BUILDING OCCUPANCY RESUMPTION PROGRAM (BORP) Guidelines for Engineers

Similar documents
GROWTH MANAGEMENT DEPARTMENT POLICY


REQUEST FOR PROPOSALS RFP # September 16, 2011 Proposals Due on October 5, 4:00 pm

Below Market Rate Program Administrator. Request for Proposals

COMMERCIAL CONDOMINIUM CONVERSION APPLICATION MATERIALS. Table of Contents

Secondary Dwelling Unit

PERRY CITY UTAH REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

Request for Proposals HQS Inspection Services May 21,

Town of North Castle New York REQUEST FOR PROPOSALS REAL ESTATE BROKER SERVICES

Alternative plans review and inspection.-- (1) As used in this section, the term:

County of Kern HOME Program Housing Developer Pre-Application

COMMERCIAL THIRD PARTY UCC BUILDING INSPECTOR SELECTION FORM & FEE SCHEDULE

Right-of-Way Acquisition and

Home Occupation and Cottage Industry standards are divided into three (3) groups of provisions:

RELOCATION ASSISTANCE PROGRAM (RAP) BOOKLET THE 10 MINUTE MANAGER

PROPERTY MANAGEMENT PROPOSAL

Annual Registration of Vacant or Abandoned Commercial Storefront [San Francisco Ordinance , effective ]

County of San Bernardino Department of Public Health Environmental Health Services

Lawrence Township. Mercer County, New Jersey. Working with our Planning and Zoning Boards & A Guide to our Permit Process

Abatement and Management Office Demolition at Parks Place IFB Number

ADDITION/REMODEL APPLICATION CHECKLIST 2017 FBC. Please make sure you have ALL required copies before submitting permit application

CITY OF MENIFEE RIVERSIDE COUNTY, CALIFORNIA REQUEST FOR PROPOSALS SPECIAL DISTRICTS ADMINISTRATION SERVICES

March 3, 2017 REQUEST FOR PROPOSALS FOR THE PURCHASE AND REUSE OF PROPERTY LIST OF AVAILABLE PROPERTIES

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

EXPEDITED CONVERSION PROGRAM

1. Annual Registration Form Names the Responsible Party, the Owner Representative and provides phone numbers and mailing addresses.

THE TOWN OF BANCROFT REQUEST FOR PROPOSAL (RFP) COMMERCIAL REAL ESTATE BROKERAGE SERVICES

HOUSING AUTHORITY OF THE CITY OF PHARR REQUEST FOR PROPOSAL - HQS INSPECTIONS AGENCY OWNED

Application for a Building/Zoning Permit

Short-term residential rental authorized advertisement

MEMO. Hon. Carter Borden, Chair Gloucester County Board of Supervisors. Brenda G. Garton County Administrator. HMA Grants Coordinator

Establishing a Wetland Bank in Minnesota

APPLICATION PACKET FOR. In the Coastal Zone Area

SECOND UNIT DRAFT. workbook. A tool for homeowners considering building a second unit in San Mateo County

Your Homeowners Association Property Improvement Handbook

BUILDING PERMIT SUBMITTAL REQUIREMENTS

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

Kane County Foreclosure Redevelopment Program

NOTICE OF ACKNOWLEDGMENT

REQUEST FOR QUALIFICATIONS REAL ESTATE SERVICES

2018 Requirements Manual An In-Depth Look at Changes to the Requirements

RESIDENTIAL CONDOMINIUM CONVERSION APPLICATION MATERIALS

Chapter 5. Competitive Sealed Bidding: Procedure

Special Report All About

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

Guide to Taking a Rent Arrears Case to VCAT

PACE Financing Application Los Angeles County Commercial Property Assessed Clean Energy (PACE) Program

Honorable Members of the Rent Stabilization Board. Budget and Personnel Committee and Jay Kelekian, Executive Director

PENN MANOR SCHOOL DISTRICT

DELAWARE STATE HOUSING AUTHORITY RELOCATION ASSISTANCE POLICY

TOWN OF SAN ANSELMO PLANNING COMMISSION STAFF REPORT. For the meeting of December 7, Agenda Item 5A

Request for Proposals for Commercial Real Estate Brokerage Services Port Angeles, Washington. Issued June 6, 2016

Town of Manchester, Connecticut. General Services Department. Request for Qualifications Approved Real Estate Appraiser List RFQ No.

