Bylaw No Page 1. The Council ofthe City of Bumaby ENACTS as follows: A BYLAW to impose fees in respect ofplanning and Building matters

Similar documents
Delta Bylaw No. 7273, 2013 Page 5. Amend BL 7743, 2018 Schedule A Building and Plumbing Regulation

CHAPTER 1321 Permit and Inspection Fees

City of Oregon City. Community Development Building Division Fee Schedule Effective April 1, 2016 BUILDING DIVISION

SCHEDULE OF PERMIT FEES. (Effective November 3, 2015)

APPENDIX A BUILDING PERMIT AND RELATED FEES

COUNTY OF FREDERICK INSPECTIONS DEPARTMENT FEE SCHEDULE Approved July 14, COMMERCIAL FEES Minimum Fee $ unless stated otherwise

TOWN OF HERNDON, VIRGINIA ORDINANCE MAY 26, 2015

DEPARTMENT OF BUILDING AND SAFETY

Fee Type How Determined Rate Permit Processing Charge Flat Permit or Plan Review Submittal $32.00

CITY OF BURNABY BYLAW NO

ORDINANCE NO ORDINANCE TO AMEND AN ORDINANCE CODIFIED IN THE CODE OF THE TOWNSHIP OF NUTLEY, CHAPTER 272, ENTITLED CONSTRUCTION CODES, UNIFORM

FY 2018 FEE SCHEDULE (Effective )

CONSTRUCTION PERMIT FEE SUMMARY

Fee Resolution

City of Wausau Building, Housing and Zoning Fee Schedule 2019

Acting General Manager of Planning and Development Services

RESOLUTION NO

The City of Daytona Beach Fee Schedule

VILLAGE OF BELCARRA Fees and Charges Bylaw No. 517, 2018

This fee structure applies to applications submitted on or after January 1, 2018.

CITY OF CORTEZ COUNCIL RESOLUTION NO. 45, SERIES 2016

THE CITY OF SPRUCE GROVE BYLAW C DEVELOPMENT FEES AND FINES BYLAW

LIMERICK TOWNSHIP 646 WEST RIDGE PIKE LIMERICK, PENNSYLVANIA 19468

Fees for construction of all buildings except single family dwellings, shall be calculated using Table 2.

Planning&Development Fee Standards

County of Fresno / Public Works and Planning Master Schedule of Fees for Development Services, Effective January 3, 2008

ORDINANCE NO (revised by Ordinance )

Planning, Development, and Building Fees and Charges 2018

BUILDING & ZONING SCHEDULE OF FEES Effective March 15, 2015

SECTION 1. That Section 20-3 of Chapter 20 entitled Fees be and is hereby amended to read as follows: *Plan review fees are not refundable*

MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION DEVELOPMENT SERVICES

BYLAW NO A BYLAW TO REGULATE AND MANAGE THE LOON LAKE COMMUNITY WATER SYSTEM

BUILDING PERMIT FEE ESTIMATE

THE CITY OF WINNIPEG BY-LAW NO. 66/2016. A By-law of THE CITY OF WINNIPEG to impose planning, development and building fees.

List of Principal Officials

CORPORATION OF THE CITY OF NEW WESTMINSTER DEVELOPMENT SERVICES FEES AND RATES BYLAW NO. 7683, EFFECTIVE DATE: November 3, 2014

BUI L DIN G A ND E L E V A T O R F E ES

City of Ridgefield, WA Master Fee Schedule Effective Date: February 24, 2017

CITY OF SEA ISLE CITY NEW JERSEY ORDINANCE NO (2016)

Chapter 101, CONSTRUCTION CODES, UNIFORM [HISTORY: Adopted by the Mayor and Council of the Borough of Laurel Springs as indicated in article

VILLAGE OF NAKUSP. The Council of the Village of Nakusp, in open meeting assembled, enacts as follows:

KODIAK ISLAND BOROUGH, ALASKA FEE SCHEDULE Effective: August 3, 2017

City of High Point Development Fee Schedule

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT

THE CORPORATION OF THE CITY OF ROSSLAND BYLAW #2503

MIDDLESEX TOWNSHIP SCHEDULE OF FEES

Amendment to the City s Master Schedule of Fees, Charges & Application Fees

Appendix G Fee Schedule

APPLICATION. Airport Hazard In ETJ - one- and two family dwelling $100 Airport Hazard in ETJ anything other than one- and twofamily

