NOTICE. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section

Similar documents
PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

Residential Permits R-2, R-3, R-4, and U Occupancies 2019 Building Permit Valuation/Fee Schedule

Town of Aurelius 1241 West Genesee St Rd Auburn, NY Ext # (fax)

FEE SCHEDULE ADMINISTRATION FEES OF 35% ARE CHARGED TO THE PROPERTY OWNER IN ADDITION TO ALL OTHER APPLICABLE FEES AND COSTS. SEE NO. 13.

ORDINANCE NO: INTRODUCED BY: ADMINISTRATION

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

Rules and Regulations. for. Building Control Fees. Revised January 2, 2018

~ Please Detach and Save This Page ~

CITY OF LITTLE FALLS BUILDING PERMIT APPLICATION ALL BUILDING PERMITS ARE GOOD FOR ONE YEAR

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

EAST COCALICO TOWNSHIP BUILDING / ZONING PERMIT PROCEDURE AND GENERAL NOTES Revised 6/12/2012

Chapter CONSTRUCTION CODES

4. Building plans should include top of foundation elevation

ORDINANCE NO (revised by Ordinance )

WELD COUNTY BUILDING PERMIT & INSPECTION FEE SCHEDULE JANUARY 2018

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

BUILDING PERMIT FEE SCHEDULE

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

APPLICATION FOR DRIVEWAY PERMIT

NOW, THEREFORE, BE IT ORDAINED, by the Council of the City of Maple Heights, County of Cuyahoga, State of Ohio that:

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

EXHIBIT A to Ordinance No PART 1

RENTAL REGISTRATION APPLICATION

APPLICATION FOR BUILDING PERMIT

NEW SINGLE FAMILY RESIDENTIAL

RESOLUTION PERMIT FEE SCHEDULE

Application for a Building/Zoning Permit

Appendix G Fee Schedule

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Zoning and Building Permit Application

INSTRUCTIONS FOR COMPLETING APPLICATION FOR VARIANCE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

PLANS MUST BE APPROVED BY THE FIRE DEPARTMENT BEFORE SUBMITTING TO OUR OFFICE FOR REVIEW.

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

New Hanover Township

APPLICATION FOR A BUILDING PERMIT

BUILDING PERMIT APPLICATION

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR FENCES

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

ALEXANDRIA TOWNSHIP Land Use/Building Permit Application

RESOLUTION NO BUILDING, ZONING, AND SEWAGE ENFORCEMENT FEE SCHEDULE

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR SIGNS

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

Town of Jamestown Single/Two-family Residential. Building Permit Application Packet

BUILDING PERMIT FEE SCHEDULE AMENDED April 9, 2002

RESOLUTION NO NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SATELLITE BEACH, BREVARD COUNTY FLORIDA, as follows:

CITY OF PALM COAST SUMMARY OF APPLICATION AND IMPACT FEES

RESIDENTIAL / HOME OCCUPATION

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

Land Use & Development Application

9. Public (Federal, State, or local

BUCKINGHAM COUNTY BUILDING PERMIT CHECKLIST

ZONING PERMIT APPLICATION and INSTRUCTIONS

FEE SCHEDULE Construction Services and Permitting

DEPARTMENT. A Current Contractor Listing: If the contractor is pulling the permit, they must be listed with the County

ARLINGTON COUNTY, VIRGINIA

BUILDING PERMITS Table Total Valuation. $1.00 to $ $26.00

COMMUNITY AND DEVELOPMENT SERVICES APPLICATION FOR RESIDENTIAL BUILDING PERMIT HOPKINSVILLE KY

Manor Township Zoning Permit Application (Section 702) Application Number Application Date / /

SECTION 5: ACCESSORY USES

1. STRUCTURE TYPE (CHECK ONE): METHOD FOR MEETING ENERGY CODE COMPLIANCE: RESIDENTIAL COMMERCIAL PRESCRIPTIVE REScheck COMcheck PERFORMANCE

SWIMMING POOL GUIDELINES

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

City of Wausau Building, Housing and Zoning Fee Schedule

CHAPTER 4 BUILDING AND CONSTRUCTION TABLE OF CONTENTS TITLE, STATE BUILDING CODE AND BUILDING PERMIT REQUIREMENTS

CITY OF MANSFIELD NEWS RELEASE

ADMINISTRATIVE REVIEW FOR AN ACCESSORY DWELLING UNIT

RESIDENTIAL BUILDING PERMIT FEES. New Construction and Multi-Residential Construction* Including living, habitable space, basement, & garages

APPLICATION FOR AN ACCESSORY APARTMENT PERMIT

Zoning Fee Schedule. Per Chapter Part VIII Administrative Code

BOROUGH OF BANGOR ZONING PERMIT APPLICATION PACKET. Submission Checklist

WEST COCALICO TOWNSHIP P.O. Box 244 Reinholds, PA (717) ZONING/BUILDING PERMIT APPLICATIONS INFORMATION & PROCEDURES

TATAMY BOROUGH 2018 FEE SCHEDULE ADOPTED 1/2/18 EFFECTIVE 1/1/18

Township of Moorestown

Zoning Permit Application Information Sheet

INTRUCTIONS FOR BUILDING/USE PERMIT APPLICATION All applicable sections of this packet must be completed.

