Frequently Asked Questions for: Drainage, Watershed and Water Quality Property Owners Near Creeks Developers and Engineers and Definitions of Terms

Similar documents
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

FREQUENTLY USED PLANNING & ZONING TERMS

Flood Hazard Area Control Act Rules

Drainage Maintenance Policy

Appendix J: Stormwater Utility Ordinance Guidance

ORDINANCE NO WHEREAS, the County Council desires to amend the current Code of

ARTICLE 3 DEFINITIONS

Appendix A Reproducible Forms

CHECKLIST FOR DEVELOPMENT REVIEW

Condominium Unit Requirements.

REGULATIONS OF WALLER COUNTY, TEXAS

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Floodplain Management and Regulation

ARTICLE 7 UTILITIES AND EASEMENTS

ARTICLE 13 CONDOMINIUM REGULATIONS

ANDOVER CODE. Checklist #5 Preliminary Site Plan Conditional Use

Dedicated program for municipal drainage management

BASICS OF FLOODPLAIN MANAGEMENT & PLANNING IN NEW JERSEY

Tentative Map Application Review Procedures

LYON COUNTY COMMUNITY DEVELOPMENT DEPARTMENT

ORDINANCE CITY OF DUNDAS RICE COUNTY STATE OF MINNESOTA

DIVISION 2 - CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CHAPTER 5 RULES, RATES AND CHARGES FOR THE STORMWATER UTILITY SERVICE 1

Residential Minor Subdivision Review Checklist

TOWN OF LAKE LURE LAND DISTURBANCE PERMIT (LESS THAN 1 ACRE) Permit Fee Permit No. LDP- (see Fee Schedule below) Approved:

SECTION 10: FLOOD HAZARD EVALUATION 10-1

CITY OF GLASGOW ORDINANCE NO. 2809

Residential Major Subdivision Review Checklist

CITY OF CORNING TENTATIVE MAPS

ORDINANACE NO

Walmart Excess Land For Sale

Ordinance No. An Amendment to the City Code of Ordinances

Chapter 5. Floodplain Management. 5.0 Introduction. 5.1 Douglas County Comprehensive Master Plan. 5.2 Floodplain Management and Regulation

DRIVEWAY REQUIREMENTS

PLANNING BOARD CITY OF CONCORD, NH MINOR SUBDIVISION CHECKLIST

New Electronic Planning Commission Submittal Process

610 LAND DIVISIONS AND PROPERTY LINE ADJUSTMENTS OUTSIDE A UGB

City of Duluth Development Regulations

BACKGROUND There are 23 flood control structures in the Upper Brushy Creek Water Control and Improvement District (District). See attached map.

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2003

PREPARED BY PLANNING DEPARTMENT ORANGE COUNTY NORTH CAROLINA

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT)

FINAL PLAT CHECKLIST

City Of Attleboro Conservation Commission

BUFFALO TOWNSHIP PLANNING COMMISSION REGULAR MONTHLY MEETING AUGUST 2, 2017

DETAILED GRADING PLAN CHECKLIST (TEARDOWN/REDEVELOPMENT) Updated: 12/12/2017

CONCEPT PLAN APPLICATION Meeting with Staff Commercial Projects

SPANISH FORT PLANNING COMMISSION PRELIMINARY SUBDIVISION PLAT APPLICATION. Number of Lots (Units) Address. Address.

FINAL SUBDIVISION AND LAND DEVELOPMENT PLAN CHECKLIST. Plan Name. Applicant's Name:

BRIDGETON SUBDIVISION APPLICATION CHECKLIST

City of Suwanee Development Regulations ARTICLE 10 PLAN AND PLAT SPECIFICATIONS

Contents ARTICLE 13. SUBDIVISION PLAT/SITE AND DEVELOPMENT PLAN REGULATIONS

WASTEWATER SERVICE CHARGES EFFECTIVE FOR ALL BILLS ISSUED ON AND AFTER AUGUST 1, 2005

SECTION 4: PRELIMINARY PLAT

City of Leavenworth DEPARTMENT OF DEVELOPMENT SERVICES MAJOR SUBDIVISION APPLICATION 1

Appendix A. Definitions

SUBDIVISION APPLICATION

SACRAMENTO COUNTY WATER AGENCY ORDINANCE NO. WA0-0089

Plan and Zoning Commission Review Process

ELK RAPIDS TOWNSHIP ANTRIM COUNTY, MICHIGAN ORDINANCE NO

ARTICLE 5 MINOR SUBDIVISION/LAND DEVELOPMENT

ARTICLE 4 MAJOR SUBDIVISION/LAND DEVELOPMENT PLAN REQUIREMENTS

City of Yelm. Community Development Department BOUNDARY LINE ADJUSTMENT OR LARGE LOT SUBDIVISION

