Request for Proposal RFP

Similar documents
STATE OF ALASKA RFP NUMBER AMENDMENT NUMBER 2

City of Seward, NE Tuesday, April 19, 2016 Regular Session

The Alaska Mental Health Trust Authority Trust Land Office

United States Forest Service Alaska Mental Health Trust Authority Proposed Land Exchange September 4,

Schulte 180 Totaling approximately 180 acres, more or less

BIDS DUE: THURSDAY, MAY 17, 2018

*Note: Due to Funding Restrains, this Bid Proposal may be altered to stay within existing funds.

NOTICE OF TIMBERLAND SALE HOWARD & POLK COUNTIES BID. County Line 160 Totaling approximately 160 acres, more or less

NOTICE OF TIMBERLAND SALE BY SEALED BID IN CLEVELAND COUNTY, AR. Cleveland County CM acres, more or less

MINOR SUBDIVISION PLAT

Regular Agenda / Public Hearing for Board of Commissioners meeting January 7, 2015

FOR SALE. The bid procedure has ended. The sales price is $152, THE FOLLOWING PROPERTY IS BEING OFFERED FOR SALE BY THE STATE OF NORTH CAROLINA

JACKSONVILLE AVIATION AUTHORITY INVITATION TO BID NUMBER: TIMBER SALE - ARMADILLO VICINITY 2012

MnDOT Contract No Exhibit B. Scope of Work. Scope of Work

Final Plat Approval of a Minor Subdivision Application Packet

To provide for the review of the final engineering plans, the subdivision improvement agreement, public dedications, and other legal agreements.

INFORMATION FOR VENDORS DOING BUSINESS WITH THE CITY OF CORAL SPRINGS, FLORIDA FINANCIAL SERVICES DEPT

COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF GENERAL SERVICES

CARROLL COUNTY BUREAU OF DEVELOPMENT REVIEW OFF-CONVEYANCE SUBMITTAL CHECKLIST AND REVIEW FEE SHEET NOTICE: INCOMPLETE SUBMITTALS WILL BE RETURNED

CITY OF VERONA. Request for Proposals (RFP) Assessment Services For the Assessment Years

I would like to own a parcel of agricultural land in Alaska. What programs does the State of Alaska have that would allow me to do this?

June 1, 2017 BOARD MATTER H - 1 FINAL CONSIDERATION OF STATE TRUST LAND EXCHANGE

ADDENDUM #1 Boulder County Housing Authority Housing Quality Standard (HQS) Inspection Services RFP #

Certified Federal Surveyor Program Standards of Practice Handbook (Modified February 19, 2013 and November 18, 2014) "Trained to Make a Difference"

Final Plat Approval of a Major Subdivision Application Packet

Town of Manchester, Connecticut General Services Department. Request for Qualifications

FINAL PLAT. Community Development Department 8101 Ralston Road Arvada, Colorado 80002

Attachment A SPECIAL SURVEY INSTRUCTIONS ALASKA STATE LAND SURVEY NO Sage Subdivision. Authority 11 AAC 53, Survey and Platting Standards

SENATE BILL NO. 88 IN THE LEGISLATURE OF THE STATE OF ALASKA THIRTIETH LEGISLATURE - FIRST SESSION A BILL FOR AN ACT ENTITLED

Marion County Board of County Commissioners

Request for Qualifications (RFQ) # On-Call Land Surveying Services November 21, 2018

City of Fort Lupton Amended Plat Process

General Instructions For Surveys and Plans Outside the Provincial Survey System

*** PUBLIC NOTICE ***

Steamboat Ski Area Zone Change

Marion County Board of County Commissioners

Kingwood Forestry Services, Inc. has been authorized to manage the sale of the Womble Silver Road

Wheeler Estates LLC Attn: Matthew Colbert PO Box 190 Brookneal, VA May 24, 2017

Guide to Minor Developments

REQUEST FOR PROPOSAL

Prepared by Office of Procurement and Real Property Management. This replaces Administrative Procedure No. A8.215 dated November 2012 A8.