TOWN OF ROME 1156 ALPINE DR. NEKOOSA, WI (715)

Fee Schedule for Zoning, Building Permits, and Plan Review Services

Town of Chino Valley Consolidated Fee Schedule Resolution No , Adopted October 23, 2012 Effective January 1, 2013

BUILDING PERMIT FEE SCHEDULE

Administration Fees Photocopies $ Returned Checks $ Credit Card Convenience Fee $ 1.50 minimum OR 2.45%

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

Reynoldsburg Code of Ordinances. CHAPTER 1305 Permits and Fees

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

City of Georgetown. Inspection Services

APPLICATION FOR ZONING USE AND COMPLIANCE CERTIFICATE CENTER TOWNSHIP, BEAVER COUNTY, PA

ORDINANCE NO. WHEREAS, the last update to the Chapter 6 Buildings and Building Regulations fees schedule was over a decade ago; and,

BUILDING SERVICES ~ FEE SCHEDULE

Worcester Township Fee Schedule

Department of Public Works Permit Fee Schedule

City of Beacon Building Department

Information Needed for a Building Permit

The Quick Guide to UCC Amendments. Agenda. Quick Guide to UCC Amendments. Residential Provisions of the Pennsylvania UCC and Local Amendments

BOROUGH OF MOUNT ARLINGTON ZONING PERMIT APPLICATION PROCEDURE 419 Howard Blvd., Mt. Arlington, NJ (973) ext. 14

ZONING & BUILDING PERMIT AND SUBDIVISION & LAND DEVELOPMENT PLAN MASTER FEE SCHEDULE PER RESOLUTION No

TOWN OF ROXBURY INSTRUCTIONS FOR FILING A BUILDING PERMIT. Phone/Fax/Message(607) Phone/Fax (607) REVISED 6/2/17

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

PATIO PERMIT REGULATIONS

CITY OF ELSMERE 318 Garvey Avenue, Elsmere KY 41018

SWIMMING POOLS VILLAGE OF WADSWORTH THE VILLAGE OF COUNTRY LIVING

Transcription:

NOTICE The following building permit application information and fee schedule is intended to assist with communications between potential permit applicants and City of Marion Building Department staff. Contact the Marion Building Department for an explanation of fees and assistance in completing information before submitting permit application information. Valuations for determining the building permit fee shall be set by the Building Official per International Building Code Section 109.3.

Building Inspections Department 1225 6 th Avenue, Suite 220 Marion, IA 52302 (319) 743-6330 Fax (319) 373-4260 www.cityofmarion.org BUILDING PERMIT APPLICATION INFORMATION ADDRESS WHERE WORK WILL TAKE PLACE (INCLUDE ALL ADDRESS FOR MULTI-FAMILY): DESCRIPTION OF ALL WORK BEING DONE: LEGAL INFORMATION ( ON ALL NEW CONSTRUCTION ONLY): LOT # ADDITION SUBDIVISION OWNER S CURRENT INFORMATION: NAME: ADDRESS: CITY STATE: ZIP: PHONE #: E-MAIL: WHO WILL BE DOING THE WORK: COMPANY ADDRESS CITY STATE ZIP PHONE # NEW CONTRACTOR REQUIRES STATE CONTRACTOR REGISTRATION INFORMATION CONTRACTOR # EXP DATE: NEW CONSTRUCTION INFORMATION (valuations are calculated according to information provided on plans) 2 SETS OF BUILDING PLANS & 2 SETS OF S FOR RESIDENTIAL (3 OF BOTH FOR COMMERCIAL) TO INCLUDE: BUILDINGS, DRAINAGE, DRIVEWAY WIDTH, DECKS/PORCHES EROSION CONTROL PERMIT APPLICATION Page 1 of 4

VALUATION PLANS (PLEASE COMPLETE INFORMATION BELOW PERTAINING TO YOUR PROJECT) : If Building Plans or Site Plans are required, please submit on separate pages >>>>>>>>>>>>>>>>>>>>>>>>>>> INDICATE PROJECT X REMODEL(EXCEPT BSMT) COST OF MATERIALS COST OF LABOR BUILDING PLAN BASEMENT FINISH SQUARE FEET OF BUILDING FINISHED AREA ONLY PLAN ADDITION DIMENSIONS ADDITION USE DECK (>30 ABOVE GRADE) DIMENSIONS SQUARE-FOOT RE-ROOF TEAR OFF # OF SQUARES RE-ROOF OVERLAY # OF SQUARES 1OO SQUARE FT = 1 SQUARE RE-SIDE # OF SQUARES 100 SQUARE FT = 1 SQUARE SHED (OVER 120 SQ FT) DIMENSIONS SQUARE FOOT GARAGE DIMENSIONS SQUARE FOOT FENCE (OVER 6 ONLY) LINEAR FT SWIMMING POOL COST OF PROJECT IF UNDER 6 NO PERMIT IS HOWEVER YOU STILL NEED TO MEET P&Z REQUIREMENTS Applicant being duly sworn, deposes and says that he/she is authorized and empowered to make affidavit for the owner, who makes the accompanying application; that the application, plat, plans and specifications are true and contain a correct description of the proposed building, lot and work, and use to which the building is to be placed. Subject to deed restrictions. Subject to all Government Regulations. Application for certificate of occupancy is herewith made. Signature Date NAME OF PERSON COMPLETING THIS FORM CONTACT NUMBER EMAIL ADDRESS Page 2 of 4