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 29-11

CITY OF JOHNSTOWN SCHEDULE OF PERMIT FEES

Permit Fees for The City of Monroe **Effective July 2, 2018** Table of Contents

2017 TOWN OF RISING SUN FEE SCHEDULE ADOPTED

THE CORPORATION OF THE CITY OF MISSISSAUGA BUILDING BY-LAW 60-12

AN ORDINANCE FOR ADOPTION OF FEES IN CONJUNCTION WITH THE FAMILY OF INTERNATIONAL BUILDING CODES FOR PEARL RIVER COUNTY

Class of Permits and Fees Schedule A

MASTER FEE SCHEDULE Amended June 12, 2018

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

TOWN OF HIGHLAND PARK, TX MASTER FEE SCHEDULE

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised April 9, 2019)

NEW BRITAIN BOROUGH SCHEDULE OF FEES (Revised December 15, 2017)

Fee Schedule Last Updated: November 21, 2017

Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Village of Glen Ellyn Fee & Deposit Schedule Per Village Code 4-1-4

Record of Amendments to Water Regulation and Fee Bylaw No. 967 Amending Bylaw No. 984 Section 12, Schedule A September 19, Section 4.

Village of Baxter Estates Fee Schedule

Consolidated as of May 14, 2012

CONSOLIDATED PLANNING AND DEVELOPMENT APPLICATION FEES REGULATION

FEE SCHEDULE Construction Services and Permitting

LANE COUNTY BUILDING & ELECTRICAL PROGRAMS PERMIT FEE GUIDE

Item No Harbour East - Marine Drive Community Council May 4, 2017

TOWN OF SIDNEY BYLAW NO A BYLAW OF THE MUNICIPALITY TO IMPOSE DEVELOPMENT COST CHARGES.

DENMARK TOWNSHIP FEE SCHEDULE Adopted by Ordinance No on April 2, 2018

C. For all areas of unincorporated Multnomah County:

Van Buren Township Water & Sewer Department Schedule of Rates - Effective January 1, 2019 Resolution

City of Wooster Schedule of Fees and Charges Effective March 1, 2018

Chapter 3.08 FEE SCHEDULE OF VILLAGE PERMITS AND SERVICES*

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

PERMIT FEES CITY OF BATAVIA DEPARTMENT OF PUBLIC WORKS ONE BATAVIA CITY CENTRE BATAVIA, NEW YORK Revised: July 21, 2008

CITY OF TARPON SPRINGS, FLORIDA

BUILDING DIVISION SIMPLIFIED BUILDING PERMIT FEE SCHEDULE January 01st, 2019 to December 31st, 2019

Town Code Section Department Fee Type Parking Permits (pro-rated fees)

TENANT IMPROVEMENT APPLICATION Page 1 of 4

WEST NOTTINGHAM TOWNSHIP FEE SCHEDULE

FEE SCHEDULE SAFETY CODE PERMIT FEES EFFECTIVE JANUARY 1, 2018 PART 1 - DEFINITIONS

TOWN OF BROOKFIELD CHAPTER 15 PLUMBING CODE

CITY OF WEST KELOWNA BYLAW NO. 0236, 2017 A Bylaw to Regulate, Prohibit and Impose Requirements Respecting Health and Safety on Property

RESOLUTION NO

SCHEDULE A. Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule:

Violet Township requires Zoning and Plans Examination and Building Permits for all new construction.

CITY OF SURREY. Surrey Waterworks Cross Connection Control By-law, 2007, No

EXHIBIT A PERMIT & GENERAL BUILDING FEES SCHEDULE

CITY OF BRANDON BY-LAW NO ANNUAL SCHEDULE OF FEES SCHEDULE "A"

Resolution No Miscellaneous Fees - Engineering Effective

Building Safety Department 6401 E Lincoln Dr Paradise Valley, AZ PARADISE VALLEY (480) Application / Permit #: Job Site Information

RESIDENTIAL BUILDING/GENERAL PERMIT FEE SCHEDULE

RESOLUTION # WHEREAS, The Board of Supervisors of Upper Southampton Township has established a fee schedule, and

SCHEDULE K PLANNING & BUILDING SERVICES

By-Law of The Corporation of the City of Oshawa

Subdivision Application Form

Transcription:

