PORTLAND PLAN. Household and Employment Forecasts and Development Capacity

Similar documents
Generic Environmental Impact Statement. Build-Out Analysis. City of Buffalo, New York. Prepared by:

Residential Capacity Estimate

UNDERSTANDING DEVELOPER S DECISION- MAKING IN THE REGION OF WATERLOO

TASK 2 INITIAL REVIEW AND ANALYSIS U.S. 301/GALL BOULEVARD CORRIDOR FORM-BASED CODE

POPULATION FORECASTS

MONTGOMERY COUNTY RENTAL HOUSING STUDY. NEIGHBORHOOD ASSESSMENT June 2016

Chapter 5: Testing the Vision. Where is residential growth most likely to occur in the District? Chapter 5: Testing the Vision

CHAPTER 4. MANAGER Single-Family Multi-Family Total. CHAPTER 4: AREA OF IMPACT AND BUILDOUT ANALYSIS Housing Needs Analysis

City of Creswell DRAFT Residential Buildable Lands Inventory

CHAPTER 2 VACANT AND REDEVELOPABLE LAND INVENTORY

2014 Plan of Conservation and Development. Development Plan & Policies

Forecast of Tax Revenues for Reston Community Center Reston, Virginia. Prepared for Reston Community Center March 2013

The New California Dream How Demographic and Economic Trends May Shape the Housing Market

Table of Contents. Appendix...22

Table of Contents. Title Page # Title Page # List of Tables ii 6.7 Rental Market - Townhome and Apart ment Rents

CITY OF MEDFORD COMPREHENSIVE PLAN BUILDABLE LAND INVENTORY

PEACHTREE INDUSTRIAL BOULEVARD small area study

Bylaw No , being "Official Community Plan Bylaw, 2016" Schedule "A" DRAFT

Gold Beach Buildable Lands Analysis

The Onawa and CHAT Report

Buildable Lands Analysis within the Overall UGB Expansion Process

Portland Streetcar Development Impacts

GENERAL PLAN UPDATE. Joint Study Session March 29, 2017

Land Capacity Analysis

Residential Intensification in Established Neighbourhoods Study (RIENS)

Chapter 1: Community & Planning Context

Analysis of Infill Development Potential Under the Green Line TOD Ordinance

2014 Plan of Conservation and Development

January Salem Housing Needs Analysis and Economic Opportunities Analysis. Draft Summary Report. ECONorthwest

2005 COTTAGE GROVE BUILDABLE LANDS ANALYSIS UPDATE

1.2 Forecasting Growth

Chapter 10: Implementation

Housing & Residential Intensification Study Discussion Paper Township of King

City of Astoria Comprehensive Plan URBAN GROWTH

Burlington Unincorporated Community Plan

2019 DC Study External Stakeholder Committee Minutes

ANALYSIS OF INTENSIFICATION OPPORTUNITIES IN THE CITY OF BRANTFORD. Final Report Prepared for:

Salem HNA and EOA Advisory Committee Meeting #6

RESIDENTIAL MARKET ANALYSIS

Annual (2013) Review of the Surrey Official Community Plan

Community & Infrastructure Services Committee

Upcoming Apartment Projects with No On-Site Parking Frequently Asked Questions June 2012

New challenges for urban renewal... Patrick Fensham Principal SGS Economics and Planning

PC Staff Report 11/18/2013 Z Item No. 1-1

Housing and Economic Development Strategic Plan for Takoma Park OCTOBER 18, 2017

Addressing the Impact of Housing for Virginia s Economy

Glenmont Sector Plan Staff Draft AFFORDABLE HOUSING ANALYSIS

PLANNING COMMISSION REPORT Regular Agenda - Public Hearing Item

The cost of increasing social and affordable housing supply in New South Wales

Inventory of Sites for Housing

OFFICE MARKET ANALYSIS

Regulatory Impact Statement

Linkages Between Chinese and Indian Economies and American Real Estate Markets

Technical Report 7.1 MODEL REPORT AND PARKING SCENARIOS. May 2016 PARKING MATTERS. Savannah GA Parking Concepts PARKING MATTERS

RESOLUTION NO ( R)

The New Starts Grant and Affordable Housing A Roadmap for Austin s Project Connect

To achieve growth, property development, redevelopment and an improved tax base in the cities and boroughs in the Lehigh Valley.

