DEVELOPMENT AND PERMIT RELATED SERVICES

Similar documents
DEVELOPMENT SERVICES DEPARMENT Andrew Malik, Director

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

Zoning Permit Application

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION

Preliminary Subdivision Application (Minor) (Three (3) lots or less)

Preliminary Subdivision Application (Major) (Four (4) lots or more)

E L M E R B O R O U G H L A N D U S E B O A R D APPLICATION COVER SHEET (to be completed for all applications and appeals)

PALMER TOWNSHIP NORTHAMPTON COUNTY, PENNSYLVANIA RESOLUTION#

(voice) (fax) (voice) (fax) Site Plan Review

MINOR SUBDIVISION PLAT CHECKLIST

CITY OF GROVER BEACH COMMUNITY DEVELOPMENT DEPARTMENT Tentative Map Checklist

City of High Point Development Fee Schedule

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

Sagamore Hills Township Valley View Rd. Sagamore Hills, OH (330) Phone (330) Fax

Surveyor s Checklist

Development Related Fee Schedule Effective May 1, Plan Reviews. Remodeling, Alterations, Additions Residential and Commercial

VILLAGE OF ALLOUEZ SCHEDULE OF FEES AND CHARGES

SITE DEVELOPMENT PLAN REQUIREMENTS CHECKLIST

FOCUS ENGINEERING, inc.

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

BOROUGH OF NORTH WALES. Fee Schedule Effective: 01/01/2018

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: September 15, 2016


APPLICATION PROCESSING

Use permitted by: Right Special Exemption

Fee Schedule for Zoning, Building Permits, and Plan Review Services

Section 3 Right-of-Way

City of Pleasant Hill. Master Fee Schedule

APPLICATION FOR FINAL PLAT APPROVAL (Major Subdivision)

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Easement Program Guidelines for Locating Towers and Communication Devices

TARIFF OF FEES FOR PROCESSING OF PLANNING APPLICATIONS GENERAL TERMS

Town Of Myersville. TOWN HALL Planning Office Phone: Main Street Fax: ANNUAL REPORT 2014

WHEREAS, it is necessary that an appropriate Fee Schedule be established sufficient to

APPENDIX A 2018 FEE SCHEDULE

Memorandum: October 13, 2008 REVISED To: Trowbridge Township Planning Commission From: P. Hudson, AICP Re: Suggested New Ordinance

JOHNNY S RV PARK SUBDIVISION

SECTION 7000 LAND DEVELOPMENT REQUIREMENTS

APPLICATION PROCESSING STEPS STEP 1 CHECK WITH STAFF

Revised April 3/18 Sheet Effective April 3/18 B/L 6108

MOBILE TOWERS SUBDIVISION

MINOR SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

APPLICATION PROCESSING STEPS

TOWN OF MARKHAM ONTARIO

ARTICLE VI. SPECIAL EXCEPTION REGULATIONS

Introduction. Proposed Land Use and Development Code (LUDC):

FEE The staff will let you know the current cost of filing an application. Make checks payable to the San Joaquin County Treasurer.

MASTER SUBDIVISION FINAL PLAT APPLICATION Town of Apex, North Carolina

FINAL PLAT CHECKLIST

Unified Development Code

Disposition List for the Town of East Haddam CT

STAFF REPORT Administrative Subdivision Hearing West 150 South Street, Parcel # , and

PERMIT AND SUBMITTAL REQUIREMENTS (PR)

RFQ INDEFINITE DELIVERIES CONTRACT - LAND SURVEYING SERVICES MAY

FINAL SITE PLAN PLAT APPLICATION Town of Apex, North Carolina

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

COUNCIL ACTION FORM. 1. The City Council can approve the Preliminary Plat for Menards Ames Subdivision

[Disposition and Development Agreement - Seawall Lot 337 Associates, LLC - Mission Rock Project]

Springfield Township Bucks County SCHEDULE OF FEES AND CHARGES RESOLUTION #

JEFFERSON COUNTY, ALABAMA

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

ARTICLE 900 PLAT AND PLAN REQUIREMENTS

MILLCREEK. Planning & Development Services APPROVED FEE SCHEDULE. for Submitted for review and approval in 2016