REZONING PRELIMINARY SUBDIVISION LIQUOR BUILDING ELECTRICAL GAS PLUMBING TREE FILE Bylaw No. 13790 Page 1 CITY OF BURNABY BYLAW NO. 13790 A BYLAW to impose fees in respect ofplanning and Building matters The Council ofthe City of Bumaby ENACTS as follows: 1. This Bylaw may be cited as BURNABY PLANNING AND BUILDING FEES BYLAW 2017. 2. The City of Bumaby imposes fees for Planning and Building applications, permits, inspections and related matters in accordance with the following schedules attached to and forming part ofthis bylaw: SCHEDULE A APPLICATION SCHEDULE B - PLAN APPROVAL APPLICATION SCHEDULE C - APPLICATION SCHEDULE D - LICENCE APPLICATION SCHEDULE E - PERMIT AND INSPECTION SCHEDULE F - PERMIT AND INSPECTION SCHEDULE G - PERMIT AND INSPECTION SCHEDULE H - PERMIT AND INSPECTION SCHEDULE I - PERMIT SCHEDULE J - RESEARCH, ARCHIVES AND RECORDS FEES

Page 2 3. Where applicable, Goods and Services Tax (GST) and/or Provincial SalesTax (PST)will be added to the fees specified in the schedules attached to and forming part ofthis bylaw. 4. This bylaw shall come into force and effect on January 1, 2018. Read a first time this 28"^ day ofaugust 2017 Read a second time this 2"*' day of October 2017 Read a third time this 2"^ day ofoctober 2017 Reconsidered and adopted this 16^'' day ofoctober 2017 9-. CLERK

Page 3 SCHEDULE A - REZONING APPLICATION Rezoning Application Fees Burnaby Zoning Bylaw 1965 7.9 [SCHEDULE OF REZONING APPLICATION FEES Rezoning Applications: (a) CD Rezonings with FAR less than 3.6, and Standard Rezonings First 1,700 (18,299 sq.ft.) ofsite area or part thereof $2,371.00 plus Public Hearing Fee Each additional 100 (1,076 sq.ft.) ofsite area or part thereof $63.00 (b) Master Plan Rezonings First 40,000 (430,556 sq.ft.) ofsite area or part thereof $210,021.00 plus Public Hearing Fee Each additional 100 (1,076 sq.ft.) of site area or part thereof $393.00 (c) CD Rezonings with FAR greater or equal to 3.6, and Master Plan Amendments (FAR means "floor area ratio" as defined in Burnaby Zoning Bylaw, 1965) First 8,000 (86,111 sq.ft.) ofsite area and 3.6 FAR or part thereof $29,403.00 plus Public Hearing Fee Each additional 100 (1,076 sq.ft.) ofsite area or part thereof $378.00 Each additional 0.1 FAR or part thereof $378.00 Administration of Servicing File: For a rezoning or Preliminary Plan Approval application that does not include a subdivision $1,136.00 Where there is only one servicing requirement $551.00 Public Hearing: (a) First Public Hearing $1,000.00

Page 4 SCHEDULE OF REZONING APPLICATION FEES (b) Additional Public Hearing Area Plan Notification Sign $1,000.00 $250.00

Page 5 SCHEDULE B - PRELIMINARY PLAN APPROVAL APPLICATION Preliminary Plan Approval and Development Permit Application Fees Burnaby Zoning Bylaw 1965 7.3(2)(b.l) SCHEDULE OF PPA APPLICATION FEES Preliminary Plan Approval (PPA) Applications: (a) For signs (per sign application) (b) For Comprehensive Sign Plans (c) For Integrated Comprehensive Sign Plans for Comprehensive Development rezoning or Master Plan rezoning $137.00 $525.00 $2,626.00 d) For all other development: On estimated construction value (per $1,000) Mmimum Fee $266.00 (e) For each extension $160.00

Page 6 SCHEDULE C - SUBDIVISION APPLICATION Subdivision Application Fees Burnaby Subdivision Control Bylaw 1971 8 1SCHEDULE OF SUBDIVISION APPLICATION FEES Airspace Parcel Subdivision Application: (FAR means "floor area ratio" as defined in Burnaby Zoning Bylaw, 1965) (a) FAR of less than 2.0 $11,638.00 (b) FAR of2.0 or greater $17,455.00 " Strata Title Subdivision Application: (a) two-family and industrial/commercial conversions $701.00 (b) each additional industrial/commercial unit $40.00 (c) phased strata plan: First phase $1,220.00 Subsequent phases $159.00 Last phase $483.00 Amendment to Form P $88.00 Subdivision Application other than Airspace Parcel and Strata Title Subdivision Applications: (a) Residential District subdivisions $5,110.00 (b) Muhiple Family "s" District subdivisions i $15,330.00 (c) All subdivisions other than Residential District and Multiple Family, "s" District subdivisions ' $10,220.00 Road Closure/Highway Exchange $2,388.00 Tentative Approval Extension: (a) Single family subdivision $270.00

