Surabaya River Improvement Project (II-1)

Similar documents
Kenya Tana River Basin Road Construction Projects (I) and (II)

RP1 85 November The Resettlement Policy Framework (RPF) Report on the GEF Hai Basin Project. (Final Version)

CHAPTER I INTRODUCTION. Since The Basic Law of Agrarian Affairs was issued in 1960, the

CHAPTERS 35 to 37 Reserved CHAPTER 38 PRIVATE WATER WELL CONSTRUCTION PERMITS

7-3. Engineering and Operations Committee. Board of Directors. 7/11/2017 Board Meeting. Subject. Executive Summary

Tentative Map Application Review Procedures

Responsibilities of the Grant Recipient LAND AND WATER CONSERVATION FUND PROGRAM

Republic of the Philippines Metro Manila Interchange Construction Project (IV) 1

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

DRAFT EXECUTIVE SUMMARY

Ex-Ante Evaluation (for Japanese ODA Loan)

DECREE GENERAL PROVISIONS

Town Centre Community Improvement Plan

Greater Beirut Water Supply Project Additional Finance Addendum to the Resettlement Action Plan

RESETTLEMENT POLICY FRAMEWORK AND PROCEDURAL GUIDELINES GAUNGXI ROADS DEVELOPMENT II PROJECT

PRC: Fujian Soil Conservation and Rural Development II Project

ARTICLE 7 UTILITIES AND EASEMENTS

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

Land Improvement Act

2009 QBS Request for Statement of Interest (SOI) On Call Appraisal Services

JANUARY 2016 MAMARONECK & SHELDRAKE RIVERS NEW YORK FLOOD RISK MANAGEMENT GENERAL REEVALUATION REPORT FOR THE VILLAGE OF MAMARONECK APPENDIX E

SUBJECT: Report Number PDC Acquisition of 20 Single Family Residences from the Housing Authority of Portland EXECUTIVE SUMMARY

REQUEST FOR QUALIFICATIONS FOR HOUSING ACQUISITION, RELOCATON, DEMOLITION CONSULTANT/REHABILITATION SPECIALIST WISE COUNTY, VIRGINIA

Suggestion on Annual Refund Ratio of Defect Repairing Deposit in Apartment Building through Defect Lawsuit Case Study

REVISED COMMUNITY LEVERAGING ASSISTANCE INITIATIVE MORTGAGE (ReCLAIM) Pilot Phase of Program

GOVERNMENT REGULATION OF THE REPUBLIC OF INDONESIA. NUMBER 38 of 2008 REGARDING

Guidance on Amendment Procedures Updated April 3, 2014

Lilly Creek Improvement Project

Appendix G. Non-Federal Letters of Support and Draft Real Estate Plan

A REPORT FROM THE OFFICE OF INTERNAL AUDIT

Scheme of Service. for. Housing Officers

RESPONSIBILITY AND PROCEDURE FOR IMPROVEMENT AND MAINTENANCE OF DRAINS, DITCHES AND WATERCOURSES

PLEASE COMPLETE ALL SECTIONS USING BLOCK CAPITALS AND BLACK INK

Development of a temporary grass multisport pitch and associated works (in addition to the previously approved park - Phase A).

CHAPTER I INTRODUCTION. expansion as a whole, but also balanced economic and social development

CAPITAL IMPROVEMENT PLAN POLICY/PROCEDURE Approved by the Town Council at the Town Council Meeting

CHAPTER 3 PRELIMINARY PLAT

Preliminary Caledonia-Lewiston Levee Analysis Conducted by the Levee Working Group

Appendix B Real Estate Plan

Attached is a Clinton Township Zoning Permit Application and requirements for issuance of a permit.