DRIVEWAY REQUIREMENTS

Town of Holly Springs Residential Development Fee Worksheet. Effective July 1, 2018 June 30, 2019

Residential Minor Subdivision Review Checklist

S U B D I V I S I O N AGREEMENT

DEVELOPMENT POLICY INFRASTRUCTURE GUIDELINES FOR NEW DEVELOPMENT

Operating Standards Attachment to Development Application

MINOR PLAT. The following documents are provided as required by the City of Conroe for use in the above titled platting submittals:

City of Edwardsville, Kansas Special Benefit District Policy

2 April 9, 2014 Public Hearing

MEMORANDUM. TERESA McCLISH, COMMUNITY DEVELOPMENT DIRECTOR

Prepared by: Nick Lagura, Associate Planner

Chapter 3 FINANCE, TAXATION, AND PUBLIC RECORDS

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)

Airport Rd. Lot 6 Lot 2 Lot 1. 1 Mile: Population: 1,100 Median HH Income: $51, Mile: Population: 16,300 Median HH Income: $53,500

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

Chapter 46 STREETS, SIDEWALKS AND OTHER PUBLIC PLACES*

April 10, 2017 WATER

Section Preliminary Plat Checklist and Application Forms

PARK DISTRICT DEVELOPMENT AGREEMENT

LAKE WORTH DRAINAGE DISTRICT OPERATING POLICIES TABLE OF CONTENTS

Plat Reviews. Richard Powell, P.L.S.

CITY OF BUENA PARK FEE SCHEDULE

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

Article XII. R-1 Agricultural-Low Density Residential District

WRIGHT TOWNSHIP Ottawa County 1565 Jackson Street, P.O. Box 255, Marne, Michigan 49435

CITY OF EAU CLAIRE, WISCONSIN. SPECIAL ASSESSMENT POLICY (Dated: November 8, 2016)

Short Title. This title shall be known as the "subdivision ordinance" of the City of Denver, Iowa. (Ord (part), 1992)

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT

*For Special Exception and Conditional Uses, Complete Page 3 of this application.

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT DEPARTMENT ZONING ADMINISTRATOR 300 Richards Blvd, 3rd Floor, Sacramento, CA 95811

ARTICLE V PRELIMINARY PLAN SUBMISSION

GENERAL PLANNING APPLICATION FORM

Moore Township Planning Commission 2491 Community Drive, Bath, Pennsylvania Telephone: FAX: Rev:12/23/2013

APPLICATION SUBMITTAL REQUIREMENTS FOR Tentative Parcel or Subdivision Maps

Transcription:

DEVELOPMENT AND PERMIT RELATED SERVICES Permits & Processing Fees 1 Encroachment Permit Processing 315.00 2 NOT USED 3 Driveway Encroachment Permit Processing 135.00 4 Building Permit Processing 80.00 5 NOT USED 6 Grading Permit 38.00 7 Special Permits Each Actual 8 Time Extension Subdivision Agreement 805.00 Inspection Fees 9 Inspection Fee Driveway 121.00 10 Inspection Fee Driveway Box Culvert 181.00 11 Inspection Fee Paved Frontage (Base Fee) 116.00 12 Inspection Fee Paved Frontage (Linear Fee) 0.53 13 Inspection Fee Curb Gutter and Sidewalk (Base Fee) 121.00 14 Inspection Fee Curb Gutter and Sidewalk (Linear Fee) 1.16 15 Inspection Fee Utility Permits Cross Cuts 121.00 16 Inspection Fee Utility Permits Bore up to 12 Diameter 113.00 17 18 Inspection Fee Utility Permits Bore over 12 Diameter (Base Fee) Inspection Fee Utility Permits Bore over 12 Diameter (Linear Fee) 113.00 Per Inch $ 22.00 19 Inspection Fee Utility Permits Longitudinal Cut (Base Fee) 121.00 Page 1 of 8