Page 7 SCHEDULE OF SUBDIVISION APPLICATION FEES (b) Other subdivisions and servicing for rezoning and PPAs $604.00 Personal Preference Address Change (No charge when included in application for subdivision) $792.00 Fees subject to all applicable taxes Processing Fee for Development Cost Charges Installments: (a) For first installment $750.00 (b) For each subsequent installment $750.00 Administration Fees: Fees subject to all applicable taxes For processing and reviewing compliance bonds for required works (e.g. public walkways and improvements, private roads, tree replacement, landscaping, fencing, public art installations, etc.) 1% ofestimated Compliance Bonding

Page 8 SCHEDULE D - LIQUOR LICENCE APPLICATION Liquor Licence Application Fees Burnaby Liquor Licence Application Fee Bylaw 2001 2 SCHEDULE OF LIQUOR LICENCE APPLICATION FEES $868.00 Amendments to existmg liquor licences $442.00

Page 9 SCHEDULE E - BUILDING PERMIT AND INSPECTION Building Permit and Inspection Fees Burnaby Building Bylaw 2016 SCHEDULE OF BUILDING PERMIT AND INSPECTION FEES Application for a Building Permit: m&m For all building permit applications 20% ofestimated Building Permit Fee, subject to a minimum of$62.10 and a maximum of $6,884.15 " Building Permit: Value ofconstruction: $0 to $1,000 $1,001 to $20,000 $20,001 to $200,000 $200,001 and over $62.10 $62.10 plus $18.35/$1,000 or part thereof over $1,000 $410.75 plus $12.65/$1,000 or part thereof over $20,000 $2,687.75 plus $10.90/$1,000 or part thereof over $200,000 Building Permit for a Demolition: (a) Accessory building (when demolished separately from single- and two-family homes, or when the accessory building is associated with other building types) $72.05

Page 10 (b) (c) Single-family or two-family home (fee includes accessory buildings, ifthe accessory buildings are being demolished at the same time) Principal buildings and structures other than single- and two-family homes $305.75! $764.20 14(1) Building Permit for Temporary Building or Structure: Per year from date ofissue $537.60 i 14(1) i 10(1) i i 1 Application for Forced Air Heating System: Fees based on maximum BTU input ofthe appliance with a minimum fee based on 50,000 BTU's Application for Alternative Solutions under the British Columbia Building Code Fees subject to all applicable taxes $3.10 per 1,000 BTU's heating appliance input $550.65 for each alternative solution on a development and $168.60 for each revision 11(4) Certificate by Registered Professionals: When a Building Permit is issued reliant upon the certification ofa registered professional engineer or architect, the permit fee will be reduced by 2.5% ofthe fees payable, up to a maximum reduction amount. 2.5% offees payable ($500.00 max.) 14(7) Review ofpreliminary or Modified Drawings and Specifications Review Fees subject to all applicable taxes $74.45/hour (minimum 0.5 ofan hour) 4(6) Permit Transfer or Assignment Fee: For the transfer or assignment ofa building permit or to record a change ofcontractor for a project $116.40 i 19(4) " Permit Extension:

LE or BUILDING PERMIT AND INSPECTION FEES. 1St extension $200.00 Bylaw No. 13790 Page 11 2nd extension $300.00 3rd extension $400.00 Each additional extension $500.00 Reinspection Fee: Where it has been detennined by the Building Inspector that due to non-compliance with the provisions ofthis Bylaw or incomplete work, reinspection is necessary. Reinspection Fees subject to all applicable taxes. 1St reinspection $58.00 2nd reinspection $251.00 3rd reinspection $495.00 4th reinspection $989.00 5th reinspection and thereafter $1,239.00 Special Inspections: 14(9)(b) Special Inspection Fees subject to all applicable taxes and must be approved by the ChiefBuilding Inspector. (a) For an inspection outside the hours during which the offices ofthe City Hall are normally open (b) For a voluntary inspection (including Provisional Occupancy) requested by the owner, occupant, or contractor during City normal business hours to establish the condition ofa building or structure $537.25 plus $137.30/hour or part thereofafter the first four hrs. Travel time incl. $250.00 for the first hour or part thereof and $95.50 for each additional hour or part thereof ($250.00 minimum) i

Page 12 SCHEDULE OF BUILDING PERMIT AND INSPECTION FEES (c) For an inspection that requires special arrangements because of length of time, frequency of inspection visits, location outside the City limits, construction techniques or otherwise $95.50/hour or part thereof ($95.50 minimum) 14(9)(d) (d) Strata title subdivision application inspections $212.00 (e) For a special safety inspection following an electrical or gas disconnection $578.30 14(10) Occupant Load: Fee subject to all applicable taxes For confirming occupant load for liquor licence related purposes $204.40