$834, /- Acres. Chesterfield County, SC REDUCED. National Land Realty 3610 Landmark Drive Ste G Columbia, SC

Guide to Combined Preliminary and Final Plats

Chapter 8. Competitive Sealed Bidding: Addenda, Modifications, and Withdrawals

$89, /- Acres. Bamberg County, SC REDUCED. National Land Realty 3610 Landmark Drive Ste G Columbia, SC

REQUEST TO SUBMIT OFFERS FOR THE LEASING OF SCHOOL BOARD PREMISES 30+/- ACRES- WEST AREA VACANT AGRICULTURAL PARCEL

Methods of Legal Description Metes and Bounds The Rectangular Survey System Recorded Plat Method Describing Elevation

PRELIMINARY PLAT CHECK LIST

BOARD OF ZONING APPEALS CASE SUMMARY FOR VARIANCE REQUEST. 325 Veterans Road

DEVIL S CANYON TRACT

HUNTINGDON SPECIAL SCHOOL DISTRICT PROCUREMENT PLAN CHILD NUTRITION PROGRAM

REQUIREMENTS FOR ALL INSTRUMENTS OF CONVEYANCE IN HARDIN COUNTY, OHIO

AMENDED AGENDA BLUFFDALE CITY BOARD OF ADJUSTMENT. October 4, 2016

STANDARDS GOVERNING CONVEYANCES OF REAL PROPERTY

STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF MINING, LAND, AND WATER FINAL FINDING AND DECISION

FINAL MAP PLAN CHECK

CITY OF LANCASTER CITY ENGINEERING DIVISION FINAL MAP SUBMITTAL PACKAGE FINAL MAP APPLICATION

SUBDIVISION APPLICATION

REQUEST FOR PROPOSAL RFP # TOC17-001

Instructions for Maps to Accompany Proof of Appropriation and Beneficial Use of Ground Water

AGENDA ITEM # CITY OF FERNLEY PLANNING COMMISSION AGENDA REPORT. Planning Commission. Melinda Bauer, Assistant Planner

COUNTY OF TANEY, MISSOURI

Contract Risk Allocation Working Group. Recommended Practice for Managing Risks in Contracts Involving OWNER-FURNISHED PROPERTY

WYANDOT COUNTY BASIC STANDARDS FOR THE APPROVAL OF REAL ESTATE DEED TRANSFERS & LAND CONTRACT AGREEMENTS

ADDENDUM NO. 4. Modification to Part I, Section 2.0, Item J of the Project Book

October 31, Mailing Address: 4886 Chisholm Road Florence, AL Phone: (256) Fax: (256)

TEXAS GENERAL LAND OFFICE PROCUREMENT GUIDANCE FOR RECIPIENTS AND SUBRECIPIENTS UNDER 2 CFR PART 200 (UNIFORM RULES)

20 Acres Lumpkin Farmland

County Tax Sale PLEASE MARK YOUR ENVELOPE "SEALED BID # RETURN ONE (1) ORIGINAL AND THREE (3) COPIES TO:

INVITATION TO BID LETTER

Lower Rio Grande Valley Development Council. Invitation to Bid (ITB): Graphic Design Training Services. office. 301 West Railroad Weslaco, Texas 78596

Chapter 5. Competitive Sealed Bidding: Procedure

AMENDED AGENDA BLUFFDALE CITY BOARD OF ADJUSTMENT. January 24, 2017

Plats and subdivisions; mapping requirements. (a) Size Requirements. All land plats presented to the register of deeds for recording in the

CONVEYANCE - COMMONWEALTH PROPERTY IN THE BOROUGH OF EAST STROUDSBURG, MONROE COUNTY Act of Jul. 1, 2016, P.L., No. 65 Cl.

MAP CHECKLIST (Rev 02/13)

Section I General Information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2017 H 1 HOUSE BILL 454* Short Title: Surveying and Plat Recording Changes. (Public)

220 S.E. Green Street Lee s Summit, MO RFP # RE TITLE SIGNATURE PAGE REQUEST FOR PROPOSAL NO.RE

SECTION 6 - APPROVAL OF PLATS. Whenever any subdivision of land is proposed, and before any permit for the

Requirements for All Instruments of Conveyance in Logan County, Ohio

Marion County Board of County Commissioners

Limited Liability Report

*** PUBLIC NOTICE ***

COMPETITIVE BIDDING NOTICE INVITATION TO BID. The County of Waller proposes to purchase the following items on competitive bid: HYDRATED LIME

BOROUGH OF HELLERTOWN 685 Main St., Hellertown PA Phone: Fax:

MINOR SUBDIVISION PLAT

Zoning Board of Adjustment Meeting Date: June 1, 2016 BOAV16:06 Agenda Item #5

Marlboro County School District

FINAL PLAT APPLICATION

UCF FACTS MADE PART OF THIS SOLICITATION

We are Listening. Public Hearing

MINOR SUBDIVISION PLAT

DUSTY RHODES HAMILTON COUNTY AUDITOR WILLIAM W. BRAYSHAW HAMILTON COUNTY ENGINEER

FOR SALE THE FOLLOWING PROPERTY IS BEING OFFERED FOR SALE BY THE STATE OF NORTH CAROLINA BRISTOL DRIVE, STATESVILLE, NC SPO FILE #049-WF