The Drainage Control Regulations

Administration and Calculation of Servicing Agreement Fees and Development Levies

Real Estate Development Projects

Ingham County Land Bank Fast Track Authority RESIDENTIAL REAL ESTATE PROFESSIONALS

REGULATION OF HEAD OF THE NATIONAL LAND AGENCY OF THE REPUBLIC OF INDONESIA NUMBER 3 YEAR 2007 REGARDING

Burleigh County Water Resource District 1811 East Thayer Avenue Bismarck, North Dakota (701)

Zoning History of Ashville Park

These notes will be appropriate both for both students who have chosen financial reporting as a depth area as well as those who have not.

BWSR MN Public Drainage Manual Broad Users Outreach Workshop John Kolb, Attorney Lead Writer Chapter 4. MPDM Chapter 4: Viewing and Appraising

TOP 10 COMMON LAW DRAINAGE PROBLEMS BETWEEN RURAL NEIGHBOURS H. W. Fraser, P.Eng. and S. Vander Veen, P.Eng.

SAULT STE. MARIE NORTH PLANNING BOARD APPLICATION FOR A CONSENT TO CREATE NEW LOTS

Appendix B Draft Real Estate Plan

TOWNSHIP SERVICES POLICY PREPARED BY: ALAN BRUBAKER, P.E., P.S. SUMMIT COUNTY ENGINEER

TANGIBLE CAPITAL ASSETS

City of Grande Prairie Development Services Department

The Characteristics of Land Readjustment Systems in Japan, Thailand, and Mongolia and an Evaluation of the Applicability to Developing Countries

White Paper of Manuel Jahn, Head of Real Estate Consulting GfK GeoMarketing. Hamburg, March page 1 of 6

Progressive Review Time Submittal of application and necessary documents

PLANNING & BUILDING REGULATIONS

Assessment to Low-cost Apartment in Sidoarjo District, East Java Province

CHAPTER 24 F FLOOD ZONE OVERLAY DISTRICT

Easement Program Guidelines for Water Resources and Stream Work

Community Housing Development Organization (CHDO) Manual. Policies Requirements for Certification Requirements for Recertification

JORDAO PROPERTY ± RIPARIAN IRRIGATED CROPLAND. $2,438,000 ($23,000/Acre)

Land Consolidation, Valuation and Cadastre

REQUEST FOR QUALIFICATIONS

DRAINAGE BY COUNTIES F.S CHAPTER 157 DRAINAGE BY COUNTIES

County of Kern HOME Program Housing Developer Pre-Application

LAND USE APPLICATION

NSP Rental Basics: A Primer on Using Rental Projects to Meet NSP Obligation and 25% Set-Aside Requirement. About this Tool

MUNICIPAL SERVICES PROJECT LAND ACQUISITION FRAMEWORK

WASHINGTON STATE HOUSING FINANCE COMMISSION LOW-INCOME HOUSING TAX CREDIT PROGRAM RULES

CHAPTER 21 Nonconforming Lots, Structures and Uses

NOT TO BE SUBMITTED WITH SKETCH DESIGN APPROVAL Subdivision Checklist: Major Subdivision Final Plat

Texas Land Trust Conference March 6, 2015

FLOOD HAZARD AREA LAND USE MANAGEMENT

INDIANA DRAINAGE LAW. Title 36 Article 9 Chapter 27

RIGHT OF WAY LIFE CYCLE

RULES AND REGULATIONS FOR ADMINISTRATION OF AREA DRAINAGE PLANS

SANILAC COUNTY ROAD COMMISSION ROAD POLICIES. A. Drainage, Base and Grade Construction (NON BITUMINOUS)

Chapter 24 Saskatchewan Housing Corporation Housing Maintenance 1.0 MAIN POINTS

PLANNING SERVICES FORM 3.3 SUBDIVISION APPLICATION COMMERCIAL OR BUSINESS PURPOSES

CITY OF SARALAND FINAL SUBDIVISION PLAT REVIEW

Subject: Ashville Park Cost Participation Term Sheet and Briefing

(Chapter Flood Damage Prevention)