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018

Multifamily Upgrade Program

Request for Proposals

Department of Energy

ORDINANCE NO. STRTF Review

Complete Package Requirements Operating Cost Adjustment Factor

All proposals must include a current Business Registration Certificate, W-9 Form and a Certificate of Employee Information Report

CITY OF ARVIN Application Form. Planning & Building Department 141 Plumtree Dr. P.O. Box 548 Arvin, Ca Phone: (661) Fax: (661)

County Tax Sale PLEASE MARK YOUR ENVELOPE "SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO:

File Name: Private Provider Requirements and Information

Allegheny County Sanitary Authority REQUEST FOR QUALIFICATIONS. for

City Of Oakland HOUSING AND COMMUNITY DEVELOPMENT DEPARTMENT

CITY AND COUNTY OF HONOLULU DEPARTMENT OF BUDGET & FISCAL SERVICES ADMINISTRATIVE GUIDELINES FOR COMMUNITY FACILITIES DISTRICTS

Chapter 2.60 RECOGNIZED COMMUNITY ORGANIZATIONS

Initial Notice Protocol October 2012

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

NOTICE FOR PREQUALIFICATION OF CONTRACTOR

Technical Services Division 1660 Mission Street San Francisco CA Office (415) FAX (415) Website:

PLANNING APPLICATION FORM RESIDENTIAL

Frequently Asked Questions about Historic Designations

Sabine River Authority, State of Louisiana

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

RCI, PAL and Army Housing Training. Real Estate Process / Actions

IDBI BANK LTD. PREMISES REQUIRED FOR SETTING UP OF OFFSITE ATMs IN SILIGURI

Kane County Foreclosure Redevelopment Program

General Manager of Planning, Urban Design, and Sustainability in consultation with the Director of Legal Services

Pacific Union International Referral, Inc. Guidelines and Independent Contractor s Agreement

IBI Online Permits Center

Request for Proposals

Request for Proposal BUILDING INSPECTION AND RELATED SERVICES

TABLE OF CONTENTS. Choosing A Home 4. Buying A Home 7. The Manufacturer s Warranty 7. Implied Warranties 8. The Retailer s Warranty 8

RECORDKEEPING PROCESS. All ACEDP grantees are required to develop a recordkeeping system that is comprehensive, well-organized and easy to review.

CHAPTER 154 RIGHTS OF WAY

Relocation Assistance Policy

Historic Landmark Designation

REQUEST FOR PROPOSALS OF ZONING OFFICER AND CODE ENFORCEMENT OFFICER SERVICES (RFP)

CITY OF WATERLOO UPTOWN INCENTIVE PROGRAM APPLICATION FORM

CITY OF SALEM, MASSACHUSETTS BOARD OF APPEALS NOTICE TO APPLICANTS

Change of Contractor

CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT

OWNERS, BUSINESSES AND TENANTS PARTICIPATION AND RE-ENTRY RULES

Township of Salisbury Lehigh County, Pennsylvania REQUEST FOR PROPOSALS PROFESSIONAL FINANCIAL AND ADMINISTRATIVE AUDITING SERVICES

REQUEST FOR QUALIFICATIONS

AGENDA REPORT SUMMARY. Resolution No : 2017/18 Community Development Fee Schedule

Dartmouth College. Rennie Farm Value Assurance Program

CORPORATION OF THE TOWNSHIP OF BLANDFORD-BLENHEIM REQUEST FOR PROPOSAL REAL ESTATE SERVICES Sale of Property Owned by the Township of

SONOMA COUNTY FLOOD ELEVATION MITIGATION PROGRAM PROGRAM DESIGN

Transcription:

BUILDING OCCUPANCY RESUMPTION PROGRAM (BORP) Guidelines for Engineers Introduction The Building Occupancy Resumption Program (BORP) is a program developed by the City and County of San Francisco, Department of Building Inspection, with the cooperation of the Structural Engineers Association of Northern California (SEAONC) and San Francisco chapters of the Building Owners and Managers Association (BOMA) and the American Institute of Architects (AIA). The program allows San Francisco building owners to pre-certify private post-earthquake inspection of their buildings by qualified engineers and specialty contractors upon DBI acceptance of a written inspection program. The Building Occupancy Resumption Program consists of three basic phases. The first is the assessment of the building and preparation of a BORP program, including a building-specific post-earthquake inspection plan. The second phase includes annual update and renewal activities, the maintenance portion of the work. The third phase is the post-disaster implementation of the program. Purpose The purpose of these guidelines is to assist engineers with the preparation of Building Occupancy Resumption Program documents and to encourage a uniform format. Page 1