B. The proposed parcel(s) of land shall be in compliance with the current zoning requirements.

Invitation For Bid IFB 2895

Request for Proposals For Outdoor Advertising - Billboards. At the Following Locations. TelPosta Towers: Roof Top on Tower 2 (Kenyatta Avenue)

COMPETITIVE BIDDING NOTICE INVITATION TO BID. The County of Waller proposes to purchase the following items on competitive bid:

MINOR SUBDIVISION APPLICATION

Transcription:

STATE OF ALASKA Department of Natural Resources Request for Proposal RFP 10 180000041-1 TITLE: Land Survey for Juneau, Sitka, & Wrangell Areas for TLO PURPOSE: The Department of Natural Resources (DNR), Mental Health Trust Land Office (TLO), is soliciting proposals for professional land surveyor services in the Juneau, Sitka, and Wrangell areas as specified within this RFP. Important Notice: If you receive this solicitation from the State's Online Public Notice website or IRIS Vendor Self Service portal, you must register with the DNR Procurement Section to receive subsequent amendments. Registration must be in writing and may be made via email to dnr.ssd.procurement@alaska.gov or fax to 907-269-8909. Failure to register with the DNR Procurement Section may result in rejection of your offer. ADA: The State of Alaska complies with Title II of the Americans with Disabilities Act of 1990. Individuals with disabilities who may need auxiliary aids, services, and/or special modifications to submit a bid should contact the DNR Procurement Section via email to dnr.ssd.procurement@alaska.gov, fax to 907-269-8909, telephone at 907-269-8666 or 269-8687, or TDD at 907-269-8411 not later than 10 calendar days prior to the bid closing date to make necessary arrangements. Rev. 12/14 Page 1 of 3

Date of Issue: January 08, 2018 Deadline for Receipt of Proposals: January 31, 2018 14:00:00 Important Notice: If you received this solicitation from the State of Alaska's "Vendor Self-Service" web site, you must register with the procurement officer to receive subsequent amendments. Failure to contact the procurement officer may result in the rejection of your offer. PROCUREMENT OFFICER: James Sonnier TELEPHONE NUMBER: (907)269-8687 EMAIL: jim.sonnier@alaska.gov BID RECEIVING LOCATION: Support Services ANC Admin Attn: Procurement 550 West 7th Avenue Anchorage, AK 99501-3564 Rev. 12/14 Page 2 of 3

Does your business qualify for the Alaska bidder preference? PREFERENCES Does your business qualify for the Alaska veteran preference? Yes No Yes No PROPOSAL SCHEDULE Event Date 01/18/18 Questions Due Event Description 01/31/18 Solicitation Closing Date/Time LINE ITEMS Line No. Description Quantity Unit Unit Cost 1 Land Survey for Juneau, Sitka, & Wrangell Areas for TLO Start Date End Date Delivery Date F.O.B. Point Extended Line Total 02/27/18 05/31/19 Extended Description: Professional land surveyor services in the Juneau, Sitka, and Wrangell areas as specified within this RFP. DO NOT ENTER COST IN THIS AREA. EVALUATION CRITERIA The following criteria will be used when determining the award of this solicitation Code Criteria Description Points Vendor Response (DO NOT LIST PRICES IN THIS SECTION. UNIT PRICES AND TOTAL PRICES MUST BE FILLED IN ADJACENT TO THEIR LINE ITEMS.) 2 Experience 40 3 Methodology 20 4 Management Plan 20 5 Understanding 10 7 AK Offeror Pref 10 No. 004 Request for Proposals Terms and Conditions Name Section Rev. 12/14 Page 3 of 3

JUNEAU J-1A-J-1B PARCEL DESCRIPTION OF WORK All work must be performed under the direct supervision of a land surveyor licensed to practice in the State of Alaska. All work must meet the Juneau Borough Subdivision standards, specifications, and process. Except for the furnished property below, The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, materials and incidentals necessary to complete the work as specified. This contract is to provide professional surveying services to: OPTION 1 1. Subdivide Lot 2 of U.S. Survey No. 3853, Alaska to create a tract of land, "Tract A" approximately 2660 acres, as described by the Trust legal description CRM 1509,attached hereon. Tract A, will be deeded to the Forest Service. 2. Draft a preliminiary Subdivision Plat showing the proposed boundaries of the Tracts for review by the Trust and Forest Service. 3. Draft and process a subdivision plat to the standards and specifications of the Juneau Borough. OPTION 2 1. Clear, mark, post & paint the future Forest Service boundary of Tract A adjoining non Federal lands to the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. No brush or trees shall be cut on adjoining non-trust Land without written permission from the owner. FURNISHED PROPERTY (1) Corner monuments, signs, and sign posts will be provided as necessary by the Forest Service. RECORD RESEARCH AND ADJOINER NOTIFICATION (1) Record Research. It is the Contractor's responsibility to research all pertinent private and public records to obtain the title and survey history of the subject property and adjoining properties.