Town of Prescott Valley 2013 Land Use Assumptions

Comprehensive Plan /24/01

Housing Indicators in Tennessee

What does the Census of 2000 tell us about

8Land Use. The Land Use Plan consists of the following elements:

4. Parks and Recreation Fee Facility Needs and Cost Estimates Fee Calculation Nexus Findings 24

Single Family Sales Maine: Units

Multifamily Market Commentary December 2015 Single-Family Rental Sector Attracting Institutional Investment

Glenmont Sector Plan Staff Draft AFFORDABLE HOUSING ANALYSIS

Pueblo Regional Development Plan, Addendum

Existing Conditions: Economic Market Assessment

White Oak Science Gateway Master Plan Staff Draft AFFORDABLE HOUSING ANALYSIS. March 8, 2013

891941, , : COMPREHENSIVE PLAN AMENDMENT, COMMUNITY PLAN AMENDMENT, AND AREA-WIDE MAP AMENDMENT

A project of Neighborhood Projects for Community Revitalization At the Center for Urban and Regional Affairs (CURA) University of Minnesota

First Experiences under the Tauranga Housing Accord

Business Item Community Development Committee Item:

Existing Land Use. Typical densities for single-family detached residential development in Cumberland County: 1

Housing for the Region s Future

Land Supply and Growth Study Town of Rocky Mountain House October 2009

STAFF REPORT. Permit Number: Unlimited. Kitsap County Board of Commissioners; Kitsap County Planning Commission

Better Housing by Design - Proposed Draft Summary

METROPOLITAN COUNCIL S FORECASTS METHODOLOGY

BUILD-OUT ANALYSIS GRANTHAM, NEW HAMPSHIRE

Hood River Comprehensive Plan and Zoning Code Updates. March 19 th, 2018 Planning and Zoning Commission

Coburg Urbanization Study Update

Census Tract Data Analysis

P o p u l a t i o n, L a n d U s e, a n d Z o n i n g

Table 4d-1. City of Poulsbo Residential Building Permits CITY OF POULSBO Unit Type

7/14/2016. Needed Housing. Workforce Housing. Planning for Needed Housing June 30, 2016 GOAL 10: HOUSING OAR (10)

TOWN OF BROOKLINE, NEW HAMPSHIRE

STAFF REPORT. Community Development Director PO Box 4755 Beaverton, OR 97076

Final. Chapter Four: Land Use

THE REAL ESTATE BOARD OF NEW YORK REBNY ANALYSIS OF GREATER EAST MIDTOWN TDR VALUE

1 Accessory Dwelling Unit Project

Dr af t Sant a Bar b ar a Count y Housing Elem ent

13 Sectional Map Amendment

HOUSING ELEMENT Inventory Analysis

Shawnee Landing TIF Project. City of Shawnee, Kansas. Need For Assistance Analysis

ATTACHMENT NO Growth and Staging of Development Report

City of Bellingham Urban Growth Area - Land Supply Analysis Summary

Housing Characteristics

CITY OF PORT HURON, MICHIGAN EXECUTIVE SUMMARY OF THE TARGET MARKET ANALYSIS STUDY CONDUCTED BY ZIMMERMAN/VOLK ASSOCIATES, INC.

Housing. Approved and Adopted by City Council November 13, City Council Resolution City Council Resolution

Transcription:

PORTLAND PLAN Household and Employment Forecasts and Development Capacity Managing Change In recent decades, the Portland Metropolitan region and the City of Portland experienced a steady increase in population. In 1980, the city s population was about 368,000 residents. By 2005, the population had grown to nearly 555,000 residents. Much of this growth was a result of new city boundaries. In the 1980s and 1990s, the City of Portland annexed much of the city referred to as East Portland and Cully, as well as some smaller areas in North and Southwest Portland, greatly expanding the city s boundaries. Other growth can be attributed to people having children and new Portlanders arriving from across Oregon, the nation and beyond. In coming years, it is unlikely that Portland s boundaries will change. As a result, current Portlanders, their friends and growing families and new Portlanders alike will need to figure out how to manage change, direct investments and work smarter within existing city limits. In another 25 years, how many people will live on Portland s nearly 93,000 acres? Where in the city will people choose to live? What kinds of jobs will Portlanders have? Who develops household and employment forecasts? Metro, our regional government, is responsible for forecasting the amount of population growth the metropolitan area will likely experience. Metro is also responsible for developing an employment forecast that estimates the number and types of jobs that will be in the city in the future. What is a forecast? Metro s forecasts are not targets. They are projections or estimates of what is likely to happen in the future, given trends, previous experience and existing policies. Although forecasts are educated estimations of what is likely to happen, they are neither goals nor necessarily descriptions of desired outcomes. Why are forecasts important? While forecasts may not always tell Portlanders what they want to hear, they are useful and very important. Household and employment forecasts help the City of Portland and other local communities plan responsibly. After all, population growth triggers the need not only for new housing but also for a complex web of additional urban services, from water pipes and sewers to parks and open spaces, roads, railways, schools and hospitals, all of which need to be planned far in advance. Employment

page 2 forecasts tell the City of Portland what kind of land and work sites are needed to help the economy grow and tell the city which types of businesses are likely to provide jobs over the next generation. The information contained in forecasts helps Portlanders make informed and educated decisions about how to manage land, where and when to invest in infrastructure like transportation and utilities and which policies and programs should be continued and enhanced and which should not. How do Metro s household and employment forecasts work? Metro uses data from the forcasting firm Global Insight, and estimates the distribution of households and jobs based on a computer model called Metroscope. For information on how Metroscope works, please check out Metro s website: www.metro-region.org. What is The Buildable Lands Inventory? The Buildable Lands Inventory helps us begin to understand what Metro s forecasts might mean for Portland. Do our zoning and regulations allow for the development needed to accommodate the projected household and job growth? To help answer this question, the City of Portland uses its own computer model to project development capacity. Development capacity is defined as the likely number of new dwelling units or jobs that could be accommodated in the city under existing regulations assuming the continuation of recent market trends. Determining development capacity is a five-step process. For each step, assumptions must be made. The approach used in this analysis is intended to be transparent, and relatively conservative. Step I estimates the gross acreage of land that is available for development and redevelopment in the city. This includes: - Inventory of the vacant sites/acreage in the city (a) - Selection of other sites that are underdeveloped and likely available for redevelopment (b) Step II subtracts constrained lands (c) from the Step I results ((a + b) - c). Constrained lands include sites that lack needed urban infrastructure (for example, sites without sewer service), and also include physical and regulatory barriers to development (such as environmentally sensitive areas, historic landmarks, flood hazards, etc.). This is the step we re discussing now.

page 3 Step III examines market factors, past development trends, and expected near-term infrastructure improvements. In this step, the capacity estimate for some areas may be adjusted upward or downward by some factor (d). Step IV combines the results of Steps I through IV into a Default Scenario, and estimates the net acreage of land available for development and redevelopment in the city ((a + b) - c)*d. The result is a capacity estimate, expressed as the number of new dwellings that can be accommodated. The default scenario is based only on existing policy and development allowances. Step V creates other scenarios based on desired outcomes (Portland Plan Goals and Objectives). The Comprehensive Plan and Development Capacity The Comprehensive Plan sets expectations about what kind of future development may occur in different parts of the City. It is implemented through policy, zoning, and public investments (Capital Improvement Plans). The model to the right illustrates how much development intensity is allowed under the current Comprehensive Plan and zoning. Darker areas represent areas with the greatest allowances for development.!

Go to the Portland Plan Atlas for the complete set of constraint maps used in this analysis: www.pdxplan.com page 4 Key Term: Constraints Constrained land is a term used in Oregon s land use planning system to define the features of land, in addition to zoning, which may limit the intensity of future development (and therefore the distribution of future housing or jobs). The State identifies a list of specific constraints that must be considered, at minimum. Additional constraints may also be identified. Constraints could be market, regulatory, and/or physical factors that impact development feasibility. The term constraint does not imply that these factors are necessarily undesirable, or leading to negative outcomes. For example, land near the bank of a river may be considered fully or partly constrained in this model from reaching full zoned capacity for housing and jobs, but in reality the closeness to natural areas or a river may increase the desirability of a parcel and likelihood of development. The Natural Resources Inventory is one example of a constraint. It identfies environmetally-sensitive lands based on methodology developed in coordination with Metro and other Key Term: Vacant or Underutilized Land Additional capacity for jobs and housing was calculated only for properties that are considered vacant or underutilized. Rules were applied to identify these properties based on their zoning and location: - Industrial parcels (IS zones) were considered vacant or underutilized only if tax records show the property vacant and without floor area; - Low and medium density residential parcels were considered vacant or underutilized based on their size and the density allowed by zoning. In the single family (R2.5 through RF), if existing development is 33% or less of the allowed density, the property was considered underutilized. Multi-family parcels (R1 through R3 and IR zones) were considered vacant or underutilized if existing development is 20% or less of the allowed density; - High-density residential parcels (RH & RX zones) were considered vacant or underutilized if the square footage listed in the tax rolls amounts to 20% or less of their allowed floor area under current zoning;