20 21 22 23 24 25 Inspection Fee Utility Permit Longitudinal Cut Dirt 0 100' (Linear Fee) Inspection Fee Utility Permit Longitudinal Cut Dirt >100' to1000' (Linear Fee) Inspection Fee Utility Permit Longitudinal Cut Dirt > 1000' (Linear Fee) Inspection Fee Utility Permit Longitudinal Cut Paved 0 100' (Linear Fee) Inspection Fee Utility Permit Longitudinal Cut Paved > 100' to 1000' (Linear Fee) Inspection Fee Utility Permit Longitudinal Cut Paved > 1000' (Linear Fee) Plan Check Fees 0.55 0.35 0.13 0.85 0.50 0.25 26 Plan Check Fees (1st $150,000) 27 Plan Check Fees ($150,001 to $400,000) 28 Plan Check Fees (Over $400,000) Field Inspection Fees (projects not listed above) 29 Field Inspection Fees (up to $200,000) 30 Field Inspection Fees ($200,001 to $500,000) 31 Field Inspection Fees ($500,001 to $1,000,000) 32 Field Inspection Fees (over $1,000,000) Abandonment Fees 7.22% 4.20% 1.95% 9.08% 3.95% 2.82% 2.31% 33 Abandonment Application Fee 600.00 Page 2 of 8

34 Abandonment Processing Fee Minor Each Actual 35 Abandonment Processing Fee Major Each Actual 36 Process Property Acquisitions 325.00 Segregation Fees 37 Segregation Fee Owner Initiated (Base Fee) 410.00 38 Segregation Fee Owner Initiated (Lot Fee) Per Lot $ 25.00 39 Segregation Fee County Initiated (Base Fee) 400.00 40 Segregation Fee County Initiated (Lot Fee) Per Lot $ 25.00 Infrastructure Reimbursement Preparation Fees 41 Infrastructure Reimb Charge Program Preparation Fee (Base Amount) Per Application $ 4,674.00 42 Infrastructure Reimb Charge Program Preparation Fee (1st $200,000) 1.10% 43 Infrastructure Reimb Charge Program Preparation Fee (Over $200,000) 0.55% Annexation Fees 44 Annexation Processing Fees Each Actual Miscellaneous Fees 45 Agreements (3) Each Actual 46 Deferred Frontage Improvement Agreements (Preparation Fee) 1, 47 Declaration of Restriction (roads) 48 Engineering Feasibility Study Each ACTUAL COST 49 Franchise Transfer Ownership 2,000.00 50 Franchise Application Each ACTUAL COST Page 3 of 8

51 Improvement Standards & Specs Disc or Hard Copy 10.00 52 NOT USED 53 Irrevocable Offers To Dedicate (Preparation Fee) 700.00 54 Quarry Closures 55 Quarry Inspections or FACE review 750.00 56 Returned Check Fee 35.00 57 Special Districts Process Zone Change or Establish Assessment Each Actual 58 Traffic Impact Study (County Only) (2)(7) Each + 30% 59 Traffic Impact Study (Other Agency Involvement) (2)(7) Each + 40% 60 Traffic Technical Memorandum 61 Utility Service Reconnection 50.00 62 Utility Service Review/Research Each Actual 63 Will Serve Letter Simple 25.00 64 Shipping & Handling Each $10 + actual shipping costs 65 NOT USED 66 NOT USED 67 Email Image 5.00 68 Copies letter/ledger size (5) Each First 21 pages $0.10 Pages 21+ $0.07 69 All Other Copies, Map Panels (FIRMs, Topographic, etc.) 5.00 70 Historical Aerial Research 20 per site Page 4 of 8