STORMWATER MANAGEMENT ORDINANCE

Hiawatha Drain Informational Open House

ARTICLE 6 PRELIMINARY PLAT

STORMWATER MANAGEMENT SYSTEM AND FACILITIES

STORMWATER MANAGEMENT AGREEMENT AND DECLARATION OF EASEMENT

Standard Operating Procedure: Implementation of the Inspection and Maintenance Program Under the Long Creek Watershed Management Plan

CONSTRUCTION SITE EROSION CONTROL & STORMWATER MANAGEMENT JULY 3, 2014

Appendix A Orleans County Local Law Assessment

Change 6, September 1, TITLE 18 WATER AND SEWERS 1

CHARLES CITY COUNTY SITE PLAN ORDINANCE. This Ordinance shall be known as the Charles City County Site Plan Ordinance.

TOWN OF NEW HARTFORD SUBDIVISION REGULATIONS

ORDINANCE NO

DAUPHIN CREEK ESTATES SUBDIVISION

PLANNING BOARD APPLICATION FORM TOWNSHIP OF BETHLEHEM 405 MINE ROAD ASBURY, NEW JERSEY Date of Application: Township Application Number:

SCHEDULE OF RATES, RENTALS & CHARGES

YCCD EROSION & SEDIMENT POLLUTION CONTROL (E&SPC) PROGRAM SERVICES FEE SCHEDULE, RULES, & GUIDELINES

URBANDALE PLANNING AND ZONING COMMISSION MINUTES. November 26, 2018

ARTICLE 16. FLOODPLAIN MANAGEMENT, EROSION AND SEDIMENT CONTROL, AND STORMWATER MANAGEMENT

MAPLETON CITY CORPORATION. Step 7: Upon final approval and prior to plat recording the applicant shall provide the following:

ORDINANCE NO

Preliminary Subdivision Application (Major) (Four (4) lots or more)

CYPRESS FOREST Public Utility DistrictD

CITY OF TAMPA Stormwater Utility Funding Frequently Asked Questions 2017

PRELIMINARY SCHEDULE OF RATES, RENTALS & CHARGES

Emergency Watershed Program Sandy Recovery Activities and Flood Plain Easement Program

Community Development

ARTICLE 15. RULES, REGULATIONS AND DEFINITIONS

APPLICATION PROCEDURE

Towne Center Boulevard William Penn Highway. Lot 2. 1 Mile Population: 3,600 Median HH Income: $36,800

CHAPTER 18 PUBLIC WORKS

Open Space Model Ordinance

FINAL PLAT SUBMITTAL CHECKLIST

Use permitted by: Right Special Exemption

ARTICLE IV: DEVELOPMENT STANDARDS

COMMERCIAL SITE PLAN & CONDITIONAL USE PERMIT REVIEW PROCESS & CHECKLIST

Waseca County Planning and Zoning Office

ARTICLE FIVE FINAL DRAFT

Section 3.0: RESIDENTIAL AND NON-RESIDENTIAL SUBDIVISION APPLICATION AND APPROVAL PROCESS

Transcription:

FREQUENTLY ASKED QUESTIONS Draft DEFINITIONS OF TERMS Last Revised July 2, 2008

Introduction: The following questions have been organized in the categories below. We have attempted to group the questions from more general to more specific/technical in nature. Each group of questions is in a different file. You should go to the file that appears to relate best to your question. Frequently Asked Questions for: Drainage, Watershed and Water Quality Property Owners Near Creeks Developers and Engineers and s of Terms If you have questions that you cannot find in this document, please call the Flood Control District at (925) 313-2000 and ask for the Flood Control. Someone will do their best to address your question. Contra Costa County Flood Control and Water Conservation District 1 255 Glacier Drive Martinez, CA 94553 Phone: (925) 313-2000 FAX: (925) 313-2333 Maintenance Division: Phone: (925) 313-7000 FAX: (925) 313-7014 1 The Flood Control District is in the County Public Works Building July 2, 2008 Page 2 of 9