Page 13 Refund of Building Permit and Inspection Fees Burnaby Building Bylaw 2016 14(5) & (6) " >... Building Permit Application Fee Refund where plan checking has not commenced: There will be no refund ofany portion ofthe applicationfee once the plan checking has been started (a) For single- or two-family dwellings, including renovations, additions and accessory buildings 70% ofapplication Fee subject to a minimum nonrefundable amount of $157.00 (b) For all other applications 70% ofapplication Fee subject to a minimum nonrefundable amount of$157.00 Building Permit Fee Refund where construction has not commenced, no inspection has been made and a permit has not been extended or expired Refund equals 90% ofthe difference between the Building Permit Fee and the Building Peiiiiit Application Fee subject to a minimum nonrefundable amount of$315.00 14(6) For any permit or special inspection where no Application Fee is charged. Refund will be made only where work has not commenced, no inspection has been made and a permit has not been extended 70% ofthe Permit Fee subject to a minimum nonrefundable amount of$315.00

Page 14 Damage Deposits and Inspection Fees Burnaby Building Bylaw 2016 SCHEDULE OF DAMAGE DEPOSITS AND INSPECTION FEES Damage Deposit: No interest is payable on damage deposits paidto or held by the City (a) Single- or Two-Family Dwelling Construction $4,000.00 (b) Single- or Two-Family Dwelling Addition or Demolition $3,000.00 (c) Construction other than Single- or Two-Family Dwelling $10,000.00 for 15 m frontage and $60.00/m of frontage thereafter (d) Demolition other than Single- or Two-Family Dwelling 1 $10,000.00 for 15 m frontage and $60.00/m of frontage thereafter (e) Swimming Pool Installation $3,000.00 (f) Construction of Carport or Garage $2,000.00 Inspection Fee: (a) Single- or Two-Family Dwelling Construction $93.00 (b) Single- or Two-Family Dwelling Addition or Demolition $93.00 (c) Construction other than Single- or Two-Family Dwelling $187.00 (d) Demolition other than Single- or Two-Family Dwelling $123.00 (e) Swimming Pool Installation $93.00 (f) Construction of Carport or Garage $93.00

Page 15 SCHEDULE OF DAMAGE DEPOSITS AND INSPECTION FEES Reinspection Fee (for 3rd and each subsequent reinspection): Where it has been determined by the assigned Engineering Inspector that due to non-compliance with the provisions of this Bylaw or incomplete work reinspection is required Reinspection Fees subject to all applicable taxes (a) Single- or Two-Family Dwelling Construction $93.00 (b) Single- or Two-Family Dwelling Addition or Demolition $93.00 (c) Construction other than Single- or Two-Family Dwelling $187.00 (d) Demolition other than Single- or Two-Family Dwelling $123.00 (e) Swimming Pool Installation $93.00 (f) Construction ofcarport or Garage

Page 16 SCHEDULE F - ELECTRICAL PERMIT AND INSPECTION Electrical Permit and Inspection Fees Burnaby Electrical Bylaw 1974 SCHEDULE OF ELECTRICAL PERMIT AND INSPECTION FEES Electrical Installations for New One- and Two- Family Detached Dwellings: (a) Electrical system for a dwelling including service connection and Temporary Current Permit (b) Security system, data, cable, TV, vacuum, intercom, sound system and telephone 18% ofbuilding Permit Fee Fees shall be charged under Electrical Installations Other Than New Oneand Two-Family Detached Dwellings. (Minimum $250.00 job value) 22(l)(a) Electrical Installations Other Than New One- and Two-Family Detached Dwellings: Fee based on value ofelectrical installation including materials and labour Plus Temporary Current Permit where applicable Value ofelectrical Installation (as approved by Electrical Inspector): $100 or less $46.00 $100.01 -$250 $61.30 $250.01 -$350 $76.40 $350.01 -$500 $91.80 $500.01 -$700 $114.50 $700.01 -$1,000 $138.05

Page 17 $1,000.01 -$10,000 $138.05 plus $56.70/$l,000 or part thereof over $1,000 $10,000.01 -$50,000 $648.35 plus $30.75/$1,000 or part thereof over $10,000 $50,000.01 -$100,000 $1,878.35 plus $18.25/$1,000 or part thereof over $50,000 1 $100,000.01 -$500,000 $2,790.85 plus $12.20/$1,000 or part thereof over $100,000 $500,000.01 -$1,500,000 $7,670.85 plus $10.35/$1,000 or part thereof over $500,000 $1,500,000.01 and over $18,020.85 plus $3.25/$1,000 or part thereof over $1,500,000 22(l)(a) Temporary Saw Service Fees shall be charged under Electrical Installations Other Than New Oneand Two-Family Detached Dwellings. (Minimum $91.80)