Phase I BORP Submittal Owner/Engineer Agreement You should have owner/engineer agreements covering work for each of the three BORP phases. The intent of the program is that the engineers who develop the inspection plan become the individuals who maintain their training in ATC 20 procedures and building-specific inspection exercise, participate in annual DBI update activities, and inspect the buildings to which they are assigned after the next major earthquake. Because considerable time may elapse between the development of a BORP program and its implementation, it may be more practical to separate the BORP activities into two or three discrete agreements. Draft an agreement between your firm and the building owner or owner s authorized agent to assess the building s condition. The minimum standard for this condition assessment is the ATC 20 Procedures for Postearthquake Safety Evaluation of Buildings, Detailed Evaluation. Some owners or engineers choose a more complete engineering evaluation. An agreement for Phase I work should include the following tasks: a. Choose structural inspectors who meet qualification license and experience criteria. b. Obtain building construction drawings, if available. c. Identify building structural system. d. Write inspection plan. e. Develop building information, evacuation plan, inspector response requirements, equipment and drawing locations, and other pertinent information. f. Prepare precertification documentation. g. Submit written building emergency inspection program, including inspection plan. h. Revise, correct, or add information as requested by BORP review committee. Preparation Follow the directions given in the Building Occupancy Resumption Program (Attachment A), using the checklist, format, and forms provided. Signatures Obtain signatures of the owner s representative and the elevator and life safety inspectors. Initiate this task as early as possible. One of the more time-consuming tasks associated with preparation of a submittal is obtaining the required signatures of the elevator and life safety inspectors. The owner s representative is often involved in the process, so that signature should be easy to get. But, unless you have some prior communication with the elevator firm and life safety system maintenance people, they may be suspicious of your asking for signatures certifying their responsibilities. An effective way of handling this is to: a. Call them, introduce yourself, and tell them about the BORP program and that the building owner is requesting their participation. b. Tell them you will be sending them a letter [See Attachment B]and forms that the building owner wants them to sign and return to you as soon as possible. c. Mail the letter and forms to them, including a self-addressed stamped envelope for their use. If they have some idea of the extent of their responsibilities and know that the form is coming in the mail, they won t be as likely to involve their attorneys - of if they do, they may have already discussed the matter before the material arrives. An example of a letter you might send is provided as Attachment B. Page 2

Phase II - BORP Maintenance Program It is important to develop the program so that it can be maintained over many years. Changes may occur in the building, inspection personnel, and client relationships. An agreement for this phase of the work may also be combined with either the Phase I or Phase III tasks. Owner/Engineer Agreement An agreement for Phase II work should include the following tasks, some of which may be performed by the building owner: a. Obtain and store emergency earthquake safety and inspection equipment/supplies. b. Update inspection plan if changes have been made to building. c. Maintain and replenish inspection supplies and equipment, if needed. d. Select qualified replacements for any engineers who are no longer assigned to the building. e. Participate in annual DBI update seminars. f. Maintain proficiency in ATC 20 procedures. g. Conduct exercises to maintain inspection plan familiarity. h. Submit Annual Renewal form. Page 3

Phase III - BORP Emergency Inspection Services Agreement In order to promptly respond to your call to request BORP emergency inspection services, it will be mutually beneficial to have the terms and conditions for the emergency inspection services pre-authorized by the building owner or owner s representative in advance of the next major earthquake. That way this important detail will be resolved in advance. The events that would trigger the emergency inspection procedures, along with the associated scope of work, schedule, limits of liability, and fee are summarized in the example agreement below. Scope of Work and Schedule The Structural Engineer will provide the following emergency structural inspection services for the building located at [insert Building Address], San Francisco in accordance with the requirements of the Building Occupancy Resumption Program (BORP). The services include an ATC-20 Detailed Evaluation, upon which a post-earthquake inspection plan is based. A flow chart showing the normal, ATC-20, building safety evaluation process is included as Attachment C. Following are activities to be included in the Phase III services. a. Upon notification of an earthquake resulting in a declared state of emergency and/or authorization by the Client to proceed with the BORP inspection, initiate emergency inspection program within 8 hours of daylight access to building or as indicated in the inspection plan. It is understood that the engineers will give their best effort to respond as promptly as circumstances will allow. b. Contact DBI immediately if building or area (including sidewalk, street, or parking area) presents a public safety hazard or if an emergency demolition or shoring permit is needed. c. Arrange for barricading of all unsafe areas. Contact the Department of Public Works immediately if areas barricaded include a City street or otherwise adversely affect City services, or if barricades provided by the building owner are insufficient. d. Complete ATC-20 Detailed Evaluation as soon as reasonably possible. e. Post building (green, yellow, or red) at the main entry of the building or at all entrances of multientrance buildings. f. Take preventative measures regarding gas leaks, release of hazardous materials, or other lifesafety mitigation. g. At owner s and inspector s discretion, non-structural hazards may be mitigated without a building permit. h. Submit ATC-20 Detailed Inspection report (Appendix G) signed and dated by pre-qualified engineer(s) to DBI within 72 hours of the declared state of emergency and to the Client, as agreed. If the reports are not received at that time, an inspection may be made by City inspectors or deputized volunteer inspectors using standard citywide inspection criteria. i. Qualified specialty contractors who are familiar with the building s elevator, HVAC, plumbing, fire protections system, electrical system and related life-safety systems will participate in the inspection under a separate agreement with the building owner s representative. The specialty contractors will report their findings to the structural inspectors. The services do not include the higher level ATC-20 Engineering Evaluation. Page 4