NSP DEVELOPER ARRESALE PROGRAM PROCEDURES

POLICY FRAMEWORK FOR COMPENSATION, RESETTLEMENT AND REHABILITATION OF PROJECT AFFECTED PERSONS. November 2000

POLICY & PROCEDURE FOR THE TAKING IN CHARGE OF RESIDENTIAL DEVELOPMENTS

CHAPTER 15 SOIL DRAINAGE MANAGEMENT PLAN DESIGN STATE HEALTH DEPARTMENT SEWAGE HANDLING AND DISPOSAL REGULATIONS. Article 5

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

SCOPE OF SERVICES Appraisal Consultant Services For SR 710/Beeline Highway FM

LIMITED-SCOPE PERFORMANCE AUDIT REPORT

CHAPTER 15 SOIL DRAINAGE MANAGEMENT PLAN DESIGN STATE HEALTH DEPARTMENT SEWAGE HANDLING AND DISPOSAL REGULATIONS. Article 5

STATE OF OHIO FINANCIAL REPORTING APPROACH GASB 34 IMPLEMENTATION ISSUES TRANSPORTATION INFRASTRUCTURE

Grantee: Broward County, FL Grant: B-08-UN April 1, 2012 thru June 30, 2012 Performance Report

Draft Integrated Feasibility Report and Environmental Assessment and Draft Finding of No Significant Impact

DECREE GENERAL PROVISIONS DETAILED REGULATIONS ON COMPENSATION, SUPPORT, AND RESETTLEMENT UPON LAND EXPROPRIATION BY THE STATE

Presentation Outline

CHAPTER V: IMPLEMENTING THE PLAN

Vietnam Land Administration - the Past, Recent and for the Future

Transcription:

Indonesia 1. Project Profile and Japan s ODA Loan (1) Background Surabaya River Improvement Project (II1) Report Date: June 2 Field Survey: February 2 When this project was planned in 199, the city of Surabaya in East Java Province, Indonesia s second largest city and a political and economical center, had a population of more than 2 million. In addition, Surabaya was a strategic point for transportation and commerce and was enjoying rapid economic development. Surabaya is located along the left coast of the Brantas Delta. The average annual rainfall for this region is around 1,4mm, but 9% of it falls during the rainy season between November and May. Surabaya is frequently threatened by flooding due to the poor drainage capacity of the surrounding drainage channels and small rivers such as the Gunungsari Canal and the Kedurus River. (2) Objectives The objectives of this project was to reduce the amount of flood damage, by conducting river improvement to protect Surabaya urban area in East Java Province from frequent flooding, ultimately to provide the local residents with a greater sense of security and support development of this region. (3) Project Scope This project covered (a) improvement works for the Kedurus River and (b) detailed design for river improvements in southern and western regions of Surabaya. The Japan s ODA loan covered the foreign currency portion and some of the local currency portion for consulting services and civil works needed for carrying out the abovementioned project. (4) Borrower/Executing Agency The Republic of Indonesia / Directorate General of Water Resources Development, Ministry of Public Works (5) Outline of Loan Agreement Loan Amount/Loan Disbursed Amount 4,22million / 3,527 million Exchange of Notes/Loan Agreement December 199 / December 199 Terms and Conditions Interest rate: 2.5%, Repayment period: 3 years (1 years for grace period) Final Disbursement Date December 1996 1