Page 18 SCHEDULE OF ELECTRICAL PERMIT AND INSPECTION FEES 22(l)(a) Permit Fee to Record Work Done Without Permit and Inspection Minimum $138.05 Where electrical work has been carried out without a permit and a permit is accepted to approve and inspect the work after the fact, the fee shall be calculated under Electrical Installations based on the value ofthe electrical installation as estimated by the Chief Building Inspector at the time ofapplication for the electrical permit 22(l)(a) Temporary Current Permit (not required for one- or two-family dwelling) $182.75 Operating Permit for One Commercial or Industrial Plant or Establishment: (a) Annual fee based on service capacity $0.36 per kva Minimum 600 kva ($216.00) Maximum 8700 kva ($3,132.00) (b) For each additional permit $216.00 Operating Permit for Special Event or Film Project: (a) One location, one project (includes filming in studio): 0 to 30 days $149.20 0 to 60 days $263.35 0 to 90 days $305.75 0 to 180 days $410.35 0 to 360 days $746.45 (b) Multi locations, one project Permit valid for maximum 365 days: 0 to 30 days $115.00 per location (maximum $460.00)

Page 19 SCHEDULE OF ELECTRICAL PERMIT AND INSPECTION FEES 0 to 60 days $152.80 per location (maximum $611.20) 0 to 90 days $194.45 per location (maximum $777.80) 0 to 180 days $219.45 per location (maximum $877.80) 0 to 360 days (annual permit) $1,905.75, any number oflocations (c) Annual permit fee for film studio for repair and maintenance only $0.47 per kva Minimum 640 kva ($300.80) Maximum 6700 kva ($3,149.00) 22(l)(a) Signs: (a) Neon: For first transformer $101.85 Each for the next two transformers $67.45 Each for the next two transformers $47.70 For each remaining transformer $34.40 (b) Fluorescent or light - emitting diode (LED): For first 15 AMP branch circuit or equivalent $101.85 Each for the next two 15 AMP branch circuit or equivalent $67.45 Each for the next two 15 AMP branch circuit or equivalent $47.70

Page 20 SCHEDULE OF ELECTRICAL PERMIT AND INSPECTION FEES For each remaining 15 AMP branch circuit or equivalent (c) Other signs requiring electrical installation $34.40 Fees shall be charged under Electrical Installations Other Than New Oneand Two-Family Detached Dwellings. (Minimum $114.50) 22(3)(a) Review of Preliminary or Modified Drawings and Specifications Review Fees subject to all applicable taxes Permit Transfer or Assignment Fee For the transfer or assignment ofan electrical permit and to record a change ofcontractor for a project $74.45/hour (minimum 0.5 ofan hour) $116.40 Permit Extension $116.40 22(3)(d) Reinspection Fee; Where it has been determined by the Electrical Inspector that due to non-compliance with the provisions ofthis Bylaw or incomplete work reinspection is required Reinspection Fees subject to all applicable taxes 1st reinspection $58.00 2nd reinspection $251.00 3rd reinspection $495.00 4th reinspection $989.00

Page 21 5th reinspection and thereafter $1,239.00 Special Inspections: Special Inspection Fees subject to all applicable taxes and must be approved by the ChiefBuildingInspector. (a) For an inspection outside the hours during which the offices ofthe City Hall are normally open (b) For a voluntary inspection (including Provisional Occupancy) requested by the owner, occupant, or contractor during City normal business hours to establish the condition ofa building or structure (c) For an inspection that requires special arrangements because oflength oftime, frequency ofinspection visits, location outside the City limits, construction techniques or otherwise $537.25 plus $137.30/hour or part thereof after the first four hrs. Travel time incl. $95.50/hour or part thereof ($95.50 minimum) $95.50/hour or part thereof($95.50 minimum) (d) Strata title subdivision application inspections $212.00 Permit Fee Refund 90% ofthe fee paid subject to a minimum nonreftmdable amount of$157.00.