(2) Adjoiner Notification Prior to the start of fieldwork. The contractor shall contact all adjoining landowner to secure permission to access their lands, and to clear and mark their side of the boundary line. Contact of adjoiners shall be by letter with a self-addressed envelope. A sample Letter is attached. ADDITIONAL SURVEY SPECIFICATIONS In addition to the Borough Subdivision specification the Contractor shall comply with the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification document attached relating to the following: 1. Trespass Conflicts. If trespass conflicts are found the Contractor shall as soon as posible provide the location, information and photos to the Trust Office. 2. Corner Monuments and Accessories. The contractor shall replace missing or existing monuments in poor condition with the furnished monument posts. If missing, dead or dying Bearing Trees are found the contractor shall establish new ones. 3. Survey Control. Horizontal Control shall be based on the NAD 83 Datum, US Survey feet. An NGS OPUS GPS solution would be acceptable for the basis of horizontal control. The contractor shall determine the Latitude and Longitude (NAD 83) for an original recovered corner monument. 4. Subdivision Plat. The Contractor shall produce a subdivision plat compling with all Borough subdivision standards. The plat shall be based on True North, NAD 83. One paper copy of the plat shall be submitted to the Trust Land Office for review at all stages of the platting process 5. Boundary Line Location, Clearing, Marking, Posting, Painting, and permission to perform work on private land. QUALITY CONTROL 1. Contractor shall be responsible for performing an independent self-inspection for quality control. 2. The survey process must include check shots for each monument set or recovered. 3. Quality Control Report documenting Contractors selfinspection.

DELIVERIES 1. Original approved mylar subdivision plat. Copies of all Field Notes, Monument Photographs, and Quality Control Reports. Copy of signed Adjoiner Notification letters 2. Copy of any additional reports prepared by the Contractor for the Borough. INSPECTION AND ACCEPTANCE 1. Inspection: The contractor shall, without charge, make available for inspection, originals or copies of such items as field notes, working plats and drawings, material obtained through research, computation sheets, computer printouts, correspondence to and from adjoining landowners, and any other item deemed necessary to insure contract compliance, and verify accomplishments. 2. Acceptance: Acceptance of the work will be made only after the Trust Land Office has inspected and accepted the work and submittals from the Contractor and determined them to fulfill all specifications, terms and conditions of this contract. ATTACHMENTS A) Project Area 1 Map B) Trust CRM 1509 Description C) Sample Adjoiner Notification letter D) Forest Service Contract Specification.

TRUST LEGAL DESCRIPTION CRM-1509 THOSE PORTIONS WITHIN LOT 2 OF U.S. SURVEY NO. 3853 T. 042 S., R. 067 E., COPPER RIVER MERIDIAN, ALASKA SECTION 1: NW1/4NW1/4, S1/2NW1/4, SW1/4 SECTIONS 2, 11, 12, AND 13: T. 042 S., R. 068 E., COPPER RIVER MERIDIAN, ALASKA SECTION 7: S1/2NW1/4, SW1/4, NW1/4SE1/4, S1/2SE1/4 SECTION 8: SW1/4SW1/4 SECTION 17: SW1/4NE1/4, W1/2, SE1/4 SECTIONS 18 AND 19: CONTAINING 2,660.30 ACRES, MORE OR LESS. ACCORDING TO THE SURVEY PLAT ACCEPTED BY THE UNITED STATES DEPARTMENT OF THE INTERIOR, BUREAU OF LAND MANAGEMENT IN WASHINGTON, D.C. ON JUNE 10, 1963.

SITKA S-2 S-3 S-4 PARCEL DESCRIPTION OF WORK All work must be performed under the direct supervision of a land surveyor licensed to practice in the State of Alaska. All work must meet the U.S. Forest Service Land Survey Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. Except for the furnished property below, The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, materials and incidentals necessary to complete the work as specified. This contract is to provide professional surveying services to: OPTION 1 1. Monument, Clear, mark, post & paint the portion of the future Forest Service boundary shown in Red on the attached Exhibit Map to the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. 2. Draft and file a Record of Survey plat with the State Recorders Office after review by the Trust, Forest Service and the Borough if required. No brush or trees shall be cut on adjoining non-trust Land without written permission from the owner. FURNISHED PROPERTY (1) Corner monuments, signs, and sign posts will be provided as necessary by the Forest Service. RECORD RESEARCH AND ADJOINER NOTIFICATION (1) Record Research. It is the Contractor's responsibility to research all pertinent private and public records to obtain the title and survey history of the subject property and adjoining properties. (2) Adjoiner Notification Prior to the start of fieldwork. The contractor shall contact all adjoining landowner to secure permission to access their lands, and to clear and mark their side of the boundary line. Contact of adjoiners shall be by letter with a self-addressed envelope. A sample Letter is attached.