List of Terms Introduction:... 2 GENERAL TERMS... 4 BioEngineering... 4 Creek - Improved... 4 Creek - Natural... 4 Culvert... 4 Diversion... 4 Drainage Area - Formed... 4 Drainage Area - Unformed... 4 Drainage Facility or Drainage System... 4 Drainage Zone... 4 FEMA... 4 Flood Plain... 5 Fluvial Geomorphology... 5 Impervious surface... 5 Rainfall intensity... 5 Return Period... 6 Underground Facility... 6 Watershed... 6 LAND RIGHT TERMS... 7 Access Easement... 7 Dedicated Easement... 7 Drainage Easement or Storm Drain Easement (SDE)... 7 Floating Access Easement... 7 Flood Control Easement... 7 Flood Control Right-of-Way... 7 Flowage Easement... 7 Grant Deed of Development Rights... 8 Offer of Dedication... 8 Private Access Easement... 8 Private Drainage Easement or Private Storm Drain Easement (PSDE):... 8 Right-of-Way... 8 Separate Instrument... 9 Page 3 of 9 July 2, 2008

GENERAL TERMS Term BioEngineering Creek - Improved Creek - Natural Culvert Diversion Drainage Area - Formed Drainage Area - Unformed Drainage Facility or Drainage System Drainage Zone FEMA Using natural materials such as plants, plant cuttings, logs, and/or tree stumps to stabilize a creek bank or bed instead of using manmade materials such as concrete, steel or rocks. A circular or rectangle cross section conduit that is used to allow stormwater to flow under a road or other physical land feature. The taking or directing water from one a stream, drainage system to another. This can occur when a development site is graded so that the stormwater falling on part of the project site drains to a different stream or drainage system than it did before the project was built. County Ordinance generally do not allow diversions. A manmade feature intended to collect/direct/convey rain or stormwater. This includes swales, ditches, pipes, culverts, drainage inlets (catch basins), manholes, detention basins, reservoirs, and curb and gutter. Maurice Shiu Federal Emergency Management Agency The federal agency manages the flood insurance program and responds to various emergencies throughout the country. July 2, 2008 Page 4 of 9

Term Flood Plain Natural The flood plain is the area that naturally floods when big storms occur. The creeks average storm flows form defined beds and banks of a channel. When large events occur, and the creek cannot convey all of the flows, flows escape and flood overland. This flooded area is known as the flood plain. FEMA The flood plain in FEMA s languages is the area flooded during the base flood event. The base flood event is typically the 1 percent annual chance flood (100-year flood). The area that is flooded is determined from hydrology and hydraulic engineering studies and is plotted on a Flood Insurance Rate Map. FEMA provides and insurance program for structures in the floodplain. Fluvial Geomorphology Impervious surface Rainfall intensity County The floodplain from the County perspective is the same as the FEMA floodplain. The County has a Floodplain ordinance that defines what design features and criteria a structure in the floodplain must be designed with. This title comes from the words: water (fluvial), earth (geo) change (morphology) and is the area of science that studies how water changes the earth. In the context of drainage, fluvial geomorphology relates to the natural or man induced changes in a creek or stream over time relative to sediment size and quantity and the seasonal changes in the flow of water in the creek. This area of science is used to try to understand why a creek bank failed, or to predict what will happen to other parts of a creek if a certain part or reach of a stream is modified. It is also the basis for understanding the natural functioning of creeks, how they form their low-flow (bank full) channels as well as their floodplains. A manmade surface treatment that impedes rain water from infiltrating into the ground. Examples are: Asphalt pavement (also known as AC or asphalt concrete), concrete pavement (such as used for sidewalks and driveways, patios, sports courts), roof tops, compacted rock driveways. This is the measure of how hard it rained. Rainfall intensity is reported in inches of rain fall per hour, or inches/hour (in/hr). Page 5 of 9 July 2, 2008

Term Return Period This term is a reference to statistics that describe how rare or frequent a storms intensity is. Common terms such as 100- year storm are used to describe a return period. A term such as 100-year storm can be misleading. Some people take it to mean that the rainfall amount or creek flood level will only occur once every 100 years. However, the term really means that statistically, a certain storm event has a 1 in 100, or 1 percent (1%), probability of occurring EVERY year and that storm event could be experienced more than once in any given year. The most up-to-date way to refer to these storms it to use the phrase percent annual chance. An example would be the 1 percent annual chance storm for what used to be called the 100-year storm. Underground Facility Watershed Other return periods such as 5-year, 10-year, 25-year, and 50-year storms are also commonly used. These refer respectively to the 20%, 10%, 4%, and 2% annual chance storms. The percentages are probabilities of those levels of storms occurring EVERY year. The percent probability is calculated by dividing 1 by the return period. A pipe or culvert that conveys or store storm water under the ground. The land area that drains water to a particular stream, river, or lake. It is a land feature that can be identified by tracing a line along the highest elevations between two areas on a map, often a ridge. Large watersheds, like the Sacramento River basin contain thousands of smaller watersheds. July 2, 2008 Page 6 of 9