page 5 - In commercial and mixed-use zones (CM, CS, CX, CN, CO, CG), parcels were considered vacant or underutilized if the square footage listed in the tax rolls amounts to 20% or less of the allowed floor area under current zoning; and - In the Central City, a different model was applied, using both land values and built square footage. In the Central City, if a site was developed to 20% or less of the allowed square footage, AND if the site s improvement to land value ratio is 50% or less (e.g. $50K building on $26K land is underutilized, but $50K building on $25K land is not), it was considered underutilized. Household Forecast Snapshot Portland is projected to gain 105,000 to 136,000 new households by 2035 (an annual percent rate change of 1.2 percent - 1.6 percent). This translates into a need for 3,500-4,500 new housing units each year. For context, approximately 48,000 new dwellings were built in Portland between 1996 and 2009. During the most recent housing boom (2004 2008) growth rates reached approximately 4,500 new dwellings each year. Nationally, regionally, and within the city, household size is projected to decline in coming years. In 2005, 28 percent of households included children. By 2035, 25 percent of Portland households are expected to include children. Demand is expected to be highest for multi-family units. Currently, about 61% of the existing dwellings are single family detached homes. In contrast, In recent years (between 2004 and 2008) 62% of new housing units in Portland were apartments or condos. The number of households in the Central City is projected to nearly triple by 2035. Over 5,000 new dwellings were built in the Central City during the most recent housing boom (2004-2008). More information is available in the Housing Demand and Supply Background Report. Household Distribution This map shows Metro s projections for the distribution of new households by the year 2040 (medium growth scenario shown). Larger amounts of projected residential growth within Portland are anticipated in and around the Central City, along the Interstate Corridor, and around Gateway and other areas in Eastern Portland. Metro will update this distribution estimate in 2011.

page 6 Preliminary Housing Conclusions Zoned capacity in Portland is sufficient to meet projected housing need - that is, enough land in Portland is currently zoned to accommodate the projected number of new households. The total residential capacity of the City, with the existing Comprehensive Plan and zoning, is estimated at between 150,257 and 255,959 additional households. The low end of that range assumes no development of constrained lands, while the high end of that range assumes a percentage of constrained land will remain available for development (see the accompanying technical report for more information about those assumptions). There are approximately 266,000 households in Portland today. The existing Comprehensive Plan and zoning could accommodate 1.5 to 2 times that number of households. Only 13 to 15% of that capacity is in land available for single dwelling residential development (detached or attached homes on their own lot). The largest concentration of single dwelling capacity is in the Powelhurst-Gilbert area. About 15% of Portland s capacity is located in the Central City. Most of the remaining growth capacity is in mixed use corridors and neighborhood centers. Notable areas of high growth capacity are North Interstate Corridor, Gateway, Lents, Hayden Island, Montavilla, and some areas of East Portland. The areas of town with the least capacity for additional growth are some areas in Northeast Portland, and most of West Portland. These conclusions include an assumption that between 450 and 2,150 Accessory Dwelling Units could be built over the next 25 years. We also assume that between 1,000 and 1,721 additional infill skinny houses could be built in the R2.5 and R5 zones, primarily in North/Northeast Portland, and in the Brentwood Darlington area.