ADDITIONAL SURVEY SPECIFICATIONS The Contractor shall comply with the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification document attached relating to the following: 1. Trespass Conflicts. If trespass conflicts are found the Contractor shall as soon as posible provide the location, information and photos to the Trust Office. 2. Corner Monuments and Accessories. The contractor shall replace missing or existing monuments in poor condition with the furnished monument posts. If missing, dead or dying Bearing Trees are found the contractor shall establish new ones. 3. Survey Control. Horizontal Control shall be based on the NAD 83 Datum, US Survey feet. An NGS OPUS GPS solution would be acceptable for the basis of horizontal control. The contractor shall determine the Latitude and Longitude (NAD 83) for an original recovered corner monument. 4. Record of Survey Plat. The Contractor shall produce a Record of Survey plat compling with all Forest Service and Borough standards as required. The plat shall be based on True North, NAD 83. One paper copy of the plat shall be submitted to the Trust Land Office for review at all stages of the survey process 5. Boundary Line Location, Clearing, Marking, Posting, Painting, and permission to perform work on private land. QUALITY CONTROL 1. Contractor shall be responsible for performing an independent self-inspection for quality control. 2. The survey process must include check shots for each monument set or recovered. 3. Quality Control Report documenting Contractors selfinspection. DELIVERIES 1. Original approved mylar subdivision plat. Copies of all Field Notes, Monument Photographs, and Quality Control Reports. Copy of signed Adjoiner Notification letters 2. Copy of any additional reports prepared by the Contractor for the Borough.

INSPECTION AND ACCEPTANCE 1. Inspection: The contractor shall, without charge, make available for inspection, originals or copies of such items as field notes, working plats and drawings, material obtained through research, computation sheets, computer printouts, correspondence to and from adjoining landowners, and any other item deemed necessary to insure contract compliance, and verify accomplishments. 2. Acceptance: Acceptance of the work will be made only after the Trust Land Office has inspected and accepted the work and submittals from the Contractor and determined them to fulfill all specifications, terms and conditions of this contract. ATTACHMENTS A) Project Area 1 Map B) Sample Adjoiner Notification letter C) Forest Service Contract Specification.

C055S063E 22 C055S064E 23 24 19 27 26 25 30 C055S064E C055S063E S-4 S-3! 3 0 0.3 35 36 2 1 0.6 1.2 Miles C056S063E S-2 31 6 C056S064E C056S063E 34 5 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community C056S064E Alaska Mental Health Trust Act of 2017 Blaze, Mark and Post Agreement Blaze, Mark and Post Subdivision Line Blaze, Mark and Post Monuments Land Exchange Act Date Printed: November 29, 2017

WRANGELL PARCEL W1 DESCRIPTION OF WORK All work must be performed under the direct supervision of a land surveyor licensed to practice in the State of Alaska. All work must meet the Wrangell Borough Subdivision standards, specifications, and process. Except for the furnished property below, The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, materials and incidentals necessary to complete the work as specified. This contract is to provide professional surveying services to: OPTION 1 1. Subdivide Lot 1 of U.S. Survey No. 3709, Alaska to create a tract of land, "Tract A" easterly of the easterly Right of Way of the transmission line easement running northwesterly through the lot. Within section 6,T.63S. R.84E. C.R.M., Tract A shall exclude any of the existing Rock Pit The northerly boundary will be the east-west centerline of protracted section 31, T.62S. R.84E. C.R.M.and from its intersection with the west section line south along the protracted section line to its intersection with the easterly Right of Way of the transmission line easement. The remaining portion of Lot 1 may remain as unsurveyed remainder. Tract A, approximately 204 acres, will be deeded to the Forest Service and the remainder tract will remain in the ownership of the Trust. 2. Draft a preliminiary Subdivision Plat showing the proposed boundaries of the Tracts for review by the Trust and Forest Service. 3. Verify that a transmission line Right of Way exists for the portion of within the subdivision. 4. Draft and process a subdivision plat to the standards and specifications of the Wrangell Borough. OPTION 2 1. Clear, mark, post & paint the future Forest Service boundary of Tract A to the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. No brush or trees shall be cut on adjoining non-trust Land without written permission from the owner.