Page 22 SCHEDULE G - GAS PERMIT AND INSPECTION Gas Permit and Inspection Fees Burnaby Gas Bylaw 1978 SCHEDULE OF GAS PERMIT AND INSPECTION FEES Gas Installations in Single- and Two-Family Dwellings: a) For each appliance: For first appliance $56.20 For each additional appliance $30.65 (b) For each vent installation: For first vent $56.20 For each additional vent $30.65 (c) House Piping only - no appliance installed: For the first 30 m ofpiping or portion thereof $52.95 For each additional 30 m ofpiping or portion thereof $30.45 " Gas Installations in Commercial, Industrial, Institutional or Multi-family: (a) For each appliance with input of: (i) 30 kw (102,000 BTU/Hr) or less For first appliance $55.05 For each additional appliance $45.35 (ii) 31 to 120 kw (103,000 to 409,000 BTU/Hr) $92.85 First 30 m or less $54.10 Each additional 30 m or part thereof $38.45 (c) For each vent installation (no appliance) $54.10 (d) Laboratory equipment: For each 200,000 BTU's or part thereof in a room $77.10

Page 23 SCHEDULE OF GAS PERMIT AND INSPECTION FEES 10(3)(a) Review of Preliminary or Modified Drawings and Specifications Review Fees subject to all applicable taxes PermitTransfer or Assignment Fee $74.45/hour (minimum 0.5 ofan hour) $116.40 For the transfer or assignment ofa gas permit and to record a change ofcontractor for a project Permit Extension $116.40 Reinspection Fee: Where it has been determined by the Electrical Inspector that due to non-compliance with the provisions ofthis Bylaw or incomplete work reinspection is required Reinspection Fees subject to all applicable taxes 1St reinspection $58.00 2nd reinspection $251.00 3rd reinspection $495.00 4th reinspection $989.00 5th reinspection and thereafter $1,239.00 Special Inspections: 10(3)(e)(i) Special Inspection Fees subject to all applicable taxes and must be approved by the ChiefBuilding Inspector. (a) For an inspection outside the hours during which the offices ofthe City Hall are noriually open $537.25 plus $137.30/hour or part thereof after the first four hrs. Travel time incl.

Page 24 SCHEDULE OF GAS PERMIT AND INSPECTION FEES 10(3)(e)(ii) (b) For a voluntary inspection (including Provisional Occupancy) requested by the owner, occupant, or contractor during City normal business hours to establish the condition ofa building or structure $95.50/hour or part thereof ($95.50 minimum) 10(3)(e)(iii) (c) For an inspection that requires special arrangements because of length oftime, frequency ofinspection visits, location outside the City limits, construction techniques or otherwise $95.50/hour or part thereof($95.50 minimum) 10(3)(e)(iv) (d) Strata title subdivision application inspections $212.00 10(4) Permit Fee Refund 90% ofthe fee paid subject to a minimum nonrefundable amount of$157.00.

Page 25 SCHEDULE H - PLUMBING PERMIT AND INSPECTION Plumbing Permit and Inspection Fees Burnaby Plumbing Bylaw 2000 SCHEDULE OF PLUMBING PERMIT AND INSPECTION FEES Plumbing Fixtures: 8(3) For the rough-in and completion ofeach plumbing fixture (Fixtures shall include but not be limited to the following: roof drain, floor drain, dishwasher, clothes washer, water heater, water meter or backflow protection device tinder 4 inches in size with test ports. Each fixture $56.20 for the first fixture and $30.65 for each additional fixture For each backflow protection device 4 inches or greater in size $152.85 For the removal ofeach fixture and the capping offof piping $56.20 for the first fixture removed and $14.00 for each additional fixture removed 8(3) Replacement of Building Water Pipe: For the removal and replacement ofexisting pipe (a) in multi-family residential buildings, hotels and motels (each unit) $27.20 (b) in all other buildings: For the first 30 m ofpiping or portion thereof $91.85 For each additional 30 m ofpiping or portion thereof $53.50 8(3) Interceptors For the installation ofa catch basin, sump, oil interceptor, manhole or trench drain $38.45 per unit

Page 26 SCHEDULE OF PLUMBING PERMIT AND INSPECTION FEES 8(3) Other Piping: For the installation or alteration ofsite piping (storm, sani, domestic water), rainwater leader, domestic water piping or any other plumbing pipe or where no fixtures are involved For the first 30 m of piping or portion thereof For each additional 30 m ofpiping or portion thereof $52.90 $30.45 Application for Hydronic Heating Permits Fees based on maximum BTU input ofthe appliance with a minimum fee of50,000 BTU's $3.10 per 1,000 BTU's heating appliance input Building Fire Protection: For the installation or relocation ofthe following: First sprinkler head Each additional sprinkler head Each fire pump test header First siamese connection, hose cabinet, hose outlet, wet/dry outlet or standpipe Each additional siamese connection, hose cabinet, hose outlet, wet/dry outlet or standpipe $79.45 $2.70 $38.45 $38.45 $25.60 (Note: the second andsubsequentfixtures do not have to be the same as thefirstfixture to qualifyfor the discount) For the installation or alteration ofany above ground fire suppression piping where no fixtures are involved: Each 30 m or portion thereof $38.45 8(3) Site Fire Protection: For the installation ofunderground fireline or hydrants