2. Results and Evaluation (1) Relevance Flood control has become increasingly important as housing land around the municipal rivers in Surabaya was developed to cope with the increasing population in Surabaya. Therefore, the objective of this project was deemed to be relevant. The goal of this project was planned to protect flooding in the residential area along the Kedurus River in Surabaya with 2year probability. This plan was prepared on the basis of the results of E/S loan and made very careful technical considerations before the start of the project. Overall the project plan was judged to be relevant as the implementation of the project actually resulted in a decrease in flood damage for the target region, as mentioned later. In terms of the project scope, some items were changed as the acquisition of land did not proceed as smoothly as planned, and some additional construction works were added in accordance with the need during the implementation of the project. These were suitable changes to the plan in accordance with achieving the overall objectives of the project. (2) Efficiency There were no particular problems in terms of the capabilities of the executing agency and the performance of the consultants, but the problem has arisen in acquiring the needed land. A major cause for the problem is that the rapid economic development in Indonesia produced skyrocketing land prices, and as a result, discussions with landowners over proper compensation fell apart. In fact, the money paid for the land acquisition was 3.7 times the amount originally planned. Accordingly, the project has still not been executed for some areas, and this could prove to be a hindrance to achieving the full intended effects of the project. Further, the constructions were only conducted for the sections where land could be obtained, and thus the sections where the land could not be obtained are like islands in a regulating pond, cut off from the improved areas. However, there were no problems in relocating residents from the land that was acquired as all of the legal procedures were followed. (3) Effectiveness The flood protection facilities constructed by this project were planned to prevent from 2year return periodic flooding. There are still some sections where construction was not completed due to the delays in obtaining the needed land. However, the executing agency made an endeavor to change the location of the pump stations, digging the regulating ponds to a depth deeper than originally planned and taking other steps to insure that the planned functions would be realized. According to the executing agency, this project helped to greatly reduce the land area stricken by floods. There are still sections along the Kedurus River where river improvement works have not been conducted and there are still some inundations almost every year. However, the spread and period of inundation have improved more than before project implementation thanks to the downstream sections completed by this project and the improved floodwater discharging capacity provided by the regulating ponds and pump facilities. It is considered that the land area that is susceptible to floods on the scale of 2year probability was reduced by between 2% and 3% by this project, compared to before project implementation. However, when considering that the initial plan was to deal with 2year return periodic flooding (that is, to 2

make zero the inundation area of 2year probability), it is hard to say that the objective of the project has been fully achieved. The consulting services provided by this project included technology transfers concerning the design and installation of the discharge pumps, and transfers were conducted through the project implementation. The executing agency has placed high value on the results of these technology transfers and was satisfied with the performance of the pump stations. (4) Impact This project helped to mitigate flood damage and contributed to the stabilization of the residents living in the Kedurus River region. Since the damage caused by inundation was greatly reduced, this project also contributed to the social welfare of the region. There has been rapid development of housing land in this region, and it was confirmed that the development was partly adjacent to the rivers. According to statistics by Surabaya city, the population in the target region along the Kedurus River was 197,14 before starting this project in 199, but swelled to 224,417 in 1998. It can be said that this project contributed to regional development by supporting residential development in areas that in the past were frequently inundated by floods. The acquisition of the land for this project resulted in the resettlement of some residents, including approximately 2 households or 8 people. However, the moves to different locations within the same area were included here, and in fact only 2 households, or about 8 people, moved completely out of the region. Still, no one was forced to change their occupations due to the relocation. (5) Sustainability As for the portion where the construction works were completed, the downstream crosssection has been ensured as planned. Even though there were problems involving the land acquisition, there have been reports that the stricken land area by flooding was reduced and the pumps are being put to good use. There are some construction works left unfinished due to the fact that the land could not be fully obtained, and for this reason the operation and maintenance of the project has not been handed over to the Water Control Public Corporation, the original agency in charge. Therefore, the executing agency has provisionally been left in charge of maintaining the project. However, this agency does not have the necessary budget and most basic cleaning and repairs have not been conducted. Therefore, some of the completed sections up to date have become damaged and soiled. Except for the pump facilities, it is hard to say that the project is being adequately operated and managed. 3. Lessons Learned Both at the time of the appraisal and afterwards during the project implementation stage, necessary measures, such as encouraging greater efforts of the executing agency and studying changes of plan, must be taken for projects that accompanies land acquisition, as well as confirming the condition of land acquisition and residents relocation. The main problem in executing this project was the acquisition of land. At the time of the appraisal, an 3