FURNISHED PROPERTY (1) Corner monuments, signs, and sign posts will be provided as necessary by the Forest Service. RECORD RESEARCH AND ADJOINER NOTIFICATION (1) Record Research. It is the Contractor's responsibility to research all pertinent private and public records to obtain the title and survey history of the subject property and adjoining properties. (2) Adjoiner Notification Prior to the start of fieldwork. The contractor shall contact all adjoining landowner to secure permission to access their lands, and to clear and mark their side of the boundary line. Contact of adjoiners shall be by letter with a self-addressed envelope. A sample Letter is attached. ADDITIONAL SURVEY SPECIFICATIONS In addition to the Borough Subdivision specification the Contractor shall comply with the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification document attached relating to the following: 1. Trespass Conflicts. If trespass conflicts are found the Contractor shall as soon as posible provide the location, information and photos to the Trust Office. 2. Corner Monuments and Accessories. The contractor shall replace missing or existing monuments in poor condition with the furnished monument posts. If missing, dead or dying Bearing Trees are found the contractor shall establish new ones. 3. Survey Control. Horizontal Control shall be based on the NAD 83 Datum, US Survey feet. An NGS OPUS GPS solution would be acceptable for the basis of horizontal control. The contractor shall determine the Latitude and Longitude (NAD 83) for an original recovered corner monument. 4. Subdivision Plat. The Contractor shall produce a subdivision plat compling with all Borough requirements. The plat shall be based on True North, NAD 83. One paper copy of the plat shall be submitted to the Trust Land Office for review at all stages of the platting process 5. Boundary Line Location, Clearing, Marking, Posting, Painting, and permission to perform work on private land.

QUALITY CONTROL 1. Contractor shall be responsible for performing an independent self-inspection for quality control. 2. The survey process must include check shots for each monument set or recovered. 3. Quality Control Report documenting Contractors selfinspection. DELIVERIES 1. Original approved mylar subdivision plat. Copies of all Field Notes, Monument Photographs, and Quality Control Reports. Copy of signed Adjoiner Notification letters 2. Copy of any additional reports prepared by the Contractor for the Borough. INSPECTION AND ACCEPTANCE 1. Inspection: The contractor shall, without charge, make available for inspection, originals or copies of such items as field notes, working plats and drawings, material obtained through research, computation sheets, computer printouts, correspondence to and from adjoining landowners, and any other item deemed necessary to insure contract compliance, and verify accomplishments. 2. Acceptance: Acceptance of the work will be made only after the Trust Land Office has inspected and accepted the work and submittals from the Contractor and determined them to fulfill all specifications, terms and conditions of this contract. ATTACHMENTS A) Project Area 1 Map B) Sample Adjoiner Notification letter C) Forest Service Contract Specification.

C062S083E C062S084E C062S083E 36 Future Forest Service Tract A 31 32 Wrangell Island C062S084E 1 CRM-2402 6 USS 3709 Lot 1 5 W-1 C063S083E AMHT Unsurveyed Remainder Rock Pit C063S084E 12 7 8!0 0.25 0.5 Miles C063S083E W-1 Alaska Mental Health Trust Land Exchange Act of 2017 Wrangell Area Conservation C063S084E Easement Area Petersburg Wrangell Subdivision Line Future Forest Service Tract Approx. Acres: 204 AMHT Unsurveyed Remainder Approx. Acres: 260 US Survey Lot Boundary Craig Southeast Alaska Meyers Chuck Ketchikan Date Printed: November 20, 2017

WRANGELL PARCEL W2-W3 DESCRIPTION OF WORK All work must be performed under the direct supervision of a land surveyor licensed to practice in the State of Alaska. All work must meet the Wrangell Borough Subdivision standards, specifications, and process. Except for the furnished property below, The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, materials and incidentals necessary to complete the work as specified. This contract is to provide professional surveying services to: OPTION 1 1. Subdivide Lot 3 of U.S. Survey No. 3709, Alaska to create 3 tracts of land and the unsurveyed remainder, "Tract A" within protacted sections 8 and 17, T.63S. R84E. northerly of the easterly Right of Way of the transmission line easement running northwesterly through the lot. Tract B south of Tract A within protracted section 17, with the southerly boundary being the east-west centerline of section 17. Tract C shall be that portion of lot 3 within the south 1/2 of section 17. The remaining portion of Lot 3 can remain as unsurveyed remainder. Tract A and C, approximately 204 acres, will be deeded to the Forest Service and Tract B and the remainder tract will remain in the ownership of the Trust. 2. Draft a preliminiary Subdivision Plat showing the proposed boundaries of the Tracts for review by the Trust and Forest Service. 3. Verify that a transmission line Right of Way exists for the portion adjoining the subdivision. 4. Draft and process a subdivision plat to the standards and specifications of the Wrangell Borough. OPTION 2 1. Clear, mark, post & paint the future Forest Service boundary to the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. No brush or trees shall be cut on adjoining non-trust Land without written permission from the owner.