Page 27 Each 30 m or portion thereof $38.45 Each fire hydrant $30.60 Review of Preliminary or Modified Drawings and Specifications Review Fees subject to all applicable taxes PermitTransfer or Assignment Fee $74.45/hour (minimum 0.5 ofan hour) $116.40 For the transfer or assignment ofa plumbing permit and to record a change ofcontractor for a project Permit Extension $116.40 Reinspection Fee: Where it has been determined by the Electrical Inspector that due to non-compliance with the provisions ofthis Bylaw or incomplete work reinspection is required Reinspection Fees subject to all applicable taxes 1St reinspection $58.00 2nd reinspection $251.00 3rd reinspection $495.00 4th reinspection $989.00 5th reinspection and thereafter $1,239.00 Special Inspections: Special Inspection Fees subject to all applicable taxes and must be approved by the ChiefBuilding Inspector.

Page 28 SCHEDULE OF PLUMBING PERMIT AND INSPECTION FEES 8(22)(c)(i) (a) For an inspection outside the hours during which the offices ofthe City Hall are normally open $537.25 plus $137.30/hour or part thereof after the first four hrs. Travel time incl. 8(22)(c)(ii) (b) For a voluntary inspection (including Provisional $95.50/hour or part Occupancy) requested by the owner, occupant, or thereof($95.50 contractor during City normal business hours to ; minimum) establish the condition ofa building or structure 8(22)(c)(iii) (c) For an inspection that requires special arrangements because oflength oftime, frequency ofinspection visits, location outside the City limits, construction techniques or otherwise $95.50/hour or part thereof ($95.50 minimum) 8(22)(c)(iv) (d) Strata title subdivision application inspections $212.00 Permit Fee Refund 90% ofthe fee paid subject to a minimum nonrefundable amount of$157.00.

Page 29 SCHEDULE I - TREE PERMIT Tree Permit Fees Burnaby Tree Bylaw 1996 5(l)(a) SCHEDULE OF TREE PERMIT FEES Tree Permit Fees: Tree Cuttmg Fee (based on protected trees removed Maximum Fee A. No Development Application: (i) residential lot $78.00 per tree ' $551.00 (ii) site other than residential lot $78.00 per tree $551.00 B. Development Application Pending: (i) residential lot $166.00 per tree $1,103.00 (ii) site other than residential lot: (a) site area up to 1,000 m^ (10,764 sq.ft.) $661.00 base fee plus $166.00 per tree $1,103.00 (b) (c) site area greater than 1,000 m^ (10,764 sq.ft.) or equal to 5,000 m^ (53,820 sq.ft.) site area greater than 5,000 m^ (53,820 sq.ft.) or equal to 10,000 m^ (107,640 sq.ft.) (d) site area greater than 10,000 m^ (107,640 sq.ft.) or equal to 20,000 m^ (215,280 sq.ft.) (e) sitearea greater than 20,000 m^ (215,280 sq.ft.) Minimum Security for Tree 7(a)(i) Replacement $1,323.00 base fee plus $166.00 per tree $1,984.00 base fee plus $166.00 per tree $2,645.00 base fee plus $166.00 per tree $3,307.00 base fee plus $166.00 per tree $882.00 $5,511.00 $5,511.00 $11,022.00 $11,022.00

Page 30 SCHEDULE OF TREE PERMIT FEES Payment to Civic Tree Reserve Fund Tree Cutting Maximum Fee Fee (based on protected trees 1 removed) ^ $551.00 per tree

Page 31 Land Title Search Fees: (a) Land Title search (b) Land Title Document and Plan Image records $15.00 per search $20.00 per search File Research & Image Reproduction Fees: Comfort Letter: Fees subject to all applicable taxes (a) Single-family or two-family dwelling $117.00 (b) All other buildings $175.00 per legal address Copies ofdepartmental Records or Drawings Fees subject to all applicable taxes (a) File Research $26.00 (b) Electronic copies (c) Paper copies (size 8,5x11 inches) (d) Paper copies (size 11x7 inches or larger) $2.15 per image $3.55 per page $8.40 per page