page 7 all This map shows the distribution of potential new housing units after considering the likely impact of constraints, given current policies. A scoring system was used to evaluate how much impact each of the following factors have on housing development, and the estimated housing capacity was adjusted accordingly: -Transportation system capacity -Water service limitations -Sanitary sewer and stormwater capacity -Airport landing considerations -Natural resources -Environmental zoning -Scenic areas -Public open spaces and land -Wellhead/groundwater protection -Cultural resources -Historic structures and districts -Hazards (slopes, flooding, fire hazards) -Brownfields -Rural lands See the accompanying technical report for more information about how these constraints were evaluated. This map shows the distribution of potential new housing units if all constrained land is removed from consideration. One way to understand what might happen in the future is to evaluate past trends. The map below illustrates where new housing has been developed over the past decade. Taller, darker lines indicate a greater number of new dwelling units. new dwelling units (1996 to 2009)

Portland Plan - Household Forecasts and Development Capacity, December 10, 2010 3 4 2 18 20 6 1 5 8 7 21 19 14 16 These 20-Minute Neighborhood analysis areas were created as a framework for examining local data and trends. Each area includes several Portland neighborhoods. Most are centered on a commercial center, or main street. 15 10 11 22 23 12 9 13 page 8 17 24 Estimated Residential Capacity Assuming Existing Comprehensive Plan Analysis actual number of additional housing unit capacity Growth Area households (factoring in constraints) Factor TODAY new SFR new MFR new TOTAL by 2035 1 20,152 101 35,071 35,172 2.7 2 15,391 1,275 22,493 23,768 2.5 3 2,172 262 6,666 6,938 4.2 4 12,715 1,396 6,171 7,567 1.6 5 14,974 1,317 3,571 4,888 1.3 6 16,860 835 5,726 6,561 7 19,112 577 6,354 6,931 8 15,235 834 8,400 9,234 1.6 9 14,076 2,523 12,330 14,853 2.1 10 14,140 1,614 3,371 4,985 11 18,030 3,284 17,843 21,127 2.2 12 7,960 340 5,647 5,987 1.8 13 5,759 574 2,670 3,244 1.6 14 11,642 3,393 31,651 35,044 4.0 15 14,456 5,423 11,850 17,273 2.2 16 12,014 2,289 12,552 14,841 2.2 17 3,358 2,664 874 3,538 2.1 18 3,275 1,569 143 1,712 1.5 19 7,055 1,953 1,149 3,102 20 14,248 909 4,399 5,308 21 5,358 901 7,625 4,526 2.6 22 9,835 1,755 3,624 5,379 1.5 23 4,880 561 1,587 2,148 24 3,455 1,306 156 1,462 SFR = single family residential, MFR = multifamily residential Note: These figures incorporate constraint deductions.? The Growth Factor is a way of quantifying the amount of change possible in each area. For example, a score of 2.0 would mean that there is capacity to double the number of households in a given area. A score of 1.0 would mean there is little or no capacity for growth. This esitimate is based on the amount of underutilized or vacant land available for housing development, how many new dwellings zoning allows on that land, and factoring in the impact of the constraints (like slopes, or environmental resources).

page 9 Employment Forecast Snapshot Between 2000 and 2006, the average annual growth rate (AAGR) of jobs in Portland was just 0.2%, compared to 0.5% in the three-county area, 0.7% in the seven-county MSA, 1.6 percent in Central Portland, and 3.2% in the outer-ring sections of the three-county area. In 2006, Portland had 40% of the jobs in the 7-county metropolitan area (MSA). But, Portland s capture rate of regional job growth fell to 11% in the 2000-2006 period, down from about 27% in the 1980-2000 period. Central Portland has been an exception to this trend, as its growth has kept pace with the region. Services account for just over one-fifth (21%) of the City s employment base followed by health and social services, arts/accommodations/food services, education, retail, and manufacturing Between 2010 and 2035, the institutional sector is projected to grow by 37%, the office sector by 28%, the industrial sector by 18% and the retail and service sector by 17%. Schools and hospitals accounted for about 53,200 in-city jobs as of 2006 and for virtually all of the net job gains experienced in Portland from 2000-06. This is the City s fastest growing sector. Accommodating future job growth in the institutional sector may prove challenging because those uses are often adjacent to or within residential areas. More information is available in the Economic Opportunities Analysis Background Reports Portland s employment districts Jobs Distribution Metro s projections for the distribution of new jobs by the year 2040 (medium growth scenario). Within Portland, the largest job growth is anticipated in and around the Central City and to a lesser extent around Gateway. Metro will update this distribution estimate in 2011.

