or leased properties and PFI contracted buildings. The leased properties are to be maintained in accordance with the lease. 4.2 Obligations and standards required for planned preventative maintenance, reactive maintenance and services for the PFI building are contained within the PFI Project Agreement. As such, all references within this policy are to hospital premises other than the PFI building and to the obligations, requirements and functions of the Trust s Estates Department unless specifically referenced as otherwise. 4.3 Planned preventative maintenance, reactive maintenance and services for all properties, owned or leased by the Trust will include electrical, mechanical, plumbing, joinery, building, painting, security, fire alarms, flooring etc. A programme of works will be prepared annually to cover the schedule of requirements for each property.

Specific obligations regarding the timing of issue of programmes of work for the PFI building are contained within the PFI Project Agreement. 5. Roles & Responsibilities 5.1 Chief Executive 5.1.1 The Chief Executive of the Trust has overall responsibility for ensuring that all premises are maintained to the relevant standards. The responsibility is delegated to the Chief Estates & Facilities Director to implement. 5.2. Chief Estates & Facilities Director 5.2.1 The Chief Estates & Facilities Director is responsible to the Chief Executive for ensuring that all hospital premises are maintained to the relevant standards and shall nominate a Estates & Facilities Site Manager to manage the Planned and Reactive Maintenance programme for the Retained Estate & Off site premises excluding the PFI building. 5.2.2 The Chief Estates & Facilities Director is identified as the Trust s Representative for the PFI Project Agreements. The Chief Estates & Facilities Director may, by specific instruction, delegate certain powers of the Trust s Representative to designated members of the Estates and Facilities Management Directorate. The powers of the Trust s Representative delegated by the Chief Estates & Facilities Director shall not include the power to make binding financial commitments upon the Trust. Such power shall rest with the Chief Estates & Facilities Director, albeit to be exercised in accordance with the Trust s Standing Orders and Standing Financial Instructions. 5.3 Estates & Facilities Site Manager 5.3.1 The Trust s Estates & Facilities Site Manager will be responsible for ensuring that all work identified for the Retained Estate premises is carried out by competent persons at the appropriate intervals and to the standards as laid down in regulations and industry best practices. Records and programmes are to be provided at regular intervals to confirm that the work is being implemented and completed on time. They will also monitor and audit the PFI provider s performance against the contract obligations. 6. Operational Systems 6.1 Programme 6.1.1 The Head of Maintenance is to agree an annual programme for planned maintenance and servicing before the commencement of each financial year. Budgets are to be agreed for each element of the service to be provided. 6.2 Standards 6.2.1 All maintenance, servicing and inspection works are to be carried out in accordance with the relevant British Standards, HTM Guidance, Building Regulations, Codes of Practice, Health & Safety at Work Act, Regulatory Reform (Fire Safety) Order 2005, CDM Regulations and manufacturers instructions. 4

6.3 Servicing 6.3.1 All servicing of plant, equipment and installations is to be carried out at the prescribed intervals. Any deviance from manufacturers recommendations or HTM guidance must be subject to a Risk Assessment. 6.3.2 All parties are to ensure that competent persons are employed to carry out the specific services, and are to maintain a register of competent persons. 6.3.3 Records of servicing are to be maintained together with appropriate certificates 6.4 Maintenance Planned 6.4.1 All planned maintenance work should be carried out to comply with the relevant current standards and to apply for all necessary approvals from Local Authorities and statutory undertakings. 6.5 Maintenance Reactive 6.5.1 The Estates and Facilities Helpdesk (Ext 6000) operates 24/7, 365 days per year as the receiving point for all reactive maintenance requests for hospital premises. For Braintree Community Hospital, there is a Helpdesk (01376 314100) operates 24/7, 365 days per year as the receiving point for all reactive maintenance requests 6.5.2 Each request is allocated a priority and unique identification with response times and priorities defined by the Retained Estate Maintenance Department or in accordance with the PFI Project Agreements where the request relates to a PFI maintained building. 6.6 Notification of Problems 6.6.1 All parties are to notify the User Department immediately of any significant Building and Engineering breakdowns which will have an immediate impact on the delivery of a service from a building. 6.6.2 The Trust s Estates Department will ensure that all affected Heads of Service are informed and given advice on the effects on the service provided from the building. This is expected to be undertaken by the individual user departments using the Trust Risk Assessment Form in accordance with the Risk Management Strategy and Policy. 6.6.3 For all planned works that will result in a loss of service or interference to the users must have 2 weeks notice in advance to the users, an Essential Works Notification will be issued Trustwide to ensure all parties possibly affected will be informed. A sign off sheet for acceptance may be used for specific work. 7. Monitoring 7.1 The Retained Estate Estates Department is to compile and maintain an up to date register of all assets within the Retained Estate premises. The Retained Estate Estates Department is to provide on an annual basis records of all servicing carried out during the year for each building it has been delegated to maintain. The records are to be signed by the person who carried out the service/inspection. The Retained 5