FURNISHED PROPERTY (1) Corner monuments, signs, and sign posts will be provided as necessary by the Forest Service. RECORD RESEARCH AND ADJOINER NOTIFICATION (1) Record Research. It is the Contractor's responsibility to research all pertinent private and public records to obtain the title and survey history of the subject property and adjoining properties. (2) Adjoiner Notification Prior to the start of fieldwork. The contractor shall contact all adjoining landowner to secure permission to access their lands, and to clear and mark their side of the boundary line. Contact of adjoiners shall be by letter with a self-addressed envelope. A sample Letter is attached. ADDITIONAL SURVEY SPECIFICATIONS In addition to the Borough Subdivision specification the Contractor shall comply with the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification document attached relating to the following: 1. Trespass Conflicts. If trespass conflicts are found the Contractor shall as soon as posible provide the location, information and photos to the Trust Office. 2. Corner Monuments and Accessories. The contractor shall replace missing or existing monuments in poor condition with the furnished monument posts. If missing, dead or dying Bearing Trees are found the contractor shall establish new ones. 3. Survey Control. Horizontal Control shall be based on the NAD 83 Datum, US Survey feet. An NGS OPUS GPS solution would be acceptable for the basis of horizontal control. The contractor shall determine the Latitude and Longitude (NAD 83) for an original recovered corner monument. 4. Subdivision Plat. The Contractor shall produce a subdivision plat compling with all Borough and DNR platting and subdivision requirements. The plat shall be based on True North, NAD 83. One paper copy of the plat shall be submitted to the Trust Land Office for review at all stages of the platting process 5. Boundary Line Location, Clearing, Marking, Posting, Painting, and permission to perform work on private land.

QUALITY CONTROL 1. Contractor shall be responsible for performing an independent self-inspection for quality control. 2. The survey process must include check shots for each monument set or recovered. 3. Quality Control Report documenting Contractors selfinspection. DELIVERIES 1. Original approved mylar subdivision plat. Copies of all Field Notes, Monument Photographs, and Quality Control Reports. Copy of signed Adjoiner Notification letters 2. Copy of any additional reports prepared by the Contractor for the Borough. INSPECTION AND ACCEPTANCE 1. Inspection: The contractor shall, without charge, make available for inspection, originals or copies of such items as field notes, working plats and drawings, material obtained through research, computation sheets, computer printouts, correspondence to and from adjoining landowners, and any other item deemed necessary to insure contract compliance, and verify accomplishments. 2. Acceptance: Acceptance of the work will be made only after the Trust Land Office has inspected and accepted the work and submittals from the Contractor and determined them to fulfill all specifications, terms and conditions of this contract. ATTACHMENTS A) Project Area 1 Map B) Sample Adjoiner Notification letter C) Forest Service Contract Specification.

C063S084E USS 3709 Lot 3 Future Forest Service Tract A 7 8 W-2 9 Wrangell Island C063S084E Future AMHT Tract B C063S084E 18 17 Future Forest Service Tract C 16 W-3!0 0.15 0.3 Miles 19 C063S084E W-2 and W-3 Alaska Mental Health Trust Land Exchange Act of 2017 Wrangell Area 20 AMHT Unsurveyed Remainder 21 Conservation Easement Area Petersburg Wrangell Subdivision Line Future Forest Service Tracts Approx. Acres: Tr. A - 104; Tr. C - 63 Future AMHT Tract B Approx. Acres: 260 US Survey Lot Boundary Craig Meyers Chuck Ketchikan Southeast Alaska Date Printed: November 20, 2017

WRANGELL PARCEL W4 DESCRIPTION OF WORK All work must be performed under the direct supervision of a land surveyor licensed to practice in the State of Alaska. All work must meet the Wrangell Borough Subdivision standards, specifications, and process. Except for the furnished property below, The Contractor shall furnish all labor, supervision, transportation, equipment, supplies, materials and incidentals necessary to complete the work as specified. This contract is to provide professional surveying services to: OPTION 1 1. Subdivide Lot 4A of U.S. Survey No. 3709, Plat 2010-5, Wrangell Recording District, Alaska to create a tract of land, "Tract A" approximately 700 acres, as shown on the exhibit map. The remaining portion of Lot 1 may remain as unsurveyed remainder. Tract A, will be deeded to the Forest Service and the remainder tract, approximately 189 acres, will remain in the ownership of the Trust. 2. Draft a preliminiary Subdivision Plat showing the proposed boundaries of the Tracts for review by the Trust and Forest Service. 3. Draft and process a subdivision plat to the standards and specifications of the Wrangell Borough. OPTION 2 1. Clear, mark, post & paint the future Forest Service boundary of Tract A to the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification. No brush or trees shall be cut on adjoining non-trust Land without written permission from the owner. FURNISHED PROPERTY (1) Corner monuments, signs, and sign posts will be provided as necessary by the Forest Service. RECORD RESEARCH AND ADJOINER NOTIFICATION (1) Record Research. It is the Contractor's responsibility to research all pertinent private and public records to obtain the