What is Portland s Land Capacity to Support Job Growth? Recent trends show a declining city share of the region s jobs, despite an expanding share of the region s housing. Portland has advantageous infrastructure and workforce capacity, but tightening land supply. Portland s land supply for job growth has shifted away from greenfields to constrained land and redevelopment at higher densities. Narrowing land supply options have not slowed local housing development, but may limit employment growth. Land supply is affected by a variety of public choices, particularly in land use policy, infrastructure investments, and incentives. page 10 The draft mid-range employment forecast is for recovery to a 27- percent capture rate of regional job growth (about 150,000 new jobs; 1.3% AAGR), and translates into demand for 3,200 acres of employment land absorption. Land absorption is a measure of both the vacant land developed during the period and the sites redeveloped to higher density. The high range forecast is for 200,000 new jobs (36% capture rate, 1.6 AAGR) and absorption of 4,100 acres; the low range forecast is for 100,000 new jobs (18% capture rate, 0.9 AAGR) and absorption of 3,200 acres at lower densities. To meet forecast land absorption, 4,200 acres of developable employment land has been identified, but roughly two thirds of that land has development constraints. Supply was measured by vacant (unimproved) land and less improved sites, measured by an improvements-to-land-value ratio less than 0.5. Approximately 1,400 acres of the developable supply are potential brownfield sites (may be contaminated), of which only 33% is estimated to be available for development by 2035 under current market conditions. An additional 1,350 acres of the supply has existing or proposed environmental overlays that allow but limit development, of which 45 percent is estimated to be available for development by 2035. Comparing available supply to forecast demand by district geographies, significant shortfalls of developable land were identified for industrial district and institutional campus growth. The Economic Opportunities Analysis reports provide detailed estimates of land absorption and existing capacity within nine employment land geographies. City estimates indicate that Portland will need about 600 more acres of industrial land and 360 more acres of institutional land to meet the mid-range job forecast. Above: Regional distribution of existing employment by sector- office, retail, institutional, industrial. Larger copies of these maps are available online as part of the Portland Plan Atlas - www.pdxplan.com.

page 11 Next Steps - Development of Growth Scenarios Alternative scenarios are a tool used to explore ways the City might change it s growth policies, development regulations, and infrastructure investments to impact how and where the City grows over the next 25 years. In 2011 Portlanders will weigh the costs and benefits of several different 25-year growth scenarios, and use that information to develop a preferred growth concept. A default scenario, and two or more alternative scenarios will be produced, and after public discussion and refinement of the ideas, a preferred scenario will be selected to guide the future Comprehensive Plan update. To inform that conversation, we will evaluate the performance of both the default scenario and alternative scenarios against a specific set of performance measures. These measures are rooted in the goals and objectives of the Portland Plan. Draft performance criteria are shown below. Draft Growth Scenerio Evaluation Criteria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

The Default Scenario The Default Scenario is an estimate of the result we would likely see over the next 25 years without any regulatory or investment changes. In other words, how will new jobs and housing likely be distributed in 2035, if we follow our existing zoning anf Comprehensive Plan? The default scenario is based only on existing policies and planned investments, and does not recommend or explore choices we could make with the Portland Plan to move in a different direction. The default scenario does consider the land supply (the results of the Buildable Lands Analysis). It will consider how the market will use the supply. For example, our existing plans have more capacity for growth than the likely market demand for housing, so the default scenario will state our assumptions about which areas will most likely be developed over the 25-year horizon. It will also consider how planned but not yet built infrastructure projects could impact land supply. The Default Scenario will be the starting point for consideration of other alternatives. Other Scenarios Other scenarios will illustrate different choices for example, should we rely on neighborhood infill, main street development, or should we have a more central-city focused growth strategy? Scenarios also allow us to test different sequences of growth, or different investment options should the Lloyd District be more fully developed before Gateway? How would a Barbur or Powell Boulevard light rail line impact growth patterns? For More Information... The Portland Plan Atlas includes maps of the different factors impacting land supply. Follow the Learn About Your City links at the Portland Plan website below. For information on how Metro s forecast model, Metroscope, works, please check out Metro s website: www.metro-region.org.