Estimated hours to Conduct an ATC-20 Detailed Inspection An estimate of approximate hours is provided below in the following table. The actual cost may vary. The time required to coordinate with all of the significant parties involved in the inspection may vary greatly. We anticipate that the inspection could be conducted in about a half a day with a team of two engineers. Representative 7-story building - San Francisco Main Floor Square Footage 43,313 Sq. ft. Roof 6,188 Basement 6,188 Total Area 55,688 Sq. ft. Task Hours Remarks Travel to site 2.0 Meet with owner s representative 1.0 Locate supplies 0 Coordinate with other emergency inspectors 1.5 Assess and arrange barricading of unsafe areas 1.0 Contact DBI regarding safety hazards and permits Varies Inspect exterior cladding, veneer & plumbness 1.0 Perform floor-by-floor walkdown (@ 1 hour/25,000 sq.ft) 2.2 Complete ATC 20 Detailed Evaluation forms 1.0 Complete placard & post building entrances (based on 2) 0.5 Administrative 2.0 Total 12.2 Fees The inspection services will be billed to you on a time and materials basis. A copy of our current standard billing rates is included for your reference. The rates are usually revised annually and will be billed at the current rates at the time the inspections occur. Limits of Liability The [Structural Engineer] in cooperation with the City of San Francisco is participating in the Building Occupancy Resumption Program (BORP) to assist building owners to obtain timely building inspection in the event of an emergency post-earthquake situation. As City-authorized building inspectors, [The [Structural Engineer] expects the same exemptions from liability as is provided to the City building inspectors or deputized State OES volunteers for emergency inspection services who would otherwise be performing the post-earthquake inspections. [The Client ] agrees to indemnify and hold harmless [The Structural Engineer] and all subsidiary companies and employees against any claims including thirdparty claims in association with the San Francisco BORP program. Termination Either party may terminate the agreement at any time by giving 30 days written notice. The Client shall notify the City of any change in ownership or engineering firm. The Structural Engineer shall notify the City of any termination of services related to the Building Occupancy Resumption Program. Page 5

Signatures Please sign below to indicate your agreement to these terms and return an original copy to [the Structural Engineer] for inclusion in the BORP submittal documents. Please contact [the Structural Engineer] should you have any questions or comments. Thank you. Sincerely, [Structural Engineer Company Name] x [Client, Building Owner/Manager] Date ATTACHMENT A [please download Building Occupancy Resumption Program] Page 6

ATTACHMENT B Example Letter to Elevator or Life Safety System Maintenance Firm [Date] [Elevator or Life Safety System Maintenance Firm - Name and Address] Subject: [Building Name and Address] Building Occupation Resumption Program (BORP) Dear : On behalf of the [building owner], I am writing to request your company s participation in the BORP program. The services of [your company] are requested to inspect the [elevator or life safety] system at [building address] in the event of a major earthquake and the activation of the BORP plan. The Building Occupancy Resumption Program is administered by the City and County of San Francisco, Department of Building Inspection. The program allows San Francisco building owners to pre-certify private post-earthquake inspection of their buildings by qualified engineers and specialty contractors upon DBI acceptance of a written inspection program. I have included some information about the BORP program for your review. Also enclosed, please find the BORP Emergency Inspector Authorization form that will be part of the written inspection program. The form states that your company is familiar with the building s [elevator or life safety] systems, has access to relevant drawings, and that your company will report inspection findings to the structural inspector. Please sign and date the form, and return it to me by [date]. A selfaddressed stamped envelope is enclosed for your convenience. Please note that your agreement to provide this service should be made directly with [building owner representative]. A copy of the completed emergency inspection plan will be stored on site along with inspection supplies and pertinent construction drawings of the building s architectural, structural and life-safety systems for use during future post-earthquake inspections. Please contact [building owner representative] if you would like to examine the completed report. Thank you for your participation. Please call me at [BORP engineer phone number] if you have any questions. Sincerely, [BORP engineer] Encl. Building Owners: WHY BORP? ENGINEERS: WHY BORP? Building Occupancy Resumption Program cc: [building owner representative] ATTACHMENT C [please download BORP Flowchart] Page 7