TABLE 1-A - SCHEDULE OF FEES TOTAL VALUATION $0.00 to $500.00 $20.00 BUILDING PERMIT FEE $501.00 to $2,000.00 $20.00 for the first $500.00 plus $3.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 $2,001.00 to $20,000.00 $65.00 for the first $2,000.00 plus $11.00 for each additional $1,000.00 or fraction thereof, to and including $20,000.00 $20,001.00 to $50,000.00 $263.00 for the first $20,000.00 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 to $100,000.00 $533.00 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 $883.00 for the first $100,000.00 plus $6.00 for each additional $1,000.00 or fraction thereof to and including $500,000.00. $500,001.00 to $1,000,000.00 $3,283.00 for the first $500,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 and up $5,783.00 for the first $1,000,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof. Other Inspections and Fees: Inspections outside of normal business hours *(minimum charge - one hour) Re-inspection fees assessed under provisions of Chapter 160 *(minimum charge - one hour) Inspections for which no fee is specifically indicated *(minimum charge - one hour) Permit renewal fee assessed under provisions of Chapter 160 Additional plan review required by changes, additions ot revisions to approved plans *(minimum charge - one hour) Investigation fee - work without permit (addition to permit fee) $100.00 first hour* $50.00 each additional $50.00 not to exceed initial permit fee = permit fee Building Code Appeals application $50.00 Temporary Occupancy Certificate $100.00 Permit administration fee $5.00 each permit

!! I! ' Moving Permit Fees: a. Building Inspection fee (for application prior to moving building) - *(minimum charge - one hour) b. Moving Permit fee (each garage or shed, each day public property is occupied) $25.00 c. Moving Permit fee (other buildings, each day public property is occupied) $50.00 Building Demolition Permit Fees: a. One or two-family dwelling $50.00 b. All other buildings: (1) Each story with less than 1,000 square feet of floor area $25.00 (2) Each story with from 1,000 square feet to 3,000 square feet of floor area $50.00 (3) Each story with more than 3,000 square feet of floor area $100.00 Note: For the purpose of calculating demolition permit fees a basement or cellar in a building other than a one-or two-family dwelling shall be counted as a story. Exception: The Building Official may waive the demolition fee to a home owner for an unsalvageable, worn-out building located on the premises on which he or she resides, provided that the floor area of the building is less than 500 square feet and that the building is being wrecked by order of condemnation. PLAN REVIEW FEES. Except For Structures within the Scope of and reviewed under the provisions of the International Residential Code, when a plan or other data is required to be submitted, a plan review fee shall be paid at the time of submitting plans and specifications for review. Said plan review fee shall be thirty percent (30%) of the building permit fee as shown in Table No. 1-A. The plan review fees specified in this subsection are separate fees from the permit fees and are in addition to the permit fees. Where plans are incomplete or changed so as to require additional plan review, an additional plan review fee shall be charged at the rate shown in Table No. 1-A.

VALUATION GUIDE SHEET DWELLINGS, PRIVATE GARAGES AND MISCELLANEOUS DWELLINGS: First floor... $50.00 per square foot Additional floors... $35.00 per square foot Three-Season porch... $35.00 per square foot Habitable basement areas... $20.00 per square foot Unfinished basement areas... $10.00per square foot GARAGES: Attached... $18.00 per square foot Detached... $16.00 per square foot Car ports... $14.00 per square foot Concrete only for accessory buildings... $ 5.00 per square foot SHEDS:... $14.00 per square foot COVERED PATIO OR PORCH:... $14.00 per square foot OPEN DECKS:... $10.00 per square foot SCREENED PORCH:... $15.00 per square foot FENCE OVER 6' IN HEIGHT:... $ 7.50 per linear foot ROOFING: Overlay... $60.00 per 100 square feet Tear-off and replace... $80.00 per 100 square feet Replace sheathing and roofing... $100.00 per 100 square feet RESIDING:... $100.00 per 100 square feet SWIMMING POOLS & HOT TUBS: Temporary seasonal pools less than 42" deep & Hot Tubs... Minimum Fee All other in-ground & above-ground pools... Actual costs GAS FIREPLACE & CHIMNEY:... $1,200.00 For buildings other than dwellings or not included in the above list, reference the Building Valuation Data sheet as published by the International Code Council. Valuation for remodeling of existing buildings which does not increase floor area of the building shall be based on the total value of all construction work for which the permit is issued, including all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and any other permanent equipment.