Estate Estates Department is to provide an up to date register of maintenance and servicing contracts in place to meet the needs of the building on an annual basis. 7.2 The Retained Estate Estates Department will on a regular basis undertake performance monitoring of both contractors and directly employed labour in relation to the provision of PPM and Reactive Maintenance tasks. 7.3 The Head of Maintenance, Estates Engineers and/or Supervisor will on a monthly basis check 2.5% of worksheets to ensure the information is correctly provided, hours taken are appropriate to the work content and note any comments from the Tradesperson and take the necessary action if required. The Manger/Supervisor checking the worksheets should initial each worksheet to verify the checking procedure. 7.4 In addition, a randomly selected sample of 2.5% of a month s worksheets for both reactive and Periodic Preventative Maintenance (PPM) (14 dockets) will be audited by the Head of Maintenance, Estates Engineers and/or Supervisor each month. The audits will consist of quality of workmanship, value for money and documentation completed where applicable. The results will be formally recorded and monitored via the Estates and Facilities Management Directorate Performance Management Report on a monthly basis. 7.5 Response times to reactive maintenance is also monitored on a monthly basis and reported in Estates and Facilities Management Directorate Performance Management Report. 7.7 All monitoring and auditing will be set against realistic KPI s set by the Head of Maintenance. 7.8 The Retained Estate Estates Department, along with the PFI providers are to provide all information requested by CQC inspections, and any statutory or contractual obligations. 7.9 The Retained Estate Estates Department and the PFI providers are to monitor the life cycle of all equipment and plan for replacement equipment, a Risk Assessed Backlog Maintenance register is to be managed to provide financial planning ability. 8. Training 8.1 All Retained Estate Estates staff must be trained to the standard for the relevant task undertaken. The operatives are to be competent persons in their discipline. Regular reviews of training requirements are to be undertaken and refresher training is to be implemented as necessary within any financial constraints imposed. 8.2 The Estates & Facilities Site Manager is to ensure adequate funding is available to fulfil all statutory training requirements for all operatives. 8.3 The PFI providers training obligations are covered by the Schedules within their Contracts. 6

9. Definitions 9.1 Planned Maintenance Work identified in a programme to maintain buildings and engineering elements at hospital premises. 9.2 Reactive Maintenance Work identified outside a programme which is emergency or unexpected to reinstate building and engineering elements to working condition. 9.3 Servicing Regular maintenance and inspection of plant and equipment to maintain standards and comply with statutory requirements. 10. Communication & Implementation 10.1 The policy will be made available on the Trust s intranet & website by the Estates Department. The Trust s Principal Engineer will be responsible for issuing copies to senior operational managers for them to disseminate the policy to their staff and within their department 10.2 The Head of Maintenance will be responsible for ensuring all Trust Estates staff read and fully understand the policy and that it is read in conjunction with the Control of Contractors Policy. 11. Equality and Diversity 11.1 The Trust is committed to the provision of a service that is fair, accessible and meets the needs of all individuals. 12. References British Standards as appropriate HTM Health Technical Memorandums The Building Regulations 2000 Approved Codes of Practice Health & Safety at Work Act 1974 Construction (Design & Management) Regulations 2015 Regulatory Reform (Fire Safety) Order 2005 7