LAND RIGHT TERMS Term Access Easement Dedicated Easement Drainage Easement or Storm Drain Easement (SDE) Floating Access Easement Flood Control Easement Flood Control Right-of- Way Flowage Easement This is like a drainage easement (see below) but is only for access, not for construction of any improvements. An easement given to a public agency or other party by identifying it on the subdivision s final map or through a Offer of Dedication that is filed with the County Recorder. The dedication of an easement must be followed by an Acceptance before the easement transfer is complete. Years can pass between the time the easement is dedicated and the dedication is accepted. This is usually a strip of land set aside for use for public storm drainage purposes. The easement is created to protect the use of the property from encroachments such as a home addition, grading for a pool, planting of trees or other activities that would diminish the functionality of the drainage feature or ability to maintain it. Please check with the Permit Center [Bob Hendry at (925) 335-1375] before planning or doing any work in a drainage easement. This is like an Access Easement (see above) but is not for a specific strip of land over a property. Such an easement is appropriate if the access is over a parcel of land that is actively used for storage of materials where the materials are frequently moved around. This allows the owner of the property more freedom of use of the property while allowing the easement holder access through it. This is like a Drainage Easement or Access Easement (see above) but is for the Flood Control District access, not for construction of any improvements. This is an area of land that has been transferred to a public entity for a corridor used for roads, creeks, or utilities. In the case of the Flood Control District, these are lands acquired by or dedicated to the District for use in providing a facility that will convey drainage and flood flows or to provide access to those facilities for maintenance. This is like an access or drainage easement and is normally used to allow the Flood Control District to maintain a drainage facility to ensure floodwaters can flow through it. It does not obligate the District to maintain the earthen channel, drainage facility, bridge or other structure that may be in the Flowage Easement. Page 7 of 9 July 2, 2008

Term Grant Deed of Development Rights Offer of Dedication Private Access Easement Private Drainage Easement or Private Storm Drain Easement (PSDE): Right-of-Way A property owner can grant development rights over a piece of land to a second party. This is usually done so that the second party has the ability to keep the property owner from developing until a certain condition has been met. Sometimes a lot will be created by a subdivision but the developer will not want to develop a lot right away and so does not want to pay the development fee until later. The Flood Control District allows the granting development rights over such a commercial lot to allow the fees to be paid at a later date but also to ensure that there is a way to force the developer or subsequent property owner to pay the fees when development occurs. This is a legal document through which a property owner offers to transfer some land right to another entity. The other entity must officially accept the Offer of Dedication to enjoy the use of the land covered by the offer. The offer is normally irrevocable, in that the offerer cannot take back what was offered. The receiver of the offer can rescind the offer and if they do, the land right goes back to the property from which it was offered. This is like an Access Easement but is between private property owners. This is like a Drainage easement but is between property owners. Facilities in a private storm drain easement will not be maintained but a public entity. However, in Contra Costa County, a Drainage Permit is still required to modify the drainage facilities in a Private Drainage Easement. Typically, this refers specifically to a strip of land over which facilities such as roads, highways, railroads, drainage systems, power lines and other utilities are built. In this typical sense, the right-of-way is like a piece of property owned by the agency or utility. It is also used to describe the legal right to pass over property owned by another a property by right such as an easement and sometimes an agreement party. July 2, 2008 Page 8 of 9

Term Separate Instrument In real estate language, an instrument is a land transfer document. A Grant Deed, a Final Map, and a Parcel Map are all instruments. The term separate instrument is used when a land right is to be given to an entity besides the County or City and is shown on a Final Map or Parcel Map. Because the maps can only transfer land rights (rights-of-way, easements, offers of dedication, etc.) to the County or City they are signed by, land rights to others must be processed separately in a Grant Deed or Offer of Dedication. Land rights cannot be transferred to the Flood Control District via a Final Map or Parcel Map because the District does not approve or sign the maps. Because of this, a separate instrument is required to transfer land rights to the Flood Control District. MB:mb,gc,pd,hw,bb,mh,wb Z:\GrpData\FldCtl\Administration\Business Plan\Frequently Asked Questions\Final 10-16-07\s of Terms for FAQs 3.doc Page 9 of 9 July 2, 2008