TRANSPORTATION PERMITS 71 Transportation Permits Single Trip 16.00 72 Transportation Permits Blanket Permit 90.00 73 Transportation Permits Custom 172.00 STORM WATER POLLUTION PREVENTION (SWPP) Phase I & II SWPPP 74 SWQCCP Review Redevelopment 665.00 75 SWQCCP Review Subdivisions (10 or more units) 1,000.00 76 SWQCCP Review All Other Priority Projects 665.00 77 Review of Project Registration Documents and Inspections 635.00 78 Re Inspection Fee Following Written Notice to Clean or Notice of Violation 79 SWQCCP Inspections (Covers all Inspections) 225.00 80 SWQCCP Re Inspection Fee Following Written Notice to Clean or Notice of Violation Small Site SWPPP 81 SWPPP Inspections for sites < 1 acre (Covers all inspections) 150.00 82 83 SWPPP Re Inspection Fee Following Written Notice to Clean or Notice of Violation for sites < 1 acre Illicit Discharges Inspection Fee Following Written Notice to Clean or Notice of Violation SWPPP Inspection Fees Commercial 84 Annual Inspection 55.00 85 Inspection Fee Following Written Notice to Clean or Notice of Violation Page 5 of 8

SWPPP Inspection Fees Industrial 86 Annual Inspection 110.00 87 88 89 90 91 92 93 Inspection Fee Following Written Notice to Clean or Notice of Violation FLOOD CONTROL Watercourse Encroachment Permit Minor Project cost is less than $1,000 (as determined by FMD) Watercourse Encroachment Permit Major Project cost is $1,000 or more (as determined by FMD) Watercourse Encroachment Permit Major Central Valley Flood Protection Board Endorsement Letter Watercourse Encroachment Permit Special Investigation & Construction Oversight for Restoration of Unauthorized Work Flood Zone Construction Permit Repair/Replacement (When improvements are less than 50% of existing Structure Value as defined by County Ordinance.) Flood Zone Construction Permit Minor Permit (Accessory Structures, Grading, New wells, Well repairs, Solar Systems, Signs, Telephone Towers and Equipment Sheds, and all other miscellaneous construction that does not constitute a major permit.) 150.00 350.00 Each COST + 25% 150.00 200.00 94 Flood Zone Construction Permit Major Permit (When residential construction is greater than or equal to 500 square feet, and when agricultural and other non residential is greater than or equal to 1,200 square feet.) Each $200.00 + 0.20/sf 95 Flood Zone Construction Permit Floodway Permit Each $ + 125% of Consultant Special Report SURVEYOR FEES 96 Final Maps County/City (Base Fee) (4) 1,300.00 Page 6 of 8

97 Final Maps County/City (Lot Fee) (4) Per Lot $ 100.00 98 Parcel Map County/City (Base Fee) (4) 1,300.00 99 Parcel Map County/City (Parcel Fee) (4) Per Parcel $ 100.00 100 Legal Descriptions LAFCo (1) 700.00 101 Legal Descriptions County Lot Line Adjustment (LA) (4) 325.00 102 Legal Descriptions (Other than County LA) 850.00 103 Record of Survey with Lot Line Adjustment (4) Each $650 plus $325 for each addition map sheet. 104 Record of Survey w/o Lot Line Adjustment (4) Per Sheet $ 325.00 105 Abandonments Public Utility Easement (PUE) Surveyor Fee Each Actual 106 Abandonments Right of Way Surveyor Fee Each Actual 107 Processing Maps to Board of Supervisors 1, 108 Corner Records ( of Recording Documents, Max 2 Pages) 10.00 109 Revised Certificate Sheets for Final Maps and Parcel Maps 110 District Annexations Each Actual Special District Fees 111 Buy in charges (6) Each Special Footnotes: Fee may be based on actual cost in lieu of the listed fee based on determination of the Director per San Joaquin (1) County Ordinance Code Section 9 240.10 and Board Resolution R 13 126. (2) Consultants cost to prepare plus percentage of consultant cost indicated. (3) Infrastructure, road, or development related agreements with Public Works or Board of Supervisors. (4) All projects sitting dormant for 2+ years will be recharged current applicable fees for re evaluation of project (5) Per County Administrative Manual 709.7 Page 7 of 8

(6) Buy in charges for special districts annexations to be calculated per Board Resolution R 13 127 (7) A $500 deposit is required for scope preparation on all Traffic Impact Studies. The deposit shall be applied towards the total cost of the study unless the study is not initiated by the applicant within 90 days, in which case a new $500 deposit may be required to re evaluate the scope. Page 8 of 8