title and survey history of the subject property and adjoining properties. (2) Adjoiner Notification Prior to the start of fieldwork. The contractor shall contact all adjoining landowner to secure permission to access their lands, and to clear and mark their side of the boundary line. Contact of adjoiners shall be by letter with a self-addressed envelope. A sample Letter is attached. ADDITIONAL SURVEY SPECIFICATIONS In addition to the Borough Subdivision specification the Contractor shall comply with the U.S. Forest Service Standards as outlined in the Forest Service Region 10, Alaska Region, Tongass and Chugach National Forest Professional Land Survey Services CY 2009-2012 Contract Specification document attached relating to the following: 1. Trespass Conflicts. If trespass conflicts are found the Contractor shall as soon as posible provide the location, information and photos to the Trust Office. 2. Corner Monuments and Accessories. The contractor shall replace missing or existing monuments in poor condition with the furnished monument posts. If missing, dead or dying Bearing Trees are found the contractor shall establish new ones. 3. Survey Control. Horizontal Control shall be based on the NAD 83 Datum, US Survey feet. An NGS OPUS GPS solution would be acceptable for the basis of horizontal control. The contractor shall determine the Latitude and Longitude (NAD 83) for an original recovered corner monument. 4. Subdivision Plat. The Contractor shall produce a subdivision plat compling with all Borough and DNR platting and subdivision requirements. The plat shall be based on True North, NAD 83. One paper copy of the plat shall be submitted to the Trust Land Office for review at all stages of the platting process 4. Boundary Line Location, Clearing, Marking, Posting, Painting, and permission to perform work on private land. QUALITY CONTROL 1. Contractor shall be responsible for performing an independent self-inspection for quality control. 2. The survey process must include check shots for each monument set or recovered. 3. Quality Control Report documenting Contractors selfinspection.

DELIVERIES 1. Original approved mylar subdivision plat. Copies of all Field Notes, Monument Photographs, and Quality Control Reports. Copy of signed Adjoiner Notification letters 2. Copy of any additional reports prepared by the Contractor for the Borough. INSPECTION AND ACCEPTANCE 1. Inspection: The contractor shall, without charge, make available for inspection, originals or copies of such items as field notes, working plats and drawings, material obtained through research, computation sheets, computer printouts, correspondence to and from adjoining landowners, and any other item deemed necessary to insure contract compliance, and verify accomplishments. 2. Acceptance: Acceptance of the work will be made only after the Trust Land Office has inspected and accepted the work and submittals from the Contractor and determined them to fulfill all specifications, terms and conditions of this contract. ATTACHMENTS A) Project Area 1 Map B) Sample Adjoiner Notification letter C) Forest Service Contract Specification.

CONTRACTOR S LETTERHEAD DATE NAME AND ADDRESS OF ADJOINER Dear NAME, Our firm has been contracted by the Alaska Mental Health Trust Land Office (TLO) to survey and mark your common boundaries. These lands are being exchanged with the United States Forest Service. We plan to be in your area during the week/s of month/s doing this work. There are provisions in the contract to mark your side of the line, if you desire. The Future Forest Service lands are preferred to mark both sides of the boundary line, so Forest users can easily see the limits of National Forest land. Surveying and marking Forest Service boundaries includes the following: 1) Cut and remove brush 3 feet each side of the line. 2) Painting blazes on trees within 3 feet of the line. 3) Boundary line signing. 4) Setting Forest Service corner monuments, where needed, and marking corner accessories, where needed. NOTE: Items 1 and 2 can only be accomplished on private land with the permission of the landowner. Should the need arise, we ask permission to cross your land to gain access to the project. SAMPLE Please fill out the enclosed card concerning project access and boundary line marking, and return the card to our office in the enclosed self-addressed envelope. If you have any information, concerns, or desires you wish to express, please use the Remark s Section of the card, or contact this office at the above address. Thank you for your cooperation. Sincerely, NAME OF CONTRACTOR TITLE OF COMPANY OFFICIAL Enclosures Those items bolded to be filled in/out by the Contractor.