appropriate budget was in place and the executing agency agreed to provide compensation for acquiring the land. However, it is hard to say that this duty was properly executed. Even though this land acquisition is a major premise for the execution of this project, JBIC cannot directly participate in these efforts. There was also the unforeseen external factor of the sudden surge in land prices. Consideration needs to be given to the various risks associated with acquiring land. If the project is started on the process of land acquisition, while there is still land that has not been acquired, there will be the unfortunate situation where the project cannot be abandoned, but cannot be moved forward as well. Therefore, the executing agency must prepare a suitable plan for obtaining the land and relocating the residents, and it must do this in a careful and timely manner to avoid such problems. JBIC cannot be directly involved in these efforts, but during the appraisal stage it must confirm the relevance of the schedule for obtaining land and resettling the residents, then check on the progress of this schedule during the implementation stage, call for further efforts on the part of the executing agency and consider changes to the plan when necessary. 4. Recommendations Improvement of maintenance system The target section of the project has yielded a certain extent of its effects. In order to preserve the deterioration of facilities, it is necessary to conduct appropriate operation and maintenance including the cleaning of rubbish from the residential district, it is essential for the Indonesian Government to conduct the following countermeasures; (a) the government should not adhere to the project completion and should transfer maintenance to the Water Management Corporation, Operation & Maintenance Body, and (b) even if the maintenance cannot be transferred to the Water Management Corporation, sufficient budget should be allocated to the executing agency. Taking urgent measures against the uncompleted section There still remains some uncompleted construction works, which results in the limited effects of the project. It is necessary to complete part of land acquisition and construction works that greatly influence the effects of the project in spite notwithstanding of the severe economic condition of Indonesia. 4

Comparison of Original and Actual Scope Project Scope Plan Actual Difference Civil Works Extension of channel 8,35m 8,37m 2m Width of channel 14 24m 14 24m m Excavated soil volume 1,455,2Cu.m 1,646,755Cu.m 191,555Cu.m Embankment 21,1Cu.m 24,752Cu.m 39,652Cu.m Slope work 49,48Sq.m 5,487Sq.m 1,7Sq.m Retaining wall 2,41m 2,441m 31m Monitoring road 17,8m 15,634m 2,166m Street drain 1,m 9,681m 319m Irrigation channel 7Nos 28Nos 21Nos Syphon 9Nos 7Nos 2Nos Viaduct 2Nos 5Nos 3Nos Viaduct for monitoring road 3Nos 3Nos Pump capacity 1Cu.m/s 1Cu.m/s Regulating pond area 35Ha 21Ha 14Ha Drain ditch 4m 47m 7m Consulting service 587M/M 68M/M 21M/M Bidding assistance, detailed design, Foreign currency: Foreign currency: construction supervision etc. 176M/M 176M/M Local currency: Local currency: 21M/M 411M/M 432M/M River Wall Rehabilitated by the Project (near Jogoroyo Bridge) 5

Item Civil works Plan (at the time of appraisal) 2,237 1,894 Actual 593 46,678 Difference 1,644 35,784 Consulting service 734 76 418 4,514 316 3,88 Land acquisition cost 14,225 16,427 2,22 Tax 6,648 4,68 2,4 Physical contingency 224 1,89 224 1,89 Total 3,195 33,562 1,11 72,227 2,184 38,665 (Foreign currency: million, Local currency: Rp. million) Comparison of Original and Actual Implementation Schedule 199 1991 1992 1993 1994 1995 1996 I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV I II III IV L/A signing 3 1. Selection of consultant 2. Selection of contractor 3. Civl works 4. Land acquisition 5. Consulting service +1 month 4 months +3 months +12 months +12 months 6

Item Civil works Plan (at the time of appraisal) 2,237 88 Actual 593 2,26 Difference 1,644 1,38 Consulting service 734 57 418 219 316 162 Land acquisition cost 1,149 795 354 Tax 537 223 314 Physical contingency 224 88 224 88 Total 3,195 2,711 1,11 3,497 2,184 787 (All comparisons are made based on yen conversions. Unit: million) Source: PCR [Exchange rate] At the time of appraisal (March 199): 1 = Rp. 12.38 Actual: 1 = Rp.2.65 (weighted average based on the exchange rate for the loan amount each calendar year) 7